Loading...
Civil Plans 03-14-2014Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y Mar 14, 2014 - 12:23pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C1.01-TITLE.dwg C1.01 TITLE SHEET GEOTECHNICAL BRAUN INTERTEC 11001 HAMPSHIRE AVE S. MINNEAPOLIS, MN 55438 TEL 952-995-2000 FAX 952-995-2020 CONTACT: DEVELOPER/OWNER CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 TEL 952-474-4828 FAX 952-474-4826 CONTACT: BEN MERRIMAN ARCHITECT MOHAGEN HANSEN ARCHITECTURAL GROUP 1000 TWELVE OAKS CENTER DRIVE #200 WAYZATA, MN 55391 TEL 952-426-7400 FAX952-426-7440 CONTACT: JENNIFER KAPLAN, AIA CIVIL ENGINEER MFRA INC. 14800 28TH AVENUE, SUITE 140 PLYMOUTH, MN 55447 TEL 763-476-6010 FAX 763-476-8532 CONTACT: BRAD WILKENING, PE LANDSCAPE ARCHITECT MFRA INC. 14800 28TH AVENUE, SUITE 140 PLYMOUTH, MN 55447 TEL 763-476-6010 FAX 763-476-8532 CONTACT: JIM KALKES, RLA SURVEYOR MFRA INC. 14800 28TH AVENUE, SUITE 140 PLYMOUTH, MN 55447 TEL 763-476-6010 FAX 763-476-8532 CONTACT: MARCUS HAMPTON, RLS for Preliminary Site Development Plans Dakota Retail Center Companies, LLC Chanhassen, Minnesota Presented by: NO SCALE VICINITY MAP SITE CONSULTANT CONTACT LIST: SHEET INDEX SHEET DESCRIPTION C1.01 TITLE SHEET C2.01 EXISTING CONDITIONS C3.01 CIVIL SITE PLAN C4.01 GRADING AND DRAINAGE PLAN C5.01 EROSION & SEDIMENT CONTROL PLAN - PHASE I C5.02 EROSION & SEDIMENT CONTROL PLAN - PHASE II C5.03 EROSION & SEDIMENT CONTROL PLAN - DETAILS C6.01 UTILITY PLAN L1.01 SITE LANDSCAPE PLAN L1.02 SITE LANDSCAPE DETAILS SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 PREL I M I N A R Y Mar 14, 2014 - 12:23pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C2.01-EXCON.dwg C2.01 EXISTING CONDITIONS FOUND MONUMENT SET MONUMENT ELECTRIC METER LIGHT SANITARY SEWER STORM SEWER WATERMAIN FLARED END SECTION ELECTRIC TRANSFORMERAIR CONDITIONER GUY ANCHOR HANDICAP STALL UTILITY POLE GUARD POST BOLLARD SIGN TELEPHONE PEDESTAL UE UT UG GAS METER OVERHEAD WIREOW CHAIN LINK FENCE IRON FENCE WIRE FENCE WOOD FENCE EASEMENT LINE SETBACK LINE RIGHT OF ACCESS BUILDING LINE BUILDING CANOPY CONCRETE CURB BITUMINOUS SURFACE CONCRETE SURFACE LANDSCAPE SURFACE DECIDUOUS TREE CONIFEROUS TREE LEGEND SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y EXISTING USE INTENDED USE EXISTING ZONING AREA SUMMARY SIZE OF PARCEL GROSS FLOOR AREA BUILDING COVERAGE IMPERVIOUS SURFACE COVERAGE PERCENT COVERED BY PARKING PROJECTED NUMBER OF EMPLOYEES NUMBER OF SEATS FOR RESTAURANT PARKING STALLS REQUIRED (1/200 SF) PARKING STALLS PROVIDED HEIGHT OF BUILDING STRUCTURE BUILDING USES A.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT. B.ALL DIMENSIONS SHOWN ARE TO THE BACK OF CURB TO BACK OF CURB UNLESS OTHERWISE NOTED. BACK OF CURB IS SHOWN GRAPHICALLY ONLY. C.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. D.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED. E.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. F.SEE ARCHITECTURAL PLANS FOR PYLON SIGN DETAILS G.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT POLE. H.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS. I.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS ISLE SHALL BE 2.08% (1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL SAWCUT LINE NUMBER OF PARKING STALLS PER ROW SIGN PIPE BOLLARD STANDARD DUTY ASPHALT PAVING HEAVY DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED KEY NOTE DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES WETLAND LIMITS TREELINE A.BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS. B.B-612 CONCRETE CURB AND GUTTER. C.B-618 6CONCRETE CURB AND GUTTER. D.HANDRAIL. E.CONCRETE APRON F.SEGMENTAL BLOCK RETAINING WALL. G.ACCESSIBLE RAMP. H.CONCRETE STEPS. I.DUMPSTER ENCLOSURE. J.OUTDOOR SEATING. RETAIL RETAIL BH 65,996 SF 8,000 SF 12.12% 63.92% 39.85% UNKNOWN UNKNOWN 40 STALLS 53 STALLS 19 FEET ALL RETAIL Mar 14, 2014 - 12:23pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C3.01-SITE.dwg C3.01 CIVIL SITE PLAN APPLICANT: BEN MERRIMAN CENTER COMPANIES, LLC 2025 COULTER BLVD, SUITE 215 CHANHASSEN, MINNESOTA 55317 CIVIL ENGINEER: MFRA, INC. 14800 28TH AVE N., SUITE 140 PLYMOUTH, MN 55447 OWNER OF RECORD: IC JOHN, LLC SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y Mar 14, 2014 - 12:24pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C4.01-GRADE.dwg C4.01 GRADING AND DRAINAGE PLAN BUILDING RETAINING WALL PROPERTY LIMIT EXISTINGPROPOSED LEGEND WETLAND LIMITS TREELINE STORM SEWER 902 SOIL BORINGS 1042.56 ST 5 GRADING NOTES DRAINTILE THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. D A.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE. B.KEdZdKZ^,>>Zs/tWsDEd'Z/EdEKE^dZhd͞'hddZKhd͟t,ZtdZZ/E^tz&ZKD hZ͘>>Kd,ZZ^^,>>KE^dZhd^͞'hddZ/E͟hZ͘ C.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE IN 2.08% (1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. D.d,KEdZdKZ/^hd/KEd,d͞d,^h^hZ&hd/>/dz/E&KZDd/KE^,KtEKEd,^W>E^/^hd/>/dz QUALITY LEVEL ____________. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02 d/d>͞^dEZ'h/>/E^&KZd,K>>d/KEEW/d/KEK&y/^d/E'^h^hZ&hd/>/dzd͘͟d, CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA AT 1-800-252-1166). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. E.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. F.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. G.THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY: COMPANY: ADDRESS: PHONE: DATED: THE CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT. H.THE CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION. I.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. J.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER. K.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. L.THE TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO THE CONTRACTOR'S OPERATIONS. HE WILL BE REQUIRED TO PROTECT THE TREES WHICH ARE TO BE SAVED TO BE SURE THAT EQUIPMENT IS NOT NEEDLESSLY OPERATED UNDER NEARBY TREES AND SHALL EXERCISE EXTREME CAUTION IN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, HE SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF OPERATION. SHOULD THE CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY LASTING DAMAGE TO THE TREE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE MADE. M.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 4 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 4 INCHES. N.dZE,KZZKtKE^dZhd/KE͗/&>>Ktzd,KtEZ͕d,KEdZdKZDzKDW>d͞dZE,KZZKt͟ EXCAVATION IN AREAS DIRECTED BY THE ENGINEER IN ORDER TO OBTAIN STRUCTURAL MATERIAL. TRENCH BORROW EXCAVATION SHALL BE COMPLETED IN GREEN SPACE AREAS. TRENCH BORROW CONSTRUCTION SHALL BE COMPLETED ONLY WITHIN THE PLAT BOUNDARIES. TREES SHALL NOT BE REMOVED OR DAMAGED AS A RESULT OF THE EXCAVATION, UNLESS APPROVED BY THE ENGINEER. THE EXCAVATION SHALL COMMENCE A MINIMUM OF 10 FEET FROM THE LIMIT OF THE BUILDING PAD. THE EXCAVATION FROM THIS LIMIT SHALL EXTEND AT A MINIMUM SLOPE OF 1 FOOT HORIZONTAL TO 1 FOOT VERTICAL (1:1) DOWNWARD AND OUTWARD FROM THE FINISHED SURFACE GRADE ELEVATION. THE TRENCH BORROW EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED FINISHED GRADE ELEVATION, AND SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE QUALITY COMPACTION METHOD AS OUTLINED IN MN/DOT SPECIFICATION 2105.3F2. SNOW FENCE SHALL BE FURNISHED AND PLACED ALONG THE PERIMETER OF THE TRENCH BORROW AREA WHERE THE SLOPES EXCEED 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1). O.FINISHED GRADING SHALL BE COMPLETED, THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. P.TOLERANCES 1.THE RESIDENTIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 2.THE COMMERCIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 3.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE. 4.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 5.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. R.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE. S.THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE ^/d'Z/E'KE^dZhd/KEE^,>>/E/d,h>ZK^KEZK^/KEE^/DEdKEdZK>͞^/dDW͘͟ THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. THE CONTRACTOR SHALL POST WHATEVER SECURITY, AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY. (OPTIONAL) T.FILL PLACED WITHIN THE BUILDING PAD AREAS SHALL BE IN CONFORMANCE WITH HUD/FHA PROCEDURES AND DATA SHEET 79G. U.IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT REVIEW, DISCUSSION AND APPROVAL FROM THE PROJECT ENGINEER. V.RETAINING WALL(S) SHALL BE CONSTRUCTED OF MODULAR BLOCK) MATERIAL. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND LOCAL AUTHORITY CERTIFIED ENGINEERING DRAWINGS, DESIGN CALCULATIONS AND SOIL BORINGS. THE CERTIFIED ENGINEER FOR THE RETAINING WALL(S) SHALL PROVIDE CONSTRUCTION OBSERVATIONS OF THE RETAINING WALL IMPROVEMENT, AND A LETTER CERTIFYING THE INSTALLATION OF THE WALL(S) WAS CONSTRUCTED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. 962.5 X 962.5 X 902 SPOT ELEVATION CONTOUR RIP RAP OVERFLOW ELEV. CURB & GUTTER SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y Mar 14, 2014 - 12:24pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.01 EROSION & SEDIMENT CONTROL PLAN - PHASE I * REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPPP) TEMPORARY STORAGE AND PARKING AREA DIRECTION OF OVERLAND FLOW TEMPORARY DIVERSION DITCH LIMITS OF DRAINAGE SUB-BASIN INLET PROTECTION DEVICE 1 INLET PROTECTION DEVICE 2 TEMPORARY STONE CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT BASIN LIMITS OF DISTURBANCE OVERFLOW ELEV. 902902CONTOUR RIP RAP CHECK DAM PA-10 SILT FENCE SOIL BORINGS ST-9 EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE PHASE I: 1.INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2.PREPARE TEMPORARY PARKING AND STORAGE AREA. 3.CONSTRUCT THE SILT FENCES ON THE SITE. 4. CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS. 5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 6. CLEAR AND GRUB THE SITE. 7. BEGIN GRADING THE SITE. 8. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1.TEMPORARILY SEED DENUDED AREAS. 2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3.INSTALL RIP RAP AROUND OUTLET STRUCTURES. 4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. 5.PREPARE SITE FOR PAVING. 6.PAVE SITE. 7.INSTALL INLET PROTECTION DEVICES. 8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. 9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE. TSM TS SB EROSION CONTROL MATERIALS QUANTITIES ITEM UNIT QUANTITY SILT FENCE LINEAR FEET X SILT DIKE LINEAR FEET X BIO-ROLL LINEAR FEET X CONSTRUCTION ENTRANCE UNIT X INLET PROTECTION DEVICE (IP-1)UNIT X INLET PROTECTION DEVICE (IP-2)UNIT X SILT DIKE AREA SUMMARY IN ACRES PAVEMENT AREA yy͘yyц BUILDING AREA yy͘yyц SEEDED AREA yy͘yyц TOTAL DISTURBED yy͘yyц PRE - CONSTRUCTION IMPERVIOUS yy͘yyц POST - CONSTRUCTION IMPERVIOUS yy͘yyц BIO-ROLL LEGEND SEQUENCE OF CONSTRUCTION NOTE TO CONTRACTOR D SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y Mar 14, 2014 - 12:24pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.02 EROSION & SEDIMENT CONTROL PLAN - PHASE II * REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE NOTES, LOCATION MAPS, AND STANDARD DETAILS TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPPP) TEMPORARY STORAGE AND PARKING AREA DIRECTION OF OVERLAND FLOW TEMPORARY DIVERSION DITCH LIMITS OF DRAINAGE SUB-BASIN INLET PROTECTION DEVICE 1 INLET PROTECTION DEVICE 2 TEMPORARY STONE CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT BASIN LIMITS OF DISTURBANCE OVERFLOW ELEV. 902902CONTOUR RIP RAP CHECK DAM PA-10 SILT FENCE SOIL BORINGS ST-9 EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE PHASE I: 1.INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2.PREPARE TEMPORARY PARKING AND STORAGE AREA. 3.CONSTRUCT THE SILT FENCES ON THE SITE. 4. CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS. 5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 6. CLEAR AND GRUB THE SITE. 7. BEGIN GRADING THE SITE. 8. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1.TEMPORARILY SEED DENUDED AREAS. 2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3.INSTALL RIP RAP AROUND OUTLET STRUCTURES. 4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. 5.PREPARE SITE FOR PAVING. 6.PAVE SITE. 7.INSTALL INLET PROTECTION DEVICES. 8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. 9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE. TSM TS SB EROSION CONTROL MATERIALS QUANTITIES ITEM UNIT QUANTITY SILT FENCE LINEAR FEET X SILT DIKE LINEAR FEET X BIO-ROLL LINEAR FEET X CONSTRUCTION ENTRANCE UNIT X INLET PROTECTION DEVICE (IP-1)UNIT X INLET PROTECTION DEVICE (IP-2)UNIT X SILT DIKE AREA SUMMARY IN ACRES PAVEMENT AREA yy͘yyц BUILDING AREA yy͘yyц SEEDED AREA yy͘yyц TOTAL DISTURBED yy͘yyц PRE - CONSTRUCTION IMPERVIOUS yy͘yyц POST - CONSTRUCTION IMPERVIOUS yy͘yyц BIO-ROLL LEGEND SEQUENCE OF CONSTRUCTION NOTE TO CONTRACTOR D Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y Mar 14, 2014 - 12:24pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.03 EROSION & SEDIMENT CONTROL PLAN - DETAILS ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION ON SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING: 1.ALL SILT FENCES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/3 OF THE HEIGHT OF THE FENCE. THESE REPAIRS MUST BE MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. 2.TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART IV.D. OF THE GENERAL PERMIT). 3.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. THE CONTRACTOR MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. THE CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF OBTAINING ACCESS. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK. 4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL OFF-SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART IV.C.6 OF THE GENERAL PERMIT. 5.THE CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE PERMITTEE(S) ARE RESPONSIBLE UNTIL ANOTHER PERMITTEE HAS ASSUMED CONTROL ACCORDING TO PART II.B.5 OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, AND A NOT HAS BEEN SUBMITTED TO THE MPCA. 6.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS (E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS). 7.ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREA AND THESE AREAS ARE PROTECTED FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA. 1.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD SPECIFICATIONS AND MFRA STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY. 2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATIONS AND/OR ELEVATIONS OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL X. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CONTACT ALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE LOCATIONS OF SMALL UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING MINNESOTA GOPHER STATE ONE CALL AT 800-252-1166 OR 651-454-0002 3.THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISTING CONDITIONS. THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON AN ALTA OR TOPOGRAPHIC SURVEY PREPARED BY ____ DATED XX-XX-XXXX. IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, THEY SHALL HAVE MADE, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW. SEE ATTACHED SURVEY SHEETS. 4.THE GENERAL CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES OCCURRING TO THE ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 5.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PLAN-ESC PLAN), THE STANDARD DETAILS, THE PLAN NARRATIVE, AND ITS APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS. 6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS MUST BE KEPT AT THE SITE DURING CONSTRUCTION. (NOTE TO THE PREPARER: EDIT APPLICATION PROCESS PER PROJECT REQUIREMENTS) 7.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP & PERMITS. THE CONTRACTOR SHALL OVERSEE THE INSPECTION & MAINTENANCE OF THE BMP'S AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED, IS APPROVED BY ALL AUTHORITIES, THE NOTICE OF TERMINATION (NOT) HAS BEEN FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. (NOTE TO THE PREPARER: REVISE INSPECTION RESPONSIBILITY PER OPTIONS IN SWPPP NARRATIVE (SECTION 02370)) 8.CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART III.A.2 OF THE GENERAL PERMIT. 9.BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. 10.ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. 11.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THE ESC PLANS SHALL BE CLEARLY DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING ACTIVITIES MUST NOT OCCUR OUTSIDE THE LIMITS OF DISTURBANCE. 12.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 13.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR DISPOSED. NO ENGINE DEGREASING IS ALLOWED ON SITE. 14.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE LINER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. 15.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 16.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 17.SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION & DEMOLITION DEBRIS & OTHER WASTES MUST BE DISPOSED OF PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 18.HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS. 19.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL DISTURBING ACTIVITIES UPSLOPE. 20.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 14 DAYS OF INACTIVITY. SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SEED MIXTURE NUMBER 100 OR 110 DEPENDING ON THE SEASON OF PLANTING ( SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY, HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH. 21.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN ACCORDANCE WITH THE TIME TABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN FOR VEGETATIVE COVER. (NOTE TO THE PREPARER: WHERE PERMANENT SEEDING IS NOT CALLED OUT IN THE GRADING AND/ OR LANDSCAPE PLAN, REPLACE THE LAST SENTENCE IN THIS ITEM WITH THE FOLLOWING: SEED WET PONDS WITH MN/DOT SEED MIXTURE 310 "NATIVE WET TALL" BELOW THE HWL. SEED ALL OTHER AREAS WITH SEED MIXTURE 260 "COMMERCIAL TURF". SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2573.3.) 22.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN, CONVEYANCES, OR DRAINAGEWAYS DISCHARGING OFF-SITE OR TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY. 23.ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. 24.TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES. 25.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. 26.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, CHECK DAMS, INLET PROTECTION DEVICES, ETC.) TO PREVENT EROSION. 27.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION. DEVELOPER/OWNER: XXXXXXX XXXXXXX XXXXXXXX XXX-XXX-XXXX SITE OPERATOR / GENERAL CONTRACTOR SUPERINTENDENT: CROSS BRACE MI N . 15 " 18 " MA X . 2" X 4" STAKE 3' M I N . DROP INLET WITH GRATE 2" X 4" WOOD FRAME (TYP.) 5' MIN. SECURELY FASTEN OVERLAPPING ENDS OF SILT FENCE MATERIAL TO ADJACENT STAKES WITH THREE WIRE TIES OR OTHER FASTENERS ATTACH THE WOVEN WIRE FENCE TO EACH POST WITH THREE WIRE TIES OR OTHER FASTENERS (SEE NOTE 1) 1. ATTACH THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE (SPACED EVERY 30") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8" OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1" VERTICALLY APART. 2. WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED ACROSS TWO POSTS. 3. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS MAY NOT EXCEED ONE-HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE-HALF THE HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE. 4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT. OVERLAP 5' MIN. SILT FENCE MATERIAL TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH THREE TIES SPACED AT 30" ON CENTER (SEE NOTE 1) DEFLECTOR PLATE OVERFLOW 2 - TOP OF CURB BOX OVERFLOW 1 - CENTER OF FILTER ASSEMBLY 10" FILTER ASSEMBLY CURB CG 3067 HIGH-FLOW FABRIC MIRAFI FF101 ROAD DRAIN CASTING APPLICABILTY x NEENAH R-3067 x NEENAH R-3512 NOT TO SCALE CONSTRUCT 2' HIGH BERM WITH MAXIMUM SIDE SLOPE OF 4:1 2" TO 3" GRAVEL NOTE: THE ROCK ENTRANCES SHALL BE INSTALLED PRIOR TO THE START OF ANY SITE WORK THE ROCK ENTRANCES SHALL BE INSPECTED FOLLOWING EACH RAINFALL. MAINTENANCE OF THE ROCK ENTRANCES SHALL INCLUDE A TOP DRESSING OF NEW GRAVEL, OR REMOVAL AND REPLACEMENT OF THE GRAVEL AS NEEDED, TO KEEP THE ENTRANCE FREE FROM COLLECTED MUD. AS REQU I R E D UNDISTURBED SOIL BACKFILL 6" X 6" TRENCH WOVEN MONOFILAMENT GEOTEXTILE MATERIAL DIRECTION OF DRAINAGE 2" X 2" WOOD OR STEEL T-POSTS 12 " M I N . 8' X 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA 2'-0" MIN BERM AROUND PERIMETER GROUND SURFACE 12" MIN 12" MIN COMPACTED EMBANKMENT MATERIAL (TYP.)3:1 OR FLATTER SIDE SLOPES NOTES: 1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. 2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC LINER. 3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. 7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. WOVEN WIRE FENCE WITH SILT FENCE MATERIAL COVER EXTEND WIRE FENCE A MIN. OF 3" INTO GROUND EXTEND SILT FENCE MATERIAL A MIN. OF 1'-0" INTO GROUND EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" SITE LOCATION MAP NOT TO SCALE USGS MAP GENERAL EROSION NOTES: MAINTENANCE NOTES: NOT TO SCALE ROCK ENTRANCE DRIVE NOT TO SCALE SILT FENCE DETAIL NOT TO SCALE CONCRETE WASHOUT AREA ROAD DRAIN INLET PROTECTION (IP-2)SILT FENCE INLET PROTECTION (IP-1) NOT TO SCALE POSTS: 2 X 4 WOODEN STAKE FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. NOT TO SCALE SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at MFRA, Inc., Plymouth, MN office. Date:26908 Brad C. Wilkening 03/14/2014PREL I M I N A R Y Mar 14, 2014 - 12:24pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C6.01-UTIL.dwg C6.01 UTILITY PLAN THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. A.THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE SPECIFICATIONS. 1.ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE TO CITY REQUIREMENTS. 2.CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE THE LIABILITY OF THE CONTRACTOR 3.A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN (BUILDING, STORM AND SANITARY) CROSSINGS. B.ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. 1.ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. 2.ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE. 3.ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, WITH 7.5 FEET MINIMUM COVER. 4.ALL STORM SEWER PIPE TO BE REINFORCED CONCRETE PIPE WITH R-4 JOINTS, AND RUBBER GASKETS. 5.RIP RAP SHALL BE Mn/DOT CLASS 3. C.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULE, EXIT PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. D.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE LOCATIONS OF SMALL UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR, BY CALLING GOPHER STATE ONE CALL AT 454-0002. E.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. F.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. G.ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH THE SOD. H.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. I.ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: COMPANY: ___________________________________________ ADDRESS: ____________________________________________ PHONE: _______________________________________________ DATED: _______________________________________________ THE CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. J.PRIOR TO PLACEMENT OF AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. (OPTIONAL) K.THE TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO THE CONTRACTOR'S OPERATIONS. HE WILL BE REQUIRED TO PROTECT THE TREES WHICH ARE TO BE SAVED TO BE SURE THAT EQUIPMENT IS NOT NEEDLESSLY OPERATED UNDER NEARBY TREES AND SHALL EXERCISE EXTREME CAUTION IN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, HE SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF THE OPERATION. SHOULD THE CONTRACTORS' OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY DAMAGE. COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE MADE. L.THE CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUCTURES TO ______________. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING REVIEW. M.THE CONTRACTOR AND THEIR SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. TELEPHONE ELECTRIC GAS LINE FORCEMAIN (SAN.) EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE D S S SLS LEGENDUTILITY CONSTRUCTION NOTES STORM SEWER STRUCTURE SCHEDULE NUMBER*TYPE CASTING** *INDICATES NEENAH FOUNDRY CASTING NO., OR APPROVED EQUAL **PROVIDE 27 INCH ROUND OPENING IN MANHOLE SLAB COVER. NOTE: THE CONTRACTOR AND THEIR SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. GEOTEXTILE FABRIC MNDOT (3733-TYPE I) ON THE BOTTOM & SIDES OF TRENCH. 2' 3:1 M A X POND NWL = 934.00 6" PERFORATED HDPE DRAINTILE10:1 BE N C H CATEGORY III EROSION CONTROL BLANKET & 4" TOP SOIL 3' NOT TO SCALE FILTRATION TRENCH CROSS-SECTION NATIVE SOIL, SCARIFY TO A 1 FT DEPTH ON BOTTOM AND BACKSIDE PRIOR TO PLACEMENT OF IMPORTED SECTION. 4' COURSE FILTER AGGREGATE MNDOT (3149.2H) SEE GRADING PLAN FOR SEDIMENTATION BASIN SLOPE GALVANIZED GRATE (SPLIT) 4"X4" OPENINGS 6" DRAINTILE FROM FILTRATION TRENCH N.T.S. 01 ELEV=932.00 OCS-301 DETAIL ELEV= 934.3 ELEV= 935.1 OUTLET ON DOWNSTREAM SIDE OF WEIR WALL ELEV= 933.80 REPAIR STREET TO EXISTING PAVEMENT SECTION SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 PREL I M I N A R Y Registration No. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed LANDSCAPE ARCHITECT under the laws of the State of Minnesota. This certification is not valid unless wet signed in blue ink. If applicable, contact us for a wet signed copy of this survey which is available upon request at MFRA, Inc., Plymouth, MN office. Date:45071 James A. Kalkes 2014/03/14 Mar 14, 2014 - 12:25pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-L1.01-LAND .dwg L1.01 SITE LANDSCAPE PLAN QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. BOTANICAL NAME DECIDUOUS TREES KEY COMMON NAME 2.5"BB - SIZE ROOT QTY. 2.5"BB - Gleditsia triacanthos SHADEMASTER HONEYLOCUST 2.5"BB -Celtis occidentalis HACKBERRY 2.5"BB -Acer rubrum 'Nothwoods'NORTHHWOODS MAPLE var. inermis 'Shademaster'HL BL HB RM Tilia americana 'Boulevard' BOULEVARD LINDEN RIVER BIRCH 1.5"BB - ORNAMENTAL TREES Betula nigra AUTUMN BRILLIANCE 1.5"BB -Amelanchier x grandiflora 'Autumn Brilliance' RB SB ST R A I T L E A D E R NO " V " C R O T C H SPRING SNOW CRABAPPLE 1.5"BB -Malus x 'Spring Snow'SS LANDSCAPE LEGEND CL U M P FO R M ST R A I T L E A D E R N O " V " C R O T C H 2.5"BB -Acer saccharum SUGAR MAPLESM JAPANESE TREE LILAC 1.5"BB -Syringa ReticulataTL INSTALL HEIGHT MATURE HEIGHT 10'50' 15'60' 15'50' 14'50' 14'50' SERVICEBERRY 8'25' 8'20' 8'20' 8'25' NATIVE WET PRAIRIE MN SEED MIX 34-262 (OLD BWSR W3) WITH 'NO MOW FESCUE' WETLAND FRINGE MN SEED MIX 35-621 (OLD BWSR U6) WITH 'NO MOW FESCUE' COMMERCIAL TURF - SOD HIGHLAND SOD COMMERCIAL TURF - SEED MN SEED MIX 25-131 (OLD MNDOT 260) W/ "NO MOW FESCUE MIX" HARDWOOD MULCH (NATURAL COLOR) SHREADED HARDWOOD MULCH 1/2" CRUSHED GRANITE CRUSHED QUARRY GRANITE MNDOT 260 MNDOT 260 & ALL AREAS DISTURBED BY W/ "NO MOW FESCUE MIX CONSTRUCTION NOT INTENDED (USE EROSION CONTROL BLANKET SODDED, OR RETENTION BASINS FOR SLOPES OVER 3:1) ** NO MOW SEED FORMULA FROM SPECIALTY TURF & AG INC, FREEDOM MIX, AT 200LB/ACRE OR APPROVED EQUAL. - WWW.SPECIALTYTURFAG.COM - 188-685-4521 SEED MIX LEGEND (FOR ALL SHEETS) SEED MIXTYPESYM.x PROJECT VALUE / MINIMUM LANDSCAPE VALUE xx PROJECT VALUE +/- $1,500,000 = $30,000 LANDSCAPE VALUE xx BUFFERYARD "A" BETWEEN COM AND COM PER 100' xx (North Property Line 500') xx (East Property Line 250') xxx 1 CANOPY TREES xxx 2 UNDERSTORY TREES xxx 3 SHRUBS xx BUFFERYARD "C" BETWEEN COM AND MD PER 100' xx (South Property Line 500') xxx 3 CANOPY TREES xxx 6 UNDERSTORY TREES xxx 9 SHRUBS CITY LANDSCAPE CODE SCALE IN FEET 0 2010 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: CENTER COMPANIES, LLC 2025 COULTER BLVD., SUITE 215 CHANHASSEN, MN 55317 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 PREL I M I N A R Y Registration No. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed LANDSCAPE ARCHITECT under the laws of the State of Minnesota. This certification is not valid unless wet signed in blue ink. If applicable, contact us for a wet signed copy of this survey which is available upon request at MFRA, Inc., Plymouth, MN office. Date:45071 James A. Kalkes 2014/03/14 Mar 14, 2014 - 12:25pm - User:234 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-L1.01-LAND .dwg L1.02 SITE LANDSCAPE DETAILS Forsythia 'Sunrise'SUNRISE FORSYTHIA #5 CONT.TEC - Euonymus alatus 'Compactus'DWARF BURNING BUSH #5 CONT.DBB - SHRUBS BOTANICAL NAMEKEY COMMON NAME SIZE ROOT QTY. Rhus aromatica 'Gro-Low'GRO-LOW FRAGRANT SUMAC #5 CONT.GLS - #5 CONT.SVJ - #5 CONT.SMS - #5 CONT.- Spiraea x bumalda 'Anthony Waterer'ANTHONY WATERER SPIREA #5 CONT.-AWS #5 CONT.-DBW Juniperious Horizoantalis 'Savin'SAVIN JUNIPER Salix purpurea 'Nana'DWARF BLUE ARCTIC WILLOW Spiraea nipponica 'Snowmound'SNOWMOUND SPIREA Viburnum trilobum 'Bailey Compact'COMPACT AMERICAN CRANBERRYBUSH #5 CONT.BCA - LANDSCAPE LEGEND Syringa x "Bailsugar'SUGAR PLUM LILAC #5 CONT.SPF - #5 CONT.-GOLD FLAME SPIREASpiraea x bumalda 'Gold Flame' 1.5'4'x4' INSTALL HEIGHT MATURE HEIGHT 1'3'x4' 1'3'x4' 1'2.5'x5' 1.5'4'x4' 1.5'3'x4' 1.5'3'x4' 1'3'x4' 1.5'3'x4' 1.5'5'x5' 1.5'4'x4' MYS Spiraea thunbergii 'Ogon'MELLOW YELLOW SPIREA GFS Lonicera x xylosteoides 'Miniglobe'MINIGLOBE HONEYSUCKLE #5 CONT.MGH - 1.5'4'x4' SHRUB DETAIL5 L1.02 QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. #5 CONT.ALPINE CURRANTRibes alpinum 1.5'3'x4'ALP #5 CONT.SVJ -Juniperious Horizoantalis 'Savin'SAVIN JUNIPER 1'3'x4' - Ilex verticillata 'Jim Dandy'JIM DANDY WINTERBERRY #5 CONT.JDW - Ilex verticillata 'Red Sprite'RED SPRITE WINTERBERRY #5 CONT.RSW - #5 CONT.-BLACK CHOKEBERRYAronica melonocarpa elata 1.5'4'X4' 1.5'3'X3' 1.5'3'X3' BCB #5 CONT.-RED TWIG DOGWOODCornus Sericea 'Bailey'1.5'5'x5'RTD SCALE IN FEET 0 2010 SHRUB DETAIL2 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL3 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL4 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL6 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL1 L1.02