2. Park & Trail Conditions of Approval Associated with Lakeside 7th Addition MEMORANDUM
CITY TO: Park and Recreation Commission
CHANHASSEN
7700 Market Boulevard FROM: Todd Hoffman, Park and Recreation Director
PO Box 147
Chanhassen, MN 55317 DATE: August 9, 2012
Administration SUBJ: Park & Trail Conditions of Approval Associated with Lakeside
Phone: 952.2271100 7th Addition: Request for a Planned Unit Development (PUD)
Fax: 952.2271110 Amendment; Preliminary Plat of 17 Lots; Site Plan Review for 17
Townhouse Units; Variances; and Vacation of Easements on
Building Inspections property zoned Planned Unit Development- Residential (PUD -R)
Phone: 952.2271180 located on Outlet D, Lakeside between Lake Riley Drive and
Fax: 952.2271190 Highway 212, along with part of Outlot A, Lakeside, and part of
Engineering Outlot A, Lakeside 2 °a Addition. Applicant: Ron Clark
Phone:.952.2271160
Fax: 952.2271170
PROPOSED MOTION
Finance
Phone: 952.2271140 The Park and Recreation Commission recommends that the City Council confirm
Fax: 952.2271110 and approve the following conditions for Lakeside 7th Addition:
Park & Recreation
Phone: 952.2271120 1. The developer shall pay $78,600 in park dedication fees for the
Fax: 952.2271110 7 Addition concurrent with or prior to recording the final plat in lieu of
any parkland dedication or donation.
Recreation Center
2310 Coulter Boulevard 2. The sidewalk south of Lot 7, Block 4 connecting the Lakeside area to the
Phone: 952.2271400
Fax 952.2271404 newly installed Eden Prairie trail, as depicted in the applicant's plans,
shall be installed concurrent with development of the Block 4 units and a
Planning & 15 foot -wide public walkway easement centered on this newly installed
Natural Resources sidewalk be dedicated to the city.
Phone: 952.2271130
Fax: 952.2271110
Public Works BACKGROUND
7901 Park Place
Phone: 952.2271300 In 2006, the Chanhassen Park and Recreation Commission reviewed the initial
Fax: 952.2271310 application for the development of Lakeside and recommended the following
conditions of approval regarding parks and trails:
Senior Center
Phone: 952.2271125 1. The payment of full park dedication fees at the rate in force upon final
Fax: 952.2271110
plat approval in lieu of parkland dedication.
Web Site
www.ci.chanhassen.mn.us 2. The applicant shall provide all design, engineering, construction and
testing services required of the "Lyman Boulevard Trail." All
construction documents shall be delivered to the Park and Recreation
Director and City Engineer for approval prior to the initiation of each
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Park & Recreation Commission
August 28, 2012
Page 2
phase of construction. The trail shall be 10 feet in width, surfaced with bituminous
material, and constructed to meet all city specifications. The applicant shall be
reimbursed for the actual cost of construction materials for the Lyman Boulevard Trail.
This reimbursement payment shall be made upon completion and acceptance of the trail
and receipt of an invoice documenting the actual costs for the construction materials
utilized in its construction.
3. The trail connection at the northeast corner of the site connecting the Lakeside area to the
future Highway 212 trail and underpass, as depicted in the applicant's plans, is completed.
The City Council concurred with these recommended conditions of approval and the following
language was included in the development contract for the Lakeside addition:
F. PARKS AND RECREATION DEPARTMENT CONDITIONS OF APPROVAL
1. The developer shall pay $61,800.00 park dedication fees for the first phase of the
development prior to final plat recording in lieu of parkland dedication.
2. The applicant shall provide all design, engineering, construction and testing services
required of the "Lyman Boulevard Trail." All construction documents shall be
delivered to the Park and Recreation Director and City Engineer for approval prior to
the initiation of each phase of construction. The trail shall be 10 feet in width,
surfaced with bituminous material, and constructed to meet all city specifications.
The applicant shall be reimbursed for the actual cost of construction materials for the
Lyman Boulevard Trail. This reimbursement payment shall be made upon
completion and acceptance of the trail and receipt of an invoice documenting the
actual costs for the construction materials utilized in its construction.
3. The trail connection at the northeast corner of the site connecting the Lakeside area to
the future Highway 212 trail and underpass, as depicted in the applicant's plans, shall
be installed with the first phase of the development.
CLOSING
The developer's application for the 7 Addition is consistent with the original conditions of
approval for park and trail improvements and will bring 17 beautiful new homes to the
community. The Lyman Boulevard Trail referenced in item 2 of the original conditions of
approval has been completed and the park dedication dollars being generated from all phases of
the Lakeside Addition are being invested in public trails and parks in the Lakeside area.
ATTACHMENTS
1. Site Map
2. Project Plans
L O C A AT OK M AP
Lakeside 7th Addition
Ouflot 0, Lakeside
Planning / Case 2012 =1
a
f212 •
` • R
K
f
�,r+.�*" z } .. SUBJECT " y..
s PROPERTY r ro. ...‘,, .,,
t4• 41111*1111* ( 1''' fi r/ •-•
,b 44,,r, , :ittr I ,, . , r
,.
i , r .., . r . i • .., 1
} \ \ \\ X } J N R / 11
1 h ,,,,,,���--- .
*If . 4'
II
Lf ' v Q : � � Ir r , 1
WRO A. . i t ? • �
' � , , F -i -- L - `'— � e I ,
. Sri --- vi i ' s
. O • ve c,
: ,- ice .- a
TJ L' s,a n
g p y A P/-
rte '.. i��M!
-• - !at . lik: . ‘,*:4-' 1 IIIL ./11pv 'ir • 'T-W`, ' 4,, IA;
` ' µ 7 ...„7
i� o LTG+` � . _ _ i _, _ i , „..,
___---------' , , '. 1' 01__:.4
111 ., k ,,
_.,....--. _, .,,,---..,
, ,,,,,„.„ T
B........-,„ -.,-.A.,_?, .....i.,.,,,4-, .:
1 i , Pi,
x.4
_____- ..
,-- \. 1 ..,..... Ell. . Ai)
�._ _ _ - , - -- �, 4' i i re.. , ari.; • ` '
iii �, ��!� � /�� /'^�i�` % ii #
\ i I Ate 51-Ii...-1. - ii.:;-----. If .. it : Ateq-pe.,-„e,- 411Alte:.)::, ii
illrvil \
/ _ iii , ilhX. .4,:; i.
_ .,t_ ...,• , \--- -71.4-,., ,..'d . .,....„,P lir
- • - ...,. - y -....,...;.,,, --e
i
..) 2 j: i
Cl1Y O F CHANHASSEN
R IVED NG DEPT
1.
y
, 7/ t 1 ® CHAIVH SEEN ECE PLANNI
,.. -.. --___.- -- -- "”" - - - ..7, il :'-- 1
0
LAKESIDE CHANHASSEN MN Ron Clark Construction and Design WHITTEN ASSOCIATES INC.