Loading...
8a 2002 Park&Trl Acq & DevelCIP CITYOF CHAN SEN 6.90 City Center Drive ?0 Box 147 Cha nhassen, Minnesota 55317 Phoile 952.937. I~00 Ge,eral 952.93~5739 E, gi,eeHng Depar,nent 952. Q3Z9152 &d/ding Depm',nent 952.934.2524 l[t'b Site ~ 'u ,w. cf. c/;~ MEMORANDUM TO: FROM: DATE: Park and Recreation Commission Todd Hoffman, Park and Recreation Director September 18, 2001 SUB J: 2002 Park & Trail Acquisition and Development Capital Improvement Program On August 31, 2001, I submitted the Park and Recreation Commission's recommendation for 2002 Capital Improvements to Todd Gerhardt, City Manager and Bruce DeJong, Finance Director. Several items are included in this submittal which came to the forefront after the completion of our budget talks in July. I want to make the Commission aware that the following items have been submitted for funding in 2002. Trail connector; Chanhassen Hills to Bandimere Park Expenditure N/A - Awaiting findings of Feasibility Study · Trail Connector; Highway 5 at N/A Bluff Creek · Trail Connector; Hwy 5 at Riley Creek N/A Attached you will find a report to Todd Gerhardt detailing the need for a feasibility study for these important projects. Please be aware that costs for these projects are likely to exceed $500,000. G:\park\thX2002P&Tacq-CIPmemo CITYOF 690 Cig Center Drive PO Box 147 Chanhassen, Minnesota 55317 Phone 952.937.1900 GeneralFax 952.937.5739 E, gineeri,g Department Fax 952.937.9152 B, ilding Department Fax 952.934.2524 P~'eb Site wwut ci. c/;a,/Jasse,, mn. tis TO: FROM: DATE: Todd Gerhardt, City Manager Todd Hoffman, Park & Recreation Director September 5, 2001 SUB J: Approve Request for Proposal Seeking Feasibility Study and Design and Construction Consultant for City Trail Connectors: TH 5 at Bluff Creek; TH 5 at Riley Creek; and TH 101 South from Lake Susan Drive to Bandimere Park. The Minnesota Department of Transportation (MnDOT) is currently working on finishing the Highway 5 expansion and access boulevard project. This work includes pedestrian underpasses at Bluff Creek and Riley Creek. These new trails pass under both Highway 5 and the access boulevard connecting to the newly constructed trail on the north side of West 78th Street. The City must now complete "city" trail connections on the south side of Highway 5 to link these underpasses with our existing trail system. The underpasses are a highly anticipated amenity among our residents. The connection at Bluff Creek will occur at the eastern boundary of the Recreation Center and is straightforward in nature. The connection at Riley Creek is more complex due to topography and will require that a variety of routing options be investigated. It is imperative that the City dual track our construction schedule with MnDOT to ensure that these connections are made available soon after the MnDOT project is complete. Another highly sought trail project is the missing link between Lake Susan Drive and Bandimere Park. This trail would connect the city's southern trails with our northern system of trails. Further justification is that this link would allow our larger community to gain pedestrian access to Bamdimere Park, a facility in which the city has invested $2 million. This improvement is second in demand only to the Highway 101 north trail. Packaging the feasibility study and future construction of this trail along with the underpass connectors is sound planning. All three of these proposed projects have been included in the Park and Trail 2002 Capital Improvement Program request and would be funded out of the Park and Trail Dedication fund. Attached please find a draft copy of the request for proposal seeking design and feasibility work on these three projects. Mr. Todd Gerhardt September 5, 2001 Page 2 RECOMMENDATION It is recommended that the City Council approve the request for proposals seeking feasibility studies and design and construction consultation for the following city trail connectors: TH 5 at Bluff Creek; TH5 at Riley Creek; and TH 101 South from Lake Susan Drive to Bandimere Park. Wednesday, September 05,2001 Page 3 · Related Experience and References - Provide a list of the proposed key personnel and their related experience. Similar information should be submitted for each proposed sub consultant. The proposal length shall be limited to no more than 7 pages including cover letter. Evaluation Criteria and Selection Procedure Proposals will be evaluated on the following criteria: · Completeness of the proposal including a demonstrated understanding of the requirements of this project and the concerns of the City. · Qualifications and expertise of key personnel to be assigned. · Ability of the firm to perform the design and construction administration for the project with minimal involvement by the City. · Resources of the firm to conduct and complete this project in a satisfactory manner. Specifically, the ability and willingness to commit'key personnel and resources. · Fees proposed for preparation of the feasibility study and performing the design, construction administration and inspection duties. Proposals should be addressed to Todd Hoffman, Park and Recreation Director, 690 City Center Drive, P.O. Box 147, Chanhassen, MN 55317. Two copies of the proposal must be received by 3:30 p.m. on October 12, 2201 for consideration. It is anticipated that a not-to-exceed amount agreement for consultant services will be awarded on Monday, October 22, 2001. If you have any questions regarding the proposal, please feel free to contact me at 952~ 937-1900, extension 121 or by e-mail at thoffman@ci.chanhassen.mn.us. Sincerely, CITY OF CHANHASSEN Todd Hoffman Park and Recreation Director Attachment: 1. Location map 2. MnDOT Underpass Plans c: Dale Gregory, Park Superintendent Proposed Highway 5 Underpass "City" Trail Connectors and Construction of Trail between Lake Susan Drive and Bandimere Park Lyman BI~.~ Lake Ann TH 5 at Bluff Creek Trail Connector TH 5 at Riley Creek Trail Connector TH 101 South Lake Susan Drive to Bandimere Park Trail Construction Lake Lake Riley September 5, 2001 <<Title>> <<FirstName>> <,,LastName>> <dobTitle>> <<Company>> <<Address 1>> <<Address2>> <<City>>, <<State>> <<PostalCode>> Re~ Request for Proposal for Preparation of Feasibility Study and Design and Construction Consultant Services for City Trail Connectors: TH 5 at Bluff Creek; TH 5 at Riley Creek; and TH South from Lake Susan Drive to Bandimere Park. Dear <<Title>> <<LastName>>: The City of Chanhassen 2002 CIP identifies the following public trail connections. Your firm is invited to submit a proposal to conduct the feasibility study and perform design and construction services for a project to complete this work. The study is required to: Assess the feasibility and advisability of each trail connection. Provide estimated project costs for all alternates identified in the study. · Provide a project schedule. Wednesday, September 05, 2001 Page 2 · Identify and prepare descriptions for any necessary right-of-way or easement acquisitions. For purposes of the proposal for design and construction services, it shall be assumed that the feasibility study will recommend and the City Council will approve the work as proposed by the CIP and listed in this RFP. Design and Construction services shall include: · Perform design services including but not limited to surveying, preparation of plans and specifications. Preparation of and submittal of all permits required from other agencies. · Evaluate all bids received, and make a recommendation of award to the City. · Review and approve all required shop drawings. Prepare and recommend payment of all pay estimates. Provide construction inspection services including supervision of testing agencies, final inspection, and certification of completion of the project in accordance with the plans and specifications. · Provide final as-built plans to the City upon completion of the project in both digital and hard copy format. Construction plans and topographic maps of the project areas are available for review in the Park and Recreation Director's office. The City will require that the most recent version of the City's Standard Specifications along with bid and contract documents be utilized. Proposal Contents Fee proposals should include presentations and meetings with the City Council and City staff. In addition to these meetings, two (2) public information meetings and weekly e-mail updates to City staff are anticipated. All proposals should also contain: · Statement of Understanding - The statement of understanding should restate in the firm's words the requirements of the project and present a description of services to be provided to successfully complete the project. · Schedule - The City desires to complete the feasibility study by November 30, 2001. Plans and specifications, including all necessary approvals should be completed no later than February 20, 2002. The proposal should include a schedule for completion of the feasibility study and preparation of plans and specifications and discussion of the firm's ability to meet this schedule. The schedule should include the presentations and meetings with City Council and City staff. g ~ / Ld ®®o _J Z o o 0 90~. 'ON 133HS 335 1~6'L8+61, '¥15 ]NI]H31¥~ ~,, Z