TO: Park & Recreation Commission ~'//
FROM: Todd Hoffman, Park & Recreation Director
DATE: September 17, 2001
SUB J:
Submission of Alternatives for Future Park Shelter Building;
Bandimere Park
To assist the Commission in planning for a future park shelter at Bandimere
Park, I contacted two suppliers of "pre-fabricated" park shelters. Both of these
individuals recommended that the city pursue constructing a "stick-built"
structure versus a pre-fab shelter. With the need for a concession area and
mechanical room to house imgation equipment, a standard open-air shelter
would not work. Examples of contractor built park shelters are found at Lions
Park in Victoria and Community Park in Chaska. Costs for this type of shelter
can range from $75,000 to $250,000, depending on amenities.
BACKGROUND
The master plan calls for a park shelter centrally located between the soccer
fields and baseball/softball fields. The site is just south of the newly installed
playground.
The expense and associated mess of running sewer and water services to the site
was included in the original construction of the park. A sanitary sewer line and
watermain are capped and buried below the proposed building location.
The various athletic associations would like to have the capability of hosting
games and tournaments at Bandimere Park. A shelter to act as a headquarters
with a concession stand is desirable. Some of the associations have voiced a
willingness to contribute to such a project.
The site is also home to the park's irrigation controls, which are currently
protected by an extremely heavy steel box. This enclosure required three people
and a bobcat to lift the access door for servicing. The hope is that when a shelter
is constructed, the box would disappear and the controls would be housed in an
interior utility room.
The Commission can take a look at these things first hand on our tour next
Tuesday evening.
g:\park\th\bandimere shelter.doc
The Oty of Chmthassen. ,q .gJvt~q,?, com,m,irv ~cith clemz /akes, oua/is, sd,ooh, a thin,nine #o~vnto~vn, t/,ri~,i,e bz~s&esses, a,d beautigd l~arks. A freat v/ace to live. zt,ork, a,d a/a~:
Future Trail
Connection
Regional Trail
Connection
Restrooms /
Shelter with
Arbor Structure
Maintain / Enhance Buffer Between
Park and Residential Area
Soec(
Parking Lot (~: sp~.) ~
I
(80~120 yds)
Soccer
(8Oxl 20 yds)
P~Green -~
(S0x120 yds) [
I
.Neighborhood
~Trall Connection
Neighborhood
(Grades tnry pmd~
Play Area
Parking
(1~4 Spacm)
Po~d
Neighborhood
Trail Connection
}'Basketball
Courts
Concession --
Space
LA,'~ UsE PLANNING A2,4D DESIGN
BRAUE R
& ASSOCIATES, L,T,D. ]
73010hma L~., Suitt 500 Minmapoha, Ml'4 55439
Tel (612) 832-9475 - Fax (612) 832-9542
Connection
CITY OF
/
ball Field
Between Park and
/ Residential Area
Kxlstlng S~
Bandimere Park
City of Chanhassen, Minnesota
Master Plan