Loading...
Approval Letter 05-08-20130 May 8, 2013 CITY OF determination of consistency with system plan. Fax: 952.227.1110 Mr. Paul Tucci CUMNSFN Oppidan, Inc. Park &Recreation 5125 CR 101, Suite 100 7700 Market Boulevard Minnetonka, MN 55345 PO Box 147 Chanhassen, MN 55317 1. Adoption of the Chanhassen PUD Ordinance, which shall be created to govern Recreation Center Re: Chanhassen Apartments Rezoning; Site Plan Review with Variances; and Land 2310 Coulter Boulevard Use Map Amendment — Planning Case 2013 -07 Administration C. Approval of a Site Plan for a 155 -unit Apartment Building with a Variance for Phone: 952.227.1100 Dear Mr. Tucci: Fax: 952.227.1110 Building Inspections This letter is to formally notify you that on April 22, 2013, the Chanhassen City Council Phone: 952.227.1180 adopted the following three motions: Fax: 952.227.1190 A. Land Use Map Amendment from Residential -Low Density and Office, to Engineering Phone: 952.2271160 Residential -Low and High Density and Office and Residential -High Density Fax: 952.227.1170 Planned Unit Development (PUD) subject to the following condition: Finance 1. Approval of the Land Use Amendment is subject to the Metropolitan Council Phone: 952.227.1140 determination of consistency with system plan. Fax: 952.227.1110 B. Rezoning of approximately 14 acres from Agricultural Estate (A -2) to Planned Unit Park &Recreation Development - Residential (PUD -R) subject to the following condition: Phone: 952.227.1120 Fax: 952.227.1110 1. Adoption of the Chanhassen PUD Ordinance, which shall be created to govern Recreation Center the site and design standards. 2310 Coulter Boulevard Phone: 952.227.1400 C. Approval of a Site Plan for a 155 -unit Apartment Building with a Variance for Fax: 952.227.1404 parking subject to the following conditions: Planning & Natural Resources 1. Approval of the Land Use Amendment subject the Metropolitan Council Phone: 952.227.1130 determination of consistency with system plan. Fax: 952.227.1110 2. Adoption of the Chanhassen PUD Ordinance, which shall be created to govern Public works the site and design standards. 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 3. Execution of the Site Plan Permit. Senior Center 4. Payment of $294,500 park and trail fee and $116,500 stormwater fee prior to Phone: 952.227.1125 the issuance of a building permit. Fax: 952.227.1110 5. Parcel A shall be dedicated to the City, or have a conservation easement Web site placed on it, for management consistent with the Bluff Creek Management www.ci.chanhassen.mn.us Plan, the Bluff Creek TMDL and the 2 nd Generation Surface Water Management Plan. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Paul Tucci Chanhassen Apartments May 8, 2013 Page 2 6. The applicant and the City should work together to develop an appropriate mitigation scenario. 7. Any portion of the wetland presumed to be impacted under an alternate development scenario, which would require the use of Parcel A and is subsequently transferred to Parcel B for density calculations, be mitigated for at a 1:1 ratio. This mitigation should occur within the Bluff Creek Overlay District but does need to be in the form of wetland. The developer must calculate the net developable acres of the site and wetland acreage. 8. The wetland delineation report shall be finalized. 9. All existing trees proposed to be saved must be protected with fencing during construction or replaced after construction if damaged or dead. 10. The selections of Colorado spruce must be replaced by a different evergreen species in the plant schedule. 11. Before final approval for the project, the applicant will need to determine future management plans for the existing ash trees. If preserved, the applicant will be required to chemically protect or, if infested, remove and replace the trees. If the applicant decides to remove and replace the trees at this time, a revised landscape plan will be required. 12. Staff recommends that the curb radius at the driveway access be increased to facilitate the turning movements of larger vehicles. 13. Appropriate signage must be installed 10 days prior to and for the duration of the work within West 78th Street. 14. The developer must coordinate the closure of West 78th Street with the Engineering Department minimum 72 hours prior to the closure. 15. A $10,000 escrow must be provided to ensure that West 78th Street is properly restored. Once the street has been restored to satisfactory condition, 50% of the escrow will be released; the remaining 50% will be released if the patch is in satisfactory condition after one freeze -thaw cycle. 16. Minimum 18 -inch vertical separation is required between the private watermain and the private storm sewer crossing. 17. The developer shall submit $5,000 with the site plan agreement to cover half of the cost of the signal modification at TH 5 and Galpin Boulevard to accommodate a flashing yellow passive - permissive signal. Mr. Paul Tucci Chanhassen Apartments May 8, 2013 Page 3 18. The developer shall pay one -half the cost of the traffic study. 19. City trunk sanitary sewer hookup fees (City SAC), City trunk watermain hookup fees (City WAC) and the Met Council Sanitary Access Charge (Met SAC) are due with the building permit at the rate in effect at that time and shall be based on the SAC unit determination per the Met Council. 20. A "General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination" will be required for this project. Proof of permission from the PCA must be provided to the City before grading can commence. 21. A Surface Water Management Plan is required and shall be submitted to the City for review and comment. This plan shall incorporate the required elements of Parts III, IV and Appendix A of the NPDES permit. 22. Both the Bluff Creek Total Maximum Daily Load Implementation Plan and the NPDES Permit require that a portion of the Water Quality Volume is infiltrated on -site. The Stormwater Management Study shall be modified to address this requirement and incorporated into the SWPPP. 23. Because the site discharges to an impaired water, the discharge rates for the one -year design event must also be equal to or less than the existing discharge rates. The Stormwater Management Study shall be modified to address this requirement and shall be incorporated into the SWPPP. 24. In order to protect Bluff Creek, meet the goals of the Bluff Creek Natural Resources Management Plan and the Bluff Creek TMDL Implementation Plan, staff is recommending that the portion of the property north of West 78 Street be preserved through an easement to the City and that this density should be transferred to that portion south of West 78 Street. 25. Sheet C -3 GRADING AND EROSION CONTROL PLAN shall be amended to include the following: a. The swale draining into the proposed pond shall be stabilized for its entirety as it is less than 200 feet in length. b. An appropriate perimeter BMP shall be shown and installed around the proposed outlet modification for the southern wetland. c. Silt fence or another acceptable BMP shall be installed on the north end of the culvert under West 78 Street. Mr. Paul Tucci Chanhassen Apartments May 8, 2013 Page 4 d. The EOF from the pond to the wetland shall be permanently stabilized. This is addressed in the Drainage Report but is not included in the Grading and Erosion Plan. A turf reinforcement mat is an acceptable practice as is called out in the drainage report. 26. Minnesota Department of Transportation will need to review and approve the drainage plan. 27. The applicant shall revise the plans to incorporate sidewalk connections to existing trails. 28. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. A "Code Record" is required (Code Record schematic plans may be same scale as architectural). For "Code Record" information go to MN Dept. of Labor and Industry: http:// www. dli. mn .gov /CCLD /PlanConstruction.asp 29. The building(s) must be protected with automatic fire sprinkler systems. 30. An accessible route must be provided to buildings, parking facilities, public transportation stops and all common use facilities. 31. All parking areas, including parking garages, must be provided with accessible parking spaces dispersed among the various building entrances. 32. Accessible dwelling units must be provided in accordance with Minnesota State Building Code Chapter 1341. 33. The building owner and /or their representatives should meet with the Inspections Division to discuss plan review and permit procedures (in particular, type of construction and allowable area issues must be addressed). 34. Due to the large size of this building, class III Fire Dept, standpipes will be required. Have developer contact Fire Marshal for exact locations. MSFC Sec. 905.3.9. 35. " No Parking Fire Lane " signs will be required. Have developer contact Fire Marshal for exact locations. MSFD Sec. 505.31 36. An additional on site fire hydrant will be required. Contact Fire Marshal for location. 37. A PIV ( post indicator valve ) will be required. 38. A three -foot clear space must be maintained around fire hydrants. MSFC Sec 508.5.4. Mr. Paul Tucci Chanhassen Apartments May 8, 2013 Page 5 A Site Plan Agreement must be prepared by our offices for recording; however, cost estimates for the improvements must be submitted to our offices before the agreement can be prepared. Modifications must be made to the site plan as stipulated in this letter. The following fees shall be paid with the recording of the site plan agreement: a. Park and Trail Fees: $294,500 b. Storm Water Fees: $116,500 c. Erosion Control to be determined based on grading plan. d. $10,000 escrow must be provided to ensure that West 78th Street is properly restored. e. $5,000 to cover half of the cost of the signal modification at TH 5 and Galpin Boulevard. Other fees include the city trunk sanitary sewer hookup fees (City SAC), City trunk watermain hookup fees (City WAC) and the Met Council Sanitary Access Charge (Met SAC) which are due with the building permit at the rate in effect at that time and shall be based on the SAC unit determination per the Met Council. If you have any questions, please call me at (952) 227 -1139 or by email at kaanenson(a�ci. chanhassen.mn.us Sincerely, Kate Aanenson, AICP Community Development Director KA:ktm c: Alyson Fauske, Assistant City Engineer Jerry Mohn, Building Official gAplan\2013 planning cases\2013 -07 chanhassen apamnents\approval lettendoc