Loading...
Resolution 2012-72 RecordedDocument No. OFFICE OF THE A 583488 COUNTY RECORDER CARVER COUNTY, MINNESOTA Receipt # Certified Recorded on September 04, 2013 4:19 PM CERTIFICATION STATE OF MINNESOTA ) ) ss COUNTY OF CARVER ) Fee $46.00 51134//1 County Recorder I, Karen J. Engelhardt, duly appointed and acting City Clerk for the City of Chanhassen, Minnesota, do hereby certify that I have compared the foregoing copy of Resolution 2012 -72, "A Resolution Approving a Metes And Bounds Subdivision Creating Two Parcels at 1611 West 63 d Street' adopted by the Chanhassen City Council on December 10, 2012, with the original copy now on file in my office and have found the same to be a true and correct copy thereof. Witness my hand and official seal at Chanhassen, Minnesota, this 14`h day of December, 2012. ew ra° CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: December 10, 2012 RESOLUTION NO: 2012 -72 MOTION BY: Ernst SECONDED BY: Laufenburger A RESOLUTION APPROVING A METES AND BOUNDS SUBDIVISION CREATING TWO PARCELS AT 1611 WEST 63an STREET WHEREAS, Jay Meyer and Kathryn Stoddart have requested a subdivision of the property into two lots of one (1.0) acre and 0.42 acres; and WHEREAS, the Chanhassen City Council held a public hearing on December 10, 2012, and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance: NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby approves the metes and bounds subdivision of 1611 West 63`d Street (Planning Case #2012 -19). for Jay Meyer and Kathryn Stoddart for property legally described as Lots 1 and 4, Block 1, Stoddart Addition, Carver County, Minnesota, subject to the following conditions: Building: 1. A final grading plan and soils report must be submitted to the Inspections Division before building permits can be issued. 2. Retaining walls over four feet high require a permit and must be designed by a professional engineer. 3. Each lot must be provided with separate sewer and water services. Engineering: 1. If the retaining wall exceeds four feet in height, it must be designed by an engineer and a building permit for the wall will be required. 2. The $10,173.00 cash fee must be paid before the deeds are recorded. If the final subdivision submittals are received after 2012, the cash fee shall be recalculated based on the rates in effect at that time. 4. The remaining 70% of the sanitary sewer and water hookup fees must be paid with the building permit at the rate in effect at that time. Environmental Resource Specialist: 1. Prior to grading, tree preservation fencing must be installed at the tree driplines on Parcel B. If the trees are removed or damaged during construction, replacement will be required at a rate of 2:1 diameter inches. 2. Building permit survey for each lot shall be required to show all trees and their removal or preservation status. Tree removal for each lot shall be approved by the city. 3. Parcel B will be required to plant two trees. Parks: I. Parks fees of $5,800.00 shall be paid for each new single - family lot prior to the recording of the property deed. Planning: 1. The legal description for Parcel A shall be revised to include Lot 4, Block 1, Stoddart Addition. 2. Deeds shall submitted to the city for review and recorded at Carver County for the two parcels. Water Resource Coordinator: 1. Total surface water management fees due prior to recording the property deed are $1,914.55. Passed and adopted by the Chanhassen City Council this 10`h day December of 2012. ATTEST: G Todd Gerhardt, City Clerk/Manager YES NO Furlong Ernst Laufenburger McDonald Tjomhom 7—L Thomas A. Furlong, Mayor ABSENT