Loading...
7 Park&Trl Maintenance ReportCITYOF CHANHASSEN 690 Ci0, (,'cmcr D;it 'c, PO l~ox 147 C/l,~,hasse~, ;~Ji~mesot,~ 55317 l%~e 612 93~ 1900 (;c~c~d 32¥ 612. 932 5739 MEMORANDUM TO: FROM: Todd Hoffman, Park and Recreation Director Dale Gregory, Park Superintendent DATE: April 11, 2000 SUBJECT: Park and Trail Maintenance Report With the snow melting earlier than usual this year, spring came early. Our spring cleanup started with cleaning of all thc downtown boulevards and sidewalks with thc help of the Sentence to Serve crew. We then moved into sweeping all thc park trails, park parking lots, Recreation Center/Bluff Creek School parking lots and all in-line rinks. The bases have been installed in City Center Park and Bandimere Park so they are ready for use this summer. We have installcd all fishing piers and docks. The work continues on thc new trail being installed from the concession building to thc parking lot at the Lake Ann ball fields. Paving of thc trail is schcdulcd for the wcck of April 17, and thc sod will be laid in the area around thc backstop as soon as sod is available. This will be a very nice improvement for thc ball field arc& The park crew is constructing wooden park signs for Bandimerc and Lake Ann Parks. They will bc installed early this spring. We are continuing the process of moving everything out of the park shed at Lake Ann Park to various locations so the building can be removed. I am also in thc process of hiring seasonal help in the park department for this summer. If anyone knows of high school students looking for a summer job, please encourage them to fill out an application. We do require them to have a valid driver's license. '7 The C/tl, of Chm~hasscn. A f~vwi,g commi,;itl' wit/,