Loading...
PRC Report 4-27-04 î PC DATE: 4/20/04 PRC DATE: 4/27/04 CC DATE: 5/10/04 ~-r ...,.-- CITY OF CHANHASSEN REVIEW DEADLINE: 5/24/04 BY: Hoffman, T. PARK AND RECREATION STAFF REPORT PROPOSAL: Conceptual POO of 21.7 acres of property for a health club, restaurant and hotel. LOCATION: 1891 Arboretum Boulevard. ~ Z -< U ~ ~ t -< PRESENT ZONING: A2, Agricultural Estate 2020 LAND USE PLAN: Officellndustrial ACREAGE: 21.7 acres gross DENSITY: N/ A SUMMARY OF REQUEST: Requesting Concept Planned Unit Development Approval for Office Park COMPREHENSIVE PARK PLAN: This site lies within the park service area of the Chanhassen Recreation Center and Bluff Creek Elementary School. Park amenities available at these locations include ball fields, play equipment, tennis courts, hockey and in-line skating rinks and a shelter building. The acquisition of additional parklands in this area is not required. COMPREHENSIVE TRAIL PLAN: The proposed development connects directly to an existing section ofthe city's comprehensive trail plan. The proposed trail continuation depicted on the application connects with the existing trail system at an underpass location. A secondary connection at street level is desirable. It is not necessary for the trail to continue north of the proposed east/west right-of-way street. Construction of the trail continuation connecting the proposed development to the city's pedestrian trail system is the responsibility ofthe applicant. RECOMMENDA TION It is recommended that park dedication fees be collected per City ordinance in lieu of parkland dedication for the proposed Advanced Fitness Planned Unit Development. ATTACHMENTS I I I 1. Development Review Application 2. Narrative dated March 25, 2004. 3. Concept Plan dated March 25, 2004 I cml CBIIIIII City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 (952)227-1100 I CITY OF CHANHASSEN RECEIVED MAR .~ 2004 CHANHASSE~~ " Date: March 25, 2004 To: Development Plan Referral Agencies From: Planning Department By: Robert Generous, Senior Planner Subject: Request for Concept Planned Unit Development (POO) Review for a health club, office, restaurant, and hotel on 21.7 acres located at 1891 Arboretum Boulevard on property zoned A2, Agricultural Estate, Guided Officellndustrial; Applicant: Advanced Fitness. Planning Case: Planning Project 04-14 The above described application for approval of a land development proposal was filed with the Chanhassen Planning Department on March 25, 2004. The 6O-day review period ends May 24, 2004. In order for us to provide a complete analysis of issues for Planning Commission and City Council review, we would appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and proposed future utility services, stonn water drainage, and the need for acquiring public lands or easements for park sites, street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City Council. This application is scheduled for consideration by the Chanhassen Planning Commission on April 20, 2004 at 7:00 p.m in the Council Chambers at Chanhassen City Hall. We would appreciate receiving your comments by no later than Apri19, 2004. You may also appear at the Planning Commission meeting if you so desire. Your cooperation and assistance is greatly appreciated. 1. City Departments a. aty Engineer b. City Attorney c. City Park Director d. Fire Marshal e. Building Official f. Water Resources Coordinator g. Forester 8. Telephone Company (Qwest or United) 9. Electric Company (Xcel Energy or MN Valley) 10. Medicom 11. U. S. Fish and Wildlife 2. Watershed District Engineer 12. Carver County a. Engineer b. Environmental Services 3. Soil Conservation Service 4. MN Dept. of Transportation 13. Other- aty Manager 5. U.S. Army Corps of Engineers 14. 6. CenterPoint Energy Minnegasco 7. MN Dept. of Natural Resources I' ~ . CITY OF CHANHASSEN RECEIVED r I . Advanœ Fitne8sHea.ltb Club ",.,",,', .·~-......,-.:.:·:....r..:..:,: -.:,_.:','--:......_ :.<...'.:..-....... MAR)4 2004 a{j~ CHANHASSEN PLANMNG DEPT· t . ..··..~~t1alC~~et;(!ialDevelRRD:1ent· . .. ~\WV~~t.w1ùchisproposed, is løçatedontwenty..ø~>pOmt seven Dæ.ii~.;~~a Theacces$'basætttPPfOvedright"band.tuœ ÎßÙ)the~¡ 'I'høisa:prlvatetoad ä.IPS~-· ". . .:" . .. . . . , - , ',.. - - ,--' ...-. ...... i< ·..i>i ..i ...../> .......... i.·.·..·.·.·.·.. ........................../ ª'i{.I.....l:ê..w; . ,...' - ", ," . ~ ~ f i ~ . t FoutCQ~iaJ,:4evelop~e~··tV¢p~.D8th=tfisltway' b$age. Tbe1*il<ijngs. . ~:siø;4.....Itip~.$Wkt\:~.tlw!~. RoStaunmts(2) . TWQsitdø~'nR$tagtqtstre..~on'tþa.. .\Ve$t·sideøfthosjte..FQt thc~oftbis ~_.~t:¡:~ã. Otiice! ~. T:beQtfieesl.·~.. wø11JdÞe ·~.OJ1tbe.fJI1St .sideof'ti1c &ìtødircçtly a4)aceDt·tøthe =1t==.¡lyIt~=r~~~~~w:~~ra~OEb\1O.~ H_I 1\ 70 t080u$tbøte1Q(3to4stori¢s is 10CåWdbøtwoôn.the te$8UnmQ and.~ ofR~" ==r!&~==~~~"" Chanhassen Project 3/24/2004 i t CITY OF CHANHASSEN ~ RECEIVED MAR %.1 2004 CHANHASSE~~ Restaurant (10,000 SF) Floor Area Site Floor Area Ratio Parking Demand Ratio Parking Demand SF/Space Parking Area Required Remaining SF Summary Building Footprint Parking Other Total 10,000 SF 136,000 SF 0.07 15 /1,000 SF 150 Spaces 325 48,750 SF 77,250 SF Restraunt (10,000 SF) 7% ()36% 57% Restaunt (5,000 SF) Floor Area Site Floor Area Ratio Parking Demand Ratio Parking Demand SF/Space Parking Area Required Remaining SF Summary Building Footprint Parking Other Total . Building Footprint . Par1<lng C Other 7% 36% 57% 100% 5,000 SF 40,000 SF 0.13 15 /1,000 SF 75 Spaces 325 24,375 SF 10,625 SF Restraunt (5,OOO SF) 13% ~" 60% 13% 61% 27% 100% . Building Footprint . Parking C Other . . ! Chanhassen Project 3/24/2004 Hotel (80 Units / 5 Floors) No. of Units 84 Footprint 14,000 SF No. of Floors 3 Floor Area 42,000 SF Site 81,000 SF Hotel Floor Area Ratio 0.52 Parking Demand Ratio 1 !Unit Parking Demand 84 Spaces 17% -()M% SF/Space 325 Parking Area Required 27,300 SF Remaining SF 39,700 SF Summary Building Footprint 17% . Building Footprint . Parking C Other Parking 34% Other 49% Total 100% Office / Retail Footprint 15,000 SF No. of Floors 1 Floor Area 15,000 SF Site 80,000 SF Floor Area Ratio 0.19 Parking Demand Ratio 4.5 /1,000 SF Office I Retail Parking Demand 68 Spaces SF/Space 325 Parking Area Required 21,938 SF cJ Remaining SF 43,063 SF 54% Summary 27% Building Footprint 19% Parking 27% Other 54% . Building Footprint . Parking C Other 100% . Chanhassen Project 3/24/2004 ~ I, t !Ii Athletic Club Footprint Floor Area Site Floor Area Ratio Parking Demand Ratio Parking Demand SF/Space Parking Area Required Outdoor Recreation Remaining SF Summary Building Footprint Parking Other Outdoor Recreation 93,000 SF 120,000 SF 268,000 SF 0.45 4/1,000 SF 480 Spaces 325 156,000 SF o 19,000 SF Athletic Club .0% 35% 58% 35% 58% 7% 0% 100% . Building Footprint . Parking C Other C Outdoor Recreation Water Park, City of Chanhassen Area (Acres) 4.2 Area ( SF) 182,000