Loading...
Approval Letter 07-23-20120 CITY OF CgANNSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 July 23, 2012 Mr. Josh Koller Southview Design 1875 East 50' Street Inver Grove Heights, MN 55077 Re: Shoreland Management Setback Variance — 6645 Horseshoe Curve Planning Case #2012 -09 Dear Mr. Koller: This letter is to confirm that on July 17, 2012, the Board of Appeals and Adjustments approved a 25 -foot variance into the 75 -foot Shoreland Management Setback on property zoned Single Family Residential (RSF) for the reconstruction of a patio on property located at 6645 Horseshoe Curve subject to the following conditions: 1. The proposed deck can be no larger than indicated on the plan set provided with the revision dated June 14, 2012. 2. The proposed deck cannot be covered or enclosed at a future date. l?-' 3. Any proposed drainage, erosion control, and grading must be shown on a plan and cannot be more than is required to meet the requirements of this project. The applicant shall work with staff to incorporate remedies to the erosion problems on the western portion of the site. 4. The applicant must demonstrate that the patio cannot be constructed without retaining walls. Further, any walls determined necessary must be the minimum height needed to achieve the above parameters. 5. Any retaining walls exceeding 48 inches in height require a building permit and professional design. 6. The top and toe of any wall determined necessary should be shown on the plan. 7. Proposed finish elevation shall be shown on the southerly extent of the patio. 8. No tree removal may occur as a result of this project. 9. The hard cover must not exceed 25.9 percent of the lot area. Web Site 10. There shall be no expansion of the water - oriented structure located on the site www.ci.chanhassen.mn.us unless the portion of the proposal Iocated in the Shoreland Management Setback is removed. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Josh Koller July 23, 2012 Page 2 If you have any questions or need additional information, please contact me at (952) 227 -1132 or amellgren@ci.chanhassen.mn.us Sin erely, Ashley Mel en Planning Intern c: Tim and Carol Fieldhouse, 6645 Horseshoe Curve Building Permit File — 6645 Horseshoe Curve ec: Todd Gerhardt, City Manager Kate Aanenson, Community Development Director Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official gAplan\2012 planning cases \2012 -09 6645 horseshoe curve shoreland setback variance \approval letter.doc