Loading...
Approval Letter 1-26-05 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax 952.227.1110 Building Inspections Phone: 952.227.1180 Fax 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone 952.227.1400 Fax 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.ci.chanhassen.mn.us January 26, 2005 Mr. John Kohler Semper Development, Ltd. 821 Marquette Avenue South Suite 600 Minneapolis, MN 55402 Dear Mr. Kohler: This letter is to formally notify you that on January 24,2005, the City Council adopted the following motions: "The City Council approves Site Plan 05-03 for a 15,000 square-foot building to house a retail building and pharmacy, with a variance to allow a 70.4% hard surface coverage and reduction in parking, based on the findings of the staff report, and as shown on the plans dated received December 3, 2004, subject to the following conditions: 1. Applicant shall increase landscape plantings to meet minimum requirements. A revised landscape plan shall be submitted to the City prior to final approval. 2. Landscape islands shall have a minimum inside width of 10 feet. 3. Add the latest City standard detail plate Nos. 5207, 5300, and 5301. 4. On the utility plan: - Revise the proposed inverts for catch basin No.1 to 949.25 and 949.19, respectively. - Label the existing water stub to the site off Market Boulevard as 8" DIP. 5. On the grading plan: - Add a benchmark. - Show the proposed storm sewer. - Increase the rock construction entrances to a minimum of 75-feet in length. - Show the parking lot stall locations and striping. - Show the missing 954 contour elevation along the north side of the property. The City 01 Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks A great place to live, work, and play. Mr. John Kohler January 27, 2005 Page 2 6. Installation of the private utilities for the site will require permits and inspections through the City's Building Department. 7. The applicant must show the location/elevation of an emergency overflow point for catch basin No.2 that is 1.5-feet lower than the proposed building elevation. 8. Storm sewer sizing calculations will be required at the time of building permit application. The proposed storm sewer must be sized for a lO-year storm event. 9. Sanitary sewer and water hookup charges will be applicable for the new building. The 2005 trunk hookup charge is $1,458 per unit for sanitary sewer and $2,955 per unit for watermain. The 2005 SAC charge is $1,525 per unit. All of these charges are based on the number of SAC units calculated by the Met Council. Since there is an existing building, only hook-up charges for the additional SAC units will be charged. These charges will be collected at the time of building permit issuance. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel. 10. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. 11. Permits from the MPCA, Watershed District and Railroad will be required for the site grading. 12. All drive aisle widths within the parking lot must be 26-feet wide per City Code and the existing driveway aprons must be upgraded to current City standards per Detail Plate No. 5207. 13. The existing assessment for the recent 2004 Street Overlay Project, totaling $11,436.83 plus interest, must be paid prior to building permit issuance. 14. The proposed development shall maintain existing runoff rates and meet NURP water quality standards. 15. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Steeper than 3: 1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or manmade systems that discharge to a surface water. Mr. John Kohler January 27, 2005 Page 3 16. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as-needed. 17. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency (NPDES Phase II Construction Permit), Minnesota Department of Natural Resources (for dewatering), Army Corps of Engineers) and comply with their conditions of approval. 18. Fire Marshal Conditions a. A lO-foot clear space must be maintained around fire hydrants, i.e., streetlamps, trees, shrubs, bushes, Xcel Energy, Qwest, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters (pursuant to Chanhassen City Ordinance 9-1). b. Indicate on utility plans the location of PIV (post indicator valve). Fire Marshal must review and approve. 19. Building Official Conditions: a. The building is required to be protected by automatic fire extinguishing systems. b. The plans must be prepared and signed by design professionals licensed in the State of Minnesota. c. A demolition permit must be obtained prior to beginning demolition activities on the site. d. The site must be protected with an 8 foot high fence during demolition and construction activities. e. Detailed occupancy related requirements cannot be reviewed until complete plans are submitted. f. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 20. All rooftop equipment shall be screened. 21. The applicant shall enter into a site plan agreement with the city and provide the necessary financial securities. 22. The applicant must obtain a sign permit prior to erecting the signs on site. A detailed sign plan incorporating the method of lighting, acceptable to staff, should be provided prior to requesting a sign permit. 23. The Planning Commission recommends the withdrawal of approval of Site Plan 92-1 for the Americana Community Bank building, concurrently with the approval of Planning Case 05- 3. The applicant shall file the notice of withdrawal against the property at Carver County. 24. Allow additional hard surface variance coverage for an additional bench on the southwest comer. " Mr. John Kohler January 27, 2005 Page 4 CONDITIONAL USE PERMIT "The City Council approves conditional use permit 05-03, for the LED display within a monument ground low profile sign." A Site Plan Agreement must be prepared which will be done by our offices; however, we need an estimate on the cost of improvements for the site (erosion control, landscaping, etc.). A building permit cannot be issued until the Site Plan Agreement has been executed and recorded at Carver County and financial guarantees submitted to the City. Should you have any questions, please feel free to call me at 952-227-1134 or e-mail atsaliaff@ci.chanhassen.mn.us Sincerely, Sharmeen AI-Jaff Senior Planner c: Mr. Robert Dittrich Matt Saam, Assistant City Engineer Steve Torell, Building Official g:\plan\2005 planning cases\05-03 walgreens\approvalletter.doc