Conditions Response from Terry JefferyJune 14, 2013 Martin Schutrop 540 Lakota Lane Chaska, MN 55318 Re: Preliminary Plat for Bluff Creek Woods Planning Case #2013 -09 Dear Mr. Schutrop: Todd EUMI /Alvson /Terrv/Jerry M,/Mark: BLUFF CREEK WOODS FINAL PLAT is scheduled for the August 26, 2013 City Council meeting. Please review the conditions of approval in this letter with the attached plans and respond to Bob no later than Friday, August 9, 2013. Respond to each condition as follows: • Still applies • Does not apply or has been met • Is modified as follows (include modification) • New condition This letter is to confirm that on June 10, 2013, the Chanhassen City Council approved the Rezoning of the property from Agricultural Estate District (A -2) to Single- Family Residential District (RSF); PrefiminaryPlat with Variances for a neck lot and the construction of a private street; and a Conditional Use Permit to allow development within the Bluff Creek Overlay District subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: At the entrance off Hazeltine Boulevard, a monument sign displaying all four address numbers shall be installed. hi addition, at the start of the individual driveways to each home, an address sign shall also be installed. Submit proposed signage to Fire Marshal for approval. 2. Park fees shall be collected in full for the two new homes at the rate in force upon final plat submission and approval. 3. Any use of or work within or affecting MnDOT right -of -way requires a permit. Permit forms s,,,y are available from MnDOT's utility website at http: / /www.dot.state.mn.us /utility /. AW16S 4. Outlet A and the preservation easement shall be coincidental with the primary zone for the Bluff Creek Overlay District and shall be recorded with the final plat. The primary zone shall follow the east property lines of lots 2 and 3 and the southeast 55 feet of Lots 1 and 2. t c-r ne betweQu,D dot A and r oW-shall- be- slig°' to the zufli� =pest. 5. A structure setback of 40 feet is required from the primary zone. No disturbance shall occur within the first 20 feet of the setback. The ^ *�n�ced__grading plans shall he amend_._ed to show ho`w thz-lets-n�y-bezieveloped. 6. The Bluff Creek Overlay District primary zone and the corresponding, ck shall be shown so, on all plan sheets. wrues 7. Signs clearly demarcating the Bluff Creek Overlay District primary zone shall be installed at all major angle points and at the intersection of lot lines with the primary zone boundary. s7l� Site plans shall be amended to show the placement of the signs. ALIKI S Martin Schutrop June 14, 2013 Page 2 8. In keeping with the purpose of the Bluff Creek Overlay District to protect natural resources, the proposed driveway for Lot 1 shall share a common drive with Lot 2 until the existing 16 hammerhead. 9. The applicant shall provide drainage calculations for pre - development and post - development ,,. conditions. 10. Preservation of natural vegetation shall be allowed as a volume and rate control tool. Water quality best management practices are still required. This shall meet the requirements of the NPDES permit for drainage to an impaired water or NURP plus enhanced treatment, si�LL �9u S whichever is stricter. �h 11. SWMP charges shall be paid in the amount of 33 percent of the normal fees due to the protection of land through a combination of preservation easement and the dedication of Outlot A to the City. Total SWMP fees are $19,952.00. The developer shall pay SWMP fees of $6,584.06 at the time of final plat recording. lb 12. Water that now heads west and then south along the trail and away from this area will be directed northwest into the depression north of the shared entrance. An adequate outlet must J be provided for this area and the existing drainage patterns must be maintained. 5m. 64NIF 13. Prior to grading, each lot shall install tree protection fencing at the edge of grading limits. S 14. Building permit surveys for each lot shall be required to show all inventoried trees within the grading limits and 10 feet beyond and their removal or preservation status. 15. The developer must revise the Existing Conditions plan to show the power pole, utility box, propane tank and shed. "`' 16. Ground shot elevations must be shown on the Existing Conditions plan to verify that a topographic survey was completed. 17. The developer shall work with staff to realign the access to Lot 1. 18. The developer must provide proof that the common portion of the driveway to Lots 1 and 2 meets a 7 -ton design. 19. If the existing driveway does not meet the 7 -ton design standard, the developer must install the 7 -ton driveway and submit an escrow with the final plat to ensure that the driveway meets this specification. 20. The driveway easement shall be recorded as a separate document; all references to the driveway easement shall be removed from the preliminary plat. 21. The grading plan must be revised so that the grades do not exceed 3HA V. Martin Schutrop June 14, 2013 Page 3 22. A permit is required from MnDOT to install the sewer and water services as well as grading in the right -of -way. 23. The City must be notified a minimum of 72 hours before the sewer and water services are to be installed. 24. The sewer and water service connections must be inspected and approved by the City. 25. The developer must submit an escrow for the necessary boulevard restoration associated with the service installation. 26. Lots 1 and 3 will be subject to the City sewer and water hook -up charges and the Metropolitan Council Sanitary Access Charge. These fees shall be collected in accordance with the City Code at the rate in effect at the time. Z7 . Imfi rpATiy,1 A&Aks tlov- 'BE regs'. '7a- 'ro ccas�Ra� 1 au , 44lIhtc� Final plat documents must be submitted to the City 30 days prior to the City Council meeting to Ao,�� rtes which you wish to have your final plat approved. Conditions of the preliminary plat approval -rKe 9,p,S must be addressed for final plat approval. Enclosed is the list of items required for submittal forSra,.,_. L. final plat approval. l4nt+aaw2p To 24. Fyn, pu,' h.»-t SKO..) �rtGSZ4.,l Mto,l - 1�S�Ta asi. _ ZaECcR -,BC 41e"s' Should you have any questions, please contact me at (952) 227 -1131 or by email at 1 „'s "EGE5y,-jr AN bgenerousna ci.chanhassen.mn.us. Svto..., Ho.. -fiat S t� Sincerely, Robert Generous, AICP Senior Planner Enclosure ec: Kate Aanenson, Community Development Director Alyson Fauske, Assistant City Engineer Todd Gerhardt, City Manager Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official Perry Ryan, Ryan Engineering gAplan\2013 planning cases12013 -09 bluff creek woods\approval lever prelim plat for final plat review.doc �° '3r �mRPub