4 SPR West Village CenterCiTY OF
STAFF REPORT
PC DATE: 3/1/00
CC DATE: 3/27/00
REVIEW DEADLINE: 3/28/00
CASE #: SPR #96-7 (file 2)
By: BG, DH, JS, ML, ST
PROPOSAL:
LOCATION:
APPLICANT:
Two retail buildings - Building A having 23,607 square feet and Building B
having 7,800 squ..are feet, West Village Center Phase II. ..
Northeast Comer of West 78th Street and Powers Boulevard, Lots 1 and 2, Block
1, West Village Heights 3ra Addition
T. F. James Company
P. O. Box 560
Excelsior, MN 55331
(612) 401-6600
PRESENT ZONING: BG, General Business District
ACREAGE: 3.41 acres
2020 LAND USE PLAN: Commercial
DENSITY: 0.21 F. A. R.
IMPERVIOUS COVERAGE: 65 %
SUMMARY OF REQUEST: The applicant is requesting site plan approval for two one-story retail
buildings. Building A, located on Lot 1, is a 23,607 square foot building to be occupied by Office Max.
Building B, on Lot 2, is a 7,800 square foot'multi-tenant building.
Notice of this public hearing has been mailed to all property owners within 500 feet.
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The City's discretion in approving or denying a site plan is limited to whether or not the proposed
project complies with Zoning Ordinance requirements. If it meets those standards, the City must then
approve the site plan. This is a quasi-judicial decision.
I KIMBERLY LANE
2 Kelly Court
3 Nicholas Way
W. Village
Road
Park Road
West Village Heights Phase II
March 1, 2000
Page 2
PROPOSAL/SUMMARY
This site serves as a gateway for people entering the central business district from the west. As such,
its aesthetic and architectural features are an important component of the image the city wants to
create for the downtown. This corner serves as one of four significant corners in the downtown area,
and it is important that an anchor for the development be of a high quality, and have an exceptional
design. The brick exterior is compatible with buildings within the immediate area, such as City Hall,
the Fire Station, the Chanhassen Bank, Century Bank, and West Village Center (Byerly' s).
Additional emphasis should be undertaken to help create an entrance statement for the downtown.
Both building's primary material will consist of brick matching the previous buildings in West Village
Center. The building sign area is backed by white EIFS. Windows are proposed adjacent to the
entrance and in the southeast corner of the building. Spandrel glass is proposed along the south building
elevation. Above the windows and entrances, a red metal canopy will be incorporated. Though not
specifically shown, staff believes that the building mechanical equipment is below the top of the parapet
and will not be visible from the public right-of-way.
The applicant originally submitted plans with building elevations for Building A that were less
articulated on the south elevation (see large plan sets). In response to staff comments, they have since
submitted revisions adding a window and canopy in the southeast corner of the building and two
spandrel glass coverings and canopies on the western portion of the building elevation (see attached
elevation reduction). In addition, the roof line has been lowered in the southeast corner of the building
to create addition facade variation. While these revisions improve the appearance, staff is still
concerned about this elevation as well as that on the west.
Staff has also attempted to relocate building B to the south. However, due to site constraints, we were
unable to make this relocation work and still provide the parking required. The design of the site, in
conjunction with TCF Bank and Kinkos, does create a U-shaped area for parking that helps to lessen the
perception of a "sea of asphalt." The applicant should further investigate relocating the buildings to the
south, closer to West78th Street and providing most or all parking between or behind the buildings.
Adjacent zoning and land use are N - PUD-R~ 2, Oak Pond/Oak Hills townhouses; S - PUD, Target,
Taco Bell, Lee Ann Chin's, Perkins, W. 78th St.; E - BG, TCF Bank; and W - R12, Eckankar
property, Powers Blvd. The site is currently used for the storage of soil excavation material from the
previous development of West Village Heights 2nd addition. A significant elevation change will be
maintained between Oak Ponds and this development. The site is serviced with municipal sanitary
sewer and water service in West 78th Street. Fire hydrant locations should be coordinated with the
City's Fire Marshal. The sewer and water lines wilt also be privately owned and maintained by the
property owner.
The site is proposed to be accessed from a relocated curb cut on West 78th Street. The access point is
restricted to a right-in/right-out from West 78th Street. A second access point will also utilize the
West Village Heights Phase II
March 1, 2000
Page 3
existing driveway entrance in the southeast corner of the site adjacent to the bank property. The
development is proposing a total of 157 parking spaces as required by city code.
Staff is recommending approval of Site Plan #96-7 (File 2) subject to the conditions of approval.
COMPLIANCE TABLE
Building Height
Building Setback
GENERAL BUSINESS DISTRICT
Ordinance
3 story/40 ft
N-50', E-10'
S-25', W-25'/10'
BLDG A
1 sty./28.33 ft.
N-52.6', E-60'
S-86', W-25'
BLDGS A & B
BLDG B
1 sty./25.33 ft.
N-54', E-10'
S-215', W-24'
Parking Stalls 157
157 total
Parking Setback
N-50', E-0'
S-10', W-10'
N-50', E-9.4'
S-15.5', W~9'*
Hard Surface Coverage
70 percent 65 percent
Interior Parking Lot
Landscaping
8 percent 8 percent
Lot Area 20,000 sq. ft. 3.4 acres
· Does not comply with city ordinance.
BACKGROUND
On March 10, 1997, the City Council approved the preliminary and final plat for West Village Heights
3rd Addition replatting the Second Addition. At the same meeting, the Council also approved Site Plan
#96-7 for 26,786 square feet of commercial development for three buildings and Conditional Use
Permit # 96-2 to permit more than one building on a lot for West Village Center Phase II. The site
plan was not built.
The applicant received an interim use permit, IUP #93-2, in November 1993 to allow site grading to
begin on West Village Heights 2nd Addition prior to obtaining final site plan approvals for West
Village Center. Approximately 100,000 yards of excavation were to be involved as part of the overall
grading operation. Of this amount, approximately 40,000 cubic yards of excess material was
removed from the site. The excess was to be stored on-site. Grading was completed during 1994.
West Village Heights Phase II
March 1, 2000
Page 4
The site contained a small depression that is not a protected wetland. While it had wetland
characteristics, available information indicated that it was created for storm water purposes and was
therefore exempt. A review of the history of the pond indicates that it was created when West 78th
Street was constructed for stormwater holding purposes. The records show that this was not a
mitigation site for other wetlands filling in the area, but was created for the specific purpose of
stormwater retention. The basin was approximately 0.5 acre.
The City of Chanhassen, after reviewing the proposed project to ensure compliance with the Wetland
Conservation Act (WCA) of 1991, processed and administered a WCA exemption report. In this case
under the WCA exemptions, this wetland did not require mitigation. The WCA states that a
replacement plan for wetlands is not required for impoundments or excavations constructed in non-
wetlands solely for the purpose of effluent treatment, stormwater retention, soil and water
conservation practices, and water retention, soil and water conservation practices, and water quality
improvements, and not as part of a compensatory wetland mitigation process that may, over time,
take on wetland characteristics (WCA; Exemption 10).
In November 1986, this property was approved for a mixed use subdivision (West Village Heights
2nd) including five commercial lots, one multi-family lot, and the realigned right-of-way for West
78th Street. In addition, this property was rezoned from R-1 a, Agricultural Residence, to C-3,
Service Commercial, and R-4, High Density Residential. In 1987, the southern five lots were rezoned
to BG, General Business District, as part of the revisions to the Zoning Ordinance. Prior to the
redevelopment of the downtown and the finalization of the West 78th alignment, the western portion
of the site was rough graded in anticipation of a PDQ center. This center and other commercial uses
were never built, although all of the residential acreage has either been developed or is currently
being built out. The West 78th Street alignment was modified and a revised road section employed
concurrent with the approval of Target.
GENERAL SITE PLAN/ARCHITECTURE
Both building' s primary material will consist of brick matching the previous buildings in West Village
Center. The larger building has a maximum height at the top of the parapet wall of 28 feet 4 inches.
The wall area at the entrance and the faux entrance on the south elevation project out from the body of
the building 1 foot 4 inches. These areas also step up the roof line 6 feet 2 inches. Red decorative metal
borders the sign area and is used as canopy material over the entrance and windows. Decorative stone,
matching the stone on the shopping center, is inset in the brick fields. A soldier course band at the
height of the canopy runs completely around the building. A brick cornice and metal coping matching
the shopping center is at the top of the wall. The building sign area is backed by white EIFS. Windows
are proposed adjacent to the entrance and in the southeast comer of the building. Spandrel glass is
proposed along the south building elevation.
Staff's primary concern with the building A's architecture is that there is insufficient articulation
around the building and the two inch reveals proposed in the brick facade will not be sufficient to
provide variation in the west side of the building. Therefore, staff is recommending that windows be
West Village Heights Phase II
March 1, 2000
Page 5
added at the employee lounge area in the southwest comer of the building, that a canopy be provided
over the doorway and windows, and that a patio be provided to permit employees to sit outside in this
area. Also, the west and north elevations should be modified in one or more of the following ways:
add windows or more articulation in the walls (perhaps through the use of columns, larger recesses).
In addition, the increase in the landscaping along the western and northern sides of the building as
well as the use of larger caliper trees should help soften the long expanses of relatively blank wall
areas. The fake entrance on the south should be further defined by continuing the 1 foot 4 inch
projection of the brick out from the building between the columns, creating a canopy. This will
provide additional shading and highlight the south side. Additionally, staff would support and
recommend showing the western portion of the south parking lot for Office Max as proof of parking
and instead create an artistic feature in a small green area including sculptures, fountains, benches,
gazebo, etc.
LANDSCAPING
Minimum landscaping requirements for the proposed development include parking lot landscaping,
boulevard trees along W. 78th St. and Powers Blvd., and bufferyard plantings. Ordinance
requirements for the proposed development are shown in the following table.
Landscaping Item
Boulevard trees - West
78th Street
Boulevard trees - Powers
Blvd.
Buffer yard B* - West
78th Street (380')
Buffer yard B* - Powers
Blvd. (260')
Buffer yard D* - North
property line (460')
Parking lot
Required
13 overstory trees
9 overstory trees
6 overstory trees
8 understory trees
14 shrubs
4 overstory trees
6 understory trees
11 shrubs
17 overstory trees
35 understory trees
52 shrubs
4,748 ft2 landscape area
7 overstory trees
0 overstory trees
5 overstory trees
16 understory trees
15 shrubs
3 overstory trees
11 understory trees
0 shrubs
12 overstory trees
46 understory trees
0 shrubs
51,965 ft2 landscape area
19 overstory trees 20 overstory trees
*Shown is 75% of the total required plantings. According to city buffe~2~ard ordinance, the project developer is responsible 7or only 75% of the
required plantings. Abutting property owners may plant the remaining 25% on their property.
The applicant does not meet minimum landscape requirements for boulevard trees and buffer yard
plantings along the north property line and Powers Boulevard. These areas will need to be revised in
'order to meet the minimum requirements. Staff recommends that the applicant revise the landscape
plan to reflect these requirements.
West Village Heights Phase II
March 1, 2000
Page 6
Of concern are the parking lot landscape islands. The space planned for the proposed Marshall's Ash
trees is as narrow as 4' wide in some islands. This is unacceptable even with aeration tubes. The
applicant shall work with staff to revise island configurations to meet acceptable standards.
LIGHTING/SIGNAGE
The proposed lighting will be consistent with the lighting used at West Village Center, dark bronze
anodized with square heads. Lighting shall use shielded fixtures and be directed away from public
right-of-way and adjacent residential property. Sufficient lighting shall be provided to illuminate all
areas of the parking lot to provide adequate levels of safety. To minimize off-site impacts, light
levels as measured at the property line, shall not exceed one-half foot candle.
The plans propose that wall mounted lighting unit be provided on the south, west and north sides of
the building. This wall unit must be shielded from direct off site view.
The development shall comply with City Code (section 20-1303) in the installation of development
signage. The proposed development has two street frontages. One ground sign may be permitted per
street frontage. Such signage must be separate from other ground low profile signs by at least 300
feet. It appears the developer is proposing a monument sign in the southwest comer of the site. The
two faces of the sign may not be separated by more than 45 degrees or they will be considered two
signs or the total area of both faces added together does not exceed the maximum allowable sign area
for the district (64 square feet).
Wall business signage is permitted per street frontage. Wall signs may be located on the south and
west elevations of Building A and the south elevation of Building B. Wall signs shall not exceed five
percent of the total area of the east and south elevations of Building A and five percent of the south
elevation of Building B. Staff has calculated the sign area for building A as follows: east elevation
based on 3,735 square feet permitted sign area of 187 square feet; and south elevation based on 4,351
square feet permitted sign area 217 square feet. A separate sign permit application shall be required
for all signage.
SURFACE WATER MANAGEMENT PLAN (SWMP}
This development is not responsible for storm water management fees since they are not subdividing. In
addition, the properties have been specially assessed for storm water drainage improvements in
conjunction with the West 78th Street upgrade.
GRADING
The entire site is proposed to be graded for the parking lots and building pads. Currently there is a
grade difference on the site of over 30 feet north to south. The slopes on the northerly portion of the
site, behind the buildings, are proposed with 2.5:1 side slopes which is the maximum slope staff
would recommend from an erosion control and maintenance stand point. For comparison, the
existing slopes on the parcel to the east have similar slope conditions. A segment of retaining wall is
West Village Heights Phase II
March 1, 2000
Page 7
proposed at the base of the slope adjacent to the trash enclosure and truck loading areas. The
retaining walls range in height from 1- 6 feet high. All retaining walls in excess of 4 feet will need to
engineered and separate building permits obtained.
The first floor elevation of building "A" will be approximately the same elevation as the intersection
of Powers Boulevard and West 7gth Street. Both first floor elevations of the buildings will be 4-6 feet
above West 78th Street. The top of building "A" will be approximately 9.5 feet higher than the north
property line and building "B" will be approximately the same elevation of the north property line.
The grade difference is due to the site's topographic constraints. Overall, staff believes the applicant
has done a good job of blending the buildings into the site.
The applicant has indicated that the site grading will generate approximately 40,000 cubic yards of
excess material that will need to be removed from the site. Staff is concerned about haul routes and
recommends that the haul route be restricted to West 78th Street to Powers Boulevard and not through
the downtown area east of the site. The applicant should also be aware that if any of the material is to
be hauled to property within the City, the individual property owner must obtain a grading permit
through the Engineering Department prior to earthwork activities commencing.
The existing boulevard trees along West 78th Street may need to be temporarily relocated or graded
around in conjunction with site improvements. These boulevard trees were planted in conjunction
with the City's West 78th Street Downtown Improvement Project. The applicant shall be responsible
for replacement of any or all damaged boulevard trees as a result of construction activities.
The City has existing utility lines and streetlights adjacent to this parcel that may be impacted by site
development. The applicant shall be responsible for all adjustments of the City utility lines, streets
and street lights impacted by development of the site. A financial security shall be included in the site
plan agreement to guarantee restoration and/or replacement of the city's infrastructure impacted by
this development.
EROSION CONTROL
Type I erosion control is already employed from previous earthwork activities on the site. The plans
propose Type I silt erosion control fence along the southerly grading limits. A rock construction
entrance is also proposed at the main entrance on West 78th Street. Staff recommends additional
erosion control fencing be installed along the westerly grading limits on the site as well. The
applicant should also consider incorporating additional erosion control measures such as temporary
sediment ponds during construction to prevent erosion from leaving the site.
DRAINAGE
Storm drainage will be conveyed through a series of proposed storm sewer pipes in the parking lots
which will be connect into the City's storm sewer system along W. 78th St.. The City's storm sewer
system discharges into the downtown regional storm water quality and quantity pond located west of
Powers Boulevard and north of Highway 5. Therefore, no on-site ponding will be necessary with this
West Village Heights Phase II
March 1, 2000
Page 8
proposal. Staff recommends the applicant's engineer submit drainage calculations for a 1 O-year, 24-
hour storm event for staff review and approval prior to issuance of a building permit. The proposed
storm sewer system on the site will be privately owned and maintained by the property owners. The
applicant will be responsible for obtaining the proper permits through the City's Building
Department.
UTILITIES
The site is serviced with municipal sanitary sewer and water service in West 78th Street. The plans
propose to extend the utilities to the buildings along with a water line connecting the two lots.
Minnesota plumbing codes require individual service lines for each building; therefore, the
interconnecting water line will need to be deleted. Fire hydrant locations should be coordinated with
the City's Fire Marshal. The sewer and water lines will also be privately owned and maintained by
the property owner. The appropriate utility permits and inspections will be required by the Public
Safety Department.
STREETS
Both lots are proposed to be accessed from a shared access point along west 78th St. The existing curb
cut from West 78th Street will be relocated approximately 60 feet west. This access point is restricted
to a right-in/right-out from West 78th Street. The existing curb cut will be removed and restored with
sidewalk and landscaping. A second access point will also utilize the existing driveway entrance in
the southeast comer of the site (next to TCF). This will allow traffic to access West 78th Street across
from Target Lane.
Staff has reviewed the overall parking lot layout and is comfortable with the configurations. Staff
recommends that a traffic signage plan be submitted for staff review and approval prior to building
permit issuance.
Internal sidewalks are proposed throughout the site. A sidewalk will extend from West 78th Street to
and in front of Building "A", across to Building "B" and reconnect to the existing sidewalk by TCF.
MISCELLANEOUS
The building owner and or their representative should meet with the Inspections Division as early as
possible to discuss plan review and permit procedures. Detailed Building Code review items will be
discussed at that time.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance with
the following:
West Village Heights Phase II
March 1, 2000
Page 9
Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may be
adopted;
(2) Consistency with this division;
(3)
Preservation of the site in its natural state to the extent practicable by minimizing tree
and soil removal and designing grade changes to be in keeping with the general
appearance of the neighboring developed or developing or developing areas;
(4)
Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visnal relationship to the
development;
(5)
Creation of functional and harmonious design for structures and site features, with
special attention to the following:
ao
An internal sense of order for the buildings and use on the site and provision of
a desirable environment for occupants, visitors and general community;
b. The amount and location of open space and landscaping;
Materials, textures, colors and details of construction as an expression of the
design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
do
Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms of location and number of access points to the public streets,
width of interior drives and access points, general interior circulation,
separation of pedestrian and vehicular traffic and arrangement and amount of
parking.
(6)
Protection of adjacent and neighboring properties through reasonable provision for
surface water drainage, sound and sight buffers, preservation of views, light and air
and those aspects of design not adequately covered by other regulations which may
have substantial effects on neighboring land uses.
Finding: The overall design and architectural theme for the development is established by
West Village Center and consists of brick exterior walls with "classical" uses of arches,
recessed areas, and varied building facades. Subject to the recommended conditions of
approval, the development embodies many of the design elements specified in the Highway 5
Corridor Study including a well designed and varied building facade, appropriate building
scale and proportion, harmonious colors and building accents, appropriate screening, and the
use of high quality building materials. Pedestrian access will be provided from West 78th
West Village Heights Phase II
March 1, 2000
Page 10
Street and TCF Bank. The proposed development is consistent with the City's Highway 5
Corridor design requirements, the comprehensive plan, the zoning ordinance, and the site plan
review requirements. The site has few existing natural amenities due to previous development
in the area. The site design is functional and harmonious with the approved development for
this area.
RECOMMENDATION
Staff recommends that the Planning Commission adopt the following motion:
"The Planning Commission recommends approval of Site Plan #97-6, plans prepared by James R.
Hill, Inc., dated 1/28/00, subject to the following conditions:
1. The applicant shall enter into a site plan agreement with the City and provide the necessary
security to guarantee erosion control, site restoration and landscaping.
The proposed lighting will be consistent with the lighting used at West Village Center, dark
bronze anodized with square heads. Lighting shall use shielded fixtures and be directed away
from public right-of-way and adjacent residential property. Sufficient lighting shall be provided
to illuminate all areas of the parking lot to provide adequate levels of safety. To minimize off-site
impacts, light levels as measured at the property line, shall not exceed one-half foot candle.
Wall signs shall not exceed five percent of the total area of the east and south elevations of
Building A and five percent of the south elevation of Building B. Staff has calculated the sign
area for building A as follows: east elevation based on 3,735 square feet permitted sign area of
187 square feet; and south elevation based on 4,351 square feet permitted sign area 217 square
feet. A separate sign permit application shall be required for all signage.
The applicant shall further investigate the possibility of relocating Building B closer to West 78th
Street. If this cannot be done, then the applicant shall provide the city with an analysis of why
this cannot be achieved.
Windows shall be added at the employee lounge area in the southwest comer of the Building A, a
canopy shall be incorporated over the doorway and windows, and a patio shall be provided in this
area. The north and west elevations shall be further modified to incorporate one or more of the
followings: add windows or more articulation in the walls (perhaps through the use of columns or
larger recesses).
o
If the entrance for Building A cannot be relocated to the south, then the fake entrance on the south
should be further defined by continuing the 1 foot 4 inch projection of the brick out from the
building between the columns, creating a canopy.
West Village Heights Phase
March 1, 2000
Page 11
o
The western portion of the south parking lot for Office Max shall be shown as proof of parking
and instead this area shall be used to create an artistic feature including sculptures, fountains,
benches, gazebo, etc.
8. All roof mounted equipment shall be screened from views from the public right-of-ways.
o
The applicant shall revise proposed landscape plan to meet minimum landscape ordinance
requirements. In addition, the landscaping along the western and northern sides of the building
shall use larger caliper trees to help soften the long expanses of relatively blank wall areas
10. The applicant shall work with staffto revise landscape island configurations in order to meet
provide acceptable space for plant growth.
11. The applicant and/or contractor shall notify the City Engineer upon encountering any existing
drain tile on the site. The City Engineer will determine whether or not the drain tile can be
abandoned or relocated.
12. Additional erosion control fence (Type I) shall be installed along the westerly property line.
Erosion control measures shall be in place and maintained at all times until the site has been fully
restored and revegetated and the City authorizes removal.
13. The applicant shall obtain and receive the necessary permits from the regulatory agencies such as
the Watershed District, Carver County Highway Department, and Chanhassen Building
Department.
14. The proposed watermain connection between the lots shall be deleted.
15. If earthwork material is to be hauled to or from the site, the applicant shall submit to City staff the
designated haul routes and traffic control signage plan for approval prior to hauling activities
commencing. The applicant will be required to maintain haul routes and clean the streets of any
dirt and mud accumulated from vehicles tracking. Any damage to City streets, curbs or other
public facilities will be the responsibility of the applicant. Hauling earthwork material east along
West 78th Street through the downtown will not be permitted. All construction vehicles shall
access the site from a designated location along West 78th Street.
16. The existing boulevard trees along West 78th Street shall be preserved/protected from construction
activities. If any city boulevard trees need to be relocated as a result of site improvements they
shall be transplanted or replaced in kind in a location designated by the City Forester. The
applicant shall be responsible for replacement of any boulevard tree that does not survive for up to
one year after the certificate of occupancy has been issued.
17. The applicant shall be responsible for adjustments to the City's utilities systems, streets, sidewalk,
street lights and boulevard impacted by the site improvements. The applicant shall apply for and
obtain a permit for construction in right of way for work performed within West 78th Street right
West Village Heights Phase II
March 1, 2000
Page 12
of way. A financial security in the form of a letter of credit or cash escrow in the amount of
$10,000 will be required to guarantee boulevard restoration.
18. The applicant shall submit a detailed traffic control plan to the City for review and approval prior
to issuance of a building permit.
19. Retaining walls in excess of four feet in height shall be engineered and separate building permits
obtained.
20. A cross-access and maintenance agreement shall be prepared by the applicant and recorded
against both parcels.
21. The applicant shall pay full park and trail fees pursuant to City Ordinance.
22. The buildings are required to be protected with an automatic fire extinguishing system.
23. The east wall of building B must be one-hour fire-resistive construction where it is closer than 20
feet to the property line.
24. Each building must be provided with one access aisle for accessible parking that is a minimum of
eight feet wide.
25. A ten foot clear space must be maintained around fire hydrants, i.e., street lamps, trees, shrubs,
bushes, NSP, US West Cable TV and transformer boxes. This is to ensure that fire hydrants can
be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance 9-
1.
26. Referencing the 23,607 square foot building, the fire department sprinkler connection must be
located near the main entrance to the store. Contact the Fire Marshall for exact location.
27. The P. I. V. shall be equipped with electronic tamper device.
28. Fire sprinkler design shall be submitted for review and approval. It must be designed for high
piled storage.
29. Comply with Chanhassen Fire Department Policy regarding fire department's notes to be included
on all site plans. Pursuant to Chanhassen Fire Department Policy #04-1991.
30. Contact Chanhassen Fire Marshall for exact location of fire lane signs and curbing to be painted
yellow. Pursuant to Section 904-1 1997 Uniform Fire Code.
31. Comply with Chanhassen Fire Department policy regarding premise identification. Submit plans
to the Fire Marshall for review of building identification. Pursuant to Chanhassen Fire
Department/Fire Prevention Division policy #29-1992."
West Village Heights Phase II
March 1, 2000
Page 13
ATTACHMENTS
1. Development Review Application
2. Reduced Copy Paving and Dimensional Plan
3. Reduced Copy Office Max (Bldg A) Elevations
4. Reduced Copy Building B Elevations
5. Site Area Plan
6. Memo from Mark Littfin to Robert Generous dated 2/9/00
7. Memo from Bill Weckman to Robert Generous dated 2/16/00
8. Public Hearing Notice and Mailing List
West Village Heights Phase II
March 1, 2000
Page 14
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
Application of T. F. James Company Site Plan Review #96-7
On March 1, 2000, the Chanhassen Planning Commission met at its regularly schedule
meeting to consider the application of the T. F. James Company for a site plan review for the property
located at 930 and 970 West 78th Street. The Planning Commission conducted a public hearing on
the proposed site plan was preceded by published and mailed notice. The Planning Commission
heard testimony from all interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned BG, General Business District.
2. The property is guided by the Land Use Plan for commercial.
o
The legal description of the property is: Lots 1 and 2, BlockI, West Village Heights
3~a Addition.
4. Section 20-110:
(1)
Is consistent with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may be
adopted;
(2) Is consistent with this division;
West Village Heights Phase II
March 1, 2000
Page 15
(3)
Preserves the site in its natural state to the extent practicable by minimizing tree and
soil removal and designing grade changes to be in keeping with the general appearance
of the neighboring developed or developing or developing areas;
(4)
Creates a harmonious relationship of building and open space with natural site features
and with existing and future buildings having a visual relationship to the development;
(5)
Creates a functional and harmonious design for structures and site features, with
special attention to the following:
An internal sense of order for the buildings and use on the site and provision of
a desirable environment for occupants, visitors and general community;
b. The amount and location of open space and landscaping;
Co
Materials, textures, colors and details of construction as an expression of the
design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
do
Vehicular and pedestrian circulation, including walkways, interior drives and
parking in terms of location and number of access points to the public streets,
width, of interior drives and access points, general interior circulation,
separation of pedestrian and vehicular traffic and arrangement and amount of
parking.
(6)
Protects adjacent and neighboring properties through reasonable provision for surface
water drainage, sound and sight buffers, preservation of views, light and air and those
aspects of design not adequately covered by other regulations which may have
substantial effects on neighboring land uses.
5. The planning report #96-7 (File 2) dated March 1, 2000, prepared by Robert Generous,
AICP, is incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the site plan review.
ADOPTED by the Chanhassen Planning Commission this 1 st day of Marsh, 2000.
West Village Heights Phase II
March 1, 2000
Page 16
ATTEST:
Secretary
g:\plan\bg\west village center phase ii.doc
CHANHASSEN PLANNING COMMISSION
BY:
Its Chairman
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937-1900
DEVELOPMENT REVIEW APPLICATION
APPLICANT: 7
ADDRESS: ~-~,
TELEPHONE (Day time)
OWNER:
ADDRESS:
TELEPHONE:
. Comprehensive Plan Amendment
. Temporary Sales Permit
Conditional Use Permit
Vacation of ROW/Easements
Interim Use Permit
Variance
Non-conforming Use Permit
Wetland Alteration Permit
Planned Unit Development*
Zoning Appeal
~ Rezoning
Zoning Ordinance Amendment
..... Sign Permits
Sign Plan Review
Notification Sign
..~ Site Plan Review*
X
Escrow for Filing Fees/Attorney Cost**
($50 CUPISPR/VACNARAIV AP/Metes
and Bounds, $400 Minor SUB)
Subdivision*
TOTALFEE $
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application. -~ ~,C.~_~ TO [~IP.~P,,'dE.~.. ,~/jl~) J/,~O~)~C~ '"T: 'F. ":~t,~-~ C~u,~?~,~
Building material samples must be submitted with site plan reviews.
*Twenty-six full size folded copies of the plans must be submitted, including an 8W' X 11" reduced copy of
transparency for each plan sheet.
** Escrow will be required for other applications through the development contract
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
?REJECT NAME
LOCATION
LEGAL DESCRIPTION
TOTAL ACREAGE
WETLANDS PRESENT
PRESENT ZONING
YES X NO
REQUESTED ZONING
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST_
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements app{icable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either
copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make
this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines 'for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate pdor to any
authorization to proceed with the study. The documents and information I have submitted are true and correct.to the best of
my knowledge.
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensionsT~. ~' "j~are approved ~-'~/z~ '/1/'''~by the applicant. ~'"~ ,.,7::Z~-~,~ ~O,~~,_--.,,/)
Signature of A Date
Signature of Fee Owne Date
Application Received on /'~0" Ob Fee Paid ~"7~'3,0~ Receipt No. ~3
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting.
If not contacted, a copy of the report will be mailed to the applicant's address.
~[ItlI
--~
t_.j ~ .............. :
Z£;g~:ZL O00Z/gZ/i,O.
Z¥
,'.'II
~ ', ....... ~ , ....:.,=:. J_=
,_. , -~. · -_ .J=
~ '---....--. IJ'--U) :~1 IJITiT~l~..
~,o.,-. -. · _ ~ """""""""""""""""""~ -- ',57~ .... ~ _ ,,
x ' ~"
¢- ....
'
,,..., ,
~ I//r~-~ ~ ~ U
-'O~z~ ~ .,. . --
"~"'.,~,..;'--.. _ ',
~-'~"- - ' ~ I
SITE AREA PLAN
-I
MEMORANDUM
CIT OF
CHANHASSEN
Robert Generous, Senior Plam~er
Mark Littfin, Fire Marshal
690 Gty Center Drive, ?O aox I47 DATE:
Chanhassen, Minnesota 55317
RE:
Phone 612.937,1900
General Fax 612. 937. 5739
Engineering Fax 612.937.9152
Public Safe~y Fax 612.)34.2524
Web www. ci. chanhassen, mn. us
February 9, 2000
Site plan review for two retail buildings. Building A having 23,607
square f~et and Building B having 7,800 square feet to be located
on Lots 1 and 2, Block 1, West Village Heights 3rd Addition on
property zoned BG, General Business, located at the northeast corner
of the West 78th Street and Powers Boulevard intersection, TF Jmnes
Company, West Village Center Phase 2.
Planning Case: 96-7 Site Plan (File 2).
[ have reviewed the site plan for the above project. In order to co~npty with the Chanhassen
Fire Department/,~'ire Prevention Division, I have the following fire code or city
ordinance/policy requirements. The site plan is based on available in£ormation submitted at
this tin)e. If additional plans or changes are submitted the appropriate code or policy items will
be addressed.
A 10 fool clear space must be nmintained around fire hyarants, i.e, street lamps, trees,
shrubs, bushes, NSP, US West, Cable TX/m~d transt~brmer 'boxes~ This is to ensure that
fire hydrants can be quickly' located and safely operated by firefighters. Purstmnt to
Chanhassen City Ordinance 9-1.
o
Referencing the 23,607 l:oot build rog. Condition 1~- the fire .depallment sprinkler
connection must be located near ~:he main emrance to the store. Comact Chanhassen
Fire Marshal for 'exact location'.
3. The P.!.V. shall be equipped ~a4th electronic tamper deuice.
4. Fire sprinkler design shall be submitted for review and apprOvaL 'It must be de_signed
for high piled stbrage.
5. Comply xvith ChanhasSel~ Fire Department ~Policy regarding fire department's notes to
be inelud'ed °n ali sit'e Plans. PtirSuantio :Chanh~ssen. Fire _?)epm~fi~en.~ Policy/~04:
1991. copy enclosed.
6. Contact Chanhassen Fire Marshal for exact location Of fire lane signs and curbing to be
painted yellow. Pursuant to Section 904-1 1997 Unifom~ Fire 'Code.
Comply with Chanhassen Fire l)epartment policy regarding premise idenfifiCa'fon.
Submit plans to Fire Marglial for re~:iew Off~uilding identification. Pursuant to
Chanhassen Fire Department/Fire Prevention Division :Policy #29- 1999_. Copy
enclosed.
The Gty of Chanhassen. A growing community with'clean lakes, quali~y schools, a charming downtown, thriving businesses, and beautiful parks. A great place to live, work, and play.
CITYOF
CHAN SE
690 City Center Drive, PO Box 247
Chanhassen, Minnesota 55317
Phone 612.937.1900
General Fax 612.937,5739
Engineering Fax 612.937.9152
Public Safety Fax 612.934.2524
Web www. ci. chanhassen.mn, us
CHANHASSEN FIRE DEPARTMENT POLICY
CHANHASSEN FIRE DEPARTMENT NOTES TO BE
INCLUDED ON ALL SITE PLANS
Fire Marshal must witness the flushing of underground sprinkler
service line, per NFPA 13-8-2.1.
A final inspection by the Fire Marshal before a Certificate of
Occupancy is issued.
3. Fire Department access roads shall be provided on site during all
phases of construction. The construction of these temporary roads
'~,. will conform with the Chanhassen Fire Department requirements for
' iemporai'y ac,cess roads at construction sites. De{,ails are available.
4. Onsite fire 'hydrants shall be provided and in operating condition
during all phases of construction.
5. 'The use of liquefied petroleum gas shall be in conformance with
NFPA Standard 58 and the Minnesota Uniform Fire Code. A list of
these requirements is available. (See policy #33-
6. All fire detection and fire suppression svstems shall be monitored by'
an approved UL central station with a UL 72 Certificate issued on
these systems before final occup ,ancy is issued. ":' :'.
:7,. -.:?.~.: iTAri 1 l"X i4" As. Built shall, be provid, ed to the Fire Department;' ~-'ke
=i?:' i}'il ?!i As BUilt shall be reproducible and ~ccePtable ta the Fire Marshal.
Chanl'lassen Fire Deparmaent
Fire PreventiOn .:,~'.~.=. .............. ~ ............
PolicY #04-199~ ~: '!'' ~''i!i~:i:i}i?i~:!,!i?!~iii:i!
Date: 11/22/91
.Revised: 06/05/98
.'i.i?:i::~Page 1 of 2
The City of Chanhassen. .4 growing community with clean [akes, quality school, a charming downtown, thriving businesses, and beautiful parks. A great place to live, work, and pla3
o
An approved lock box shall be provided on the building for fn:e
department use. The lock box should be located by the Fire
Department connection or as located by the Fire Marshal.
10.
11.
High-piled combustible storage shall comply, with the requirements
of Article #81 o.__f the Minnesota Uniform Fire Code. High-piled
combustible storage is combustible materials on closely packed piles
more than 15' in height or combustible materials on pallets or in
racks more than 12' in height. For certain special-hazard
commodities such as rubber tires, plastics, some flammable liquids,
idle pallets, etc. the critical pile height may be as low as 6 feet.
Fire lane signage shall be provided as required by the Fire Marshal.
(See policy #06-1991).
Maximum allowed size of domestic water service on a combination
domestic/fire sprinkler supply line policy must be followed. (See
policy #36-1994).
Approved- Public Safety Director
Chanhassen Fire Department
Fire Prevention
Policy #04-1991
Date: 11/22/91
Revised: 06/05/98
Page 2 of 2
CITYOF
6)0 Cig Center Drive, PO Bax 147
Chanhassen, Minnesota 55317
Phone 612.937. I900
General Fax 6I 2. 937. 5739
Engineering Fax 612.93Z9152
Public Safeg £ax 612334.2524
Web www. ci. chanhassen.mn, us
CHANHASSEN FIRE DEPARTMENT POLICY
PREMISES IDENTIFICATION
General
Numbers or addresses shall be placed on all new and existing
buildings in such a position as to be plainly visible and
legible from the street or road fronting the property. Said
numbers shall contrast with their background. Size and
location of .numbers shall be approved by one of the
following - Public Safety Director, Building Official,
Building Inspector, Fire Marshal.
Requirements are for new construction a~nd existing buildings
where no address numbers are posted:.~ ·
Other ReQuirements - General ~ '
1. ' Numbers shail be a contrasting color fro~ the background.
2. Numbers shall not be in script.
3. If a structure is not visihie from the street, additional n%~l~bers are
required at the driveway entrance. Size and loc~tion must be approved.
4. Numbers on mail box at driveway entrance may be a minimum of 4". However,
requirement %3 must still be met.
5. Administrative authority may require additional numbers i~ .deemed
necessary.
Residential Requirements (2 or less dwellin~ unit)
1. Mini+~um height shall be 5 1/4".
2. Building permits wi:ll not be finaled unl~ess numbers a~re posted and..approved
by the Building Department.
.1, ~inimum height shall be 12".
a. Multi tenant building wil~ have minimum height reqUi-r~ments of 6".
.: b. Address n%lmbers shall be on the ~ain entrance and on all hack doors.
3. If address ntmbers are located on a directory entry sign, additional
numbers will be ·required on the buildin~s, main entrance.
~~/ ' Rev i s e d:
Approved P=blic .g~Zet~y Di:rector Page 1 of 1
The Cig of Chanhassen. A growing community with clean lakes, quali~y schools, a charming downtown, thriving businesses, and beautiful parks. A great piace to live, work, and plz3
CARVER
COUNTY
PUBLIC WORKS DEPARTMENT
Carver County Government Center
Administration Building
600 East Fourth Street
Chaska, Minnesota 55318-2192
Phone (612) 361-1010 Fax (612) 361-1025
Administration
Parks
Engineering
Highway Maintenance
Surveying & Mapping
February 16, 2000
To;
From:
Subject:
Robert Generous, Senior Planner, City of Chanhass~l~
Bill Weckman, Assistant County Engineer I,~
Site Plan Review - West Village Center Phase II
Planning Case: 96-7 Site Plan (File 2)
We have reviewed the information regarding the proposed site plan for west Village Center
Phase II as transmitted to Carver County by your memorandum dated January 3!, 2000,
This proposed development does not directly impact a County roadway but it is close to
the existing County Road 17 (Powers Blvd.) /West 78th Street intersection. Based on the
information provided, the proposed development does not directly impact Powers BIvd.,
but the plan indicates the proposed access onto 78th Street is located closer to the CR
17/78th St. intersection than was shown on previous development proposals. As a result
of this change, questions we have include: Has it been determined if [his change will
impact the intersection? Does the stacking distance at the intersection extend:past this
access?
Thank you for the opportunity to comment on this proposed site plan. If you have any
questions regarding these comments, please call me at 612-361-1010.
Affirmative Action/Equal Opportunity Employer
Printed on ]0% Post-Consumer Recycled Paper
NOTICE OF PUBLIC HEARING
PLANNING COMMISSION MEETING
WEDNESDAY, MARCH 1, 2000 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
690 CITY CENTER DRIVE
PROPOSAL:
Site Plan Review for
Two Buildings
APPLICANT: T, F. James Company
LOCATION: North of West 78th in the
West Village Center
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant,
T. F. James Company, is requesting site plan review for two retail buildings, Building A having 23,607
sq. ft. and Building B 7,800 sq. ft., to be located on Lots 1 and 2, Block 1, West Village Heights 3rd
Addition on property zoned BG, General Business, and located on the northeast corner of the West 78th
Street and Powers Boulevard intersection.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the developer's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The Developer will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses project.
Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Bob at 937-1900 ext. 141. If you choose to submit written comments, it is helpful to have one
copy to the department in advance of the meeting. Staff will provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on February 17, 2000.
1 KIMBERLY LANE
2 Kelly Court
3 Nicholas Way
CHANHASSEN H/R~/'
690 CITY CF~qI2R DR
PO BO~1'4~
,.~4~ASSEN MN
55317
PERKINS RESTAURANTS OPERTNG C
PO BOX 1600
ROWLETT TX 75030
CONNIE LEE SCHIBILLA
960 KIMBERLY LN
CHANHASSEN MN
55317
JAMES J & CAROL J HERSMAN
966 KIMBERLY LN
CHANHASSEN MN 55317
DEAN R JOHNSON CON,~R INC
HAME~ MN 55340
DEAN R JOHNSON ~R INC
20170 75TH AVE.,J~ .
HAMEL J' MN 55340
CNL AMERICAN PROPERTIES FUND
450 S ORANGE AVE
3RD FLOOR
ORLANDO FL 32801
JOHN W & KAY M HANLON
970 KIMBERLY LN
CHANHASSEN MN 55317
DEAN R JOHNSO13C'C~ONSTR" INC
20170 75TH Ay~E'N
HAMEL .,/-- MN 55340
CAPTEC HEALTHNET REALTY INC
224 FRANK LLOYD WRIG
ANN ARBOR MI 48106
PATRICK J BLAIR & CATHERIN
942 KELLY CT
CHANHASSEN MN 55317
DEAN R JOHNSO~,'CONSTR INC
20170 75TH
HAMEL/" MN 55340
DAYTON HUDSON CORP T-BB2)PERT
777 NiCOLLET MALL
MINNEAPOLIS MN 55402
PETER G & KRISTIN A TERRELL
4912 SPUR WAY
ANTIOCH CA 94509
CAROL A OLSON
901 KELLY CT
CHANHASSEN
MN 55317
DANIEL JOHNSON
938 KIMBERLY LN
CHANHASSEN
MN 55317
PATRICK J & MICHELLE M MURPHY
934 KELLY CT
CHANHASSEN MN 55317
DAVID Y & YEAN LING L CHUA
905 KELLY CT
CHANHASSEN MN 55317
ASHLEY G STORM
942 KIMBERLY LN
CHANHASSEN
MN 55317
SUZANNE B SONDUCK
930 KELLY CT
CHANHASSEN MN
55317
TERRY J & JUDITH L WHITMORE
909 KELLY CT
CHANHASSEN MN 55317
TIFFANY E QUICK
948 KIMBERLY LN
CHANHASSEN
MN 55317
BRYAN D & SARAH K PRESCHER
926 KELLY CT
CHANHASSEN MN 55317
KATHLYN J ANLAUF
913 KELLY CT
CHANHASSEN MN
55317
CHARLES D & MARY H EITEL
952 KIMBERLY LN
CHANHASSEN MN 55317
DEAN R JOHNSON CONSTR INC
20170 75TH AVE N
HAMEL MN 55340
PAUL O & CATHERINE H JACKSON
917 KELLY CT
CHANHASSEN MN 55317
RONALD D CORDIE &
956 KIMBERLY LN
CHANHASSEN MN
JAYME J K
55317
DEAN RJOHNSO~,GONSTR INC
20170 75TH..,A,.V.E~
HAME.~~ MN 55340
GARY E UECKE
915KIMBERLY LN
CHANHASSEN
MN 55317
OAK PONDS HOMEOWNERll;/KlgflIq'IES
2815 WAYZATA BLVD
MINNEAPOLIS MN 55405
DONALD R RYE
957 SANTA VERA DR
CHANHASSEN MN
55317
CONSTANCE L COOK
939 SANTA VERA DR
CHANHASSEN MN
55317
DONALD R CONDON III
977 SANTA VERA DR
CHANHASSEN MN
55317
NEIL M MONSON &
959 SANTA VERA DR
CHANHASSEN MN
LEAH G PR
55317
MARK A & SANDRA L BERGER
923 SANTA VERA DR
CHANHASSEN MN 55317
MARK A HEYER &
979 SANTA VERA DR
CHANHASSEN MN
BRENT T
55317
BRENDA ANN SMIEJA
961 SANTA VERA DR
CHANHASSEN MN
55317
JOSHUA J NICHOLS &
925 SANTA VERA DR
CHANHASSEN MN
JACQUEL
55317
CHERYL L STOCK
981 SAANTA VERA DR
CHANHASSEN MN
55317
LONNY K WILKiNSON &
945 SANTA VERA DR
CHANHASSEN MN
MELISSA
55317
BETH A TRAVER
927 SANTA VERA DR
CHANHASSEN MN
55317
VAHID S & SANAZ SAMIE
983 SANTA VERA DR
CHANHASSEN MN 55317
SUSAN G CONZET
947 SANTA VERA DR
CHANHASSEN MN
55317
SHELLEY E MEHL
929 SANTA VERA DR
CHANHASSEN MN
55317
SANG CAM & NHI THE KY
2711 LONGACRES DR
CHANHASSEN MN 55317
JOHN E & MICHELLE D LiNDEN
949 SANTA VERA DR
CHANHASSEN MN 55317
PANKAJ K SARMA
911 SANTA VERA DR
CHANHASSEN MN
NAMITA
55317
CYNTHIA L YORKS
969 SANTA VERA DR
CHANHASSEN MN
55317
LARRY A ZAMOR
951 SANTA VERA DR
CHANHASSEN MN
55317
PETER & MOLLY GARBERG
913 SANTA VERA DR
CHANHASSEN MN 55317
LURETTA LARSON
971 SANTA VERA DR
CHANHASSEN MN
55317
ANDREW T ALTHAUSER & CHRISTIN
8533 CHANHASSEN HLS
CHANHASSEN MN 55317
PATRICIA M HAUCK
915 SANTA VERA DR
CHANHASSEN MN
55317
DEBBIE A JANZEN
973 SANTA VERA DR
CHANHASSEN MN
55317
JEANNE H ETEM
935 SANTA VERA DR
CHANHASSEN MN
55317
BRIDGET MCMAHON
917 SANTA VERA DR
CHANHASSEN MN
55317
RORY LUCK &
955 SANTA VERA DR
CHANHASSEN MN
JODY C HI
55317
JEFF R CROWELL
937 SANTA VERA DR
CHANHASSEN MN
55317
RODNEY A BROWN
7717 NICHOLAS WAY
CHANHASSEN MN
55317
KIMBERLY J BAKER
7719 NICHOLAS WAY
CHANHASSEN MN
55317
CARY J & KRISTINE K BEIL
7707 NICHOLAS WAY
CHANHASSEN MN 55317
CITY OF CHANHASSE~--~'~ C/O SCOT ·
690 CITY CEN.T~R~D~~'-
PO BOX 14.~y~~
CHAN~xSS SEN MN 55317
CHERYL K ESTES
7721 NICHOLAS WAY
CHANHASSEN MN
55317
DARCY P JOSLiN
7693 NICHOLAS WAY
CHANHASSEN MN
55317
DANIEL P & NORA L FLAHERTY
7677 NICHOLAS WAY
CHANHASSEN MN 55317
CHARLES A & MARTHA V WALKER
7723 NICHOLAS WAY
CHANHASSEN MN 55317
DANIEL S & TRINIDAD B SANCHEZ
7695 NICHOLAS WAY
CHANHASSEN MN 55317
STEVEN J & TERESA R LABERGE
7679 NICHOLAS WAY
CHANHASSEN MN 55317
ELIZABETH CARLSON
7709 NICHOLAS WAY
CHANHASSEN MN
55317
SCOTT L GREBE &
7697 NICHOLAS WAY
CHANHASSEN MN
KRISTiN F
55317
BRIAN J KJESBO
7681 NICHOLAS WAY
CHANHASSEN MN
55317
JEFFREY A & DEBRA L MILLER
7711 NICHOLAS WAY
CHANHASSEN MN 55317
HELEN C BOLDEN
7699 NICHOLAS WAY
CHANHASSEN MN
TRUSTEE
55317
OAK HILL HOIVi~[S ASSN
8984 ZAC~NN STE
OSSE~ MN 55369
ERIC D & ANNA M KIRSLING
7713 NICHOLAS WAY
CHANHASSEN MN 55317
LAURIE A GILK
7685 NICHOLAS WAY
CHANHASSEN MN
55317
DEAN R JOHNSON CO~,$-TR INC
20170 75TH AV.F.~N'~
HAr~,~"~' MN 55340
KELLY E SHAW
7715 NICHOLAS WAY
CHANHASSEN MN
55317
RYAN M CLARK &
7687 NICHOLAS WAY
CHANHASSEN MN
VISHNU T
55317
ECKANKAR
PO BOX 27300
GOLDEN VALLEY
MN 55427
ALVIN J KREMER &
7701 NICHOLAS WAY
CHANHASSEN MN
JEFFREY
55317
JAMES R LOWELL
7689 NICHOLAS WAY
CHANHASSEN MN
55317
T F JAMES COMPANY
PO BOX 560
EXCELSIOR MN
55331
DOUGLAS PFANSTIEL
7703 NICHOLAS WAY
CHANHASSEN MN
55317
MONICA J HANLEY
7691 NICHOLAS WAY
CHANHASSEN MN
55317
T F JAMES
E E §IOR MN
55331
HAROLD K & VIRGINIA E LAMSON
7705 NICHOLAS WAY
CHANHASSEN MN 55317
OAK HILL HOMEOWNERS ASSN
8984 ZACHARY LN N STE
OSSEO MN 55369
T F JAMES COMP~gzN¥~
PO BOX~J,60
EX~F~L~S i 0R MN
55331