Loading...
4 Bandimere Park Future Shelter CITYOF CHANHASSEN 690 Ci9~ Cemer Drive PO Box 147 Chanhassen, Minnesota 55317 Phollf 952. 93Z 1900 General Fax 952.937.5739 Engineering Deparmlent £ax 952.937.9152 Building Department Fax 952.934.2524 Web Site 4 MEMORA~ TO: Park & Recreation Commission ~'// FROM: Todd Hoffman, Park & Recreation Director DATE: September 17, 2001 SUB J: Submission of Alternatives for Future Park Shelter Building; Bandimere Park To assist the Commission in planning for a future park shelter at Bandimere Park, I contacted two suppliers of "pre-fabricated" park shelters. Both of these individuals recommended that the city pursue constructing a "stick-built" structure versus a pre-fab shelter. With the need for a concession area and mechanical room to house imgation equipment, a standard open-air shelter would not work. Examples of contractor built park shelters are found at Lions Park in Victoria and Community Park in Chaska. Costs for this type of shelter can range from $75,000 to $250,000, depending on amenities. BACKGROUND The master plan calls for a park shelter centrally located between the soccer fields and baseball/softball fields. The site is just south of the newly installed playground. The expense and associated mess of running sewer and water services to the site was included in the original construction of the park. A sanitary sewer line and watermain are capped and buried below the proposed building location. The various athletic associations would like to have the capability of hosting games and tournaments at Bandimere Park. A shelter to act as a headquarters with a concession stand is desirable. Some of the associations have voiced a willingness to contribute to such a project. The site is also home to the park's irrigation controls, which are currently protected by an extremely heavy steel box. This enclosure required three people and a bobcat to lift the access door for servicing. The hope is that when a shelter is constructed, the box would disappear and the controls would be housed in an interior utility room. The Commission can take a look at these things first hand on our tour next Tuesday evening. g:\park\th\bandimere shelter.doc The Oty of Chmthassen. ,q .gJvt~q,?, com,m,irv ~cith clemz /akes, oua/is, sd,ooh, a thin,nine #o~vnto~vn, t/,ri~,i,e bz~s&esses, a,d beautigd l~arks. A freat v/ace to live. zt,ork, a,d a/a~: Future Trail Connection Regional Trail Connection Restrooms / Shelter with Arbor Structure Maintain / Enhance Buffer Between Park and Residential Area Soec( Parking Lot (~: sp~.) ~ I (80~120 yds) Soccer (8Oxl 20 yds) P~Green -~ (S0x120 yds) [ I .Neighborhood ~Trall Connection Neighborhood (Grades tnry pmd~ Play Area Parking (1~4 Spacm) Po~d Neighborhood Trail Connection }'Basketball Courts Concession -- Space LA,'~ UsE PLANNING A2,4D DESIGN BRAUE R & ASSOCIATES, L,T,D. ] 73010hma L~., Suitt 500 Minmapoha, Ml'4 55439 Tel (612) 832-9475 - Fax (612) 832-9542  Connection CITY OF / ball Field Between Park and / Residential Area Kxlstlng S~ Bandimere Park City of Chanhassen, Minnesota Master Plan