Loading...
1e1 Powers Ridge Final Plat CITY OF CHANHASSEN City Cmt" Drive, PO Box 147 hanhllSS"" Minn,sol4 55317 Phon, 612.937.1900 G",,,aI Fox 612.937.5739 19inttring Fox 612.937.9152 blic Saftty Fox 612.934.2524 'tb www.d.chanhalJt1/.mn.1IJ 1.e... -1- - MEMORANDUM TO: Scott Botcher, City Manager FROM: Shannin AI-Jaff, Senior Planner Matt Saam, Project Engineer Lori Haak, Water Resources Coordinator DATE: December I I, 2000 SUBJ: Final Plat Approval to Replat Outlot A, Powers Ridge Apartment . Homes Into Four Lots (SUB 99-14), Powers Ridge Apartment Homes 2nd Addition. On March 13,2000, the City Council approved the preliminary plat of2I.34 acres into 4 lots (SUB-99-14) and Site Plan Review #99-19, approval of Phase I (Building A), 100 units, as shown on the plans dated received December 3, 1999, revised February 2, 2000, and subject to the following conditions: 1. Approval of this application is contingent upon the City Council approving a PUD amendment to allow a 35% hard surface coverage of the site. Finding: This condition has been met. 2. A cross-access easement shall be conveyed to all the lots for use of the private street. Finding: This condition is a duplication of condition #26, therefore deleted. 3. Park and trail dedication fees shall be paid in lieu of parkland dedication. The PUD contract requires no trail fees and Y:. park fees. Finding: This condition still applies. 4. Landscaping along the south property line shall be installed with Phase I after review and approval by the City Forester. Applicant shall increase understory tree plantings in the north property line buffer yard in order to meet minimum ordinance requirements. Finding: This condition still applies. , City of Chanhl1SSm. A f!OWinJ( community with ckan la/ItS, quality schools, a chil111/inr downtown, thrivinf busintSSts, and btautiM Mm. A mat pia" to liut. work. and p/ov. Scott Botcher December 11, 2000 Page 2 5. The PUD agreement states that the applicant shall provide $500.00 oflandscaping per multiple family unit. The applicant shall provide the city with a cost estimate for the required landscaping. Finding: This condition has been met. The applicant has provided a cost estimate of landscaping for the project. The total cost is $325,229.80. This amount translates to $945 per unit. 6. Fire Marshal conditions: a. Fire hydrants: Additional fire hydrants will be required. Some proposed fire hydrants will be required to be re-Iocated. Contact the Chanhassen Fire Marshal for exact location of new and relocation of proposed fire hydrants. Pursuant to 1997 Uniform Fire Code Section 903.2. Finding: This condition has been met. b. Install post indicator valves (p.LVs). Contact the Chanhassen Fire Marshal for exact location. Finding: This condition still applies. c. A IO-foot clear spaceIDust be maintained around fire. hydrants, Le. street lamps, trees, shrubs, bushes, NSP, US West, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance 9-1. Finding: This condition still applies. d. Comply with Chanhassen Fire Department Policy regarding fire department notes to be included on all site plans. Pursuant to Chanhassen Fire Department Policy #04-1991. Copy enclosed. Finding: This condition still applies. e. Contact the Chanhassen Fire Marshal for exact location of fire lane signs and curbing to be painted yellow. Pursuant to Section 904-1 1997 Uniform Fire Code. Finding: This condition still applies. Scott Botcher December 11, 2000 Page 3 f. Required access. Fire apparatus access roads shall be installed pursuant to Section 902.2.1 of the 1997 Uniform Fire Code. In reviewing the plans, because access cannot meet fire code requirements, the following additional fire protection shall be required: f-I. Attic spaces shall be sprinklered perNFPA 13. f-2. Class 1 standpipes shall be installed in stair towers. f-3. The exterior balconies shall be protected by the fire sprinkler system. Finding: This condition still applies. g. Water supplies for fire protection shall be installed and made serviceable prior to and during the time of construction. Pursuant to Uniform Fire Code Section 901.3. h. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all weather driving capabilities. These surfaces shall be provided for prior to construction. Pursuant to 1997 Uniform Fire Code Section 902.2.2.2. Finding: This condition still applies. Finding: This condition still applies. 1. Comply with Chanhassen Fire Department Policy regarding premise identification. Submit plans to Fire Marshal for review of building identification. Pursuant to Chanhassen Fire DepartmentlFire Prevention Division Policy #29-1992. Copy enclosed. Finding: This condition still applies. 7. Turning radius shall be reviewed by the Chanhassen City Engineer and Chanhassen Fire Marshal for approval. Pursuant to 1997 Uniform Fire Code Section 902.2.2.3. This condition has been met. 8. Building Official conditions: a. The buildings must be protected with automatic fire sprinkler systems. Finding: This condition still applies. Scott Botcher December 11, 2000 Page 4 b. An accessible route must be provided to all buildings, parking facilities, public transportation stops and all common use facilities. Finding: This condition still applies. c. All parking areas, including parking garages, must be provided with accessible parking spaces dispersed among the various building entrances. Finding: This condition still applies. d. Accessible dwelling units must be provided in accordance with Minnesota State Building Code Chapter 1341. Finding: This condition stiU applies. e. The building owner and or their representatives should meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. In particular, the locations of the property lines must be reviewed prior to final plat to address allowable building area and exterior wall protection requirements. Finding: This condition still applies. 9. The developer shall supply the City with a detailed haul route for review and approval by staff for materials imported to or exported ITom the site. If the material is proposed to be removed off site to another location in Chanhassen, that property owner will be required to obtain an earthwork permit ITom the City. Finding: This condition stiU applies. 10. The applicant will need to develop a temporary sediment and erosion control plan in accordance with the City's Best Management Practice Handbook. The plan shall be submitted to the City for review and formal approval in conjunction with final plat submittal. Finding: This condition has been met. 11. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. Finding: This condition still applies. Scott Botcher December 11, 2000 Page 5 12. All utility improvements shall be constrUcted in accordance with the latest edition of the City's Standard Specifications and Detail Plates. Detailed constrUction plans and specifications shall be submitted for staff review and City Council approval. The constrUction plans and specifications will need to be submitted a minimum of three weeks prior to final consideration. Finding: This condition has been met. 13. All driveway access points shall incorporate the City's Industrial Driveway Apron Detail Plate No. 5207. Finding: This condition has been met. 14. The applicant shall provide detailed storm sewer calculations for IO-year and 100- year storm events and provide ponding calculations for storm water quality/quantity ponds in accordance with the City's Surface Water Management Plan for the City Engineer to review and approve. The applicant shall provide detailed pre-developed and post-developed storm water calculations for IOO-year storm events and normal water level and high water level calculations in existing basins, created basin, and/or creeks. Individual storm sewer calculations between each catch basin segment will also be required to determine if sufficient catch basins are being utilized. In addition, water quality ponding design calculations shall be based on Walker's Pondnet model. Emergency overflows ITom all storm water ponds and wetlands will also be required on the plans. Finding: This condition has been met. 15. The applicant shall enter into a development contractlPUD agreement with the City and provide the necessary financial security to guarantee compliance with the terms of the development contract. Finding: This condition still applies. 16. The applicant shall apply for and obtain permits ITom the appropriate regulatory agencies, i.e. Carver County Public Works, Watershed District, Metropolitan Environmental Service Commission, Minnesota Department of Health, and Minnesota pollution control Agency and comply with their conditions of approval. Finding: This condition still applies. 17. No berming shall be permitted within the city's right of way. A 2% boulevard grade must be maintained. Landscaping may be permitted subject to staff review and approval. \:,.! Scott Botcher December 11,2000 Page 6 Finding: This condition still applies. 18. The utility improvements located within the main drive aisles and trunk storm drainage lines upon completion shall become City maintained and owned. The individual sewer and water services through each lot shall be privately owned and maintained. Building permits will be required ITom the City's Building Department for the private utility portion of the project. Drainage and utility easements shall be dedicated over the public utility lines located outside of the right-of-way on the final plat. Depending on the depth of the utilities, the minimum drainage and utility easement width shall be 20 feet wide. Consideration for access routes to the ponds for maintenance proposes shall also be incorporated in the easement width. Finding: This condition still applies. 19. The developer shall escrow with the City a financial guarantee for a share of the local cost participation based on traffic generated ITom the site for a future traffic signal at the intersection of Lake Drive West and Powers Boulevard. The cost of the traffic signal is not known at this time. Preliminary estimates between the City and County shall be used for a security escrow. Finding: This condition has been modified to read: "The developer shall escrow $4,880 with the City a f'mancial guarantee for a share of the local cost participation based on traffic generated from the site for a future traffic signal at the intersection of Lake Drive West and Powers Boulevard. The cost of the traffic signal is based upon a figure of $20 per unit. 20. Type III erosion control fence will be required adjacent to the wetland areas. Storm water ponds and/or temporary detention ponds shall be constructed with the initial grading phases to minimize erosion potential to the wetlands or downstream water bodies. Erosion control blanket will be required on slopes greater than 3: I. Revegetation of exposed slopes should occur immediately after grading is completed in accordance with the City's Best Management Practice Handbook. Finding: This condition still applies. 21. Storm water ponds must have side slopes of 10: I for the first ten feet at the normal water level and no more than 3:1 thereafter or 4:1 throughout for safety purposes. Finding: This condition has been met. Scott Botcher December 11,2000 Page 7 22. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer. Finding: This condition still applies. 23. All retaining walls in excess of 4 feet in height will need to be engineered and require building permits. All retaining walls over 4 feet in height should be protected with fences and/or landscaping materials to prevent children ITom falling off the walls. Emergency overflows ITom all storm water ponds and wetlands will also be required on the plans. Finding: This condition has been partially met. The modified condition reads, "All retaining walls in excess of 4 feet in height will need to be engineered and require building permits. All retaining walls over 4 feet in height should be protected with fences and/or landscaping materials to prevent falling off the walls". 24. The plans shall be revised to utilize the existing sewer and water services provided to the site ITom Lake Drive West. Open cutting of the street Lake Drive West will not be permitted. Finding: This condition has been met. 25. The bus stop location along Lake Drive West is subject to city review and approval. Finding: This condition still applies. 26. The drive aisles shall be a minimum of 24 feet wide and 26 feet wide when adjacent to parking stalls and built to 7-ton per axle weight pursuant to Ordinance 18-570-1 and 20-1101. Parking lots shall be designed and constructed in accordance with section 20-1118. Cross-access easements will need to be prepared and recorded by the developer over the lots in favor of the property owners. The minimum easement width shall be 40 feet wide. The applicant's engineer shall work with city staff in reviewing the turning radiuses requirements over the entire site and make the necessary changes. The westerly driveway entrance shall be realigned to be perpendicular to the intersection of Lake Drive West and Upland Circle. Finding: This condition has been partially met. The modified condition reads, "The drive aisles shall be a minimum of 24 feet wide and 26 feet wide when adjacent to parking stalls and built to 7-ton per axle weight pursuant to Ordinance 18-57 0-1 and 20-1101. Parking lots shall be designed and constructed in accordance with section 20-1118. Cross-access easements will , ,~ Scott Botcher December I I, 2000 Page 8 need to be prepared and recorded by the developer over the lots in favor of the property owners." 27. The proposed high-density residential development of21.34 net developable acres is responsible for a water quality connection charge of $34,997. The applicant has provided water quality ponds to treat 18.6 acres which will waive $30,504 of this fee. The applicant is also responsible for a water quantity fee of $93,042, for a total SWMP fee of$97,536. These fees are payable to the City prior to the City filing the final plat. Finding: This condition has been modified. (Refer to SWMP section of staff report for details.) The modified condition reads: "Phases II through IV of the proposed high-density residential development (13.88 developable acres) are responsible for a water quality connection charge of $22,763.20. The applicant is also responsible for a water quantity fee of $60,516.80, for a total SWMP fee of$83,280 for Phases II through IV. These fees shall be paid to the City prior to the City filing the final plat." 28. The applicant shall re-seed any disturbed wetland areas with MnDOT seed mix 25 A, or an approved seed mix for wetland soil conditions. Finding: This condition still applies. 29. The staff and the applicant work òn a landscaping plan that shows all materials presented to City Council supporting each other in terms of what actually will go into that transition area on the south side of the property between Building B2 primarily and the single family residences. Finding: This condition has been met. 30. The applicant shows the following specific materials on the buildings. The low maintenance siding must be flat, not ship lap. Asphalt shingles must be textured, not smooth. Balcony railings must be metal, not wood. Finding: This condition is not applicable. It has been included in the site plan agreement. 31. The applicant shall enter into a site plan agreement prior to issuance of the building permit. Finding: This condition applies to the site plan application only. 32. Site Plan approval is contingent upon final plat approval. Scott Botcher December 11,2000 Page 9 Finding: This condition applies to the site plan application only and will be met with the approval of the f'mal plat application. 33. Each phase of the development shall conform to the overall master plan. Finding: This condition applies to the site plan application only. 34. All signs must receive a separate sign permit. Finding: This condition applies to the site plan application only. 35. There shall be a tree conservation easement on the southerly 137 feet of the south property line. Finding: This easement was dedicated and recorded against the property with Phase I therefore the condition has been met. Finding: This condition has been met with Phase I and applies to the site plan only. 36. Coniferous trees to be planted on the south side behind Buildings Bland B2 shall be increased in height ITom 7 feet to 10 feet. This condition applies to the site plan application only. 37. The berm on the south property line shall be extended 25 feet to the west. This condition has been met. 38. The complex shall operate under the Minnesota Crime Free Multi Housing Program. At that same meeting, the City Council also approved the Amendment to the Lake Susan Hills PUD contract to state the impervious surface coverage ofthe site cannot exceed 35%. On June 26, 2000, the City Council approved site plan 99-19 SPR for the construction of phases II, III, and IV of three multi-family buildings (244 apartments units) and a community space. The applicant is requesting fmaI plat approval to replat Outlot A of Powers Ridge Apartment Homes, consisting of 14.74 acres, into 4 lots. The preliminary plat showed Building B and the community space on a single lot. The proposed final plat shows the community room under a separate parcel. Staff is recommending the applicant Scott Botcher December 11,2000 Page 10 recombine Lots I and 2 to make it consistent with the preliminary plat. Staff is recommending approval with conditions. SUBDIVISION The subdivision request consists of subdividing 14.74 acres into four lots. Lot I will contain apartment building B, Lot 2, Community Room and Swimming pool, Lot 3, Building D, and Lot 4, Building C (Senior Housing Building). All these buildings received site plan approval ITom the City Council on June 26, 2000. The preliminary plat showed Lots 1 and 2 as a single lot containing building B and a community room. The applicant must recombine these two lots into one. The subdivision request is a relatively straightforward action. GRADING The site received preliminary and final plat approval for Phase I back in April 2000. The grading plan for this submittal conforms with the overall approved grading plan for the subdivision. The site will be mass graded in one phase. Berming has been proposed in the south half of Lot I. This will help provide screening between the proposed building and some of the existing homes in the Lake Susan Hills West development. The top of the berm will be approximately 20 feet higher than the existing homes to the south. The fIrst floor and lowest floor elevations of the proposed buildings need to be shown on the grading plan. EROSION CONTROL Erosion control measures are proposed around the grading limits, storm water ponds and wetlands in accordance with the City's Best Management Practices. Type III silt fence is required along the southerly grading limits of Lots 1 and 4 adjacent to the existing wetland. The plans include one rock construction entrance for Phase 2 off of Lake Drive West. UTILITIES Municipal sewer and water is available to the site ITom Lake Drive West. Since the site was platted as outlots, the developer is responsible for extending sewer and water improvements to provide service to the interior lots of the development. The main line sanitary sewer, watermain, and stOrm sewer will be City owned and maintained. The individual sewer and water services to each lot will be privately owned and maintained by the property owner or association. Building permits will be required ITom the City's Building Department for the private utility portion of the project. Drainage and utility easements shall be dedicated over the public utility lines on the final plat. Depending on the depth of the utilities, the minimum drainage and utility easement width shall be 20 feet wide. The developer will be required to enter into a development contact/PUD Scott Botcher December 11, 2000 Page 11 agreement with the city and provide a financial security in the form of a letter of credit or cash escrow to guarantee installation of the public improvements and conditions of final plat approval. STREETS No public streets or right-of-way is being proposed with this plat. The internal street system will be privately owned and maintained. The proposed drive aisle widths meet the City's ordinances. The drive aisles shall be a minimum of 24 feet wide and 26 feet wide when adjacent to parking stalls and built to 7-ton per axel weight pursuant to Ordinance 18-57 0-1 and 20-1101. Parking lots shall be designed and constructed in accordance with section 20-1118. Cross-access easements will need to be prepared and recorded by the developer over the lots in favor of the property owners. The minimum easement width shall be 40 feet wide. WETLANDS There are two ag/urban wetlands located on-site. The wetland located on the south side of the property (0.86 acres) is directly adjacent to the existing Lake Susan Hills development. This wetland has been influenced by agricultural activities to the north and residential development to the south. An existing buffer, approximately 15- 20 feet, remains intact around the edge of the wetland. The wetland contains an open water area that remains IDundated throughout the year. When the Lake Susan Hills development was constructed, an outlet structure was installed to maintain the existing water level. This wetland requires a 50 foot setback (including an average 10 foot buffer), which the applicant has included in the plans. The applicant is also constructing a pond to pre-treat runoff before it enters this wetland. The second wetland on-site is located on the east edge of the property along powers Boulevard. This basin is classified as an ag/urban wetland, but it has actually been used as a storm water pond for a number of years. Runoffftom the Lake Susan Hills development, Powers Boulevard and the existing agricultural land are directed to this area before entering the City's trunk storm sewer system. The applicant has proposed to expand this existing wetland to treat runoff and meet water quality requirements. The applicant will be required to re-seed any disturbed wetland areas with MnDOT seed mix 25 A, or a similar seed mix approved for wetland soil conditions. Drainage and utility easements will be required over all existing and proposed wetlands, ponds and buffer strips. Wetland buffer areas should be surveyed and staked in accordance with the City's wetland ordinance. The City will install wetland buffer edge signs and will charge the applicant $20 per sign. Scott Botcher December 11, 2000 Page 12 SURFACE WATER MANAGEMENT PLAN ŒWMP} Phases II through IV consist of 14.74 acres, of which 0.86 acres is wetland. The developer has already final platted 6.6 acres with Phase 1; therefore, the SWMP are only applicable to the 13.88 acres (phases II through IV). The developer provided water quality ponds for a portion of the site and therefore received credits against the SWMP fees for Phase L Phases II through IV are not entitled to additional water quality credits. The developer is responsible for a SWMP fee of$83,280 with the plat of Phases II through IV. A summary of the fees and credits is provided below by phase. PHASE I Water Quality Fees Because of the high percentage of impervious surface associated with this development, the water quality fees for this proposed development are based on commercial land use at $1,640/acre. Based on the proposed Phase I developed area of 6.6 acres, the water quality fees associated with Phase I of this project were $10,824. The applicant proposed water quality ponds to treat runoff for 18.6 acres of the site (21.34 acres). The applicant therefore received a water quality credit of $30,504 in conjunction with Phase I. Water Quantity Fees The SWMP established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. High-density developments have a connection charge of$4,360 per developable acre. Based on the proposed Phase I developed area of 6.6 acres, the water quantity fees associated with this project were $28,776. The applicant proposed 1 outlet control structure, which gave the applicant an additional $2,500 credit in conjunction with Phase I. The total SWMP fee 01$6,596 for Phase I was paid by the applicant. Future phases are not entitled to water quality credits. PHASES II THROUGH IV Water Quality Fees Because of the high percentage of inIpervious surface associated with this development, the water quality fees for this proposed development are based on commercial land use at $1,640/acre. Based on the proposed Phases II through IV developed area of 13.88 acres, the water quality fees associated with Phases II through IV of this project are $22,763.20. Water Quantity Fees The SWMP established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land Scott Botcher December 11, 2000 Page 13 acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. High-density developments have a connection charge of $4,360 per developable acre. Based on the proposed developed area of 13.88 acres, the water quantity fees associated with this project are $60,516.80. The total SWMP fee for Phase n is $83,280. This phase is not entitled to any water quality credits. LANDSCAPING AND TREE PRESERVATION Landscaping required for the proposed development is shown in the following table. Buffer yard B* - East property line >8,599 ft2 landscape area 41 overstory trees 40 understory trees 24 overstory trees 25 overstory trees 60 understory trees 65 understory trees 60 shrubs 121 shrubs 14 overstory trees 16 overstory trees 29 understory trees 25 understory trees 29 shrubs 169 shrubs 6 overstory trees 11 overstory trees 12 understory trees 34 understory 12 shrubs 37 shrubs Boulevard Trees _ 59 overstory trees 59 overstory trees Lake Drive West (1 per 30 feet) (1 per 30 feet) Boulevard Trees _ 15 overstory trees powers Boulevard (1 per 50 feet) . According to city butTer yard ordinance, the project develnper is responsible for only 75% of the required plantings. Abutting property owners may plant the remaining 25% on their property. Required by today's buffer ordinance 8,599 ft2 landscape area 34 overstory trees Proposed Landscaping Item Parking lot Buffer yard C* - South property line Buffer yard B* - North property line The applicant's plans meet minimum requirements for buffer yard, boulevard, and parking lot landscaping. The applicant has submitted ground cover plan showing areas of seed or sod. Minimum maintenance areas have been seeded with a ground cover that will not require mowing. These areas are generally sloped and would be difficult to manicure. The PUD agreement also states that the applicant shall provide $500.00 of landscaping per multiple family unit. This would translate to $172,000. The applicant is providing landscaping that exceeds $300,000. Staff is requiring the applicant to provide the city with a cost estimate for the required landscaping at the time of building permit approval. Scott Botcher December II, 2000 Page 14 PARK AND TRAIL DEDICATION FEES As part of the whole Lake Susan Hills PUD, a significant amount of parkland was dedicated to the city and trails were to be developed by the applicant. Therefore, the PUD contract requires no trail fees and Y:. park fees. No parkland will be required with this proposal. RECOMMENDATION "The City Council approves the Final Plat for Subdivision #99-14 for Powers Ridge Apartment Homes 2n Addition, as shown on the plat dated November 20, 2000 with the following conditions: !. Park and trail dedication fees shall be paid in lieu of parkland dedication. The PUD contract requires no trail fees and Y:i park fees. 2. Landscaping along the south property line shall be installed with Phase I after review and approval by the City Forester. Applicant shall increase understory tree plantings in the north property line buffer yard in order to meet minimum ordinance requirements. 3. Fire Marshal conditions: a. Install post indicator valves (P.LVs). Contact the Chanhassen Fire Marshal for exact location. b. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, NSP, US West, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance 9-1. c. Comply with Chanhassen Fire Department Policy regarding fire department notes to be included on all site plans. Pursuant to Chanhassen Fire Department Policy #04-1991. Copy enclosed. d. Contact the Chanhassen Fire Marshal for exact location of fire lane signs and curbing to be painted yellow. Pursuant to Section 904-1 1997 Uniform Fire Code. e. Required access. Fire apparatus access roads shall be installed pursuant to Section 902.2.1 of the 1997 Uniform Fire Code. In reviewing the plans, because access cannot meet fire code requirements, the following additional fire protection shall be required: e-!. Attic spaces shall be sprinklered per NFP A 13. e-2. Class I standpipes shall be installed in stair towers. e-3. The exterior balconies shall be protected by the fire sprinkler system. Scott Botcher December 11, 2000 Page 15 f. Water supplies for fire protection shall be installed and made serviceable prior to and during the time of construction. Pursuant to Uniform Fire Code Section 901.3. g. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all weather driving capabilities. These surfaces shall be provided for prior to construction. pursuant to 1997 Uniform Fire Code Section 902.2.2.2. h. Comply with chanhassen Fire Department Policy regarding premise identification. Submit plans to Fire Marshal for review of building identification. Pursuant to chanhassen Fire DepartmentlFire Prevention Division Policy #29-1992. Copy enclosed. 4. Building Official conditions: a. The buildings must be protected with automatic fire sprinkler systems. b. An accessible route must be provided to all buildings, parking facilities, public transportation stops and all common use facilities. c. All parking areas, including parking garages, must be provided with accessible parking spaces dispersed among the various building entrances. d. Accessible dwelling units must be provided in accordance with Minnesota State Building Code Chapter 1341. e. The building owner and or their representatives should meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. In particular, the locations ofthe property lines must be reviewed prior to final plat to address allowable building area and exterior wall protection requirements. 5. The developer shall supply the City with a detailed haul route for review and approval by staff for materials imported to or exported ftom the site. Ifthe material is proposed to be removed off site to another location in chanhassen, that property owner will be required to obtain an earthwork permit ftom the City. 6. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. 7. The applicant shall enter into a development contractIPUD agreement with the City and provide the necessary financial security to guarantee compliance with the terms of the development contract. 8. The applicant shall apply for and obtain permits ftom the appropriate regulatory agencies, Le. Carver County Public Works, Watershed District, Metropolitan Environmental Service Commission, Minnesota Department of Health, and Minnesota Pollution control Agency and comply with their conditions of Scott Botcher December 11,2000 Page 16 approval. 9. No berming shall be permitted within the city's right of way. A 2% boulevard grade must be maintained. Landscaping may be permitted subject to staff review and approval. 10. The utility improvements located within the main drive aisles and trunk storm drainage lines upon completion shall become City maintained and owned. The individual sewer and water services through each lot shall be privately owned and maintained. Building permits will be required ftom the City's Building Department for the private utility portion of the project. Drainage and utility easements shall be dedicated over the public utility lines located outside of the right-of-way on the final plat. Depending on the depth ofthe utilities, the minimum drainage and utility easement width shall be 20 feet wide. Consideration for access routes to the ponds for maintenance proposes shall also be incorporated in the easement width. 11. The developer shall escrow $4,880 with the City a financial guarantee for a share of the local cost participation based on traffic generated ftom the site for a future traffic signal at the intersection of Lake Drive West and powers Boulevard. The cost of the traffic signal is based upon a figure of $20 per unit. 12. Type III erosion control fence will be required adjacent to the wetland areas. Storm water ponds and/or temporary detention ponds shall be constructed with the initial grading phases to minimize erosion potential to the wetlands or downstream water bodies. Erosion control blanket will be required on slopes greater than 3: 1. Revegetation of exposed slopes should occur immediately after grading is completed in accordance with the City's Best Management Practice Handbook. 13. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer. 14. All retaining walls in excess of 4 feet in height will need to be engineered and require building permits. All retaining walls over 4 feet in height should be protected with fences and/or landscaping materials to prevent falling offthe walls. 15. The bus stop location along Lake Drive West is subject to city review and approval. 16. The drive aisles shall be a minimum of 24 feet wide and 26 feet wide when adjacent to parking stalls and built to 7-ton per axle weight pursuant to Ordinance 18-57 0-1 and 20-1101. Parking lots shall be designed and constructed in accordance with section 20-1118. Cross-access easements will need to be Scott Botcher December 11,2000 Page 15 f. Water supplies for fire protection shall be installed and made serviceable prior to and during the time of construction. Pursuant to Uniform Fire Code Section 901.3. g. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all weather driving capabilities. These surfaces shall be provided for prior to construction. Pursuant to I 997 Uniform Fire Code Section 902.2.2.2. h. Comply with Chanhassen Fire Department Policy regarding premise identification. Submit plans to Fire Marshal for review of building identification. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #29-1992. Copy enclosed. 4. Building Official conditions: a. The buildings must be protected with automatic fire sprinkler systems. b. An accessible route must be provided to all buildings, parking facilities, public transportation stops and all common use facilities. c. All parking areas, including parking garages, must be provided with accessible parking spaces dispersed among the various building entrances. d. Accessible dwelling units must be provided in accordance with Minnesota State Building Code Chapter 1341. e. The building owner and or their representatives should meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. In particular, the locations of the property lines must be reviewed prior to fmal plat to address allowable building area and exterior wall protection requirements. 5. The developer shall supply the City with a detailed haul route for review and approval by staff for materials imported to or exported ITom the site. If the material is proposed to be removed off site to another location in Chanhassen, that property owner will be required to obtain an earthwork permit ITom the City. 6. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc-mulched or wood fiber blanket or sod within two weeks of completion of each activity in accordance with the City's Best Management Practice Handbook. 7. The applicant shall enter into a development contract/PUD agreement with the City and provide the necessary financial security to guarantee compliance with the terms of the development contract. 8. The applicant shall apply for and obtain permits ITom the appropriate regulatory agencies, i.e. Carver County Public Works, Watershed District, Metropolitan Environmental Service Commission, Minnesota Department of Health, and Mirmesota Pollution control Agency and comply with their conditions of Scott Botcher December 11,2000 Page 17 prepared and recorded by the developer over the lots in favor of the property owners. 17. Phases II through IV of the proposed high-density residential development (13.88 developable acres) are responsible for a water quality connection charge of $22,763.20. The applicant is also responsible for a water quantity fee of $60,516.80, for a total SWMP fee of$83,280 for Phases II through IV. These fees shall be paid to the City prior to the City filing the final plat. 18. All wetland areas disturbed as a result of construction activities shall be re-seeded with MnDOT seed mix 25 A, or a similar seed mix approved for wetland soil conditions. 19. Drainage and utility easements shall be dedicated over all existing and proposed wetlands, ponds and buffer strips. 20. Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs per the City's wetland ordinance. 2 I. The first floor and lowest floor elevations of the proposed buildings need to be shown on the grading plan. 22. Type III silt fence is required along the southerly grading limits of Lots I and 4 adjacent to the existing wetland. 23. Submit revised construction plans for administrative staff approval. 24. The applicant shall combine Lots 1 and 2, Block I, Powers Ridge Apartment Homes 2nd Addition, into a single lot." ATTACHMENTS: 1. Final Plat dated November 20, 2000. g:\plan\sa\Jake susan hills pud\powers ridge ß-IV