2 SPR Stone Creek Office Bldg.CITY OF STAFF REPORT DATE: 04/19/00 DATE: 05/08/00 EVIEW DEADLINE: 05/17/00 By: Kirchoff PROPOSAL: LOCATION: i~.' APPLICANT: A request for: (1) a Rezoning of 3.98 acres from A2, Agricultural Estate to lOP, Industrial Office Park; ' (2) a Site Plan Review for a 10,270 sq. fi. office building; (3) a Variance from the re. quirement that 100 percent of property within the Bluff Creek .. Overlay District Primary Zone remain open space; (4) a Conditional Use Permit to construct a structure within the Bluff Creek Overlay District; (5) a 37 foot Variance from the 50 foot setback required when office use abuts a residential use; and (6) a 9 stall Variance from the parking requirements for offices uses. The southwest comer of the Coulter Blvd. and Stone Creek Drive M. J. Gorra 1680 Arboretum Blvd. Chanhassen, MN 55317 (474-7124) lxl 2020 LAND USE PLAN: Office/Industrial and Open Space ACREAGE: 3.98 acres FLOOR AREA RATIO: .05 SUMMARY OF REQUEST: The applicant is seeking approval of a site plan to construct a 10,270 sq. ft. office building on land designated for this use. The site is located within the Bluff Creek Primary District and HC-2 Overlay District. Notice of this public hearing has been mailed to all property owners within 500 feet. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has a relatively high level of discretion in approving rezonings, PUDs, and amendments to PUDs because the City is acting in its legislative or policy-making capacity. A rezoning or PUD, and amendment thereto, must be consistent with the City's Comprehensive Plan. The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. ~- 8 CHICORY WAY _~. 9 POPPY DR · 10 BLUE SAGE LN E =L 11 WATERLEAF LANE E ' ' ' I .~''''' 12LADYSLIPPERLANE ,~1 14 BLUESAGE LN W 15 WATERLEAF LANE W 16 SNAPDRAGON DR Harvest Lane 2 Harvest ~ay 3 Autumn Ave~uc Coulter Blvd I ~'~ber Nooc Dr ~'0 15 ~ Highway .h / / M~lynn D Coulter Blvd -O, ourt Stone Creek Office Building April 12, 2000 Page 2 The City's discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi-judicial decision. The City has limited discretion in approving or denying conditional use permits, based on whether or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the City finds that all the applicable conditional use permit standards are met, the permit must be approved. This is a quasi-judicial decision. PROPOSAL/SUMMARY The applicant is requesting the rezoning of 3.98 acres to IOP, Industrial Office Park from A-2, Agricultural Estate District to construct a 10,270 sq. ft. office building. The requested rezoning is consistent with the comprehensive plan. The entire property is located within the Primary Zone of the Bluff Creek Overlay District, thus requiring a variance from the requirement that open space shall comprise 100 percent of the primary zone of the Bluff Creek Overlay District. A conditional use permit is necessary to construct a building in this district. Further, a variance is requested from the 50 foot minimum setback required when lOP property abuts a residential district. The proposed parking and drive aisle, as well as the building do not meet the required setback. The proposed number of parking stalls does not meet the minimum required by the parking ordinance. The parcel is located within the HC-2, Highway 5 Overlay District. This property is a renmant piece left from the construction of Coulter Blvd. The proposed office building is residential in character and is located on the high point of the property, the only "buildable" portion. The building is to be constructed of E.I.F.S. and face brick with neutral colors. The parcel is north of Timberwood Estates (RR, Rural Residential), south of Bluff Creek Corporate Center (PUD, Planned Unit Development), east of a vacant parcel (Parks and Open Space) and west of Townhomes at Creekside (PUD-R, Planned Unit Development, Residential). Staff recommends approval of the application subject to the conditions outlined in this report. BACKGROUND This parcel is a remnant piece. When Coulter Blvd. was constructed this piece was separated from the parcel to the north. The site has utility services extended so development was intended. A storm water pond was placed on the site adjacent to an ag/urban wetland. The wetland will not be altered with this development. Stone Creek Office Building April 12, 2000 Page 3 ANALYSIS REZONING The applicant proposes to rezone the parcel from A-2 to IOP. The land use map designates this site as Office/Industrial. The requested change is consistent with the comprehensive plan. SITE PLAN REVIEW The proposed 10,270 sq. ft building is located at the intersection of Coulter Blvd. and Stone Creek Drive. The building is situated on the highest elevation of the site. Access is gained via Coulter Blvd. and Stone Creek Drive. Parking is located to the north and east of the proposed building. The proposed office building is a one-story, walk out. The proposal is residential in character with prairie style architecture. The pitched roof with large eaves blends harmoniously with the adjacent residential to the south and east. Also, the height of the office building is in keeping with the nearby single-family homes and townhomes. The building height is 23 feet along the north and east. Along the south and west, the walk-out elevation, the building is 33 feet. Note: The height of the building is measured fi'om grade to the top of the roof. Typically, the height is measure to mid-roof. The building will be composed of EIFS (neutral in color) and a base of face brick (color to complement EIFS) with colored insulated glass windows (light green tint). Cultured stone frames the two entrances. The roof will be covered with heavyweight fiberglass shingles, with a "Bermuda Shingle Technique" to create a shadow line effect. The chimney will be constructed of cultured stone. The building has an ample supply of windows, which will be supported by stone sills. The design calls for a patio/balcony on the southern elevation, which is directed toward the wetland and wooded area. The trash enclosure is located on the southern portion of the site, along the drive aisle. The plans do not indicate its exterior material, however, a condition of approval requires that the trash enclosure be compatible in materials with the primary structure. Overall, the design is high quality and compatible with the surrounding uses. FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; Stone Creek Office Building April 12, 2000 Page 4 (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas; (4) Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the comprehensive plan and the zoning ordinance subject to conditions outlined in this staff. The site's existing natural amenities are preserved on the western portion of the parcel. The design is compatible and harmonious with the approved office developments throughout the city and adjacent residential uses. The building, landscaping and parking lot are appropriately designed. Stone Creek Office Building April 12, 2000 Page 5 BLUFF CREEK OVERLAY DISTRICT The intent of the Bluff Creek Overlay District is to allow development that blends in with the natural environment while protecting Bluff Creek and creating an interconnected open space network for wildlife and people. According to maps on file with the City, all but the extreme northeast comer of the parcel is located within the primary zone. The district requires the 100 percent preservation of the natural features in the primary zone and a 40 foot setback from the edge of this zone. In order for the property owner to have a reasonable use of the property, a variance must be granted from Sec. 20-1563, which states, "Open space shall compromise' 100 percent of the area located within the Primary Zone." Without relief from the ordinance, this parcel could not be utilized. (Note: Since the parcel is within the Primary Zone, a density transfer is not possible.) VARIANCE - FINDINGS The Board of Adjustments and Appeals shall not recommend and the City Council shall not grant a variance unless they find the following facts: That the literal enforcement of this chapter would cause an undue hardship. Undue hardship means that the property cannot be put to reasonable use because of its size, physical surroundings, shape or topography. Reasonable use includes a use made by a majority of comparable property within 500 feet of it. The intent of this provision is not to allow a proliferation of variances, but to recognize that there are pre-existing standards in this neighborhood. Variances that blend with these pre-existing standards without departing downward from them meet this criteria. be The conditions upon whicha petition for a variance is based are not applicable, generally, to other property within the same zoning classification. The purpose of the variation is not based upon a desire to increase the value or income potential of the parcel of land. d. The alleged difficulty or hardship is not a self-created hardship. The granting of the variance will not be detrimental to the public welfare or injurious to other land or improvements in the neighborhood in which the parcel is located. The proposed variation will not impair an adequate supply of light and air to adjacent. property or substantially increase the congestion of the public streets or increase the danger of fire or endanger the public safety or substantially diminish or impair property values within the neighborhood. Stone Creek Office Building April 12, 2000 Page 6 Finding: The literal enforcement of the ordinance creates a hardship. The requirement that the site remain 1 O0 percent open space precludes development of the site. Without relief from the ordinance, the property owner will not have a reasonable use of the property. In addition, a conditional use permit is required prior to the construction of any structure within the Bluff Creek Overlay district. CONDITIONAL USE PERMIT - FINDINGS The Planning Commission shall recommend a conditional use permit and the council shall issue such conditional use permits only if it finds that such use the proposed location: 1. Will not be detrimental to or damage the public health, safety, comfort, convenience or general welfare of the neighborhood of the city. 2. Will be consistent with the objectives of the city's comprehensive plan and this chapter. o Will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. 4. Will not be hazardous or disturbing to existing or planned neighboring uses. Will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. 6. Will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. Will not involve uses, activities, processes, materials, equipment and condition of operation that w/Il be detrimental to any persons, property or the genera/welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. 8. Will have vehicular approaches to the property that do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. 9. Will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. 10. Will be aesthetically compatible with the area. 11. Will not depreciate surrounding property values. Stone Creek Office Building April 12, 2000 Page 7 12. Will meet standards prescribed for certain uses as provided in this article. Findings: The office use is consistent with the comprehensive plan. This type of use is the least intrusive of any use permitted in the lOP district. An office also provides a transition from more intensive uses to the north in the Bluff Creek Corporate Center. The structure is compatible in appearance with neighboring uses and is served adequately by public infrastructure. The site plan indicates appropriate vehicular approaches. The proposed structure will not depreciate surrounding property values. HC-2 OVERLAY DISTRICT The proposed development is located within the Highway 5 corridor (HC-2) and must comply with the following design standards: 1. Parking and build!ng orientation: The site plan meets this standard. The HC-2 district requires a minimum 50 foot setback for structures abutting the access boulevards parallel to Hwy. 5. 2. The architectural design standards: The materials and details of the building are consistent with the Hwy. 5 standards. The project incorporates E.I.F.S. and brick exterior with a pitched roof. The overall design and architectural theme is "Prairie Style" with a low pitched roof and elongated eaves. The proposed office building meets the height requirement. The building height is limited to 4 stories or 50 feet in the IOP District. The HC-1 District permits a 3 story or 40 foot structure. The proposal is a one-story, walk out with an average of 28 feet of height. The project incorporates the use of high quality materials in both the building and landscaping. The site design is such as to avoid the accumulation of trash, leaves and dirt. The building components are proportional and relate well to one another. Building colors are harmonious and create a pleasant aesthetic experience. The refuse container is located appropriately. However, landscape screening is required from adjacent properties. Stone Creek Office Building April 12, 2000 Page 8 3. Landscape Design and Site Furnishings: The landscaping plan is designed appropriately for the site. IOP DISTRICT STANDARDS TABLE 1 A COMPARISON OF STONE CREEK OFFICE BUILDING TO ORDINANCE REQUIREMENTS Building Height lOP HC-2 Setbacks North (Front Yard) Structure Parking South (Resid. Property) Structure Parking East (Side Stree0 Structure Parking West (interior) Structure Parking Parking Wetland Setback Floor Area Ratio (FAR) Impervious Surface Lot Area Required 4 stories/50 feet 3 stories/40 feet Proposed 28 feet (average) 30 feet/50 feet (HC-2) 60 feet 30 feet or 10 feet* 10 feet 50 feet 41 feet** 50 feet 13 feet** 30 feet 60 feet 25 feet or 10 feet 10 feet 10 feet 477 feet +/- 10 feet 445 feet +/- 46 Stalls 37 Stalls 40 feet + 10 foot buffer 40 feet (average) None specified .06 70 Percent Not shown 1 acre 3.98 acres *The zoning ordinance permits a reduction of a setback along public rights-of-way to 10 feet, provided 100 percent screening is demonstrated 5 feet above the parking area. **Variances required The proposal does not meet the 50 foot setback required when lOP property abuts residentially zoned property; therefore, a variance is required to construct this site plan. The buildable area of the site is limited due to topography. The upland area is constricted to the eastern portion of the site. The site slopes to the west, with the highest elevation of 938 feet at the eastern property line and 917 near the center of the site. A storm water pond is located 180 feet from the eastern property line. Stone Creek Office Building April 12, 2000 Page 9 The zoning ordinance requires a 50 foot setback from the property line abutting Coulter Blvd. and a 50 foot setback from the property line abutting Timberwood Estates on the south. Furthermore, a setback is required from the eastern property line and a 10 foot distance should be maintained from the sanitary sewer line running parallel to the utility pond. These setbacks in addition to the existing topography make it difficult to position an attractive building and necessary parking on the site. It is appropriate to locate the parking adjacent to the street and the building on the slope. In addition, the proposal is deficient nine parking stalls. The zoning ordinance requires four and one-half parking stalls per 1,000 sq. fi. of gross floor area for office uses. The applicant utilized five per 1,000 sq. fi. of rentable area to obtain the required number of spaces. The northern portion of the lower level is crawl space. Since this area cannot be utilized for office space, parking should not be required for this portion of the building. The deficiency requires a variance. Staff is recommending approval of this variance with the condition that the northern portion of the lower level never be utilized as office space. Should this be used as such in the future, additional parking must be provided. VARIANCES - FINDINGS The Board of Adjustments and Appeals shall not recommend and the City Council shall not grant a variance unless they find the following facts: That the literal enforcement of this chapter would cause an undue hardship. Undue hardship means that the property cannot be put to reasonable use because of its size, physical surroundings, shape or topography. Reasonable use includes 'a use made by a majority of comparable property within 500 feet of it. The intent of this provision is not to allow a proliferation of variances, but to recognize that there are pre-existing standards in this neighborhood. Variances that blend with these pre-existing standards without departing downward from them meet this criteria. bo The conditions upon which a petition for a variance is based are not applicable, generally, to other property within the same zoning classification. Co The purpose of the variation is not based upon a desire to increase the value or income potential of the parcel of land. d. The alleged difficulty or hardship is not a self-created hardship. eo The granting of the variance will not be detrimental to the public welfare or injurious to other land or improvements in the neighborhood in which the parcel is located. The proposed variation will not impair an adequate supply of light and air to adjacent property or substantially increase the congestion of the public streets or increase the danger of fire or endanger the public safety or substantially diminish or impair property values within the neighborhood. Stone Creek Office Building April 12, 2000 Page 10 Finding: The literal enforcement of the ordinance creates a hardship. The required setbacks and the topography limit the location ora structure and parking on the site. Without relief from the ordinance, the property owner will not have a reasonable use of the property. WETLAND An ag/urban wetland is present to the west and south of the existing storm water pond. The ordinance requires a 40 feet setback from the edge of the buffer. The buffer can range between 0- 20 feet, with an average of 10 feet. According to the site plan, the structure meets the required setback. This wetland will not be impacted by the development. GRADING No detailed grading plan was submitted for review; however, staff anticipates the parcel will need to be graded for development for the office building, parking lot and utilities. The existing site conditions range in elevation from 939 in the northeast coruer of the property to 918 along the wetlands in the westerly portion of the site. During construction of Coulter Boulevard fill material was placed on the site. Site grading will involve leveling the site to an elevation of 932.0+ for the parking lot. The building is proposed with a walkout level; therefore, should conform fairly well to the existing terrain. Since no building elevations were provided, .staff will recommend that the lowest floor elevation of the building be a minimum of two feet above the high water level of the stormwater pond (per city ordinance) which is 922. Therefore, the lowest floor elevation must be a minimum of 924.0. Staff does not believe any earthen material will need to be exported or imported to the site based on proposed spot elevations on the parking lot. However, should material need to be imported or exported, the applicant should be aware that if the material is to be deposited in another location in Chanhassen it will require an earthwork permit from the city. In addition, a detailed haul route will also need to be submitted to the city for review and approval. Retaining walls are proposed along the parking lot on the westerly and southerly sides of the parking lot. Top and bottom elevations of the walls need to be shown on the grading plans to determine whether or not the wall will need to be engineered (retaining walls in excess of four feet in height need to be engineered and a separate building permit applied for). It is difficult to tell if the existing power poles which parallel the easterly property line will be affected by site development. The power pole/line may need to be relocated or adjusted due to the proposed access from Stone Creek Drive. The developer shall be responsible for any and all coordination and adjustments to the power pole/line. A detailed grading, drainage and erosion control plan with proposed and existing two-foot contours and showing existing site conditions shall be submitted prior to this item being considered before the City Council. Stone Creek Office Building April 12, 2000 Page 11 Typically along collector roads berming is required to provide screening for the parking lot improvements. Given the site configuration, staff is recommending that screening be accomplished by landscaping in lieu of berming. The city does have boulevard tree plantings along Coulter Boulevard. These trees appear not to be impacted by site development. It may be possible to work with the developer in increasing the plantings along Coulter Boulevard as well as Stone Creek Drive to achieve the desired screening of the parking lot as long as sight lines and snow storage areas are not jeopardized. DRAINAGE For the most part, the site sheet drains toward the city's stormwater pond located in the westerly portion of the site. The plans propose for the parking lot drainage to be collected by catch basins in the parking lot and conveyed via storm sewer to the city's stormwater pond for pretreatment prior to discharging off site. No additional ponding improvements will be necessary with this site plan proposal since the site will be draining into the existing pond. Staff does recommend the applicant provide the city with detailed stormwater drainage calculations for a 1 O-Year and 100-year, 24-hour storm event for the storm drainage system to insure the number of catch basins and pipe sizes are adequate. The storm sewer outlet pipes shall be designed with a maximum discharge rate of 5 cfs. This may reqUire deeper catch basin structures or additional drop manholes prior to discharging runoff into the city's stormwater pond. SWMP The parcel has not been assessed for storm drainage improvements. Although this is not a subdivision, staff recommends the applicant be responsible for surface water management fees (SWMP) in accordance with city 0.rdinance. The site overall is approximately 4.0 acres; however, most of the site is encumbered by wetlands and stormwater pond. Staff estimates a net developable acreage of one acre. Based on the land use of office/industrial the rate per acres is $4,360 for stormwater quantity and $4,633/acre for water quality. These fees are payable at time of building permit issuance. UTILITIES Municipal sanitary sewer and water service are available to the property. Water services have been extended from Coulter Boulevard to the property line. The city's sanitary sewer line intersects the property along the south and westerly portion of the proposed building site. The applicant will need to connect into the city's trunk sewer line for service. The city will require the applicant to obtain the appropriate sewer and water connection permits and fees in conjunction with site development. All proposed utility improvements on the site will be privately owned and maintained upon completion. All utility improvements shall be installed in accordance with the City's 2000 Standard Specifications and Detail Plates and/or State of Minnesota Plumbing Code. Stone Creek Office Building April 12, 2000 Page 12 According to a search of the assessment history of this parcel the property was not previously assessed for sanitary sewer, storm sewer and water or street improvements in conjunction with the Coulter Boulevard and Bluff Creek trunk improvement projects. The assessments for sewer and water were deferred until development occurs. Based on the proposed land use (office commercial/industrial), residential equivalent units (REUs) are applied at a rate of four units per acre. The 2000 sanitary sewer hookup charges and connection charges are $1,300/REU and $4,075/REU, respectively. The 2000 water hookup and connection charges are $1,694/REU and $4,075/REU, respectively. Based on the net developable acreage of the site (one acre), the applicant will be responsible for sewer and water hookup and connection charges in the amount of $44,576.00. These fees are collected at time of building permit issuance and may be specially assessed against the property. On a footnote, should the Metropolitan Environmental Commission determine the building will generate more that four SAC units, the number of hookup and connection charges will also increase proportionately. The site plan should be revised to indicate the invert and top of manhole structure on all sewer and storm sewer lines to determine if the lines have sufficient cover and if there will be any impacts with existing infrastructure. STREETS The site is proposed to be accessed from Stone Creek Drive and Coulter Boulevard. Stone Creek Drive is constructed with a 36-foot wide, face-to-face, residential collector-type street with street lighting, boulevard landscaping and sidewalk. There is also sidewalk on the east and west side of Stone Creek Drive which is not shown on the plans. The plans need to incorporate the existing six-foot wide sidewalk along the west side of Stone Creek Drive and provide pedestrian ramps at the driveway curb cuts. Coulter Boulevard is also 36-foot wide, but commercial-type street section and is listed as a collector street in the city's comprehensive plan and Minnesota State Aid (MSA) route street. According to city ordinances, driveway locations on collector roads shall be minimized whenever feasible. Staff is recommending that the driveway entrance onto Coulter Boulevard be eliminated. Staff believes that the property can be accommodated with only one curb cut on Stone Creek Drive. Staffhas reviewed the parking lot configuration and finds them fairly well designed and in general accordance with city ordinances with the exception of the driveway radiuses onto Stone Creek Drive. They need to be expanded from 10 feet to 20 feet. The parking lot pavement and drive aisles must be designed to accommodate 7-ton per axle weight design per city ordinance. The applicant will need to have a soils engineer recommend a pavement design to accommodate the 7~ton per axle design requirements based on soil conditions experienced on the site. The driveway entrance onto Stone Creek Drive will need to incorporate the city's industrial driveway detail No. 5207 and pedestrian ramps for the existing sidewalk. The property does not have easements or right-of-way recorded for Coulter Boulevard, storm drainage ponds or sanitary sewer. The owner (previous) petitioned the city for the improvements and signed a waiver of trespass agreement to construct the improvements. The intent was for the property owner to dedicate the necessary right-of-way and utility improvements in conjunction Stone Creek Office Building April 12, 2000 Page 13 with final platting of the property. However, since this property was created in conjunction with the Coulter Boulevard project, no subdivision or final plat was needed to develop the site. Therefore, staff is requesting the applicant/owner dedicate the necessary street right-of-way for Coulter Boulevard, sanitary sewer line and stormwater pond. The city shall prepare the necessary legal description and easement agreement for the applicant to execute. In conjunction with Coulter Boulevard construction, none of the adjacent properties were compensated for right-of- way or utility and drainage easements as part of the project. If the properties would have been, the assessments for street and utility would have been higher essentially reassessed against the property anyway. EROSION CONTROL The plans do not propose any erosion control measures. The site plan and grading plan will need to incorporate erosion control measures around the perimeter of the construction limits. In addition, a rock construction entrance will be needed off of Stone Creek Drive at the access point to the site. LANDSCAPING The minimum requirements for landscaping include a 1,263 sq. ft. landscaped area around the parking lot, five trees for the parking lot, complete screening of the parking lot and bufferyard plantings along the north, east and south property lines. The west property line abuts park property and no buffer plantings are required. A comparison between the proposed landscape plan and ordinance requirements is depicted in the following table. TABLE 2 PROPOSED LANDSCAPING FOR STONE CREEK OFFICE BUILDING COMPARED TO ORDINANCE REQUIREMENTS Vehicular use landscape area Trees/parking lot Required Proposed 1,263 sq. ft. >1,263 sq. ft. 5 overstory trees 5 overstory trees Boulevard trees- Coulter Blvd. North prop. line - buffer yard B* (25' width) - Coulter Blvd. 1 tree per 30 feet 2 overstory trees 4 understory trees 8 shrubs existing trees planted by City 2 overstory trees 5 understory trees 24 shrubs South prop. line- Buffer yard C* - Timberwood Dev. East prop. line - overstory trees understory trees shrubs 1 overstory trees Existing vegetation, feet from building to property line, existing wetland 1 overstory tree Stone Creek Office Building April 12, 2O00 Page 14 Buffer yard B* I2 underst°ry trees I 4 underst°ry trees I Stone Creek Drive 4 shrubs J 8 shrubs *Shown is 75% of the total required plantings. According to city buffer yard ordinance, the project developer is responsible for only 75% of the required plantings. Abutting property owners may plant the remaining 25% on their property. The proposed landscape plan meets or exceeds all minimum landscaping requirements, except for the 100 percent screening required of the parking lot. As proposed, much of the parking lot is visible from Coulter Blvd. and Stone Creek Drive. The applicant will need to increase screening in order to meet ordinance requirements. Staff believes no buffer planting should be required for the southern property line since there is a substantial distance, existing vegetation and a wetland between the proposed building and the existing homesin the Timberwood development. The plan shows 12 overstory trees, 4 evergreens and a number of shrubs along the property line without the requirement. SIGNAGE/LIGHTING The lighting plan indicates three freestanding fixtures in the parking lot and' two wall-mounted fixtures above the entrances. The light poles are proposed to be 20 feet in height. The lighting meets ordinance requirements including fixture shielding, height and maximum illumination at the property line. However, the plan does not indicate existing light fixtures along Coulter Blvd. and Stone Creek Drive. The ordinance requires that all existing fixtures that may impact on the site be shown on the lighting plan. PARK AND TRAIL FEES The applicant shall pay full park and trail fees at the time of building permit. RECOMMENDATION Staff recommends the Planning Commission adopt the following motions: "The Planning Commission recommends approval of the rezoning (REZ#00-1) of 3.98 acres from A-2, Agricultural Estate to IOP, Industrial Office Park." "The Planning Commission recommends approval of the site plan (SPR #00-6) for a 10,270 sq. ft. office building, a variance from the requirement that 100 percent of property within the Bluff Creek Overlay District Primary Zone remain open space, a 37 foot variance from the 50 foot setback required when office use abuts a residential use, and a 9 stall variance from the parking requirement for office uses, subject to the following conditions: The applicant shall enter into a site plan agreement with the city and provide the necessary financial security to guarantee erosion control, site restoration, utility connections, driveway access and landscaping. Stone Creek Office Building April 12, 2000 Page 15 All boulevard trees along Coulter Boulevard shall be preserved and guaranteed by the applicant. If any trees need to be removed in conjunction with site grading or utility installation, they must be replaced elsewhere on Coulter Boulevard and guaranteed for one growing season after the construction has been completed. ge Protective tree fencing or erosion control fencing shall be installed along the boulevard to protect the trees from construction activities. Landscaping may be placed within the Stone Creek Drive boulevard area as well as portions of Coulter Boulevard to assist screening the parking lot. A landscaping plan will need to be reviewed and approved by engineering prior to any landscaping being installed. Se The site plan and grading plan should include the existing six-foot wide concrete sidewalk along the west side of Stone Creek Drive and any power poles and street lights to determine potential impacts to the existing infrastructure. The site plan shall also include rim and invert elevations, size, type and grade of utility pipes. A detailed grading, drainage and erosion control plan including the lowest floor and first floor building elevations needs to be submitted prior to this item being considered by the City Council. All private utilities shall be constructed in accordance with the city's latest edition of Standard Specifications and Detail Plates and/or the State Plumbing Codes. Installation of the utilities will require a building permit through the city's building department. All retaining walls in excess of four feet in height will also need to be engineered and permits obtained through the city's building department. o An encroachment agreement will be necessary for any structures and/or the parking lot that fall within the proposed drainage and utility easement for the sanitary sewer line. This document shall be recorded against the property. All disturbed areas as a result of construction activities shall be immediately restored with seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each construction activity in accordance with the city's Best Management Practice Handbook. 9. The applicant shall provide detailed storm sewer calculations and drainage area map for 1 O-year and 100-year 24-hour storm events prior to issuance of a building permit. 10. The applicant shall apply for, obtain permits from the appropriate regulatory agencies, i.e. Watershed District, Minnesota Department of Health, and comply with their conditions of approval. 11. Driveway access onto Coulter Boulevard shall be prohibited. Access to the site shall be limited to Stone Creek Drive. The plans shall incorporate the city's industrial driveway detail plate and construct pedestrian ramps. Stone Creek Office Building April 12, 2000 Page 16 12. The applicant shall be responsible for surface water management fees in the amount of $8,993.00. These fees shall be collected at time of building permit issuance. 13. The applicant shall be responsible for sewer and water hookup and connection fees based on four REUs unless the Metropolitan Environmental Commission estimates more than four SAC units. The applicant will be charged these fees at time of building permit issuance. The hookup and connection fees may be specially assessed. 14. The applicant will need to have a soils engineer recommend a pavement design to accommodate the 7-ton per axle design requirements based on soil conditions experienced on the site. 3.5. 16. 17. 18. 19. 20. 21. 22. 23. The applicant/owner shall dedicate the necessary street right-of-way for Coulter Boulevard, sanitary sewer line and stormwater pond. The city shall prepare the necessary legal description and easement agreement for the applicant to execute. The northem one-half of the lower level shall not be utilized for leasable office space. The lighting plan shall incorporate existing light fixtures along Coulter Blvd. and Stone Creek Drive that may impact the site. Landscaping shall be increased around the parking lot to provide 100 percent screening of the area. The trash enclosure shall be constructed of materials compatible with the primary structure. Further, it shall be screened from adjacent properties on the west, south and east elevations with landscaping. The building is required to be protected with an automatic fire sprinkler system. Detailed occupancy related requirements will be reviewed when complete plans are submitted. Two accessible parking spaces are required for the thirty-six spaces that are provided. The fire marshal's conditions are as follows: a. Submit utility plans showing fire hydrant locations for review and approval. bo Submit radius turn plans to City Engineer and Chanhassen Fire Marshal for review and approval. Co Comply with Chanhassen Fire Department Policy regarding notes to be included on all site plans. Pursuant to Policy #04-1991. Copy enclosed. Stone Creek Office Building April 12, 2000 Page 17 24. Full park and trail fees shall be paid at the time of building permit. "The Planning Commission recommends approval of the conditional use permit (CUP# 00-1) for the construction of a building within the Bluff Creek Overlay District." Attachments 2. 3. 4. 5. 6. Application Memo from David Hempel dated April 13, 2000 Memo from Steven Torell dated April 10, 2000 Memo from Mark Litfin dated April 12, 2000 Site Plan Public Heating Notice Stone Creek Office Building April 12, 2000 Page 18 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION Application of M.J. Gorra Rezoning On April 19, 2000, the Chanhassen Planning Commission met at its regularly schedule meeting to consider the application of M. J. Gorra for rezoning property from A-2, Agricultural Estate to lOP, Industrial Office Park. The Planning Commission conducted a public hearing on the proposed rezoning preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 2. 3. 4. The property is currently zoned A-2, Agricultural Estate District The property is guided in the Land Use Plan for Office/Industrial and Open Space. The legal description of the property is: see Exhibit A The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse affects of the proposed amendment. The six (6) affects and our findings regarding them are: The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. b) The proposed use is or will be compatible with the present and future land uses of the area. Stone Creek Office Building April 12, 2000 Page 19 e) The proposed use conforms with all performance standards contained in the Zoning Ordinance. The proposed use will not tend to or actually depreciate the area in which it is proposed. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f) Traffic generation by the proposed use is within capabilities of streets serving the property. The planning report #s REZ 00-1, SPR 00-6 and CUP 00-1 dated March 16, 2000, prepared by Charles Radloff, Architects and Planners is incorporated herein. RECOMMENDATION rezoning. The Planning Commission recommends that the City Council approve the ADOPTED by the Chanhassen Planning Commission this __ day of ,2000. CHANHASSEN PLANNING COMMISSION ATTEST: BY: Its Chairman Secretary g:\plan\ck\plan commXstone creek office bldg. 00-6 spt.doc T-'O o b 242-474-7124 That part of the North Half of the Northwest Quarter, Sectiotl 15, Township 116, Range 23, Carver County,. Minnesota described as follows: Commencing at intersection of the south line said North Half of the Northwest Quarter with the cer~terline of County State. Aid Highway No. ] 9 fllence North 89 degree, 30 minutes 44 seconds East, assumed basis for bearings, along soath line of said North Half of the Northwest Quarter, 1809.45 feet to .the actual point of beginning; thence North I0 degrees 59 minutes 16 seconds West 281.71 feet; thence easterly 194.00 feet along a non-tangential curve, concave ;o the south, having a radius of 450.00 feet, a central angle of 24 degrees 42 minutes 01 seconds, m~d a chord wl~ich bears North 87 degrees 11 minute, 20 seconds East; thence South 80 degrees 27 minutes :39 seconds East 530.54 feet, to the east line of said North Half of the Northwest Quarter; thence South 02 degrees 26 minutes 25 seconds ] 92.531 feet, along said east line, to the south line of said Northwest Quarter thence South 89 degrees _30 minutes 44 seconds West 670.00 fee~, along smd south l~ne to the point of beginning. 02/28/00 10:28 FAX 612 937 5739 ............ CITY 002 CiTY OF CHANi-IASSEN 690 COULTER DRIVE CHANHASSEI~,'MN -55317 (612) 937-1900 DEVELOPMEN3: RE~IL=W ABEUCA::['iQN V/APPLICANT: ADDRESS: .-.~ TELEPHONE (Day time) ~'~ 7 ¢' - 7 t 4- V/OWNER: ADDRESS: TELEPHONE: Comprehensive Plan Amendment Temporary Sales Permit Conditional Use Permit Interim Use Permit Vacation of ROW/Easements Variance ~j~7~'~ Non-conforming Use Permit Wetlan--d-AlteratJon Permit ' Planned Unit Development' Zooin. g ...~..~ Rezoning ~r~~ . Zoning Ordinance Amendment .. Sign Permits V- Sign Plan Review Site Plan Revlew* ~ S~Jbdivisio n* ~SQ ~],Jl~SP FI/VACNA B/WAP/Metes and ~'ounds, ~.~,0 Minor SUB) v'"A llst'of all property owners within 500 feet of the boundaries of the property must be Included with the application. . -V~Buiidlng material samples must be submitted wit.b _s~_e I~La_n _r_e.v.!_.e~_._s. · / *Twenty-six full size folded copies of the plans must be submitted, Including an 8W' X 11" reduced copy of transparency for each plan sheet. ~* Escrow will be required for other applications through the development contract NOTE - When multiple applications are processed, the appropriate fee shaJI be charged _fo_ _r _e_ac__h _ap@!!.c_.a~!.o..n. 0~2~/d~"-['0:2g'~AX' ~I2 937 5799 CI~z' OF CH~I~$$EN ~003 PROJECT NAME L(~AT~ON LEGAL DESCRIPTION WETLANDS PRESENT PRESEN'.[ ZONING REQUESTED ZONING YES ~ NO PRESENT 1_AND'USE DESIGNATION REQUESTED LAND USE DESIGNATION This ~pli~on must ~ ~mplet~ in ~11 ~d ~ ~e~n or cleady pdnl~ a~ must be a~ompani~ by afl info,orlon and plans r~uir~ by ~plicable C~ O~lna~ pmvlsbns. Before fili~ this appli~on, ~u should ~nf~ ~ ~e Planni~ A dete~inafion of complete~ss of ~s appli~fion sh~l be made ~thin ten business da~ of ~plication ~al, A noti~ of application deficiencies sh~l be mail~ to the ~pli~ ~thin ten business da~ of application. This is to ce~ that I ~ maki~ applbstlon for the descd~ a~on by ~e C~ and that. I ~ mspo~ible ~r ~mpl~ng wRh ~1 c~ requirements wEh r~a~ to this request. ~ appli~tion shou~ be process~ in my name ~d I ~ ~e p~ whom the G!~ ~bg~ ~9~ct regaling any roarer pe~i~ng to ~is appli~on. I have a~ach~ a copy o[ proof of o~emhip (either ~py of ~eds DupJi~Jb'~CEt~ 0'f ~ffe,'Ab~t'~c't ~f ~tle orp~h~e agreement), or I am-~e a~odz~ ~mon to m~e this ~pli~Qon and the fee o~er has a~o signed ~ ~plJ~fion. 1 will keep myself' informed of the deadlines for submission of m. _a:Le_n'_a! ~ ~.e.p.r..og..r.e..s.s of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc, ~Jtli'~-n [iS'ti~te"prioi' t~"a~ly authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. The city hereby notifies the applicant that development review cannot be completed withiri 60 days due to public hearing requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day extension for development review. Development review .sb_a!! _b_e _c_o_mp!.e.L.eEl...w..!l.h.!.q ~.2..0..d._a~ unless additional review extensions are approved by the applicant. ' ............................... Slg nattJ re of ~,/~e Ow n"~"r ~' D~ate Application Received on ~;;~l ~/~) Fee Pak~l, J~ ~'~::~ . - Receipt No, The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting. If not contacted, a copy of the report will be mailed to the applicant's address. Charles J. Radloff · Architect Mar_ch 16, 2.000 ~',[TY OF CHAN~-' .... ~N NAR 1 7 2000 CHAI~Hr~ .................. cr~T Stone Creek Office Building Coulter Boulevard and Stone Creek Drive Chanhassen, Minnesota Request the following items fOr consideration in reference to the site plan review for_ this building. Item #1 Rezone subject property I. O. P. zoning from present zoning of AG2. Item #2 Requests a variance to Bluff Creek Primary Overlay District for permission to build in the district. This variance should be granted because the whole site is within the Bluff Creek Primary Overlay District and the entire site would be unbuildable. Item # 3 Request conditional use permit for construction of a building in. Bluff Creek Primary Overlay District. Item #4 Request a variance from 50'-0" setback for parking and building to the residential property. Parking set back reduced to 15 ft., and the building set back reduced to 40 ft. This variance should be granted because of the unusual shape of the site, minimal buildable area in the site, and very large unbuildable area in the adjacent residential property, creating a substantial buffer to the existing residential properties. Item Request variance for reduction of parking stalls from 46 to $6 parking stalls. This variance should be granted because of the unusual shape of 979 VALLEY VIEW ROAD · SUITE 256 · EDEN PRAIRIE. MINNESOTA 55344 * 952-941-1667 Stone Creek Office Page 2 the site, minimal buildable area within the site and the number of Code required parking spaces is based on gross buildable area. Yhe building was designed with a large lobby and two-story space as an amenity to the occupants and is not considered to be occupied space by the building inspection department. A ratio of five cars per 1000 square feet of net rental area was used to determine the appropriate parking requirements, Item #6 Easements are being drafted by the city of Chanhassen for a existing _.w.a_t~r r _e t _e _n_ _t i q _n_ p.o_.n.d f.o_r _stre_et r.u_.n _o. ff a_~d a~ e_.x!~st!.ng _se_..w._er !!.ne_ tha~t r.u__n_s through the property. It should be noted that the easements will require an encroachment description for the south parking lot retaining wall and exterior stairway. These easements are under consideration by the landowner in coordination with the requests outlined in Item #1 through Item #5. - cc: Mike Gorra MEMORANDUM CffYOF TO: FROM: Kirchoff, Planner II ~..a,Ynvte,-hiHaemp el' Assistant City Engineer ~)C'~ !'~k~'' Bill tsement, Engineering Technician IV 690 City Center Drive, PO Box I47 Chanhassen, Minnesota 55317 Phone 612.937.1900 General Fax' 612.93Z5739 Engineering Fax 612. 937. 9152 P~tb/ic Safety Fax' 612934.2524 Web wwm cl. &anhassen. m,.lts DATE: SUB J: April 13, 2000 Site Plan Review for Stone Creek Office Building in the Southwest Comer of Coulter Boulevard and Stone Creek Drive - Land Use Review File No. 00-09 Upon review of the plans prepared by Charles Radloff dated March 16, 2000 we offer the following comments and recommendation: GRADING No detailed grading plan was submitted for review; however, staff anticipates the parcel will need to be graded for development for the office building, parking lot and utilities. The existing site conditions range in elevation from 939 in the northeast comer of the property to 918 along the wetlands in the westerly portion of the site. During construction of Coulter Boulevard fill material was placed on the site. Site grading will involve leveling the site to an elevation of 932.0+ for the parking lot. The building is proposed with a walkout level; therefore, should conform fairly well to the existing terrain. Since no building elevations were provided, staff will recommend that the lowest floor elevation of the building be a minimum of two feet above the high water level of the stormwater pond (per city ordinance) which is 922. Therefore, the lowest floor elevation must be a minimum of 924.0. Staff does not believe any earthen material will need to be exported or imported to the site based on proposed spot elevations on the parking lot. However, should material need to be imported or exported, the applicant should be aware that if the material is to be deposited in another location in Chanhassen it will require an earthwork permit from the city. In addition, a detailed haul route will also need to be submitted to the city for review and approval. Retaining walls are proposed along the parking lot on the westerly and southerly sides of the parking lot. To and bottom elevations of the walls need to be shown on the grading plans to determine whether or not the wall will need to be engineered (retaining walls in excess of four feet in height need to be engineered and a separate building permit applied for). It is difficult to tell if the existing power poles which parallel the easterly property line will be affected by site development. The power pole/line may need to be relocated or adjusted due to the proposed access from Stone Creek Drive. The developer shall be responsible for any and all coordination and adjustments to the power pole/line. A detailed grading, drainage and erosion control plan with The Gtv o£ Chanhassen. A growing community, with dean lakes, quality, schools, a charmin~ downtown, thrivin¢ businesses, and beautiful barks. A freat olace to live, work, and olay. 1 Cynthia Kirchoff, Planner II Stone Creek Office Building PPR April 13, 2000 Page 2 proposed and existing two-foot contours and showing existing site conditions shall be submitted prior to this item being considered before the City Council. Typically along collector roads berming is required to provide screening for the parking lot improvements. Given the site configuration, staff is recommending that screening be accomplished by landscaping in lieu ofberming. The city does have boulevard tree plantings along Coulter Boulevard. These trees appear not to be impacted by site development. It may be possible to work with the developer in increasing the plantings along Coulter Boulevard as Well as Stone Creek Drive to achieve the desired screening of the parking lot as long as sight lines and snow storage areas are not jeopardized. DRAINAGE For the most part, the site sheet drains toward the city's stormwater pond located in the westerly portion of the site. The plans propose for the parking lot drainage to be collected by catch basins in the parking lot and conveyed via storm sewer to the city's stormwater pond for pretreatment prior to discharging off site. No additional ponding improvements will be necessary with this site plan proposal since the site will be draining into the existing pond. Staff does recommend the applicant provide the city with detailed stormwater drainage calculations for a 10- year and 100-year, 24-hour storm event for the storm drainage system to insure the number of catch basins and pipe sizes are adequate. The storm sewer outlet pipes shall be designed with a maximum discharge rate of 5 cfs. This may require deeper catch basin structures or additional drop manholes prior to discharging runoff into the city's stormwater pond. SWMP The parcel has not been assessed for storm drainage improvements. Although this is not a subdivision, staff recommends the applicant be responsible for surface water management fees (SWMP) in accordance with city ordinance. The site overall is approximately 4.0 acres; however, most of the site is encumbered by wetlands and stormwater pond. Staff estimates a net developable acreage of one acre. Based on the land use of office/industrial the rate per acres is $4,360 for stormwater quantity and $4,633/acre for water quality. These fees are payable at time of building permit issuance. UTILITIES Municipal sanitary sewer and water service is available to the property. Water services have been extended from Coulter Boulevard to the property line. The city's sanitary sewer line intersects the property along the south and westerly portion of the proposed building site. The applicant will need to connect into the city's trunk sewer line for service. The city will require the applicant to obtain the appropriate sewer and water connection permits and fees in conjunction with site Cynthia Kirchoff, Planner II Stone Creek Office Building PPR April 13, 2000 Page 3 development. All proposed utility improvements on the site will be privately owned and maintained upon completion. All utility improvements shall be installed in accordance with the City's 2000 Standard Specifications and Detail Plates and/or State of Minnesota Plumbing Code. According to a search of the assessment history of this parcel the property was not previously assessed for sanitary sewer, storm sewer and water or street improvements in conjunction with the Coulter Boulevard and Bluff Creek trunk improvement projects. The assessments for sewer and water were deferred until development occurs. Based on the proposed land use (office commercial/industrial), residential equivalent units (REUs) are applied at a rate of four units per acre. The 2000 sanitary sewer hookup charges and connection charges are $1,300/REU and $4,075/REU, respectively. The 2000 water hookup and connection charges are $1,694/REU and $4,075/REU, respectively. Based on the net developable acreage of the site (one acre), the applicant will be responsible for sewer and water hookup and connection charges in the amount of $44,576.00. These fees are collected at time of building permit issuance and may be specially assessed against the property. On a footnote, should the Metropolitan Environmental Commission determine the building will generate more that four SAC units, the number of hookup and connection charges will also increase proportionately. The site plan should be revised to indicate the invert and top of manhole structure on all sewer and storm sewer lines to determine if the lines have sufficient cover and if there will be any impacts with existing infrastructure. STREETS The site is proposed to be accessed from Stone Creek Drive and Coulter Boulevard. Stone Creek Drive is constructed with a 36-foot wide, face-to-face, residential collector-type street with street lighting, boulevard landscaping and sidewalk. There is also sidewalk on the east and west side of Stone Creek Drive which is not shown on the plans. The plans need to incorporate the existing six- foot wide sidewalk along the west side of Stone Creek Drive and provide pedestrian.ramps at the driveway curb cuts. Coulter Boulevard is also 36-foot wide, but commercial-type street section and is listed as a collector street in the city's comprehensive plan and Minnesota State Aid (MSA) route street. According to city ordinances, driveway locations on collector roads shall be minimized whenever feasible. Staff is recommending that the driveway entrance onto Coulter Boulevard be eliminated. Staff believes that the property can be accommodated with only one curb cut on Stone Creek Drive. Staffhas reviewed the parking lot configuration and finds them fairly well designed and in general accordance with city ordinances with the exception of the driveway radiuses onto Stone Creek Drive. They need to be expanded from 10 feet to 20 feet. The parking lot pavement and drive aisles must be designed to accommodate 7-ton per axle weight design per city ordinance. The applicant will need to have a soils Cynthia Kirchoff, Planner II Stone Creek Office Building PPR April 13, 2000 Page 4 engineer recommend a pavement design to accommodate the 7-ton per axle design requirements based on soil conditions experienced on the site. The driveway entrance onto Stone Creek Drive will need to incorporate the city's industrial driveway detail No. 5207 and pedestrian ramps for the existing sidewalk. The property does not have easements or right-of-way recorded for Coulter Boulevard, storm drainage ponds or sanitary sewer. The owner (previous) petitioned the city for the improvements and signed a waiver of trespass agreement to construct the improvements. The intent was for the property owner to dedicate the necessary right-of-way and utility improvements in conjunction with final platting of the property. However, since this property was created in conjunction with the Coulter Boulevard project, no subdivision or final plat was needed to develop the site. Therefore, staff is requesting the applicant/owner dedicate the necessary street right-of-way for Coulter Boulevard, sanitary sewer line and stormwater pond. The city shall prepare the necessary legal description and easement agreement for the applicant to execute. In conjunction with Coulter Boulevard construction, none of the adjacent properties were compensated for right-of-way or utility and drainage easements as part of the project. If the properties would have been, the assessments for street and utility would have been higher essentially reassessed against the property anyway. EROSION CONTROL The plans do not propose any erosion control measures. The site plan and grading plan will need to incorporate erosion control measures around the perimeter of the construction limits. In addition, a rock construction entrance will be needed off of Stone Creek Drive at the access point to the site. RECOMMENDED CONDITIONS OF APPROVAL The applicant shall enter into a site plan agreement with the city and provide the necessary financial security to guarantee erosion control, site restoration, utility connections, driveway access and landscaping. All boulevard trees along Coulter Boulevard shall be preserved and guaranteed by the applicant. If any trees need to be removed in conjunction with site grading or utility installation, they must be replaced elsewhere on Coulter Boulevard and guaranteed for one growing season after the construction has been completed. Protective tree fencing or erosion control fencing shall be installed along the boulevard to protect the trees from construction activities. Landscaping may be placed within the Stone Creek Drive boulevard area as well as portions of Coulter Boulevard to assist screening the parking lot. A landscaping plan Cynthia Kirchoff, Planner II Stone Creek Office Building PPR April 13, 2000 Page 5 o o will need to be reviewed and approved by engineering prior to any landscaping being installed. The site plan and grading plan should include the existing six-foot wide concrete sidewalk along the west side of Stone Creek Drive and any power poles and street lights to determine potential impacts to the existing infrastructure. The site plan shall also include rim and invert elevations, size, type and grade of utility pipes. A detailed grading, drainage and erosion control plan including the lowest floor and first floor building elevations needs to be submitted prior to this item being considered by the City Council. All private utilities shall be constructed in accordance with the city's latest edition of Standard Specifications and Detail Plates and/or the State Plumbing Codes. Installation of the utilities will require a building permit through the city's building department. All retaining walls in excess of four feet in height will also need tobe engineered and permits obtained through the city's building department. An encroachment agreement will be necessary for any structures and/or the parking lot that fall within the proposed drainage and utility easement for the sanitary sewer line. This document shall be recorded against the property. 8. All disturbed areas as a result of construction activities shall be immediately restored with Seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each construction activity in accordance with the city's Best Management Practice Handbook. 9. The applicant shall provide detailed storm sewer calculations and drainage area map for 10-year and 100-year 24-hour storm events prior to issuance of a building permit. 10. 11. 12. 13. The applicant shall apply for, obtain permits from the appropriate regulatory agencies, i.e. Watershed District, Minnesota Department of Health, and comply with their conditions of approval. Driveway access onto Coulter Boulevard shall be prohibited. Access to the site shall be limited to Stone Creek Drive. The plans shall incorporate the city's industrial driveway detail plate and construct pedestrian ramps. The applicant shall be responsible for surface water management fees in the amount of $8,993.00. These fees shall be collected at time of building permit issuance. The applicant shall be responsible for sewer and water hookup and connection fees based on four REUs unless the Metropolitan Environmental Cynthia Kirchoff, Planner II Stone Creek Office Building PPR April 13, 2000 Page 6 14. 15. Commission estimates more than four SAC units. The applicant will be charged these fees at time of building permit issuance. The hookup and connection fees may be specially assessed. The applicant will need to have a soils engineer recommend a pavement design to accommodate the 7-ton per axle design requirements based on soil conditions experienced on the site. The applicant/owner shall dedicate the necessary street right-of-way for Coulter Boulevard, sanitary sewer line and stormwater pond. The city shall prepare the necessary legal description and easement agreement for the applicant to execute. g:\eng\dave\pc\office building spr.doc CITYOF C HASSEI 690 Gq Ce,ret D~qve, PO Box' 147 Cha,hassen, Minnesota 55317 Pho,e 612.937.1900 Ge,eM Fax 612937.5739 E, gi,ee~q,g F~r 612.937.9152 Pubhc Sago, Fax 612934.2524 l~b www. d. cbanhasse,, m,.,s MEMORANDUM Kirchoff, Planner II - TO: Cynthia FROM: Steven Torell, Building Official~"~"'~ / DATE: April 10, 2000 SUB J: Site Plan Review for: Stone Creek Office Building Planning Case: 00-1 Rezoning, 00-6 Site Plan, 00-1 CUP I have reviewed the plans for the above building and offer the following comments: The building is required to be protected with an automatic fire sprinkler system. Detailed occupancy related requirements will be reviewed when complete plans are submitted. Two accessible parking spaces are required for the thirty-six spaces that are provided. The building owner and or their representative should meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. G/safcty/st/memos/plan/stonecreekoffice The G~y qf Chanhasse,. A g~vwi,~ communi~, with clea~ lakes, ,ualit¥ schools, a c/~amti,~ dow,tow,, thrivi,~ businesses, and beautiful ~arks, A ~reat ,lace to live, work, and ~lay. CITYOF HAN EN MEMORANDUM 690 O9, Center Ddve, PO Box I47 TO: Chanhassen, Mim~esota 55317 Pho,e 612937.1900 General £ax 612.93Z5739 Enginee~q,g F~ 612.93Z9152 &t b/ic Sago, Fax 6IZ 93 4. 2524 ~b wwu~ci.&anba~sen, mn. tts FROM: DATE: SUBJECT: Cynthia Kirchoff, Planner II Mark Littfin, Fire Marshal April 12, 2000 M J Gorra is requesting to re-zone 3.98 acres of property zoned A2, Agricultural Estates to lOP, Industrial Office Park, Site Plan approval ora 10,270 square foot office building, a conditional use permit to construct a building in the Bluff Creek Overlay District, and variance from the 40 foot setback from the primary zone of the Bluff Creek Primary Overlay District, a 35 foot variance from the required 50 tbot setback when property abuts a residential use, and a variance from parking requirements, located at the southwest corner of Coulter Blvd and Stone Creek Drive, Stone Creek Office Building. Planning Case: 00-1 Rezoning, 00-6 Site Plan, 00-1 CUP. 1 have reviewed the site plan for the above project, in order to comply with the Chanhassen Fire Department/Fire Prevention Division, 1 have the following fire code or city ordinance/policy requirements. The site plan is based on the available information submitted at this time. If additional plans or changes are submitted, the appropriate code or policy items will be addressed. 1. Submit utility plans showing fire hydrant locations for review and approval. 2. Submit radius turn plans to City Engineer and Chanhassen Fire Marshal for review and approval. 3. Comply with Chanhassen Fire Department Policy regarding notes to be included on all site plans. Pursuant to Policy #04-1991. Copy enclosed. The Cit~, o/'Chanhassen. /I crowh~f communin, with dean lakes, aualit~ schools, a chamdng downtown, thriving businesses, and beaufihd varks. A freat olace to live, work, and ola~. CITYOF CHAI EI 690 City Center Drive, PO Box 147 Chanhassen, Minnesota 55317 Phone 612.93ZI900 General Fax 612. 937. 5739 Engineering Fax 612.93Z9152 Public Safe~y tax 612.934.2524 Web www. ci. chanhassen, mn. us CHANHASSEN FIRE DEPARTMENT POLICY CHANHASSEN FIRE DEPARTMENT NOTES TO BE INCLUDED ON ALL SITE PLANS Fire Marshal must witness the flushing of underground sprinkler service line, per NFPA 13-8-2.1. A final inspection by the Fire Marshal before a Certificate of Occupancy is issued. Fire Deparlrnent access roads shall be provided on site during all phases of construction. The construction of these temporary roads will conform with the Chanhassen Fire Department requirements for temporary access roads at construction sites. Details are available. Onsite fire hydrants shall be provided and in operating condition during all phases of construction. The use of liquefied petroleum gas shall be in conformance with NFPA Standard 58 and the Minnesota Uniform Fire Code. A list of these requirements is available. (See policy #33-1993) All fire detection and fire suppression systems shall be monitored by an approved UL central station with a UL 72 Certificate issued on these systems before final occupancy is issued. An 1 l"x 14" As Built shallbe providedto the Fire Department. The As Built shall be reproducible and acceptable to the Fire Marshal. (See policy #07-1991). Chanhassen Fire Department Fire PreventiOn Policy #04-1991 Date: 11/22/91 Revised: 06/05/98 Page 1 of 2 The Gix o£ £hanbassen. A crowing commumtv with clean lakes, attalin, schools, a charming downtown, thrivin~ businesses, and beautiful parks. A great place to live, work, and play. An approved lock box shall be provided on the building for fn'e department use. The lock box should be located by the Fire Department connection or as located by the Fire Marshal. 10. 11. High-piled combustible storage shall comply with the requirements o__f Article #81 of the Minnesota Uniform Fire Code. High-piled combustible storage is combustible materials on closely packed piles more than 15' in height or combustible materials on pallets or in racks more than 12' in height. For certain special-hazard commodities such as rubber tires, plastics, some flammable liquids, idle pallets, etc. the critical pile height may be as low as 6 feet. Fire lane signage shall be provided as required by the Fire Marshal. (See policy #06-1991). Maximum allowed size of domestic water service On a combination domestic/fire sprinkler supply line policy must be followed. (See policy #36-1994). Approved- Public Safety Director Chanhassen Fire Department Fire Prevention Policy #04-1991 Date: 11/22/91 Revised: 06/05/98 Page 2 of 2 NVqd ::Ills 39111 ..L3:4HS V. LVQ J.~HS "0 "n Z HOA:IAEIr~S ONV9 I'=' 'q993~¥OH¥O )tNVI:~I ~ Z JJOIFe~l 'f S,l.mqD ~ --t · 9VBFLLO::LLIHOH¥ 'dEtO0 3SIBd~3J. NB NOIIO~iSNOO ~NlO~l~a ~Ol~O >l=l~aO ~NO.LS NV'ld .LIS V. LVQ .LOqroEId H3BINIgN .L33H~ NOI_LO=IS ~ SNV3d htoog.-I 31ILL/3:4HS VI.Va .LE]3HS BOABA~n$ ONV'I '399=l~VOhlVO JJolPe~l 'f soN~qD 'IVBN£O311HOI-IV 'dblO0 3SIEId~J3/N3 NOIJ. OrIW.LSNO0 ~)NIa-Ilfl8 301:1::10 N33biO 3NO.LS Z ~-# V~WV ~lOId~O NOI.L03S 9NIaglr18 NV-Id hlO09=l ia:lddn A880'I .LB:IHS I:i::I~I/'IflN J.~3HS SNOIJ_¥A3-13 ::l-IJ.l J..1.33HS V.L¥C) .133HS NOI/VA_-q'13 .LSV--J 1van£o3..UHOUV Z :la -< 0 Z I"" Z NOIIVA3q:::I HJJ'IOS 'dj:J00 ::JSIlddl:t:l I N3 NOIIOflUJ.SNOO 9Nla'llnil =lOI-L-IO N33UO 3NO.LS NV-Id ~d¥OSCINV-I ~"lli.L J.~3H$ ¥J.¥0.1.33HS I::]OX~AIdA S aNVl 'aT~aavoavo ;NNV~-I }Jolpe~l ' f sMx~q;D "lV~nJ.O:q.LiHOav 'd~O0 3~l~ld~3J. N3 NOIIOflld.LSNO0 E)NIQ'IIflE] :JOl-l"40 0 ! 0 ~ z / / o / z gO-LPg ~0-,0~ = J- :::¥]¥0S ~ NV-Id 3dVOSQNV-I ~' NV'lei 9NI/Hg13 39.LI1 .LB3HS "o rn r- ¥J.¥<3 J.~::IH8 33 uo~^ens ONV9 0 "' ~ ..... -',~-' C 9VHRIO3J.IHOBV 'd~O0 ~SI~d~IN~ NOI/OR~J. SNO0 ~NIQqlRS aOlJJO )t=13t:lO BNO.LS 1 NVqd 91VJ.:IO =1S¥8 BlOd/H~)I9 m // TIVM ~DNINIV I :lt:::l C]IV'I ::ISOO-I a:::II:::F:I:::INI~DN:::I AdONVO -IOO1:::1 NIHJ_IM ANOO-IVI~ >lOIl::l~i ::qOV_-I $-I-IIS ~]NOJ.S 'S'-~'I'~ 8:II~IJ_N:I :INO.LS a::l~r-i/-ino ssv-i~) Qq.LV-InSNI (3q~O'~OO S~O(3NIM I~nNIl~n-I¥ a::IZIQON¥ ¢j::lNr'l -IOO1::i ¥(3f'1~1::1~ HJ. IM s::r'I~NIH$ .L-IYH,-IS¥ A::INI~IIHO ::INO.LS qqVM IDNINIVJ._qI::I CIlV-! ::tSOO-1Ci:::II::I:::t::INIIDN:::I AdONVO :JOOJ:! NIH.LIM ANOO"IVI:I NOII::18 :::IOV::I ~'T'II~ :iNO/~ 'S'..-I'I'~I $::III::IJ.N::I ::INO.L8 a:::l~f'lJ."1f'1o ssV-'l~) CF:I.LV-IRSNI C]::11:tO'1OO SMOaNIM ~l'1NII/~r1'1¥ a::IZIC]ON¥ SqNr'l -...IOOIzl vanv~u:~e HIIM $=f-19NIHS J_"IVHdSV A=INI611HO qNOl$ c]:lblnJ_"lno NOTICE OF PUBLIC HEARING PLANNING COMMISSION MEETING WEDNESDAY, APRIL 19, 2000 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 690 CITY CENTER DRIVE PROPOSAL Site Plan for an Office Building APPLICANT: LOCATION: M. J. Gorra SW Comer of Coulter Blvd. and Stone Creek Drive NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, M. J. Gorra request to rezone 3.98 acres of property zoned A2, Agricultural Estates to lOP, Industrial Office Park, site plan approval of a 10,270 sq. ft. office building, a conditional use permit to construct a building in the Bluff Creek Overlay District, a variance from the Bluff Creek Primary Overlay District, a 35 fL variance from the requested 50 ft. setback when property abuts a residential use, and a variance from parking requirements, located at the southwest comer of Coulter Boulevard and Stone Creek Drive, Stone Creek Office Building. What Happens at the Meeting: The purpose of this public hearing is to inform you about the developer's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The Developer will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses project. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Cindy at 937-1900 ext. 117. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on April 6, 2000. Smooth Feed SheetsTM Use template for 5160® MICHAEL J GORRA 1680 ARBORETUM DR CHANHASSEN, MN 55317 FAMILY OF CHRIST LUTH CHRUCH 275 EAST LAKE DR PO BOX 388 CHANHASSEN, MN 55317 BLUFF CREEK PARTNERSC/O LAND GROUP 123 NORTH 3RD ST MINNEAPOLIS, MN 55401 HERITAGE DEVELOPMENT INC ,450 CO RD D E ST PAUL, MN 55117 THE PILLSBURY COMPANYATTN: CHRIS MUNTIFERING MSO8X3 200 6TH ST S MINNEAPOLIS, MN 55402 RICHARD D & MARY A FRASCH 8000 ACORN LN CHANHASSEN, MN 55317 MARK J FOSTER &KAREN S OLSSON 8020 ACORN LN CHANHASSEN, MN 55317 GREGORY B & JULIE R MAANUM 8040 ACORN LN CHANHASSEN, MN 55317 SISKA GROUP INC 450 EAST CO RD D ST PAUL, MN 55117 ALBERT & CAROL BISTANY 1931 ANDREW CT CHANHASSEN, MN 55317 JAMES H & KATHLEEN PENSYL 1972 ANDREW CT CHANHASSEN, MN 55317 WILLIAM R B ANDERSON &KATHLE M B ANDERSON 1974 ANDREW CT CHANHASSEN, MN 55317 KEVIN R WRIGHT &MEGAN A ARNOLD 1976 ANDREW CT CHANHASSEN, MN 55317 KATHY J DONOVAN 1978 ANDREW CT CHANHASSEN, MN 55317 CREEK FIVE ASSOCIATESC/O LAND GROUP INC 123 3RD ST N MINNEAPOLIS, MN 55401 VAN & NGA DANG 12307 PARKWOOD DR BURNSVILLE, MN 55337 MARTIN K & KATHLEEN M SCHUTROP 2230 TIMBERWOOD DR CHANHASSEN, MN 55317