Loading...
2 Market Street StationCITYOF CHANHASSEN 7700 Uar,<.?, B uievard ?O Bx !47 Ch:hies? Mli 55',i~7 Administration 952 ~7 !!0(/ Pax 9!}2227 Building ~},e 952 227 1180 Fax 952 227 ~190 Engineering P~oi: 952 22'7 Fax 952 227 ~170 Einanee Phune: 952227 1140 Fax 952 227 !110 Park a Recreation R~c ~e: q52 227 Fax 95222~!!10 23!0 05 Jlt(r Bo,J!e'~srd Pho,~ %2 227 1400 Fax 952 227 1404 ~la~in~ a Nalural Resources P')n~ 952227 1!30 Fax 952 22711i0 Public Works !59! P~BaJ Phc,~u %2 227 !300 no, %2 227 1310 Senior Center Pho~, 95?227 1!25 ~<!x 952227 ~', 10 Web Sile MEMORANDUM TO: FROM: SUB J: DATE: Planning Commission Kate Aanenson, AICP, Community Development Director Market Street Station Update October 1, 2003 On September 16, 2003, the Planning Commission held a public hearing on the Market Street Station development. One of major concerns was the bus circulation within the site. On September 30, staff met with the applicant and Southwest Metro Transit to review circulation within the site. An alternative circulation pattern was proposed. The alternative was less desirable because it introduced more conflicts by having the bus circulation between two parking aisles. The proposed solution staff is recommending is to provide a drop off and pick up area adjacent to the Frontier building. The area is currently gravel but will be improved with asphalt and concrete curbing (see revised plans). Attached is a letter fi'om Southwest Metro dated October 1, 2003 addressing concerns raised at the meeting. Staff met with the applicant on September 24th to review the other issues that were raised by the commission. The majority of these issues have been resolved. The "Bank" building has been moved to the east 4 feet. This resolves the parking aisle width and drainage issues. These changes have been modified as part of the grading and drainage issues in the staff report and have been revised in the conditions of approval. Deletions are shown as a strike out and additions are shown in bold. Revised Engineering plans will be submitted to staff on Friday and will be shared with the Planning Commission on October 7, 2003. Staff is recommending approval with the conditions in the staff report. 1'he Cily of Chanhassen · ,:, g'o,,'m~ )xr~J~q tv ,,',~ith cJ¥,,~ir/i]ke5 ~Ud ~ Ski ~ acha rr' n,i t [i,,,mi ti]S ne',ss(',s ,,~h~Ji~lg trois axl bea~/it,O '~,ar~< ?, :r~i ~ ,;~i,: ,~ ~ ~[ ~ i] ~j ~t} ..... Original Message ..... From: Len Simich [mailto:lsimich@swtransit.or~g] Sent: Wednesday, October 01, 2003 2:41 PM To: Justin Miller Subject: Safety & Schedule Good afternoon Justin, At our meeting on Tuesday, September 30, 2003, you asked me to prepare responses to the questions listed below. Answers appear after the question. Please let me know if I can be of any further assistance. P.S. I do plan on attending next Tuesday's meeting of the Planning Commission. Also attached is the letter I submitted to the Metropolitan Council in response to their question about the CMAQ request. Question #1. Do we foresee any potential conflicts between pedestrians accessing business locations within the development and our buses? Answer #1. SMTC does not anticipate any conflicts. We feel any potential conflicts have been reduced with the new proposed option that circulates buses closer to the retail buildings (i.e. only one parking isle to contend with). SMTC has been in operation since 1986. During that tenure we have never had an incident between a pedestrian and a bus. SMTC has one of the highest safety records in the business. We are currently operating on a record of over 500,000 miles without an accident, and over the past year we traveled over 1.3 miles with only 8 minor accidents, well above the national average of 1 accident per 50,000 traveled. Our drivers are trained professionals. We require all drivers to go through an extensive safety training program that reviews pedestrian, cyclist and children's unpredictable actions, to better prepare our drivers to avoid problem situations before one actually occurs. SMTC also currently operates in locations similar to what is being proposed in the new Chanhassen development without any problems. Those areas are the Eden Prairie Mall, Southdale Mall, Preserve Village Mall Highway 169 and Anderson Lakes Rd.), and we operate in areas with higher levels of pedestrian traffic than what we would experience in Chanhassen such as downtown Minneapolis and on the campus of the University of Minnesota. Question # 2. How many buses do we foresee operating out of the Market Station Location? We anticipate four scheduled trips per peak hour into and out of the park and ride lot (6:00 am to 8:30 am, and 3:30 pm to 6:30 pm). Depending of the success of the service, some of these trips may require two buses. The answer would be somewhere in the range from 4-8 buses per hour. Question ~3. What is the status of the parking ramp proposed for the site? A grant has been submitted for the transit portion of any future parking ramp. The grant has made it through the initial screening process, and is being prioritized with other eligible projects. SMTC should know if the project will be funded by the end of the year. If we are successful, the funding would be in place by the year 2007. CITY OF Il P.C. DATE: 9-15-03 C.C. DATE: 10-30-03 REVIEW DEADLINE: 10129102 CASE: SPR 03-9, Rez 03-03 BY: Aanenson:v STAFF REPORT PROPOSAL: Replat of 3 Subdivisions; Conditional Use Permit for more than one building on a lot; Rezoning fi'om BG, General Business to CBD, Central Business District; Site Plan Review with Variances of approximately 60,000 square feet of retail, office, cinema and restaurant; Vacation of utility easements LOCATION: 7880 Market Boulevard Easy Rider Subdivision Chanhassen Mall Addition Frontier Cinema Addition APPLICANT: Market Street Station, LLP c/o Kraus Anderson Realty Corp. 4210 Old Shakopee Road Bloomington, MN 55437 PRESENT ZONING: 2020 LAND USE PLAN: CBD, Central Business District Commercial h.l ACREAGE: 11,4 acres SUMMARY OF REQUEST: Redevelopment of the Bowling Alley Site including demolition of the bowling alley; Site Plan Review with variances for the construction of a 60,000 sq. ft. building including cinema expansion, retail, restaurant and office; rezoning from General Business to General Business; replat of subdivision; and a conditional use permit for more than one building on a lot. Notice of this public hearing has been mailed to all property owners within 500 feet. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. Market Street Station September 16, 2003 Page 2 The City's discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi judicial decision. The City has limited discretion in approving or denying conditional use permits, based on whether or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance. If the City finds that all the applicable conditional use permit standards are met, the permit must be approved. This is a quasi judicial decision. The City has a relatively high level of discretion in approving rezonings, PUD's, and amendments to PUD's because the City is acting in its legislative or policy making capacity. A rezoning or PUD, and amendment thereto, must be consistent with the City's Comprehensive Plan. PROPOSA L/S UMMA RY The development proposal is a partnership between Bloomberg Companies, Inc. and Kraus Anderson Realty Company. The partnership is called Market Street Station. The proposal includes relocation of the Southwest Metro Park and Ride and removal of the existing bowling alley. Lots are being assembled that include properties previously owned by the City of Chanhassen and Bloomberg Companies into a single lot. The property is currently zoned General Business. The proposal seeks rezoning to Central Business District; a conditional use to allow for more than one building on a lot; site plan review with variances from architectural standards and sign standards; and vacation of utility easements. The proposed development is consistent with the proposal that was presented to the city (including thc Economic Development Authority, the City Council and the Planning Commission). The premise behind this development is an extension of the city's entertainment center. The redevelopment of the site consists of mixed uses and a shared parking plan. The current building footpad is 41,000 square feet. The new development footprint is 42,000 square feet. This includes the removal of the bowling alley and one storage shed behind the Dinner Theater. Staff is recommending approval with conditions in the staff report. BACKGROUND The subject area was studied in 1994 in a study that was called Chanhassen Vision 2002. This area was identified as one of the building blocks for the downtown area. The study states, "The Dinner Theatre is the cornerstone of an entertainment center. This proposed entertainment center will mix uses to include theaters, restaurants, commercial recreation, hotels and related uses. The entertainment uses will be concentrated, allowing visitors to park once and shop twice in a common parking area and move to the various destinations on foot. Its emphasis on nighttime activities will extend the downtown's daytime vitality into the evening hours." Market Street Station September 16, 2003 Page 3 This site is a highly visible one and is likely to become one of the most important intersections in the Chanhassen CBD. On January 22, 1996, the City Council approved a Site Plan for the Entertainment Complex to remodel the existing Chanhassen Bowl/Filly's and a po~Xion of the Frontier building into an Entertainment Center (#95-21 SPR). The proposal included the redevelopment of the existing bowling alley/Filly's building into an entertainment center. The Center was to include a bowling alley/restaurant with an area of 40,000 square feet and 8 theaters with an area of 20,000 square feet. On September 9, 1996, the City Council approved phasing of the construction of the Entertainment Complex. The remodeling was phased due to the fact that the Cinema developer was ready to proceed with construction while the Entertainment Center developer had not completed the financing package. The phasing of the development included the reconstruction of the facade, the parking lot, and the railing surrounding the building for the Cinema portion only. On September 9, 1996, the Council also approved Subdivision 96-17 for the Entertainment Complex and Frontier Cinema Addition. On May 26, 1998, the City Council approved the Site Plan for the Frontier Building (#98-7 SPR), with a variance to allow signs on a building that does not have direct frontage on a public street. On August 24, 1999, the City Council reviewed a proposal for demolishing the entire building located west of the existing Chanhassen Cinema, expanding the number of movie screens to 16 and adding 9,000 square feet of retail space. This application was withdrawn. At the joint meeting earlier this summer (2003) with the Planning Commission and the City Council, the following issues were discussed as a part of any potential development: · Bus conflict through the parking lot · Shared parking uses--Is the park and ride large enough for mixed uses? · Drive through uses · Signage · Railroad and pedestrian movement · Design issues: - Pitched roofs - Entrances - Articulation SOUTHWEST METRO TRANSIT Currently, Southwest Metro Transit has a parking easement over the southwest section of the development's parking lot. This parking easement has been in existence since 1992. This is the only Park and Ride location in the city. There are approximately 110 cars per day. Market Street Station September 16, 2003 Page 4 To provide for additional parking spaces and a more controlled interior traffic circulation, the applicant is working with Southwest Metro Transit and the City to construct a ramp to be used as a park and ride facility. The applicant has reviewed the concept of moving the park and ride facility with Southwest Metro, which has consented to these alterations (see attached resolution #3-10). Southwest Metro also has applied for grants to help facilitate the future parking ramp/bus shelter that will be relocated at the east end of Market Street (Pauly Drive), which will also then access the new parking lot. The road will turn northerly and, in a future phase, connect directly to West 78th Street between the Chanhassen Dinner Theatre and Frontier buildings, offering future redevelopment opportunities. These improvements anticipate relocating overhead power lines and generally improving the aesthetics and circulation of the area behind the Chanhassen Dinner Theatre. The new parking lot will also require the removal of one of the support workshops and warehouses for thc Chanhassen Dinner Theatre. These activities will be consolidated into the remaining structure. REZONING As identified in the Vision 2002, the subject site is identified as the "entertainment center" for the city. This development will be an extension of the center. The Dinner Theatre, Frontier Building, and the Country Suites Hotel are zoned Central Business District (CBD). The subject site is zoned General Business. The site currently does not meet the impervious surface requirement ot' 70% maximum. The ultimate build-out in Phase 3 includes housing. The Central Business District allows multi-family housing, whereas the General Business District allows only senior housing. Staff is recommending the rezoning to CBD consistent with the remainder of the "Entertainment District." "The intent of the Central Business District it to provide for downtown business development supporting a strong business district while enhancing the overall character of the community in conformance with downtown redevelopment plans, goals and objectives." Findings: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Finding: The site is guided for commercial uses. b) The proposed use is or will be compatible with the present and future land uses of the area. Finding: The uses continue the entertainment center. Market Street Station September 16, 2003 Page 5 c) The proposed use conforms with all performance standards contained in the Zoning Ordinance. Finding: If the property is rezoned to CBD, it would meet the performance standards with variances for signs for signs and architecture. d) The proposed use will not tend to or actually depreciate the area in which it is proposed. Finding: Demolition of a vacant building and redevelopment will improve the value of the subject site. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Finding: Municipal service exists in the area. Traffic generation by the proposed use is within capabilities of streets serving the property. Finding: A traffic study was completed for the subject site in 1996 and updated in 1999. Based on the findings, staff is recommending approval of the rezoning. REPLAT The applicant is proposing to combine three plats into one. This does not constitute a subdivision because a new lot is not being created, but rather three plats are being combined. The combination of the lots does require a conditional use permit for more than one building on a lot. Because this is not a subdivision, extraction fees are received. Fees are not collected for park and trail and storm water. CONDITIONAL USE With the replat of three subdivisions into one, all the building will be on one lot. More than one building on a lot requires a conditional use permit. Because there is one master developer, staff supports the one lot proposal. All development must provide cross access easements, especially for Southwest Metro Transit. GENERAL ISSUANCE STANDARDS Will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or city. Market Street Station September 16, 2003 Page 6 7. Finding: This is a redevelopment plan of an underutilized property in the center of the city. Will be consistent with the objectives of the city's comprehensive plan and this chapter. Finding: The proposed use is consistent with the City Comprehensive Plan. Will be designed, constructed, operated and maintained so to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. Finding: Meets the zoning district requirements and design standards. Will not be hazardous or disturbing to existing or planned neighboring uses. Finding: Sun'ounding uses are commercial. Will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. Finding: The site is cmTently serviced by municipal services. Will not create excessive requirements for public facilities and services and will not be detrimental to the economic welfare of the community. Finding: The site is cun'ently serviced by municipal services. Will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare, odors, rodents, or trash. Finding: The uses are consistent standards of the Central Business District. Will have vehicular approaches to the property which do not create traffic congestion or interfere with traffic or surrounding public thoroughfares. Finding: The mix of uses provides day and nighttime uses with a shared parking plan. Will not result in the destruction, loss or damage of solar access, natural, scenic or historic features of major significance. Market Street Station September 16, 2003 Page 7 Finding: The city's design proposed a uniform design consistent/compatible with surrounding developments. 10. Will be aesthetically compatible with the area. Finding: The proposed use will be compatible with the area. 11. Will not depreciate surrounding property values. Finding: The use will not depreciate surrounding property values. 12. Will meet standards prescribed for certain uses as provided in this article. Finding: The use is consistent with the Central Business District. Based upon the foregoing findings, staff is recommending that the conditional use permit be approved with appropriate conditions. SITE PLAN REVIEW Building Height Building Setback COMPLIANCE TABLE - CBD DISTRICT Ordinance no maximum no maximum Parking stalls Parking Setback Hard surface Coverage Lot Area 100 x 100 Gradin?_JDrainalze/Erosion Control Per Parking Study no maximum no maximum Proposed Development Highest roof peak is 38 ft. The restaurant on Market Street is the closest to a public street at 100 feet. 526 stalls closest point is 75 feet. N/A I 1.4 acres Minimal grading for the site is being proposed with three new buildings replacing the existing bowling alley and reconfiguration of parking around the new buildings. Existing Market Street Station September 16, 2003 Page 8 topography and work limits the need to be shown on the plans. Drainage will be routed to both existing and proposed storm structures connected to an existing storm sewer line along the bowling alley access on the south side of the buildings. The applicant needs to submit proposed storm sewer sizing and drainage calculations showing that the storm sewer will accommodate the runoff. An emergency overflows needs to be added in thc parking lot to ensure that storm-water will drain out of the parking lot and not into the buildings. The emergency overflow elevations must be a minimum of one foot 0.8-foot lower than the proposed building elevations. Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type II erosion control fence be used around construction areas. Add a rock construction entrance. Utilities The applicant is proposing to relocate the existing sanitary sewer and water-main to accommodate the placement of buildings. The applicant must dedicate a 35 ft. wide public drainage and utility easement for the new utility lines and show it on the plans. Sanitary sewer and water hookup charges along with the Metropolitan Council's SAC fee will be due on all of the lots at the time of building permits issuance. All of these charges are based on the number of SAC units assigned by the Metropolitan Council. The current 2003 sanitary hookup charges is $1,440/unit, the water hookup charge is $1,876/unit, and the SAC fee is $1,275/unit. All lateral connection charges will be waived since the applicant is installing the lateral utility lines. Public utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary financial security in the amount of 110% of the estimated project cost in the form of a letter of credit or cash escrow to guarantee installation of thc improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. Streets & Drive Aisles The shared drive aisle through the site is a private street. As such, the road must be a minimum of 26 ft. wide, built to a 9 ton design, and enclosed within a 40 ft. wide private easement. The applicant must supply inspection reports certifying that the private street is built to a 9 ton design. All drive aisles adjacent to parking must be a minimum of 26 ft. in width. Market Street Station September 16, 2003 Page 9 The applicant is proposing to use two existing full accesses onto Market Boulevard along the west side of the parcel. One additional access is proposed along the south side of the site onto Pauly Drive. Ali drive aisles adjacent to parking must be 26 feet in width except the drive aisle along the north side of the proposed restaurant building which can be 24 feet. Easements The development proposal assembles the various lots and remnant parcels together into a single large lot which requires the vacation of Pauly Drive and other easements. Cross easements will be used to perpetuate the road system, allowing flexibility in design and operation of the Market Street Station complex. This is the best way to assemble and utilize the parcels purchased from the City, while accommodating the needs of all the future tenants. Sidewalks There is existing sidewalk along Market Boulevard on the north side of Pauly Drive. A new sidewalk will be placed on the north side of the north entrance and where pedestrians would have to cross to the south to the bank building. There is also a sidewalk along the cinema and the new restaurant adjacent to it. Wetlands There are no wetlands on the site. Parkin~ PHASE I New/Expanded Uses S.F. GLA. Spaces/1000 Spaces Needed S.F. Day Night Restaurant/Coffee Shop 3,000 sf 10 day 30 15 1 story 5 night Restaurant w/bar 5,000 sf 10 day 50 100 I story 20 night Bank/Retail (lst floor) 21,665 sf 4 day 165 42 Office (2nd floor) 19,565 sf I night Cinema 1351 seats .02 day 27 270 .2 night Frontier Lower Level Fitness Center Dance Studio 11,000 sf 3 day 33 33 3 night 5,000 sf 1 day 5 15 Market Street Station September 16, 2003 Page 10 Office Park & Ride (existing) 4,000 sf 3 night 4 day I night 120 day 0 night Total Needed Phase I Reconfigured parking lot New east parking lot Total Parking Provided Phase 11 Potential Frontier Addition (Phase 25,000 sf 4 day II) office/retail I night Total Needs Phase 1I Note: All square footage find parking counts are approximate 16 4 120 0 446 479 421 421 105 105 526 526 100 25 551 526 Architectural Character of Buiidin~ As stated in the applicant's narrative, "The architectural intent of thc Market Street Station development is to provide as unified an assembly of buildings that include: the Chanhassen Dinner Theatre and associated commercial development of the Frontier Center; the a~iacent hotel; the commercial area immediately to the north across the street; and the larger context of the Highway 5 Corridor District and City of Chanhassen. This intent is, primarily, achieved via the disposition of buildings on the site; the planned routing of internal roads, drives and parking areas; and the architectural character of the buildings and landscaping. The development consists of thc following buildings in Phase I: A two-story main building of approximately 45,000 gross square feet containing a bank and commercial/retail tenants on thc first floor and speculative office space on the second floor. This building is the centerpiece of the development and occupies a prominent location on the site. A bank occupies the west end of the building. The bank has four covered drive-up lanes, one of which contains an ATM machine. The drive-up lanes are screened from Hwy. 5 by the main building and circulation to and fi'om the drive-up area is well controlled. Market Street Station September 16, 2003 Page 11 An approximately 3,000 gross square foot "pad" for a stand-alone restaurant or cafe that will likely have an area roi' outdoor seating/dining. This building is located immediately north of the main building and across the proposed site road that enters off of Market Street. An approximately 5,000 gross square "white table cloth" restaurant that will have an outdoor seating/dining area. This building is located immediately to the east and across the internal circulation road of the main building and is attached to the Chanhassen Cinema to the east. An addition to the Chanhassen Cinema on the south and, possibly east side, that includes a new, 220 to 230 seat, stadium-style auditorium and expanded lobby and entry areas. Please note that, whereas the Cinema plans to add an auditorium in this phase, the overall seating capacity roi- the entire cinema complex will only moderately be increased because prior to this proposed project, the cinema will be converting the remaining, traditional- style seating areas to stadium seating which is far less dense. The accompanying parking summary takes both the proposed new auditorium and the conversion of the existing, traditional-style auditoriums into account. Phase II (and later phases) focus on an approximately 25,000 gross square foot addition to Frontier Center to the south of the existing building and the possibility of additional lobby space and up to two additional auditoriums roi' Chanhassen Cinema. Land purchase/future leasing scenarios are, as yet, unknown roi' this phase and parking requirements for this possible future development will be difficult to meet without a future, structured parking ramp. As such, these future plans are shown only diagrammatically on the site plan." Disposition of Buildimzs/Roads on the Site Again, as stated in the applicant's narrative, "The development has been designed to accommodate the design requirements of thc City, the requirements of thc development for highly visible commercial space and the requirements of tenants to have individual identities. By developing thc project as several buildings rather than one large building, the scale of the development has been reduced and designed to develop a very desirable precinct or commercial neighborhood with highly recognizable entries, streets, pedestrian ways and parking areas. For example, the "pad" restaurant is located ac[jaccnt to a main site entry road and the west end of the main building containing the bank. This composition of building location, massing and roof forms allows for a highly lma,:,e-ablc entry area for the northern portion of the site. This entry road continues to the east where the entry/drop-off area for the second floor offices and north facing first floor retail areas are located. Thc L-shaped plan of the main building and the design of the road/landscaped islands creates a courtyard mTangement that helps to differentiate the areas of the site and provides more apparent entry points. Diagonal parking marks this road as a special vehicular circulation route within the development. As the road turns south, it becomes a major internal street for the development and is strongly marked by the massing and rooflines of the flanking corner pavilion form of the main building and the "white table cloth" restaurant to Market Street Station September 16, 2003 Page 12 the east. The south entry drive will be located in the general area of Pauly Drive and will serve as a circulation way for the development as well as serving as the route for thc Southwest Metro Park and Ride. There will also be a new drop-off area immediately south of the cinema to ease congestion at the cinema before and after shows." Chanhassen Cinema The ownership of the Cinema provides this additional narrative of their project's background, goals and needs: "The Chanhassen Cinema is a recognized anchor business in downtown Chanhassen. We currently draw close to 300,000 people to the downtown area every year. We are confident that thc city recognizes the importance of our continued existence and financial viability by allowing us relief fi-om some cun'ent zoning restrictions in order for us to remain competitive and profitable. We expect to achieve our goals by joining along with Market Street Station LLP in the development of Market Street Station on the site of the old bowling alley on Pauly Dr. We are relinquishing our current easements to help facilitate and promote this entire project and we are confident the city recognizes the importance of granting our requests via the PUD. Backlzround The cinema opened in 1997 with eight screens in a remodeled facility. Soon after opening, a proposed expansion of up to sixteen screens on the bowling alley site was denied by thc city for various reasons. The cinema then decided not to pursue the project. The site has been an eyesore ever since. Thc Cinema changed ownership and management in March of 2001. The Cinema experienced solid growth and improved profitability up to and until the day a major big box cinema chain opened up at Eden Prairie Mall on April 19, 2002. This Eden Prairie facility with its 15 screens and high-tech equipment has had a significant impact on our business. They have forced us to review our business plan and methodology in order to remain a viable and competitive movie theater for years to come. Our experience and studies indicate we need additional seating theater capacity, all with stadium style seating, improved lobby capacity and a highly visible sign to indicate our location. We currently have eight theaters, four of which are non-stadium style houses. Our need for one, two or even three more theaters is necessary for capturing more mainstream films and attracting more customers to the downtown area. Our lobby is currently accessible only via outside stairs and handicap ramping. Risk for injury and lawsuits, especially during the winter season, is significant. There currently is no signage to indicate our location other than what is on the fl'ont Market Street Station September 16, 2003 Page 13 facade of our building, which faces no roads and is not visible from anywhere other than directly in front. We sometimes inconvenience our customers with inadequate lobby space. In order to remain viable and competitive, our intentions include the following: · Participate with Market Street Square LLC in the PUD. · Renegotiate our parking easements in favor of all parties involved · Financially participate in new parking stalls. Remodel four existing theaters into stadium style seating. This will reduce the number of seats by approximately 230. This is a separate project from the overall development. This will help facilitate parking needs within the PUD. Phase 1: 2. 3. 4. Add one 230-seat stadium theater. Redesign and expand lobby to encompass customer entry at ground level Enlarge existing concession area. Erect a sign on thc corner of Market Blvd. and Pauly Dr. to identify and complement all of Market Street Station, the Cinema and Southwest Metro Transit Park & Ride. Improve exterior appearance of building via a grand entrance facade, accent lighting, neon bands, chaser (running) lights and more movie poster locations built into wall treatment. Add outdoor seating along walkways under new canopies around building. Phase 11 or !11 or beyond: 1. Allow for more expansion encompassing the existing alley between the Cinema and the Frontier building. 2. Parking allocation to coincide with future proposed parking ramp." Architectural Comlffiance (this is an overview of all buildimzs) Sec 20-1062 District Applications exceptions Internal alterations to httildin,~s af{~ectin,g less than 50 percent o/',~ross /loot area or Replace,tent or repair o/'existin,g materials or Stamlards apply oulv to the buildings or site bein,~ developed or altered. Finding: Thc cinema is an existing industrial building. Additions to the building will enhance the design. The new building meets standards and staff is recommending a variance for the cinema for the architectural standards for facade transparency because of the use of the building as a cinema. Market Street Station September 16, 2003 Page 14 Sec 20-1063 Architectural Style/Building Character [] Design is not restricted but it should fit in with thc surrounding uses nothing bizarre or exotic The applicant states that, "The architecture of the Market Street Square development substantially conforms to the Dexig~ Stamtards for Commercial, b~duxtrial, & Ol?i'ce Institutio~al Developments qf the City q{' Ctumhasse~. The architectural design strives to harmonize with the surrounding context of the entire parcel (including the Chanhassen Dinner Theatre, hotel, and Frontier Center) while setting a new standard for development of the property. The buildings have been designed to have significant variations in detail, material use, texture and form to provide visual interest. All of the buildings are designed around a 30' module that is subdivided first into 15' foot, bay spaces and then into a 5' module that accommodates window and wall assemblies. The first floor faqjade of the building is composed of "fi-ames" of windows and doors that are 15' on center and are formed with architecturally finished pre-cast concrete trim pilasters and matching lintel band. These frames modulate the fagade of the lower level and provide interest by casting shadows on the building elevation. This regular rhythm of frames sets the design tone for the project and allows for the "fagade events" that occur at various points along the elevation. Fol' example, at the south elevation, thc bank building has two projecting bays and a recessed entry area, and, fm'ther east, bays that project out fi'om the base wall plane modulate the scale of the building. The bay spacing also allows for appropriate placement of fabric awnings for retail spaces on the first floor. These projecting bays, recessed entries and fabric awnings serve to mark the entrances to the various retail and office spaces and break down the scale of this elevation to a more pedestrian fl'iendly environment. The cultured stone base on thc buildings further helps to provide interest to the elevations as well as a long lasting, durable material at this damage prone area of any building. At the Cinema, architectural pre-cast concrete panels with heavy .joint lines and display case windows break-up the long south wall elevation. All of these techniques serve to articulate the facade of the buildings. The ground level of thc two-story main building is made visually distinct from the second floor by introducing a "belt course" around the buildings at the level just above the first floor windows. This distinction is made even more apparent by making a change in materials to vertically oriented, pre-finished, fiber-cement siding that is applied in a vertical pattern that conforms to the previously noted 5' module. This siding is applied in a batten fashion so that the upper story has visual interest by virtue of the shadows cast by the board and batten pattern. This strikes a regnlar rhythm of siding that readily accepts modular windows and provides visual interest via surface texture. This area is also often used as a band on which signage can be logically arranged and accommodated. At the Cinema, the structured canopy provides the visual division between the upper and lower level. The Cinema further distinguishes the pedestrian level from the auditorium wall by changing materials to a stucco finish exterior insulation system. This tipper wall system uses a technique similar to the fiber-cement siding used of the other buildings, only at a much larger scale. As on the other buildings, the tipper Cinema waif is based on a 5' and 10' module.' Large battens are formed every 10' to provide more visual interest via shadow lines on the fa(jade. These battens are of a larger scale (approximately 2" Market Street Station September 16, 2003 Page 15 deep) than those of the fiber-cement siding in keeping with the larger scale of the Cinema. The rooflines of the buildings are, perhaps, the most important architectural features on the project as they provide significant visual interest to the project by providing a variety of roof forms, building profiles and "events" along the facades. Ends and corners of buildings typically end in a gabled or dormered roof or a turreted or pavilion-styled roof forms. Hip roof forms, while not present in the designed buildings, can also serve the same purpose at restaurant areas that are yet to be finalized. The roof pitch for mansard m'eas is to be approximately 12 inches vertical for every 5 inches horizontal. Main areas of roof (gables) will have a pitch of 10 inches vertical for every 12" horizontal. Dormer projections and porch areas are to have a roof pitch of approximately 4" vertical for every 12" horizontal. Feature areas such as pavilion roofs are to have a pitch that ranges between approximately 4" and 6" vertical for every 12" horizontal. Cupolas or other ancillary roof rearm'es may also have roof pitches that range from 4" to 12" vertical for every 12" horizontal. Mechanical equipment is screened via roof features such as ridges and gables. In particular, the mansard roof screen at the main building both screens equipment and recalls design motifs used at the Frontier Center to the northeast and other commercial developments in the area. Trash and meter areas are screened via wall construction similar to the rest of the buildings. Mechanical equipment that serves thc buildings is typically located on fiat roofing systems screened by mansards or other roof features. Finding: The design is consistent with the surrounding uses. Once the existing bowling alley is removed, there will be a segment of the wall that will be left painted block. The applicant proposed to landscape the planter island to screen it. Sec 20-1064 Size portion Placement [] All buildings shall be setback as close as possible to the principal building setback [] Entrances shall be as close as possible to the abutting streets [] All components, such as windows, doors, eaves and parapets, shall have good portions that relate to the la,jade [] Entries o Canopy, portico, overhang or re'ch over the entrance o Recesses or projections in the building facade sun'ounding entrance o Peaked roof or raised parapet over the door o Display windows around the entrance o Architectural detailing such as tile work or ornamental molding o Permanent planters or window boxes for landscaping [] Articulation o No unbroken expanses of greater than 40 feet break into smaller increments (20- 40 feet) o Facade modulation-stepping back or forward or extending a portion of the facade o Vertical division into storefronts with separate display windows and entrances o Division into storefronts with separate display windows and entrances Market Street Station September 16, 2003 Page 16 o Variation in the rooflines by alternation dormers and stepped roofs. Gables or other roof elements to reinforce the modulation or articulation o Provide a light fixture, trellis, tree or other landscape feature [] Ground level of a multi story must be visually distinct from the upper stories through the use of: 0 0 0 0 0 A intermediate cornice line A sign band Awning arcade 07' portico Change in building material, texture or detailing A change in window treatment Finding: Meets these standards. Sec 20-1065 Material and detail [] High quality materials, accent material may occupy up to 15 percent of the buildings facade, acceptable materials include: · Brick · Stone · Glass · Textured Masonry Units · Wood, consisting of lap siding with an exposure not greater than 7 inches or wood shakes, surfaces must bc painted · Stucco · Tilt-up concrete panel the a grid or brick like in appearance Exterior Walls: Exterior walls on most of the buildings are either cultured stone or prefinished, vertically oriented, fiber-cement board or a combination of the two. Some walls at key areas such as entries 07' building ends are shown as having cultured stone up to the bottom of the lintel line; however, further design development may result in stone reaching only to the aforementioned building base with the fiber-cement board systcm above. The color of these walls will be a soft grey, tan or beige. The exterior walls of the Cinema are architectural finish pre-cast concrete with cast reveals and faux stone joints with graffiti resistant sealer or paint for the lower section of the walls and stucco finished exterior insulation system with cast faux .joints and projecting vertical battens. Again, the exterior walls of the Cinema are to be of the same color palette as the rest of the development. Gable ends of roofs are marked by pro-finished ornamental louvers or diagonally patterned, pro-finished fiber-cement board and batten ornamental patterns. The gable ends will be of the same color 07' slightly lighter than the walls. The Cinema may use pre-formed or cast ornamental panels in the wall panels of the main entry area. Exterior Building Bases: Cultured stone base (adhesive applied). Minimum of 16" high around perimeters of each building except for the Cinema (see below). There is a possibility of corner conditions having an ashlar laid or dressed stone appearance. The cultured stone is to have a tan, light gray and/or brownish beige color. Screen walls for outdoor seating areas at restaurants are Market Street Station September 16, 2003 Page 17 to be of the same cultured stone material with a cast or pre-cast stone top. If more transparency is required at the outdoor seating areas by tenants of the rcstam'ants, then painted, ornamental metal guardrails may be considered. The Cinema is concerned about issues of durability and graffiti resistance at the lower areas of the building. They are also concerned that the cultured stone at the base provides the wrong image for the cinema. The base of the Cinema is to be architectural finish pre-cast concrete panels with cast joints to resemble large, ashlar laid stone masonry (such as Mankato or limestone) and to be of similar color as the cultured stone. As such, the base for the cinema is done in a color similar to thc cultured stone but using a "grand order" of ashlar stone appearing panels. The design intent is to have the larger scale of the Cinema visually tied to the development by providing more monumentally scaled materials that are of the same color and apparent texture of the rest of the development. Finding: Meets these standards. Sec 20~ 1066 Color ~ Harmonious, muted colors with low reflectance. ~ Brilliant colors and sharply contrasting colors can be used for accent purposes only and may not occupy more than 10 percent of a facade. Finding: Meets these standards. Sec 20~ 1067 Height and Roof Design [] Height is limited to 3 stories or 40 feet in the Overlay District otherwise they must be consistent with the underlying district. Maximum height exclude antenna but does include architectural features (parapet walls). [] Pitched roofs shall have a minimum roof pitch of 1 foot of rise to every 4 feet of run. Each building shall have more than one pitched element. [] Average parapet height shall not exceed 15 percent of the height of the supporting and maximum height at any point shall not exceed 1/3 of the support wall. [] Mechanical equipment screened. No wooded fences on the roof. Exposed Roofing: Asphalt shingles are to be used on all visible roof features except at the Cinema and on monument and pylon signs where Bermuda-style, pro-finished metal roofing is to be used. A light grey to blue-grey is anticipated for the metal roofing while the asphalt shingles are proposed to be soft grey, tan or beige. Pro-finished metal roof flashing for the asphalt shingle roofs will be complimentary in color. Finding: Meets these standards. Sec 20-1068 Facade transparency [] 50 percent of the first floor elevation that is viewed by the public shall include transparent windows and/or doors. All other areas shall include landscaping material and architectural detailing and articulation. Market Street Station September 16, 2003 Page 18 The windows and exterior doors are to be pre-finished metal or vinyl clad wood or anodized aluminum frames with clear, low 'e' insulating glass. The restaurants may chose to have more ornate wood and/or aluminum doors and this is perfectly in keeping with the modular pattern of the exteriors of the buildings. Sec 20-1069 Site Furnishing [] Community features may include: landscaping, lighting, benches, tables Finding: Staff recommends bike racks and benches be added. Sec 20-1070 Loading areas, rq/hse area, etc'. [] Screening of service yards, refuse and waster removal, other unsightly areas and truck parking/loading areas. Finding: Meets these standards. Sec 20-1070 Landxcaping [] Preserve and enhance natural features (mature trees, wetlands, etc.) [] Grades conform to Americans with Disabilities Act [] Emphasize massing rather than isolated or scattered placement. [] Unity of design with repetition of certain species or materials. [] Materials selected for texture and color, size, etc [] Appropriate for location, i.e. traffic [] In areas where plants won't prosper, rock gardens, raised planters, fence or walls may be used. Finding: The majority of the landscaping is along the perimeter and parking islands. Sec 20-1073 Lot Frontage and Parking location 1. Highway 5 ~ Abutting Highway 5, the Highway is the fl'ont setback [~ Also abuts thc frontage road (double frontages) ia One row of parking shall be allowed in the front setback-screened 2. All other Commercial, Industrial or Office-Institutional Districts [] Parking distributed around large buildings ~ No more than 50 percent of the parking shall be between the front facadc and the principals guiding the primary street Finding: Meets this standard. LANDSCAPING The applicant narrative states "the road and parking system are well defined with landscaped Market Street Station September 16, 2003 Page 19 islands and pedestrian walks around the buildings. The existing landscape will be modified to accommodate the new pattern while maintaining good visibility to the retail facades and cinema marquis. The bank drive through facility will be screened with landscaping along Market Boulevard. The exposed east face of the Chanhassen Cinema will receive special landscape treatment, including decorative arbors and vines, integrated with new cinema exits and signage. The area along the raih'oad tracks will be cleaned up and integrated more carefully into the setting. Site lighting will be relocated to accommodate the adjusted parking lots and new light fixtures will be installed in the proposed eastern parking lot." Minimum requirements for landscaping include 18,290 sq. ft. of landscaped area around thc parking lot, 73 trees for the parking lot, and boulevard trees along Market Boulevard. Applicant's proposed landscaping as compared to the requirements fei' landscape area and parking lot trees is shown in the following table. Vehicular use landscape area Trees/parking lot Market Boulewlrd trees (1 per 30 feet) Requi red 18,290 sq. ft. 73 overstory 7 overstory Proposed approx. 9,150 sq. fi. 73 overstory 7 ovcrstory Applicant meets minimum requirement for landscaping quantities. City ordinance requires a landscape island or peninsula for every 6,000 sq. ft. of vehicular use area. The applicant is short 2 islands in the parking areas that contain 16 spaces and 23 spaces that are directly south of the theater and new building. The proposed islands appeal' to be less than 10 feet in width and therefore will require aeration tubes; however, a better solution would be to widen the island to allow for better growth. Staff recommends that the applicant reconfigure landscape islands to increase planting space. As noted in the plant schedule on the landscape plan dated August 15, 2003 there will be a choice of tree selected as a unifying species along the "main street". In the selection of species given, only the honeylocust and red maple meeting the minimum requirements for parking lot landscaping. LIGHTING Lighting locations for the parking lot have been illustrated on the plans. They are located in the planter islands. The cinema proposed a significant amount of lighting. The cinema was granted approval for an electric sign with chaser lights, which will be continued with the addition. Up- cast lights are proposed on the two elevations of the new roof. While this may provide an interesting marker for thc cinemMcntertainment center, the ordinance does not permit unshiclded up-lighting. If the Planning Commission wants to approve them, they could be noted in the variance sections. Market Street Station September 16, 2003 Page 20 SIGNAGE Monument, Pylon and Awning Signs: An approximately 21' to 24' high pylon sign is to be placed in the southwest corner of the site. It is proposed to be a two-sided sign. it is designed to incorporate motifs fi-om the main building and the Cinema. Thc sign is designed to have a cultured stone base and stucco finished metal columns that are of similar proportion to thc pilasters used to separate the window-wall system on the first floor of the main building. The top is a combination of the ornamental gable ends found on thc main building and the neon canopy band of the Cinema. The sign is proposed to have "Market Street Station" in the gable area of the sign. Immediately below the gable is a row of neon tubes similar to those on the canopy of the cinema and directly below this are chaser lights that rim the soffit area of the neon strip area that, again, mimics the cinema canopies. The main, rectangular sign (saying, "Chanhassen Cinema") below the gable motif will be an individually lit (via neon) channel lettering-style and chaser lights are placed along the entire perimeter of the sign. Below the "Chanhassen Cincma" sign and between the columns is an LED reader board with red LED's. It is assumed that a channel lettering sign is to be provided below thc LED reader board to accommodate the needs of the Southwest Metro Park and Ride. The sign may have an ornamental weather vane of a profile of an old-fashioned cameraperson with their camera. Monument signs are to have the same cultured stone base and sides of pro-finished cement board as the main building. Thc roofs of these signs are proposed to be Bermuda-style, pro-finished metal roofs to coordinate with thc pylon sign and Cinema. It is presumed that the metal roofs will both last longer and look better than asphalt shingles at these locations. The signs will be individually lit channel lettering signs. Monument signs for the bank (of which there are two) will include signage and directional mTOWS for the drive-up ATM machine. A monument sign is also proposed at thc east end of the axis of the entry road off of Market Street to direct patrons to the Cinema. There may be one to three additional monument signs based on future tenants such as the pad restaurant. Awnings and awning signs are to be used. They are, typically, considered to be made of an opaque, canvas-type material for the roof and sides and a translucent, printed fabric for the fi'ont face that serves as the sign for the business and can be backlit at night. The awnings can have either be a shed, pitched or arched profile in elevation." Signs are proposed on all building facades, as noted in the architectural plans. The site will have one pylon sign, south of Pauly Drive, setback approximately 10' along Market Boulevard. The pylon sign is primarily for cinema use but will also contain a reader board and signage for the Southwest Metro Park and Ride. This pylon sign requires a variance because pylon signs are permitted only on highway frontage. Because the site is the "entertainment center," the cinema does not have frontage and the only city park and ride is now located to the interior. Staff supports the pylon sign 20 ft. high, but it is too close to Market Street. The top billing on thc sign is the Cinema. Staff would like to work with the applicant to ensure Southwest Metro Transit is clearly identified as well as the identification of the center (Market Street Station). Directional signs for the drive through bank will be located on the circulation island and adjacent Market Street Station September 16, 2003 Page 21 to the bank building. Two bank signs arc proposed to be ground monument signs. Staff is recommending only one monument sign be permitted per ordinance. Directional signs and a wall sign are permitted. Wall signs should be consistent with city ordinance with channel letters and backlighting. Monument signs are designed to fit the architecture of the buildings. These signs are located facing diagonally to Market Street at the two site entrances. The restaurants will also have monument signs similar to thc bank monument. SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil remowtl and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; (4) Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to thc development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: An internal sense of order for the buildings and uses on the site and provision of a desirable environment fox' occupants, visitors and general community; b. Thc amount and location of open space and landscaping; Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with a~jacent and neighboring structures and uses; and Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. Market Street Station September 16, 2003 Page 22 (6) Protection of ac[iacent and neighboring properties through reasonable provision for surface water drainage, sound and sight burl'ers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the City's Highway 5 comdor design requirements, the comprehensive plan, thc zoning ordinance, the design standards, and the site plan review requirements with the exception of the hard surface coverage and the parking deficiency. The applicant is applying for a variance and staff is recommending approwd of the variances. The site design is compatible with the surrounding developments. It is functional and harmonious with the approved development for this ama. Staff regards the project as a reasonable use of the land. Based upon the foregoing, staff is recommending approval of the site plan, with wu'iances, with conditions outlined in the staff report. VARIANCE ANALYSIS The applicant is requesting relief fi'om the fenestration requirement on the Cinema. The building is a reuse of an industrial building and currently doe not meet window opening requirements. The proposed addition and new front entrance enhances the look of the building. The entrance has a significant amount of windows. In addition the new restaurant will further enhance the look of the Cinema. The applicant is also requesting a pylon sigh 20 feet in height along Market Boulevard. It is important because the only park and ride is in thc interior of this site that is being identified. The cinema is also one of the largest attractions in thc development. Staff supports the variance but wants to work with the applicant to ensure visibility for all users on the sign. FINDINGS The Planning Commission shall not grant a variance unless they find the following facts: That the literal enforcement of this chapter would cause undue hardship. Undue hardship means that the property cannot be put to reasonable use because of its size, physical surroundings, shape or topography. Reasonable use includes a use made by a majority of comparable property within 500 feet of it. The intent of this provision is not to allow a proliferation of variances but to recognize that and develop neighborhoods where pre- existing standards exist. Variances that blend with these pre-existing standards without departing downward from them, meet this criteria. Market Street Station September 16, 2003 Page 23 Finding: The variance for the Cinema is based on a preexisting condition. entrance will have numerous windows. Thc new b. The conditions upon which a petition for a variance is based are not applicable, generally, to other property within the same zoning classification. Finding: This is the only cinema in the city. c. The purpose of the variation is not based upon a desire to increase the value or income potential of the parcel of land. Finding2 The use of the building is a theater which necessitates less light. Those areas that can allow light in such as the entrance do have windows. d. The alleged difficulty or hardship is not a sell' created hardship. Finding: It is based on the reuse of a building. e. The granting of the variance will not be detrimental to the public welfare or injurious to other land or improvements in the neighborhood in which the parcel is located. Finding: The building is currently being used this way. The other improvements will add to the value. f. The proposed variation will not impair an adequate supply of light and air to adjacent property or substantially increase the congestion of the public streets or increase the danger of fire or endanger the public safety or substantially diminish or impair property values within the neighborhood. Finding: The improvements should improve property values and not cause congestion or impair air or light. Staff is recommending approval of the fenestration wn-iance based upon the findings listed above. Sign Variance Criteria The City Council may grant a variance from the sign ordinance where by reason of topography or other conditions strict compliance with the requirements would cause a hardship. Finding: While the site is visible from Market Boulevard the Cinema has no street presence. In addition the park will be moving to the interior of the site and will also not be visible from Market Blvd. Market Street Station September 16, 2003 Page 24 RECOMMENDATION Staff recommends the Planning Commission adopt the following motion: "The Planning Commission recommends approval of Market Street Station, LLP, for Site Plan Review 03-9 with a variance for fenestration on the Cinema and the pylon sign, Conditional Use Permit 2003-5, for more than one building on a lot and Rezoning 03-03 from General Business to Central Business District as shown on plans dated August 15, 2003 and September 2003 based on the findings of the staff report, and subject to the following conditions: 1. Show the driveway dimension on the site plan to read 26 feet in width and the access cornel' radius to read 30 feet. 2. Submit storm sewer and drainage calculations for staff review before site plan approval. 3. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign all plans. 4. Sanitary sewer and water hookup charges along with the Metropolitan Council's SAC fee will be due on all of thc lots at the time of building permits issuance. All of these charges are based on the number of SAC units assigned by the Metropolitan Council. The current 2003 sanitary hookup charge is $1,440/unit, thc water hookup charge is $1,876/unit, and the SAC fee is $1,275/unit. 5. On the grading plan: i) Add silt fence type 11 around the construclion limits. ii) Show rock construction entrance. iii) Show existing contour lines. iv) Show a bench mark (mean sea level datum.) v) Show all existing and proposed easements. vi) Show existing and proposed property lines. vii) Show the construction limits for phase I. 6. Show all existing utilities, buildings and street lights within the site. 7. Show the proposed storm sewer pipe type, size, slope, class and manhole rim/invert elevations on the plans. 8. Show the existing and proposed storm sewer flow direction. 9. On the utility plan: a. Show all existing and proposed utility easements. b. Show the location of proposed water and sanitary services. c. Show the existing sanitary and water-main in profile view within the construction area. d. All of the public watermain will be PVC C-900 pipe. e. All public sanitary sewer pipe type will bc PVC, SDR35. 10. Add the latest version of City of Chanhassen detail plates # 1002, 1004, 1006, 2101, 3101, 3102, 5201,5203, 5206, 5207, 5214, 5215, 5216, 5300 and 5301. 11. Submit private easement fei' thc shared storm sewer before building permit issuance. Add a storm sewer schedule. Market Street Station September 16, 2003 Page 25 12. Seed and mulch or sod the site within two weeks of grading. Submit haul route for City approval prior to any hauling. 13. installation of the private utilities for the site will require permits and inspections through the City's Building Department. 14. Construct public utility improvements in accordance with the City's latest edition of Standard Specifications lind Detail Plates. 15. Submit detailed construction plans and specifications for the public utility improvements and approved before final platting. 16. The applicant shall enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval in the amount of 110% of the public improvement cost estimate. 17. Before building permit issuance, permits fi'om the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. 18. The main drive aisle must be a minimum of 26 feet wide, built to a 9 ton design, and enclosed within a q0 foot wide priwlte easement. Private drive no longer applicable. 19. Concrete driveway apron, per City detail plate #5207, is required at all the access points to the site. 20. Dedicate on the plat a 35 foot wide drainage utility easement over the public utility lines located in the main drive aisle. 2l. Add emergency overflows a minimum of one foot 0.8-foot lower than acljacent building elevations in thc parking lot. 22. Submit inspection reports certifying that the private street is built to a 9 ton design prior to certificate of occupancy. Parking lot no longer applicable. 23. The applicant may choose fi'om thc plant schedule on the landscape plan dated attgust 15, 2003 only honey locust or red maple as the unifying tree along "main street." Staff recommends that the applicant choose honey locust as its unifying tree species. 24. The applicant shall install two more islands in the parking areas that contain 16 splices and 23 spaces that lire directly south of the theater and new building 25. The applicant shall increase landscape island width to a minimum of 10 feet or install aeration tubing. 26. A revised landscape plan shall be submitted for city approval. 27. Any existing tree shown on the plans will be required to be replaced it' it dies. 28. Additional Street Furniture including benches, planter and bike racks shrill be added through out the development. 29. Removal of a portion of accent lights for the cinema. 30. Removal of one of the monument signs for the bank building along Market Boulevard. 31. Provide a bus circulation plan with sufficient radii. Has been met. 32, The buildings are required to have tin automatic fire extinguishing system. 33. The plans must be prepared and signed by design professionals licensed in the State of Minnesota. 34. A demolition permit must be obtained before beginning demolition of any existing structures. 35. Provide an engineered utility plan for review. Market Street Station September 16, 2003 Page 26 36. The location of property lines, existing and new, will have an impact on the code requirements for the proposed buildings. The plans as submitted do not have thc information necessary to determine code requirements. Provide a preliminary site plan indicating the proposed property line configuration so code ramifications can be determined. 37. The owner and or their representative shall meet with the inspections Division as soon as possible to discuss property line issues as well as plan review and permit procedures. 38. Provide and construct waiting areas adjacent to the Frontier Building for drop off and pick up as shown on plans dated October 1, 2003. ATTACHMENTS 2. 3. 4. 5. 6. 7. Application. Public hearing notice and property owners list. Letter from Center Point Energy dated August 25, 2003. Memo fi'om Steven Torell dated August 26, 2003. Memo from Mak Sweidan dated September 9, 2003. Plans dated August 15, 2003 and September 2003. Revised plans dated October 1, 2003. 08/15/2003 11:31 FAX 612337.5601 DAGHLGR SHARDL0W & I_FBAN [~002 PROJECT NAME L(2UA I-1(2N. LEGAL DESCRIPTION Street Station see attached TOTAL ACREAGE 11.4 +/- ~czes PRESENTZONING Central Business District and Geueza! Business District REQUESTED ZONING PUD PRESENT LAND USE DESIGNATION Commercial REASON FOR THIS REQUEST Redevelopment of bowling alley property to accommodate Lank~ retail~ 9fficq.,.restanrants, cinema and Fork and ride. This application must be completed in full and be typewritten or dearly printed and must be accompanied by all information and plans required by applicable City Ordinance previsions. Before filing this application, you should confer with the P;annin9 A determination of completeness of the applicat, ion sl~all be made within ten business days of applicgtion submittal. A written notice of application deficiencie~ shall be mailed to the applicant within ten business days of application. Tl~is is to certify that I am making application for the described action by the City and ti~at I am responsible for complying with all City requirements with regard to:this request. This application should be processed in my name and I am the'party whom the City should contact regarding ~ny matter pertaining to this application. I have attacl~ed a copy of proof of ownership (either ?~ovo[Owner'sDuDIoate Certifie. am of Title_ AhRtmnt nf Tif ~ nr nl irc_h~ca 2htCh~.)r'Th~nf~ nr I nm the n~ ifhnriT¢Cl nerenn ,n msba sapp¢O~uon~nd zne~eeownernas a so signed fill,9 app IO8.tlOl% I will keep myself informed of the deadlines for submission of m~terial and the progress of this ~pplication. I fudher understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I hay(: submitted are true and correct to the best of my knowledge_ The city hereby notifies the applicant t~h,~a}~.d..ev.e,?Ten[~r,e, vi..e,.w,, ca~n,~ot be completed within 60 days due to punic hearin~q extension for developrr~r~re'cT~w:-., Development review shall be completed within 120 days unless additional review ~gx/ena~ns are appr.~, ed by the apprpant_ '4/~ 'P¢~Signature of Apptica~ ...._ ~'" [2 / ~ / Date Signature of Fee Owner Date Application Received on _ Fee Paid .... Receipt No. The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting. .If not contacted, a copy of the report will be mailed to the applicant's address. EXHIBIT A Legal Description Outlots B, C and D, Frontier Cinema Addition, Carver County, Minnesota; and The West 90.00 feet of the South 13.50 feet and the East 60.61 feet of the West 150.61 feet of the South 3.5 feet of Lot 2, Block 1, Bloomberg 2nd Addition, Carver County, Minnesota. -9- NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING TUESDAY, SEPTEMBER 16, 2003 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 7700 MARKET BLVD. PROPOSAL: Market Street Station APPLICANT: LOCATION: Market Street Station, LLP Market Blvd, NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Market Street Station, LLP, is requesting rezoning from BG, General Business to CBD, Central Business District; replat of lots; conditional use permit for more than one building on a lot; site plan review with variances of approximately 60,000 sq. ft. including cinema expansion, retail and offices, and vacation of drainage and utility easements. What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Kate at 227-1139 or e-mail kaanenson @ci.chanhassen.mn.us. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on September 4, 2003. WEST VfLLAGE RD ~ ~z 78TN ST w Smooth Feed SheetsTM Use template for 5160® CITY OF CHANHASSEN CIO BRUCE DEJ/gNG 7700 MAR~J~E'T'BLVD PO BOX 147 CHA~SSEN MN 55317 BLOOMBERG COMPANIES INC PO BOX 730 CHANHASSEN MN 55317 CHANHASSEN EDA ATTN: BRUCE DEJQNG .... 7700 MARKE%BI='¢I~ PO BOX 147 CHAN HA'S'S~'N MN 55317 STATE BANK OF CHANHASSEN 600 78TH ST W CHANHASSEN MN 55317 NATIONAL LODGING COMPANIES INC 11800 SINGLETREE~..L~IglTE 305 EDEN PR,~~ MN 55344 BLOOMBERG COMPANIES INC / ....... FO"BOX 730 CHAN HA.A.A~$E~' MN 55317 CHANHASSEN RETAIL LTD PRTSHP CIO BROOKSTONE INC 7400 METRO BLVD STE 212 EDINA MN 55439 CHANHASSEN SUITES LLC ATTN: JOHN KLINKHA~ER CEO 11800 SING,_~..B-,-TR'EE I..2~ITE 305 EDEN PRAIRIE MN 55344 BLOOMBERG COMPANIES INC PO BOX 730 CHANHASSEM ..... MN 55317 CITY OF CHANHASSEN CIO BRUCE DEJONG~N..~ 7700 MAR~D PO BOX 147 CHAf',~CrSSEN MN 55317 MARKET SQUARE ASSTS II LLC 470 78TH ST W PO BOX 250 CHANHASSEN MN 55317 BLOOMBERG COMPANIES INC ............ PO BOX 730 C HA.~S~-~q'~ MN 55317 TWO GREEKS AND A GEEK LLC t318 SIBLEY MEMORIAL HWY MENDOTA MN 55150 MARKET SQUARE ASSOC LTD PTRSHF 200 HWY 13 W BURNSVILLE MN 55337 CITY OF CHANHASSEN CIO BRUCE DEJONG 7700 MARKET BLVD PO BOX 147 CHANHASSE~- MN 55317 BLOOMBERG COMPANIES~NC _.~OX 730 CHAN~,I~.-~ MN 55317 WENDY'S INTERNATIONAL INC PO BOX 256 DUBLIN OH 43017 CITY OF CHANHASSEN CIO BRUCE DEJONG 7700 MAR~.E$-BLVD PO BOX 147 CHANcHASr~EN MN 55317 NATIONAL LODGING COMPANIES INC 11800 SINGLETREE LSIUITE 305 EDEN PRAIRIE MN 55344 BLOOMBERG COMPANIES INC PO BOX 730 CHANHASSEN M~I 55317 BLOOMBERG COMPANIES INC PO BOX 730 CHANHASSEN MN 55317 CHANHASSEN SUITES LLC ATTN: JOHN KLINKHAMMER CEO 11800 SINGLE TREE L2~ITE 305 EDEN PRAIRIE MN 55344 CHANHASSEN PROPERTIES LLC 570 PAULY DR PO BOX 514 CHANHASSEN MN 55317 INFINITY OF CHANHASSEN LLC 1865 W WAYZATA BLVD LONG LAKE MN 55356 MARKET SQUARE ASSOC LTD PTRSHF 200 HWY 13 W BURNSVILLE MN 55337 BLOOMBERG COMPANIES INC P.O BOX 73O CHANHASSEN .,,., ...... MN 55317 CITY OF CHANHASSEN CIO BRUCE DEJO~..~.-~ 7700 MARK..~T,,,BL~D PO BOX 147 CHANHAS~EN MN 55317 BLOOMBERG COMPANIES INC PO BOX 730 C HANHASSE~N~N 55317 CHANHASSEN EDA ATTN: BRUCE DEJONG 7700 MARKET BLVD,-PE~'BOX- 147 CHANHASSEN ........ MN 55317 AVERY® Address Labels TOM-DON REAL ESTATE HOLDINGS C/O DONALD M GUILLETT 13679 DUNBAR WAY APPLE VALLEY MN 55124 Laser 5160® ~PPLE AMERIGAN LP (APPLEBEE'S) C/O AVTAX 1025 WEST EVERETT RD LAKE FOREST IL 60045 slaqe-1 ssajpp¥ ®A~J ~IA~ ~ ROBERT DITTRICH 826 BROADWAY N PO BOX 755 NEW ULM MN 56073 ~09~5 Joj Oleldu~e~ osfl n,sleoqS peoj qlootus CenterPoint Energy Minnegasco Kathryn R. Aanenson Community Development Director City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN. 55317 August 25, 2003 RE: Market Street Station Dear Ms. Aanenson: With reference to the proposed development of Market Street Station, CenterPoint Energy Minnegasco does have existing gas mains currently within the project area. These natural gas mains are within easements exclusive only to CenterPoint Energy Minnegasco. They are recorded as documents 117821, 217929, & 217930, Carver County, Minnesota. In reviewing the plans sent to Cherie Monson, only document number 217929 is referenced and only a very small portion of that easement. CenterPoint Energy Minnegasco will modify these easements upon receipt of full reimbursement for the relocation of the natural gas facilities, together with new legal descriptions provided by your registered land surveyor for same. Forward all easement information and requests to me at the address below. Rick Pilon, Senior Administration Engineer will coordinate the actual relocation of the gas facilities. As to the vacation of utility easements the plans sent make no specific reference to what is to be vacated and I cannot as this time respond until you forward the vacation notice. Respectfully, CENTERPOINT ENERGY MINNEGASCO Steven Von Barg~n Right-of-Way Administrator P.O. Box 1165 Mpls., MN. 55440-1165 pc: Rick Pilon, Senior Administration Engineer Cherie Monson, Sales Consultant MEMORANDUM Kate Aanenson, Community Development Director FROM: Steven Torell, Building Official DATE: August 26, _00o , .~ SUB J: Site Plan review' lbr Market Street Station Planning Case: 2003-3 Rezone, 2003-9 Site Plan and 2003-3 Vacation I have reviewed the plans tbr the above project received by the Planning Department on August 15, 2003. Following are my comments, which should be included as conditions of approval. 1. The buildings are required to have an automatic fire extinguishing system. 2. The plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. A demolition permit must be obtained before beginning demolition of any existing structures. 4. Provide an engineered utility plan for review. 5. The location of property lines, existing and new, will have an impact on the code requirements for the proposed buildings. The plans as submitted do not have the information necessary to determine code requirements. Provide a preliminary site plan indicating the proposed property line configuration so code ramifications can be determined. 6. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss property line issues as well as plan review and permit procedures. G/sallzt.x/stJmcmos/plan/Markct Street Station MEMORANDUM CITYOF CHANHASSEN Administration Building Inspeclions Engineering Finance Park & Recrealion Planning & Natural Resources Public Works Senior Center Web Site TO: Kathryn Aanenson, Community Development Director FROM: Mak Sweidan, Engineer DATE: Sep.9, 2003 SUB J: Site plan review of Market Street Station, LUR /03-17 Upon review of the plans dated Sep. 2, 2003, prepared by Dahlgrcn shardlow and Uban, I offer the following comments and recommendations: GRADING~RAINAGE/EROSIONCONTROL Minimal grading for the site is being proposed with three new buildings replacing the existing bowling alley and reconfiguration of parking around the new buildings. Existing topography and work limits need to be shown on the plans. Drainage will be routed to both existing and proposed storm structures connected to an existing storm sewer line along the bowling alley access on the south side of the buildings. The applicant needs to submit proposed storm sewer sizing and drainage calculations showing that the storm sewer will accommodate the runoff. An emergency overflows needs to be added in the parking lot to ensure that storm-water will drain out of the parking lot and not into the buildings. The emergency overflow elevations must be a minimum of one foot lower than the proposed building elevations. Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type II erosion control fence be used around construction areas. Add a rock construction entrance. UTILITIES The applicant is proposing to relocate the existing sanitary sewer and water- main to accommodate the placement of buildings. The applicant must dedicate a 35 wide public drainage and utility easement for the new utility lines and show it on the plans. The City of Chanhassen ~ Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permits issuance. All of these charges are based on the number of SAC units assigned by the Met Council. The curt'eat 2003 sanitary hookup charges is $1,440/unit, the water hookup charge is $1,876/unit and the SAC fee is $1,275/unit. All lateral connection charges will be waived since thc applicant is installing the lateral utility lines. Public utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary financial security in the amount of 110% of the estimated project cost in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. STREETS & DRIVE AISLES The shared drive aisle through thc site is a private street. As such, the road must be a minimum of 26-feet wide, built to a 9-ton design, and enclosed within a 40-foot wide private easement. The applicant must supply inspection reports certifying that the private street is built to a 9-ton design. All drive aisles adjacent to parking must be a minimum of 26-feet in width. The applicant is proposing to use two existing full accesses onto Market Boulevard along the west side of the parcel. One additional access is proposed along the south side of the site onto Pauly Drive. SITE PLAN RECOMMENDED CONDITIONS OF APPROVAL 1. Show the driveway dimension on the site plan to read 26 feet in width and the access corner radius read 30 feet. 2. Submit storm sewer and drainage calculations for staff review before site plan approval. 3. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign all plans. 4. Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permits issuance. All of these charges are based on the number of SAC units assigned by the Met Council. The curt'eat 2003 sanitary hookup charges is $1,440/unit, the water hookup charge is $1,876/unit and the SAC fee is $1,275/unit. o On the grading plan: a. Add a storm sewer schedule. b. Add silt fence type I1 around the construction limits. c. Show rock construction entrance. d. Show existing contour lines. e. Show a bench mark (mean sea level datum.) f. Show all existing and proposed easements. g. Show existing and proposed property lines. h. Show the construction limits for phase 1. i. Show all existing utilities, buildings and street lights within the site. j. Show the proposed storm sewer pipe type, size, slope, class and manhole rim/invert elevations on the plans. k. Show the existing and proposed storm sewer flow direction. On the utility plan: a. Show all existing and proposed utility easements. b. Show the location of proposed water and sanitary services. c. Show the existing sanitary and water-main in profile view within the construction area. d. All of the public watermain will be PVC C-900 pipe. e. All public sanitary sewer pipe type will be PVC, SDR35. 7. Add the latest version of City of Chanhassen detail plates # 1002, 1004, 1006, 2101,3101, 3102, 5201, 5203, 5206, 5207, 5214, 5215, 5216, 5300 and 5301. 8. Submit private easement for the shared storm sewer before building permit issuance. 9. Seed and mulch or sod the site within two weeks of grading. Submit haul route for City approval prior to any hauling. 10. Installation of the private utilities for the site will require permits and inspections through the City's Building Department. 11. Construct public utility improvements in accordance with the City's latest edition of Standard Specifications and Detail Plates. 12. Submit detailed construction plans and specifications for the public utility improvements and approved before final platting. 13. The applicant shall enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval in thc amount of 110% of the public improvement cost estimate. 14. Before building permit issuance, permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. 15. The main drive aisle must be a minimum of 26-feet wide, built to a 9-ton design, and enclosed within a 40-foot wide private easement. 16. Concrete driveway apron, per City detail plate #5207, is required at all the access points to the site. 17. Dedicate on the plat a 35 foot wide drainage utility easement over the public utility lines located in thc main drive aisle. 18. Add emergency overflows a minimum of one foot lower than adjacent building elevations in thc parking lot. 19. Submit inspection reports certifying that the private street is built to a 9-ton design prior to certificate of occupancy. C~ Teresa Burgess, City Engineer/Public Works Dir. Matt Saam, City Assistant Engineer. g:\eng\projccts\markct Stl'¢C! station \spt.doc