Loading...
4b. 2004 TH 41 Trail ProjectCITY OF CtlANItASSEN ENGINEER'S REPORT BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC. April 16, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. Lift Station No. 1 Renovation and New Forcemain (01-11) LS-P3.34 - Phase I (SWMP 12-X) 2004 Residential Street Improvements (04-01) 2004 T.H. 41 Trail Project (RA-649) Wetlands boundaries have been delineated and GPS'd. S~all marsh at aoah e~d of t;ail is a wetland. LL-P 7. 5 Lotus Lake Pond (Frontier Trial Pond) Potential pond location was staked in the field. City staff has met with residents to review layout. We will come up with a modified concept design. Active Private Inspection Projects ~, lq¥~" :r~, k'i~i? AD;.U/~uc~l~ (()!!4)4 i CITY OF CHANHASSEN ENGINEER'S REPORT BONESTROO ROSENE ANDERLIK & ASSOCIATES INC. April 9, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. Lift Station No. 1 Renovation and New Forcemain (01-11). LS-P3.34 - Phase I (SWMP 12-X). A punch list was sent to the contractor outlining remaining seeding and restoration work at the site. A deadline of May 15, 2004 was set to accomplish these tasks. Once these items are complete and IC-134 forms and Lien Waivers are received, we will recommend final payment. 3. 2004 Residential Street Improvements (04-01). The ad for bid has been sent to the paper and Construction Bulletin. Council approval to bid the project is set for Monday night. Once bidding is approved, we will produce a bid copy of the plans and specifications with any final revisions. 1)04 T.H. 41 Trail Project (RA-649). Todd Hoffman and Mark Statz met with the two adjacent residents on hursday. The meeting went well and both property owners did not see any major problems. They were both given copies of the initial layout for their perusal. The design will reflect any comments they may have. 5. LL-P 7. 5 Lotus Lake Pond (Frontier Trial Pond). The city met with residents today to discuss the project. The results of that meeting were unknown at the time of this report. Active Private Inspection Projects. Powers Ridge Apartments (00-04) · Arboretum Village (01-06) · Arboretum Village 2nd Addition (02-03) · Arboretum Shopping Center (03-09) · Lake Lucy Ridge (01-03) · Ashling Meadows 2nd Addition (02-07) · Vasserman Ridge (02-10) - t£~d qD~lemo - CITY OF CIIANIIASSEN ENGINEER'S REPORT BONESTROO ROSENE ANDERLIK & ASSOCIATES INC. March 26, 2004 This report is a summary of current Bonestroo projects in Chanhassen. Information that has not changed since the previous memo is shown as shaded. Lift Station No. 1 Renovation and New Forcemain (01-11). i~ lo ~:T,~,~· ~ I,;~,~ ~ ~:~,.:i, 2004 Residential Street Improvements (04-01). Final plans, specifications, cost estimate, schedule and an update on permits will be submitted to the city mid next week. The ad for bid will also be submitted to the city to be sent to the paper on the 8th. ~/'"~ 3.~-2004~ T.H. 41 Trail Project. Preliminary survey work has begun and will be finalized by mid next week. ~ Design will begin immediately after the survey is finished. 4. LL-P 7. 5 Lotus Lake Pond. Active Private Inspection Projects. · Powers Ridge Apartments (00-04) · Arboretum Village (01-06) · Arboretum Village 2nd Addition (02-03) · Lake Lucy Ridge (01-03) · Ashling Meadows 2nd Addition (02-07) · Vasserman Ridge (02-10) - End qfmemo -