6 SPR Lake Susan Apt. HomesCITY OF
PC DATE: May 19, 1999
CC DATE: June 14, 1999
CASE #: 99-9 SPR
BY: Generous/Hempel/Elkin:v
STAFF
REPORT
Z
PROPOSAL:
LOCATION:
APPLICANT:
Site Plan Review for 3 - three-story 54 unit apartment buildings (162 total units),
Lake Susan Apartment Homes ..
West side of Hwy. 101 at Main Street in Villages on the Ponds
The Shelard Group, Inc.
11455 'Viking Drive
Eden Prairie, MN 55344
(612) 946-4780
AUSMAR
c/o Lotus Realty
P.O.Box 235
Chanhassen, MN 55317
(612) 934-4538
PRESENT ZONING:
ACREAGE:
PUD-Mixed Use
9.94 acres
td
ADJACENT ZONING
AND LAND USE:
N - PUD, Market Blvd., Villages on the Ponds
S - RSF, single family homes and Lake Susan
E - PUD, Villages on the Ponds
W - lOP, Rosemount and Lake Susan
WATER AND SEWER: Available to the site
PHYSICAL CHARACTER: The site is currently occupied by a farm house and outbuildings
located in the northern portion of the property. The majority of the site is wooded. The high point on
the property is the existing house at an elevation of 949 which then slopes down to the south to a low
point on Lake Susan at elevation 881. Bluffs exist on the Lake Susan side of the development.
2000 LAND USE PLAN: Mixed Use
State Hwy 5 '
/
1~ Mayfield Court
Mission Hills Dr
3 Frisco Crt
Mien
I l~lls~' t~
Lake Susan Apartment Homes
May 19,1999
Page 2
PROPO SAL/SUMMARY
The Shelard Group, Inc., is requesting site plan approval for a three building apartment complex
with a recreation building and swimming pool within the Villages on the Ponds development.
Each building would be three stories with 54 units for a total of 162 units. Underground parking
would also be included within each building. Unit types include 73 - one bedroom, 8 - one
bedroom with den, 72 - two bedrooms, and 9 - two bedrooms with den.
The PUD requires that the development demonstrate a higher quality of architectural standards
and site design. The intent is to create a pedestrian friendly, "traditional" village character
consistent with the European heritage of the upper midwest including the north-midwestern
architectural vocabulary, village like human scale and flavor, and variety in design and facade
treatment. The apartment development is located within Sector IV of Villages on the Ponds.
Approved uses in Sector IV include 32,000 square foot office and 112 dwelling units or in lieu of
the office building an additional 56 dwelling units. Within Sector IV, apartments may be four
stories/50 feet.
Residential. Residential units shall be provided as upper level units above the commercial/office
uses within the village core and as stand alone units. A minimum of 50 percent of the residential
units shall be rental units. Of the rental units, the city has adopted a goal of 35 percent of the units
meeting the Metropolitan Council's affordable criteria. As part of the agreement for approving the
subdivision of the property and the rezoning of the property to PUD which permitted commercial
development and multi-family residential development on the property, the underlying developer,
AUSMAR, LLC., agreed to assist in the provision of affordable housing within the development. It
is not the city's responsibility to assure AUSMAR the maximum return on their investment, only a
reasonable return. While it may not be economically feasible to provide 35 percent affordable
units, a minimum of 20 percent of the units shall be affordable. Affordable monthly rents in 1998
were under $607 for a one bedroom, under $760 for a two bedroom, and under $821 for a three
bedroom.
The building architecture embodies many of the elements specified in the development design
standards and consist of earth tone colors. The facade is composed of foundation and garage
level elevations consisting of eight inch, rough textured, russet colored block to impart a sense of
strength, durability, and traditional architectural treatment. The primary building exterior
material consists of light beige colored, six inch composite board. Contrast is provided at upper
level gable and bay window elements with dark wheat colored random shake siding. The roof
will be covered with brown tOned, textured asphalt shingles. The expanse of roof is broken by
lookout windows, hip roof gable ends, and chimneys. Additional elements include the use of
buff colored random field stone retaining walls near entrances and landscape elements.
Entrances are further delineated by the use of columns and wooden canopies. Balconies are
Lake Susan Apartment Homes
May 19, 1999
Page 3
provided for individual units. Window flames and exterior metal elements are in tones of brown
and green.
The developer has shown an option beachlot dock on the site. They should be aware that
approval of recreational beachlots requires a separate conditional use permit.
Staff is recommending approval of the site plan subject to the conditions of the staff report.
BACKGROUND
On May 11, 1998, the City Council approved Site Plan 98-5 for a 7,443 square foot Houlihan's
Restaurant (Building 2).
On May 11, 1999, the City Council approved the final plat for Lot 1, Block 1, Villages on the
Ponds 3''d Addition subdividing Outlot D and part of Outlot E, Villages on the Ponds.
On November 24, 1997, the City Council approved Site Plan #97-11 for a 5,300 square foot
building (Building 3) on Lot 1, Block i, Villages on the Ponds 2nd Addition, for Famous Dave's.
On September 23, 1997, the city granted approval for a 14,849 square foot retail building on Lot
2, Block 1, Villages on the Ponds 2nd Addition, (Building 4). Building 4 is a one story, 14,849
square foot, multi-tenant, retail building.
On September 23, 1997, the city granted Final Plat approval for Outlot C into Lots 1 and 2,
Block 1, and Outlot A, Villages on the Ponds 2nd Addition.
On August 11, 1997, the City Council approved the proposed 30,000 square foot office building
(Building 17) on Outlot K, Village on the Ponds (#97-9 SPR), plans prepared by Milo
Architecture Group, dated 6/13/97.
On December 16, 1996, the City Council approved Site Plan 96-13 for a 45,505 square foot
Americlnn Motel and Suites facility (Building 1).
On September 23, 1996, the City Council approved PUD 95-2, Villages on the Ponds, including
a Comprehensive Land Use Plan amendment from Office/industrial, Institutional, Residential
Medium Density, Residential Low Density to Mixed Use-Commercial, High Density Residential,
Institutional and Office; Preliminary planned unit development for up to 291,000 sq. ft. of
commercial/office buildings, 100,000 sq. ft. of institutional buildings, and 322 dwelling units;
Rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat
dated "Received September 19, 1996" for two lots and ten outlots and public right-of-way.
Lake Susan Apartment Homes
May 19, 1999
Page 4
On September 9, 1996, the City Council approved Site Plan 96-11 for a 96,288 square foot
school church facility for St. Hubert Catholic Community.
On August 12, 1996, the City Council granted preliminary approval of PUD #92-1 including a
Comprehensive Land Use Plan amendment from Office/industrial, Institutional, Residential
Medium Density, Residential Low Density to Mixed Use-Commercial, High Density Residential,
Institutional and Office; Preliminary planned unit development for up to 291,000 sq. fi. of
commercial/office buildings, 100,000 sq. fi. of institutional buildings, and 322 dwelling units;
Rezoning from IOP and RSF to PUD, Planned Unit Development (first reading); Preliminary plat
for 13 lots and 3 outlots and public right-of-way; Wetland Alteration Permit to fill and excavate
wetlands on site; Vacation of right-of-way and easements; Environ_mental Assessment Worksheet
(EAW) findings of Negative Declaration of the need for additional environmental investigation;
and Indirect Source Permit Review for the Villages on the Ponds project.
GENERAL SITE PLAN/ARCHITECTURE
The proposed development must comply with the Villages on the Ponds Design Standards,
Sector II (see attached Exhibit C) for the PUD. The purpose of this zone is to create a mixed use
PUD consisting of commercial, institutional, office, and residential uses. The use of the PUD
zone is to allow for more flexible design standards while creating a higher quality and more
sensitive proposal. All utilities are required to be placed underground. Each lot proposed for
development shall proceed through site plan review based on the development standards outlined
in the design standards. The design criteria covers all aspects of the development including
lighting consistency, signage requirements, uses, building materials, design and architectural
detailing, site coverage, and building square footages.
Building setbacks for the development are 50 feet from future Market Boulevard and the western
property line. Parking may be setback at 20 feet. The proposed development meets these
setback requirements.
SITE PLAN REVIEW
WETLANDS
There are two delineated wetlands on this site. As part of the overall Wetland Alteration Permit
for Villages on the Ponds, there were to be two wetland mitigation areas on this site, in addition
to an upland buffer area (see attached wetland mitigation map). Either the site developer or the
Villages on the Ponds develoPer must establish 0.37 acres of new wetlands to fulfill the
obligation of the Wetland Alteration Permit. The proposed storm water pond will eliminate the
need for the upland buffer. This issue must be resolved before the final platting of this lot.
Lake Susan Apartment Homes
May 19, 1999
Page 5
SURFACE WATER MANAGEMENT PLAN (SWMP)
SWMP FEES
The Villages on the Ponds development was required to construct water quality ponds and pay fees
associated with .the management of storm water in accordance with the City's Surface Water
Management Plan (SWMP).
These fees are determined when the final grading and utility plans are submitted with each phase of
the project. The fees are due at the time of final platting.
GRADING
The site contains a considerable elevation difference from north to soUth. The north end of the
property is in the range of 949 and the south end of the project is approximately 900. In order to
prepare the site for the apartment dwellings, it will be necessary to level off most of the site. In
conjunction with the preliminary plat for Villages on the Ponds, there was a preliminary grading
plan approved for this site. The preliminary grading plan proposed a tier of buildings to retain
some of the topographic features of the parcel. However, given this apartment layout it is
relatively difficult to obtain a tiered effect in order to maintain acceptable parking lot grades.
The southerly apartment building will be approximately six feet lower than the two northerly
buildings. Staff has reviewed the proposed northerly building elevation and based on the
proposed grades they appear acceptable with some modifications.
The site contains a bluff along the southwesterly portion of the property. It appears grading will
encroach upon the 20-foot bluff setback area. The use of retaining walls and/or adjusting the
pool facility will alleviate the encroachment into the bluff setback area. Staff recommends that
the use of retaining walls and redesign of the pool area be completed to avoid encroachment into
the bluff setback area. In addition, the sanitary sewer is proposed to encroach the bluff and bluff
setback area. Staff is recommending an alternative route which will avoid bluff impacts all
together.
The site grading will also include grading for a right turn lane on the wet side of southbound
Highway 101 and a storm drainage pond located south of the apartment site. The stormwater
pond is a regional pond proposed with the Villages on the Ponds development.
The quantity of earthwork involved in this project is unknown at this time. Staff anticipates
excess material being generated from this site that will need to be exported off site. The
applicant will need to supply to the City for review and approval haul routes, traffic control
measures and location where the fill material is destined for.
Lake Susan Apartment Homes
May 19, 1999
Page 6
There is an existing trail that encompasses the site along Highway 101 and along Lake Susan.
The trail will be impacted along the easterly portion of the site due to grading activities and
utility extension. The trail corridor is fairly heavily used and staff believes that an interim trail
connection should be constructed to maintain pedestrian traffic around the site until the
permanent trail is reconstructed. The interim trail connection should maintain pedestrian traffic
around the site up to the crossing of Highway 101 from Lake Susan. The remaining trail
construction north of the pedestrian crossing could be delayed until final grades have been
established and the parking lot paved. The interim trail sections could consist of a Class V gravel
surface versus bituminous.
The construction of the auxiliary turn lane along T.H. 101 and driveway access will require
approval from MnDOT. The applicant shall be responsible for obtaining all of the necessary
approvals and permits for this work.
The site contains two existing structures (old farmhouse and outbuildings) which will need to be
razed in conjunction with this development. In addition, the existing septic system and well on
this site will need to be properly abandoned in accordance with City and State health codes.
EROSION CONTROL
Erosion control measures are proposed on the plans. Silt fence is proposed along the grading
limits on the south and west side of the site. Staff recommends additional silt fence be installed
along the southerly and easterly portion of the site up to the trail crossing Highway 10i. In
addition, ditch checks should be installed as the ditch is constructed and catch basin inlets
protected with silt fence, rock filter dikes and/or hay bales during construction. Restoration of
the ditch along Highway 101 shall include erosion control blanket or sod. Given the magnitude
of earthwork involved, a temporary sediment control plan should be incorporated into the
construction plans that provide interim ponding to the south side of this property during
construction.
DRAINAGE
In conjunction with the plans for Villages on the Ponds, a regional stormwater pond is proposed
in the southerly portion of this project. The applicant will be constructing a portion of this
regional pond in conjunction with the development of the site. The remaining portion of the
regional pond will be constructed by others when Highway 101 is upgraded and relocated
easterly. A storm sewer system is proposed to convey stormwater runoff from the parking lots
and building sites down to the regional stormwater pond. The Villages on the Ponds project has
developed a comprehensive stormwater management plan which proposes a trunk storm sewer
line from the regional pond up to main street and Trunk Highway 101. The plans propose a
storm sewer line to address runoff only from this site down to the regional pond. Staff believes
Lake Susan Apartment Homes
May 19, 1999
Page 7
that this segment of storm sewer should be installed in accordance with the comprehensive
drainage plan prepared for Villages on the Ponds development. This trunk storm sewer system
will alleviate having a dual pipe system. The applicant would also be entitled to credits against
their SWMP fees for installation of the trunk storm sewer line and construction of the regional
smrmwater pond. These credits are calculated and applied at time of final platting. Detailed
stormwater drainage calculations for pre and post-development conditions for both the pipe
system and the regional pond shall be required in conjunction with final plat review.
Calculations shall be for 1 O-year and 100-year, 24-hour storm events. As-built construction
plans of the public utility lines will be required upon acceptance of the utilities by the City.
UTILITIES
Municipal sewer and water is indirectly available to the site. Sanitary sewer and water service is
located along the east side of Highway 101 at Main Street. The plans propose on extending
water service underneath Highway 101 and looping back to the north and tie into the existing
watermain located in the drive aisle through Rosemount. Staff has determined by review of city
records that the watermain in Rosemount's driveway has not been constructed. The applicant
will need to further review whether or not the watermain needs to be looped to provide adequate
fire protection. Sanitary sewer is proposed to be extended from the existing interceptor line just
south of the site located adjacent to the public trail. The preliminary utility plans for Villages on
the Ponds propose to extend sanitary sewer underneath Highway 101 parallel to the water and
storm sewer lines to service this site. Staff believes the proposed sewer service from the City's
interceptor line is unacceptable due to the impacts to the bluff and vegetation. Staff recommends
the applicant utilize the sanitary sewer connection provided for with Villages on the Ponds
located on the east side of Highway 101. Installation of the private utilities throughout the site
will require permits and inspections through the City's Building Department. Installation of the
public improvements, water and sewer underneath Highway 101, trunk storm sewer and regional
pond will require detailed construction plans and specifications for City review and City Council
approval. The improvements shall be prepared in accordance with the City's latest edition of
Standard Specifications and Detail Plates. The applicant will also be required to enter into a
development contract with the City at time of final plat and provide the City with a financial
guarantee in the form of a letter of credit or cash escrow for construction of the public
improvements, erosion control measures and site restoration.
STREETS
The site is proposed to be accessed from Highway 101 directly across from Main Street. The
driveway must align across from Main Street. A right-mm lane is also proposed. All work
within Highway 101 right-of-way will require a permit from MnDOT. The applicant should
contact MnDOT with regards to the requirements for the access into the site. Staff believes a
minimum 36-foot wide entrance with 25-foot radii be required. This will allow for three lanes of
Lake Susan Apartment Homes
May 19, 1999
Page 8
traffic to ingress and egress the site (left mm, shared through/right turn). The drive aisle and
parking lot grades appear acceptable. The main drive aisle into the site from Highway 101 up to
the parking lot should be 28 feet wide to accommodate fire trucks. Staff also recommends the
parking lot be modified to improve turning radiuses for fire vehicles (see attached). This will
result in the loss of approximately three parking stalls in the middle of the parking lot.
The site plan proposed sidewalks from the parking lot areas to the buildings; however, no
sidewalk down to the existing trail along Highway 101. Staff recommends that a six-foot
concrete sidewalk be extended from Building A's sidewalk down to the existing/proposed trail
along Highway 101 and the sidewalk along Building C be extended to the main drive aisle.
In conjunction with the Villages on the Ponds development, a traffic study was prepared to
determine traffic impacts to the surrounding street system. The traffic study concluded that with
built-out conditions that the intersection of Trunk Highway 5 and Highway 101 (Market
Boulevard) is reported to operate near capacity in the AM peak hours and over capacity in the
PM peak hours. The intersection of Trunk Highway 5 and Great Plains Boulevard is expected to
operate over capacity in both AM and PM peak hours. The report also recommended traffic
mitigation measures at Great Plains Boulevard which has been already constructed. No
additional traffic mitigation measures were recommended at Trunk Highway 5 and Highway 101.
The unsignalized intersection of Lake Drive and Highway 101 (Market Boulevard) also were
anticipated to operate at or above the acceptable level of service. In the future, a traffic signal
may be warranted at this intersection. The developer of Villages of the Ponds is responsible for
escrowing a portion of the traffic signal cost. Again, the traffic study was based on the
preliminary plans for Villages on the Ponds which included the northerly building (Building A)
to access onto the Rosemount driveway across from Lake Drive onto to Highway 101 (Market
Boulevard). The plans propose all three buildings to access one single intersection point (Main
Street and Highway 101 ). The preliminary traffic study indicated that the left turn movements
from this site to northbound Trunk Highway 5 would operate at a Level F which is common at
unsignalized intersections during peak hours of operation. The gaps in traffic created by the
traffic signals at Trunk Highway 5 and Market Boulevard will improve the conditions for left
turn movements from the development. The traffic report indicates no traffic mitigation
measures are recommended at any of the unsignalized intersections including Main Street and
Highway 101. Staff is recommending that the applicant have the traffic engineer update the
report to reflect the changed conditions (additional apartment building will be gaining ingress
and egress through this intersection) to see if any other traffic mitigation measures other than the
right turn lane on southbound Highway 101 will be required.
MISCELLANEOUS
The site is platted as an outlot and will need to be replatted into lot and block. In conjunction
with the final platting of the property, there will be a development contract, administrative fees,
Lake Susan Apartment Homes
May 19, 1999
Page 9
park and trail fees SWMP fees and recording fees. In addition, during the building application
process there may be additional sewer and water hookup charges pending depending upon the
previous assessment history. The City assigns a sewer and water hookup for every SAC unit
determined by the Metropolitan Council Environmental Services Commission. Any previous
trunk assessments paid will be credited against the future sewer and water hookup charges.
LANDSCAPING
Approximate tree canopy coverage and preservation calculations for the Chanhassen Housing
development are as follows:
Total upland area (excluding wetlands)
Total canopy area (excluding wetlands)
Baseline canopy coverage
Minimum canopy coverage allowed
Proposed tree preservation
351,169 SF or 8.1 ac.
329,314 SF or 7.56 ac.
94%
35% or 115,260 SF
11% or 39,350 SF
Developer does not meet minimum canopy coverage allowed, therefore the difference is
multiplied by 1.2 to calculate the required replacement plantings.
Difference in canopy coverage
Multiplier
Total replacement area
Total number of trees to be planted
75,910 SF
1.2
91,092 SF
84 trees
A replacement planting plan must be submitted to the city for approval. Included in the plan
shall be location, species and size of replacements. All replacements must meet minimum size
requirements.
Additional landscaping required for the development includes buffer yard plantings along
Highway 101 and parking lot plantings. The following table summarizes the minimum
requirements:
Canopy Coverage
Hwy. 101 - bufferyard B
Required
84 overstory
18 overstory
27 understory
Proposed
19 overstory
30 understory
19 overstory
32 understory
Lake Susan Apartment Homes
May 19, 1999
Page 10
Trees/parking lot
Totals
45 shrubs
17 overstory
119 overstory
27 understory
45 shrubs
no shrubs
13 overstory
18 understory
51 overstory
80 understory
Staff recommends the applicant add overstory trees in areas to connect existing vegetation that
will remain. Appropriate species for such plantings would include sugar maple, basswood, and
oaks. These trees would be counted towards reforestation requirements. The applicant should
contact the natural resources coordinator to discuss any revisions to the plan.
LIGHTING/SIGNAGE
A shoe box fixture (high pressure sodium vapor lamps) with decorative natural colored pole shall
be used throughout the development parking lot area for lighting. Decorative, pedestrian scale
lighting shall be used in plaza and sidewalk areas and may be used in parking lot areas. A
lighting plan shall be submitted to the city for review and approval prior to site construction.
In discussions with the architect, staff has been told that parking area lighting will be provided as
well as pedestrian lighting and wall pack units at the garage entrances. The lighting shall comply
with the design standards adopted for the PUD as well as city ordinance. Wall pack units must
be screened so that they do are not directly visible from off site.
The applicant is proposing a monument sign at the entrance to the apartment complex. A project
identification sign may be located at the entrances to the development in Sector IV. Project
identification signs shall not exceed 24 square feet in sign display area nor be greater than five
feet in height. A separate sign permit shall be required prior to the installation of signage.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
(1)
Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
(2) Consistency with this division;
Lake Susan Apartment Homes
May 19, 1999
Page 11
(3)
Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing or developing
areas;
(4)
Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5)
Creation of functional and harmonious design for structures and site features, with
special attention to the following:
An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
b. The amount and location of open space and landscaping;
Materials, textures, colors and details of construction as an expression of
the design concept and .the compatibility of the same with adjacent and
neighboring structures and uses; and
do
Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
(6)
Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
Finding: Subject to the revisions contained in the staff report, the proposed site plan is
consistent with all plans and specifications and development design standards for the
Villages on the Ponds Planned Unit Development and city code requirements.
RECOMMENDATION
Staff recommends that the Planning Commission adopt the following motion:
Lake Susan Apartment Homes
May 19, 1999
Page 12
"The Planning Commission recommend approval of Site Plan #99-9 for a three building
apartment development within the Villages on the Ponds development, each building will be
three stories with 54 units for a total of 162 units, plans prepared by KKE, dated 4/16/99, subject
to the following conditions:
The deueloper shall enter into a site plan agreement with the city and provide the
necessary security to guarantee erosion control, site restoration and landscaping.
Site plan approval is contingent on the city granting final plat approval for Outlot J,
Villages on the Ponds, creating a block and lot designation for the site upon which the
apartment complex is to be built.
o
A minimum of 20 percent of the units shall be affordable for a period of not less than 25
years from the date of certification of occupancy for the three buildings.
Project identification signs shall not exceed 24 square feet in sign display area nor be
greater than five feet in height. A separate sign permit shall be required prior to the
installation of signage.
o
All rooftop or ground mounted mechanical equipment shall be screened from public
right-of-ways by walls of compatible appearing material or camouflaged to blend into the
building or background.
A lighting plan shall be submitted to the city for review and approval prior to site
construction. Wall pack units must be screened so that they do are not directly visible
from off site.
°
Development of a beachlot shall require separate Conditional Use Permit approval by the
city.
The applicant shall pay park and trail fees at the time of building permit application
pursuant to city ordinance.
o
An additional two fire hydrants will be required. Contact Chanhassen Fire Marshal for
exact location.
10.
A 10 foot clear space must be maintained around fire hydrants, i.e., street lamps, trees,
bushes, shrubs, NSP, US West, Cable TV and transformer boxes to ensure that fire
hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance 9-1.
Lake Susan Apartment Homes
May 19,1999
Page 13
11.
Submit radius turn dimensions in parking lots to determine fire department vehicle
access. Submit turn dimensions to Chanhassen City Engineer and Chanhassen Fire
Marshal for review and approval. Pursuant to 902.2.2.3, 1997 Uniform Fire Code.
12.
Required access. Fire apparatus access roads shall be provided in accordance with
Sections 901 and 902.2 for every facility, building or portion of a building, hereafter
constructed or moved into or within the jurisdiction of any portion of the facility or any
portion of an exterior wall of the first story of the building that is located more than 150
feet from fire apparatus access as measured by an approved route around the exterior of
the building or facility. Exceptions - #2. When access roads cannot be installed due to
location on property, topography, waterways, negotiable grades or other similar
conditions, the Chief is authorized to require additional fire protection as specified in
Section 1001.9. Because apparatus access roads are not accessible to within 150 feet of
all portions of the building we are requiring the following additional fire protection
features.
a. Fire sprinkler the attic space with an approved NFPA 13 system.
b. Provide fire sprinkler protection in the underground parking garage with an approved
NFPA 13 system.
c. Provide class III standpipes in all stairwells at each floor.
d. Note: The building itself will be required to be fire sprinklered per the building code.
All fire sprinkler plans must be submitted to the Fire Marshal/Inspector for review
and approval.
13. Fire lane signage and yellow curbing will be determined by the Chanhassen Fire Marshal.
Contact the Chanhassen Fire Marshal for exact location of fire lane signs and curbing to be
painted yellow. Pursuant to Section 904-1, 1997 Uniform Fire Code.
14. The buildings shall comply with Chanhassen Fire Department policy regarding premise
identification. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #29-
1992. Copy enclosed.
15. If any trees are to be removed, they must either be chipped or hauled off site. Due to close
proximity of neighboring homes no burning permits will be issued.
16. Regarding the existing buildings on site to be removed, contact the Chanhassen Fire Marshal
for determination if any buildings can be burned if they prove training value.
17. Install and indicate on utility plans locations for PIV (Post Indicator Valve). Contact
Chanhassen Fire Marshal for exact location.
Lake Susan Apaffment Homes
May 19,1999
Page 14
18. Timing of installation. When fire protection, including fire apparatus access roads and water
supplies for fire protection is required to be installed, such protection shall be installed and
made serviceable prior to and during the time of construction. Pursuant to Section 901.3,
1997 Uniform Fire Code.
19. Comply with the Chanhassen Fire Department Policy regarding fire department notes to be
included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Policy
04-1991. Copy enclosed.
20. Demolition permits must be obtained to demolish the existing structures and utilities, wells
and sewage treatment systems must be abandoned.
21. The site utility plan was not reviewed at this time.
22. Access for people with disabilities must be provided to all facilities.
23. The building owner and or designer should meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
24. Tree protection fencing shall be installed around all areas designated for preservation.
25. The number of overstory trees shall be increased to meet minimum reforestation
requirements.
26. A revised landscape plan shall be submitted to the city for approval.
27. Grading with the bluff and bluff setback areas shall be prohibited. The applicant shall
redesign the site facilities and/or incorporate the use of retaining walls to eliminate grading
into the bluff setback zone.
28. Utility improvements which lie outside of the public right-of-way for drainage and utility
easements shall be privately owned and maintained by the applicant or successors.
29. The existing house and outbuildings on the property shall be razed within 30 days after final
plat is recorded. In addition, the well and septic system shall be abandoned in accordance
with local and state health/building codes.
30. The access point onto Trunk Highway 101 is subject to MnDOT approval. The applicant will
be responsible for obtaining all necessary permits for construction of the right-turn lanes and
all work within Highway 101 right-of-way.
Lake Susan Apartment Homes
May 19, 1999
Page 15
31. The applicant shall design and construct the public utility improvements in accordance with
the City's latest edition of Standard Specifications and Detail Plates. Detailed construction
plans and specifications for the public improvements shall be submitted to city staff for
review and formal approval by the City Council in conjunction with final plat approval. The
applicant will also be required to enter into a development contract with the final plat and
provide financial security in the form of a letter of credit or cash escrow to guarantee
installation of the public improvements.
32. The applicant shall report to the city engineer the location of any draintile found during
construction. The applicant will comply with the city engineer's direction as far as
abandonment or relocation of the draintile.
33. The applicant shall develop a temporary sediment and erosion control plan in accordance
with the City's Best Management Practice Handbook (BMPH) to control erosion during
construction. Additional Type I erosion control fencing will be required around the grading
limits along Highway 101. Wood fiber blanket and/or sod shall be utilized at all slopes in
excess of 3:1 and in the ditches along Highway 101.
34. The driveway access from Highway 101 to the site shall be a minimum of 36 feet wide, back-
to-back with concrete curb and gutter with a left turn lane, shared through right turn drive
aisle. The main driveway aisle width from the garage entrances to the parking lot shall be
28-feet wide, face-to-face. A 6-foot wide sidewalk shall be constructed along the north side
of the driveway aisle from Highway 101 to the sidewalk proposed for Building A.
35. All private streets/parking lots shall be constructed in accordance with the City's Ordinance
No. 20-1118 which requires a minimum 26-foot wide driveway aisle built to 7-ton design.
36. The applicant shall update the traffic study prepared by SRF for Villages on the Ponds to take
into consideration the additional apartment building gaining access at the intersection of
Main Street and Highway 101 and install any necessary traffic mitigation measures
recommended in the updated traffic study.
37. The applicant shall be responsible for providing an interim trail connection around Lake
Susan to the pedestrian crossing at Highway 101 during construction. This interim trail
section may consist of a class V gravel surface.
38. The applicant shall petition the City to vacate trail easements which will be no longer
utilized. In addition, the applicant shall rededicate to the City a new 20-foot wide trail
easement centered upon the new trail alignment.
Lake Susan Apa~ment Homes
May 19,1999
Page 16
39.
Sanitary sewer service to the site shall be extended from the proposed connection at Main
Street and Highway 101. The sanitary sewer and water lines shall be jacked underneath
Highway 101. Open cutting on Highway 101 will not be permitted.
40.
The applicant shall be responsible for the extension of the trunk storm sewer from the
proposed regional stormwater pond to the driveway entrance to the site. The applicant will
be entitled to credits against the SWMP fees for installation of the trunk storm sewer line in
accordance the City's Surface Water Management Plan.
41.
Plans shall be revised to incorporate an outlet control structure in the regional pond. The
outlet control structure shall be located on the southwesterly comer of the pond to discharge
into the creek versus Lake Susan.
42. The applicant shall re-evaluate the water needs due to the fact that a looped water system is
not available.
43.
If material is imported or exported from the site, the applicant will need to provide the City
with a detailed haul route for review and approval. If the material is to be imported or
exported to/from another site in Chanhassen, it should be noted that those other parcels will
be required to obtain an earthwork permit from the City.
44.
The applicant shall be responsible for obtaining the necessary permits from the regulatory
agencies such as the Minnesota Department of Health, MCES, Watershed District, Minnesota
DNR, MPCA and MnDOT.
45.
The applicant shall submit detailed storm sewer and pond calculations for post- and pre-
development conditions. The calculations shall be for a 1 O-year and 100-year, 24-hour storm
event. The pond shall be designed in accordance with the Villages on the Ponds storm
drainage plan (NURP standards).
46. The applicant shall redesign the parking lot per staff's alternate parking lot plan dated May
12, 1999.
47. Either the site developer or the Villages on the Ponds developer must establish 0.37 acres of
new wetlands to fulfill the obligation of the Wetland Alteration Permit."
Lake Susan Apartment Homes
May 19, 1999
Page 17
ATTACHMENTS
1. Development Review Application
2. Reduced Copy of Site Plan
3. Schematic Building Elevations (Front)
4. Schematic Building Elevations (End/Partial Front)
5. Memo from Mark Littfin to Robert Generous dated 5/10/99
6. Memo from Steve Torell to Bob Generous dated 5/10/99
7. Letter from William J. Weckman to Greg Hollenkamp dated 3/19/99
8. Letter from David C. Hempel to Joel Anderson dated 3/12/99
9. Villages on the Ponds Wetland Mitigation Plan
10. Parking Lot Alternative Sketch Plan
11. Letter from Bill Weckman, Asst. County Engineer dated 5/12/99
12. Notice of Public Hearing and Mailing List
g:\plan\bg\lake susan apartment homes.doc
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937-1900
DEVELOPMENT REVIEW APPLICATION
APPLICANT: ~'qC ,~VI.~j~ ~zx"~_.~- ~ r~u-~., Ct'it..
ADDRESS: 114-~3~ ~[~~'~
TELEPHONE (Daytime) ~1~) ~ - ~
OWNER:
ADDRESS:
TELEPHONE: l~J?"' ~ ,C~. ~z~-'~
Comprehensive Plan Amendment
Temporary Sales Permit
Conditional Use Permit
Vacation of ROW/Easements
Interim Use Permit
Variance
.., Non-conforming Use Permit
Wetland Alteration Permit
PJanned Unit Development*
Zoning Appeal
Rezoning
..... Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
7. ×"
Subdivision*
Notification Sign
Escrow for Filing Fees/Attorney Cost*'
($50 CUPISPR/VACNAR/W AP/Metes
and Bounds, $400 Minor SUB)
TOTAL FEE $~ I J O(oO
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
:Building material samples must be submitted with site plan reviews.
~i'wenty-six full size folded copies of the plans must be submitted, including an 8W' X 11" reduced copy of
transparency for each plan sheet.
'* Escrow will be required for other applications through the development contract
'NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
· NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME ~
LOCATION HW',/ IOI
LEGAL DESCRIPTION
PRESENT ZONING JVC( x~. I) L/~ F: I~LLI~
REQUESTED ZONING
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable Cit7 Ordinance provisions. Before filing this application, you should, confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
This is to certify that I am making application for the described action by the City and that I am responsible foi' complying
with all City requirements with regard to this request. This application should be processed in my name and I am the party
whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of
ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the
authorized person to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of matedal and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true ,and correct to the best
of m.y knowledge.
I also understand that after the approval or granting of the permit, such permits shall be invalid unless they are recorded
against the title to the property for which the approvaL/permit is granted within 120 days with the Carver County Recorder's
Office and th~rig/jJ3a/I documerff..~med to City Hall Records.
I// .~
Signature o ApP' ,~hc. lc/.C)rt ~. ~'--+' Date
Signature of Fee Owner Date
Application Received on 14 ~:] 'al Fee Paid ~)~O, ' Receipt No.
· The applicant should contact staff for a copy of the staff report which will be available on Friday prior ~lo the
meeting. If not contacted, a copy of the report will be mailed tc the applicant's address,
~0-,1. = .g/L
suo!l~)13
gu!pl!n~l.
3pewoq3$
NOISSIWaFI$
,U_ID
Stll~{tdO~ld
33~1H1
dflO~lD
1N:IWdO'I]A:ICI
DNISflOH
N:tSSVHNVHD
.O',l = .g/l
suo!]~^al]
~U!pl!nB
a!]~tuaqaS
NOI$SIW~In$
Al. ID
531J_~ltdO~ld
33>!H/
dnO~lD
IN3WdO'13A]Q
DNISnOH
N3SSWHNVHD
qVlJ.l:l¥d NOI£VA~F'I3 ,LNO~I.:I 'lV31dAJ,
NOLLVA~'I~] QN~ qVDIdAl
CITYOF
C HASSEI
690 CiO, Center Drive, PO Box 147
Chanhassen, Minnesota 55317
Phone 612.937.1900
General Fax 612.937.5739
Engineering Fax 612.937.9152
Public Safety Fax 612.934.2524
Web www. ci. chanhassen, mn. us
MEMORANDUM
TO:
Robert Generous, Senior Planner
FROM:
Mark Littfin, Fire Marshal
DATE:
May 10, 1999
SUBJECT:
Site Plan Review for a 3-story, 54 unit apartment building (162 units) on
9.94 acres of property zone PUD-mixed use and located on the west side
of Highway 101 at Main Street in Villages on the Pond, Cbanhassen
Housing Development, the Shelard Group, Inc.
Planning Case 99-9 Site Plan Review
I have reviewed the site plan for the above project. In order to comply with the Cbanhassen
Fire Department/Fire Prevention Division, I have the following fire code or city
ordinance/policy requirements. The site plan is based on the available information submitted at
this time. If additional plans or changes are submitted, the appropriate code or policy items
will be addressed.
1. An additional two fire hydrants will be required. Contact Chanhassen Fire Marshal for
exact location.
A 10 foot clear space must be maintained around fire hydrants, i.e., street lamps, trees,
bushes, shrubs, NSP, US West, Cable TV and transformer boxes to ensure that fire
hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance 9-1.
Submit radius turn dimensions in parking lots to determine fire department vehicle access.
Submit turn dimensions to Chanhassen City Engineer and Chanhassen Fire Marshal for
review and approval. Pursuant to 902.2.2.3, 1997 Uniform Fire Code.
Required access. Fire apparatus access roads shall be provided in accordance with Sections
901 and 902.2 for every facility, building or portion of a building, hereafter constructed or
moved into or within the jurisdiction of any portion of the facility or any portion of an
exterior wall of the first story of the building that is located more than 150 feet from fire
apparatus access as measured by an approved route around the exterior of the building or
facility. Exceptions - #2. When access roads cannot be installed due to location on
property, topography, waterways, negotiable grades or other similar conditions, the Chief is
authorized to require additional fire protection as specified in Section 1001.9. Because
The Gty of Chanhassen. A growing community with clean lakes, quality schools, a cha~rning downtown, thriving businesses, and beautiful parks. A great place to live, work, and play.
Mr. Robert Generous
May 10, 1999
Page 2
apparatus access roads are not accessible to within 150 feet of all portions of the building
we are requiring the following additional fire protection features.
a. Fire sprinkler the attic space with an approved NFPA 13 system.
b. Provide fire sprinkler protection in the underground parking garage with an
approved NFPA 13 system.
c. Provide class III standpipes in all stairwells at each floor.
Note: The building itself will be required to be fire sprinklered per the building code. All
fire sprinkler plans must be submitted to the Fire Marshal/Inspector for review and
approval.
o
Fire lane signage and yellow curbing will be determined by the Chanhassen Fire Marshal.
Contact the Chanhassen Fire Marshal for exact location of fire lane signs and curbing to be
painted yellow. Pursuant to Section 904-1, 1997 Uniform Fire Code.
o
The buildings shall comply with Chanhassen Fire Department policy regarding premise
identification. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy
#29-1992. Copy enclosed.
7. If any trees are to be removed, they must either be chipped or hauled off site. Due to Close
proximity of neighboring homes no burning permits will be issued.
8. Regarding the existing buildings on site to be removed, contact the Chanhassen Fire
Marshal for determination if any buildings can be burned if they prove training value.
9. Install and indicate on utility plans locations for PIV (Post Indicator Valve). Contact
Chanhassen Fire Marshal for exact location.
10. Timing of installation. When fire protection, including fire apparatus access roads and
water supplies for fire protection is required to be installed, such protection shall be
installed and made serviceable prior to and during the time of construction. Pursuant to
Section 901.3, 1997 Uniform Fire Code.
1 I. Comply with the Chanhassen Fire Department Policy regarding fire department notes to be
included on ali site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Policy
04-1991. Copy enclosed.
g\safety\ml\plrev99-9
CITY OF
C HASSEN
690 Cig Center Drive, PO Sox' 147
Chanhm'sen, Minnesota .r5317
Phone 612.937. I900
General Fax 612.93.7.5 ?9
Engineering Fax 612.93-. 9152
Pttblic $~?e7 Fax 61293~..252~
Wev www. ct. chanhasse,. ,,:n. us
o
°
o
o
CHANHASSEN FIRE DEPARTMENT POLICY
CHANHASSEN FIRE DEPARTMENT NOTES TO BE
INCLUDED ON ALL SITE PLANS
Fire Marshal must witness the flushing of underground sprinkler
service line, per NFPA 13-8-2.1.
A final inspection by the Fire Marshal before a Certificate of
Occupancy is issued.
Fire. Department access roads shall be provided on site during all
phases of construction. The construction of these temporary roads
will conform with the Chanhassen Fire Department requirements for
temporary access roads at construction sites. Details are available.
Onsite fh'e hvdrants shall be provided and in. operating condition
during all phases of construction.
The use of liquefied petroleum gas shall be in conformance with
NFPA Standard 58 and the Minnesota Uniform Fire Code. A list of
these requirements is available. (See policy #33-1993)
All fire detection and fire suppression systems shall be monitored by
an approved UL central station with a UL 72 Certificate issued on
these systems before final occupancy is issued.
An 11" x 14" As Built shall be provided to the Fire Department. The
As Built shall be reproducible and acceptable to the Fire Marshal.
(See policy #07-1991).
Chanhassen Fire Department
Fire Prevention
Policy #04-1991
Date: 11/22/91
Revised: 06/05/98
Page 1 of 2
The Ci~. of Chanhassen. .", ~owing communt~, with clean lakes, auat'ii3, sc~,oo/s, ,t charming abwntown, thriving businesses, and beautifid parks. A grear place to [ice. work. ,md pla):
o
An approved lock. box shall be provided on the building for fn'e
department use. The lock box should be located by the Fire
Department connection or as located by the Fire Marshal.
o
10.
11.
High-piled combustible storage shall comply with the requirements
o__f Article #81 of the Minnesota Uniform Fire Code. High-piled
combustible storage is combustible materials on closely packed piles
more than 15' in height or combustible materials on pallets or in
racks more than 12' in height. For certain special-hazard
commodities such as rubber tires, plastics, some flammable liquids,
idle pallets, etc. the critical pile height may be as Iow as 6 feet.
Fire lane sienaee shall be provided as required by the Fire Marshal.
(See policy #06-1991).
Maximum allowed size of domestic water service on a combination
domestic/fire sprinkler supply line policy must be followed. (See
policy #36-1994).
Approved - Public Safety Director
Chanhassen Fire Department
Fire Prevention
Policy #04-1991
Date: 11/22/91
Revised: 06/05/98
Page 2 of 2
cITYOF
690 Ci~ Center Drive, PO Box I47
Chanhassen, Minnesota 55317
Phone 612.93Z I900
General Fa,v 612.937.5739
Engineering ?ax 612.937. 9152
Public Safe~. Fax 612.934.2524
l~b www. d. chanhassen, mn. us
CHANHASSEN FIRE DEPARTMENT POLICY
PREMISES IDENTIFICATION
General
Numbers or addresses shall be placed on all new and existing
buildings in such a position as to be plainly visible and
legible from the street or road fronting the property. Said
numbers shall contrast with their background. Size and
location of numbers shall be approved by one of the
following - Public Safety Director, Building Official,
Building Inspector, Fire Marshal.
Requirements are for new construction and existing buildings
where no address numbers are posted.
Other Requirements - General
1. Numbers shall be a contrasting color from the background.
2. Numbers shall not be in script.
3. If a structure is not visible from the street, additional numbers are
required at the driveway entrance. Size and location must be approved.
4. Numbers on mail box at driveway entrance may be a minimum of 4". However,
requirement ~3 must still be met.
additional numbers if deemed
5. Administrative authority may require
necessary.
Residential Rec~irements (2 or less dwelling unit)
1. Minimum height shall be 5 1/4".
Building permits will not be finaled unless numbers are posted and approved
by the Building Department.
Commercial Rec~uirements
1. Minimum height shall be 12".
Strip Malls
a. Multi tenant building will have minimum height requirements of 6".
b. Address numbers shall be on the main entrance and on all back doors.
If address numbers are located on a directory entry sign, additional
numbers will be required on the buildings main entrance.
Chanhassen Fire Department
Fire Prevention
Policy ~29-1992
Date: 06/15/92
Revised:
Approved - Public Safety Director Page 1 of 1
The Cig of Chanhassen. ,4 growing community with clean lakes, quali~, schools, a charming downtown, thriving businesses, and beaut~l parks. A ~eat place to live, work, and pla3:
CITYOF
690 G0' Cemer Drive, ?0 Box I47
C/:anhassen, Minnesota 55317
&o,e 612.937. I900
General Fax 612.937,5,739
E, gineering Fa.,: 612 937.9152
Public ha./b~ Fax 612.934.2524
Web wtezt:ci, chanhassen, mn. us
CHANHASSEN FIRE DEPARTMENT POLICY
REQUIREMENTS FOR FIRE LANE SIGNAGE
NO
PARKING
FIRE
LANE
/X
1. Signs to be a minimum of 12" x 18".
2. Red on white is 'preferred.
3. 3M or equal engineer's grade reflective
sheeting on aluminum is preferred.
4. Wording shall be: NO PARKING
FIRE LANE
o
Signs shall be posted at each end of the fire
lane and at least at 75 foot intervals along the
fire lane.
6. All signs shall be double sided facing the
direction of travel.
(NOT TO
SCALE)
GRADE
7. Post shall be set back a minimum of 12" but
not more than 36" from the curb.
8. A fire lane shall be required in front of fire dept.
connections extending 5 feet on each side and
along all areas designated by the Fire Chief.
ANY DEVIATION FROM THE ABOVE PROCEDURES SHALL BE
SUBMITTED IN WRITING, WITH A SITE PLAN, FOR APPROVAL BY THE
FIRE CHIEF. IT IS THE INTENTION OF THE FIRE DEPARTMENT TO
ENSURE CONTINUITY THROUGHOUT THE CITY BY PROVIDING THESE
PROCEDURES FOR MARKING OF FIRE LANES.
' 'c Safety Director
Chanhassen Fire Department
Fire Prevention
Policy #06-1991
Date: 01/15/91
Revised:
Page 1 of 1
The Uiff af Uhanhassen. ,4 ~awing cvmmum'~, w#h dean ~kes, qua/iq :'c/)ov& ,~ oSarming a'owntown, thriving businesses, and beautifil parks. .i gear place to live, zoork, and
CITYOF
CHAN SEN
690 City Center Drive, PO Box 147
Chanhassen, Minnesota 55317
Phone 612.937.1900
General Fax 612.937.5739
Engineering Fax 612,937.9152
Public Safety Fax 612.93<2524
Web www. ci. chanhassen, mn. us
MEMORANDUM
TO: Bob Generous, Senior Planner
FROM: Steve Torell, Building Official
DATE: May 10, 1999
'SUB J:
Site plan review for Chanhassen Housing Development, Planning
case 99-9 SPR.
I have reviewed the site plans for the above project and offer the following
comments and recommendations:
1. Demolition permits must be obtained to demolish the existing structures and
utilities, wells and sewage treatment systems must be abandoned.
2. The site utility plan was not reviewed at this time.
3. Access for people with disabilities must be provided to all facilities.
4. I recommend that the building owner and or designer meet with the Inspections
Division as soon as possible to discuss plan review and permit procedures.
g:/safety/sqmemos/plaxt/chanhousingdevl
The Gty of Chanhassen. A growing community with clean lakes, quality schools, a charming downtown, thrivi,g businesses, and beaut!fiul parks. A great place to live, work, and pIay.
CARVER
COUNTY
PUBLIC WORKS DEPARTMENT
Carver County Government Center
Administration Building
600 East Fourth Street
Chaska, Minnesota 55318-2192
Phone (612) 361-1010 Fax (612) 361-1025
Administration
Parks
Engineering
Highway Maintenance
Surveying & Mapping
March 19, 1999
Mr. Greg Hollenkamp, AIA
President'
KKE Architects
300 First Avenue North
Minneapolis, MN 55401
Re'
Chanhassen Housing Development
KKE No. 99-10-1102-01
Dear Mr. Hollenkamp:
This letter is in response to your March 10, 1999 letter requesting a review and
comment from our office of the proposed preliminary site grading plan for the
above-mentioned project.
We have received a copy of the comment letter dated March 12, 1999 sent by
Dave Hemple, Chanhassen Assistant Engineer, to Mr. Joel Anderson of your
firm. Upon review of the plans submitted and the comments from the City,
Carver County would concur with Mr. Hemple's comments, especially the
comments regarding the length of the proposed right turn lane.
As this proposal develops, we will request that the City allow for further reviews
by the County to determine potential impacts this project has on TH 101.
If there are any questions concerning the comments on the preliminary site-
grading plan, please call me at your convenience at 612-361-1010.
Sincerely,
William J. Weckman, P.E.
Assistant County Engineer
Cc:
Roger Gustafson
Anita Benson, Chanhassen City Engineer
Kate Aanenson, Chanhassen Planning Director
Affirmative Action/Equal Opportunity Employer
Printed on 10% Post-Consumer Recycled Paper
CITYOF
CHANHASSEN
690 Cigi Center Drive, PO Box 147
Chanhassen, Minnesota 55317
Phone 612.937. I900
General Fax 612.937.5739
£ngineering Fax 612.93Z9152
I)ublic Safety Fax 612.934.2524
Web www. ci. chanhassen, mn. tls
March 12, 1999
VIA FACSIMILE
Mr. Joel Anderson
KKE Architects, Inc.
300 First Avenue North
Minneapolis, MN 55401
Re:
Preliminary Review of Site Grading Plan - Chanhassen Housing
Development - LUR File 99-5
Dear Mr. Anderson:
Upon review of the preliminary site grading plan dated February 16, 1999, I offer
the following comments and recommendations:
Overall, the proposed site grades appear acceptable. Impacts to the existing site
characteristics, infrastructure, street, and trail have been minimized as requested.
After preliminary review of the site drainage improvements, it appears some
adjustments to the storm sewer system will be necessary. An outlet control
structure will be required in the Nurp pond north of the creek. The other Nurp
pond, south of the creek, will not be required with this proposal. The City/County
will construct it with the relocation of Trunk Highway 101 in the future. The City
most likely will require the extension of a storm sewer line across Market
Boulevard (Trunk Highway 101) to intercept the existing ~storm sewer line(s) that
discharge into the temporary Nurp pond on the east side of Trunk Highway 101
with this project (in accordance with the master drainage plan for Villages on the
Ponds). Additional drainage improvements to intercept the ditch runoff along the
west side of Trunk Highway 101 will be addressed after more detailed drawings
and storm drainage calculations are submitted, i.e. adding FES, catch basins, etc.
The trail impacts appear to be relatively minor. Vacation of the existing trail
easements and dedication of new trail easements will be addressed with platting of
the parcel.
The auxiliary turn lane on Trunk Highway 101 appears to be too short. We
recommend a minimum of 250 feet including the taper. The driveway access point
onto Trunk Highway I01 should be 38 feet wide face-to-face of'curb to provide
three traffic lanes. The curb radiuses need to be wide enough to accommodate
truck turning rfi0vements into the site as well (a minimum of 25 feet). The traffic
island at the driveway entrance should be deleted.
The City of Chanhassen. A erotvin¢ com,tttuin, u,it/, c/e,,/,h,.~ nlt/ll;t,, rc/mnh ii cl,fim,/,,,r ,/m,,,,rn ...... [~,.;,.;,,,, ,~,,¢; ........... d l~o,~,,,;f,,,I ~.,,.I,~ J ....... I ..... I: ......... /. ,,,~/,/...
Mr. Joel Anderson
March 12, 1999
Page 2
I apologize for the delaY in responding to your submittal.
questions, please feel free to call.
Sincerely,
'CITY OF CHANHASSEN
David C. Hempel
Assistant City Engineer
DCH:jms
c: Anita Benson, City Engineer
Kate Aanenson, Planning Director
Roger Gustafson, Carver County Engineer
\Xcfsl\vol~'~-ngklave~lettersXchan housing villages.doc
If you have any
i / .
SC]NOd EI3J.V~INt:IO.I-S ~ °
CINV-IJ.=i~ a=l.l. OVcllNl~
QNV-IJ.:IM CF:i/VAV:3Xq ~
NV'id NOI.LV~91.LIIN CINV'I.L3N~ SCINOd 3HJ. NO S3~)V-I-IIA
I
CARVER
COUNTY
PUBLIC WORKS DEPARTMENT
Carver County Government Center
Administration Building
600 East Fourth Street
Chaska, Minnesota 55318-2192
Phone (612) 361-1010 Fax (612) 361-1025
Administration
Parks
Engineering
Highway Maintenance
Surveying & Mapping
May 12, 1999
To:
From:
Subject:
Robert Generous, Senior Planner, City of Cha0hassen
Bill Weckman, Assistant County Engineer ~,LJ
Site Plan Review
Village on the Ponds, The Shelard Group (99-9 Site Plan review)
We have reviewed the information regarding the Village on the Ponds site plan transmitted to
Carver County by your memorandum dated April 20, 1999. These comments are based on that
review. Further comments may be necessary as the plans progress. Though TH 101 is not
presently on the County Road system, these comments would be applicable if the roadway were
on the County system.
Right-of-way widths listed in the Eastern Carver County Transportation Study for roadways
functionally classified as Minor Arterial (Class II) are:
Urban Undivided Rural Undivided
2-lane Roadway 2-lane Roadway
Minimum Recommended Minimum Recommended
100' 110' 120' 150'
Urban Undivided
4-lane Roadway
Minimum Recommended
100' 120' 140'
Rural Undivided
4-lane Roadway
Minimum Recommended
170'
TH 101 (Great Plains Blvd.) is functionally classified as a Minor Arterial (Class II) roadway
in the Eastern Carver County Transportation Study. The present 33-foot from centerline
corridor shown on TH 101 would not provide for a potential minimum corridor to meet this
roadway function. The future roadway corridor is shown with a 150-foot width and would
meet the needs for this future roadway.
The street entrance as proposed includes construction of a right turn lane. Carver County
supports the City of Chanhassen in this requirement. A permit for this entrance will need
to be acquired from the Minnesota Department of Transportation (Mn/DOT).
Any public utility lines that are to be installed within the TH 101 right-of-way are subject to
the utility permit requirements Mn/DOT and subject to review by Carver County.
4. Any proposed grading and installation of drainage structures within th~!~i~-~._ ~ TH
MAY 1 A 1999
Affirnmtive Action/Equal Opportunio, Employer
Printed on 10% [ o3't-Con3'tttner Recycled Paper
CITY OI~ u~i~m^$SEN
o
o
101 is subject to review and approval of Mn/DOT.
Development activities (including the installation of both public and private utilities needed
to serve the development site) that result in any disturbance of the highway right-of-way
(including tree removal, trench settlements, erosion, and sediment deposits) need to be
completed in a manner that leaves the right-of-way in "as good or better condition" than
what existed prior to construction. It is requested that the city include a provision in the
developer's agreement that requires the developer to be ultimately responsible for the final
condition of the county highway right-of-way. A clear understanding of this responsibilitY will
result in fewer project oversight problems for both the county and the city.
Any trees or landscaping completed within the right-of-way must be approved by Mn/DOT.
When locating shrubs and trees, consideration should be given to maintaining an acceptable
sight distance at the TH 101 intersection. Any trees or shrubs overhanging into the right-of-
way could be subject to trimming for safety or overhead utility consideration.
As this area develops, traffic volumes will increase. Carver County considers any potential
noise abatement improvements to be the responsibility of the developer.
Thank you for the opportunity to comment on the site plan for the proposed development.
NOTICE OF PUBLIC HEARING
PLANNING COMMISSION MEETING
WEDNESDAY, MAY 19, 1999 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
690 CITY CENTER DRIVE
PROPOSAL:
Request for Site Plan for Lake
Susan Apartment Homes
APPLICANT:
LO CATION:
The Shelard Group, Inc.
Hwy.'101, adjacent to Lake Susan
NOTICE: You are invited to attend a public hearing about a proposal in your area. The
applicants, Site Plan Review for 3 three-story 54 unit apartment buildings (162 total units) on
9.94 acres of property zoned PUD-Mixed Use and located on the west side of Hwy. 101 at
Main Street in Villages on the Ponds, Chanhassen Housing Development, The Shelard Group, Inc.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the
developer's request and to obtain input from the neighborhood about this project. During the
meeting, the Commission Chair will lead the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The Developer will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses project. The commission will then
make a recommendation to the City Council.
Questions and Comments: If you want to see the plans before the meeting, please stop by City
Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to
someone about this project, please contact Bob at 937-1900 ext. 141. If you choose to
submit written comments, it is helpful to have one copy to the department in advance of the meeting.
Staff will provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on May 6, 1999.
Lake Susan
Mayfield Court
2 Mission Hills Dr
3 Frisco Crt
0 -r
Oz~
o --r
0
w
nod
Ozz
rr
0
:~zz
m~:m
-'r-
LU z
I-ZZ
rOZZ
~U.l~
Z
-i~Z
~ZCO
z<~
ZZZ
o~
n~_Z
Om~
ZZz
0_1
cro-Z
wZZ
wo-Z
-J I_. w
ZZ
z~
ZZ
z