Loading...
Plansr� 1i T MF R 1 � L WE L v 19i MATHIOWl;"CL CONSTRUCTION COMPANY I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED - JULIE ANDERSON DESIGNED: KDB IN ALL WE DO, EVE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM DRAWN: KDB 34676 COUNTY ROAD 24 SLEEPY EYE, MN 56095 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE I LAWS OF THE STATE OF MINNESOTA. - DATE: LIC. N0_26271 CHECKED: 1KA I w \MCC \PR01Ei7S \2014 \2o0 INDEX SHEET NO. DESCRIPTION 1 - - - - -- TITLE PAGE 2 - - - - -- MAP A- CURRENT CONDITIONS 3 - - - - -- MAP B - OPERATIONS 4 - - - - -- MAP C - END USER PLAN STORM WATER POLLUTION S PREVENTION PLAN (SWPPP) THIS PERMIT SUBMITTAL CONTAINS 6 SHEETS TOTAL LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS EXISTING CONTOURS DESIGN CONTOURS PROPERTY DESCRIPTION P/0 GOVT LOT 2 & P/O WI /2 SE1 /4 DESC AS: COMM AT NE CORN NW1 /4 SEI /4 22 -116- 23 TH S 1320' TH W 66' TH S38 *W 157.08' TH S73 *W 287.1' TH S36 *W 125.4' TH S17 *W 244.2 FR TH N82 *W 99' TH N 528' TO N LINE S W 1/4 SEI /4 TH S 1029.5' TH SW TO A PT BEARING E 462'F SECTION: 22 TOWNSHIP: 116 RANGE: 23 PROJECT LOACTION COUNTY: CARVER DISTRICT: 6 0 500 1000 w DEGLER DISPOSAL SITE 5 -2 -14 TITLE PAGE SHEET NO. 1 of 6 SHEETS - County P,oiec \14100 Carve, Co 18 \01- Pmpoaal File Wpy\ CUP \DEGLER DISPOSAL SITE 5- 2- 14.dwg LEGEND KEY NOTE: 1. TOPSOIL TO BE STRIPPED ATONE FOOT DEPTH PROPERTY DESCRIPTION: P/0 GOVT LOT 2 & P/O WI/2 SEI /4 DESC AS: COMM AT NE CORN NWI /4 SEI /4 22 -116- 23 TH 5 1320' TH W 66' TH S38 *W 157.08' TH S73 *W 287.1' TH S36 *W 125.4' TH S17 *W 244.2 FR TH N82* W 99' TH N 528' TO N LINE SW 1/4 SE1 /4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 PROJECT LOACTION COUNTY: CARVER DISTRICT: 6 0 100 200 N MATHIOWL17 CONSTRUCTION COMPANY I HEREBY CERTIFYTHAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KDB DEG LER DISPOSAL SITE 5 -2 -14 IN ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM - DRAWN: KDB A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE CURRENT CONDITIONS SHEET NO. 2 OF 6 SHEETS I 30676 COUNT4 -ROAD 24 SLEEPY EYE, MN 66085 LAWS OF THE STATE OF MINNESOTA. DATE: LIC. NO. 26271 CHECKED: JKA W: \MCC\PF01ECT5\ 2014 \200 - County Project\14200 Carver Co 18 \01- Proposal File CopACUP\DEOLER DISPOSAL SITE 5- 2- 14.dw, PROPERTY LINE CONSTRUCTION LIMITS -- EXISTING CONTOURS 0 WOODLAND 'Y FARM FIELD aL WETIAND EXISTING BUILDINGS 0 EXISTING ROADS NOTE: 1. TOPSOIL TO BE STRIPPED ATONE FOOT DEPTH PROPERTY DESCRIPTION: P/0 GOVT LOT 2 & P/O WI/2 SEI /4 DESC AS: COMM AT NE CORN NWI /4 SEI /4 22 -116- 23 TH 5 1320' TH W 66' TH S38 *W 157.08' TH S73 *W 287.1' TH S36 *W 125.4' TH S17 *W 244.2 FR TH N82* W 99' TH N 528' TO N LINE SW 1/4 SE1 /4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 PROJECT LOACTION COUNTY: CARVER DISTRICT: 6 0 100 200 N MATHIOWL17 CONSTRUCTION COMPANY I HEREBY CERTIFYTHAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KDB DEG LER DISPOSAL SITE 5 -2 -14 IN ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM - DRAWN: KDB A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE CURRENT CONDITIONS SHEET NO. 2 OF 6 SHEETS I 30676 COUNT4 -ROAD 24 SLEEPY EYE, MN 66085 LAWS OF THE STATE OF MINNESOTA. DATE: LIC. NO. 26271 CHECKED: JKA W: \MCC\PF01ECT5\ 2014 \200 - County Project\14200 Carver Co 18 \01- Proposal File CopACUP\DEOLER DISPOSAL SITE 5- 2- 14.dw, LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS v WOODLAND aL WETLAND SILT FENCE EXISTING BUILDINGS O EXISTING ROADS ACCESS ROAD ® PHASE 1 MATERIAL PLACEMENT ® PHASE 2 MATERIAL PLACEMENT ® PHASE 3 MATERIAL PLACEMENT ® TOPSOIL BERM (ADDITIONAL BMP) NOTE: 1. SILT FENCE TO BE PLACED BEFORE ANY CONSTRUCTION BEGINS. 2. TOPSOIL BERM TO BE PLACED AS ADDED PROTECTION FOR EROSION AND SEDIMENT CONTROL. (TO BE SEEDED AND MULCHED IMMEDIATELY AFTER CONSTRUCTION) 3, FILL MATERIAL TO BE PLACED IN THREE PHASES ACCORDING TO THE HATCHING PATTERNS DEFINED. (TOPSOIL STAGED BESIDE FILL AREAS) 4. INLET PROTECTION TO BE PLACE ON PIPE UNDER PROPOSED ACCESS ROAD. 5. EQUIPMENT TO BE STAGED IN NE CORNER OF CONSTRUCTION AREA PROPERTY DESCRIPTION: P/O GOVT LOT 2 & P/0 W1 /2 SEI /4 DESC AS: COMM AT NE CORN NWI /4 SEI /4 22 -116- 23 THS 1320' TH W 66' TH S38 *W 157.08' TH S73* W 287.1' TH S36 *W 125.4' TH S17 *W 244.2 FR TH N82 *W 99' TH N 528' TO N LINE SW 1/4 SEI /4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 PROJECT LOACTION COUNTY: CARVER DISTRICT: 6 0 100 200 M 9 MATHIOWET'LCONSTRUCTIONCOMPANY I. HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: Q;B DEGLER DISPOSAL SITE 5 -2 -14 IN ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT AM DRAWN: RUB PROPOSED OPERATIONS SHEET NO. 3 OF 6 SHEETS fat aW76 COUNTY ROAD 24 SLEEPY EYE, MN 56085 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE: LIC. No 26271 CHECKED: m w: \MCC\PRo;EM \2014\ zoo -rounry Prelern \14200 Carver Do 18 \01- Proposal vile Copy \CUP\DECEER IsvosgLSrtE 5 2- 14.awg LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS PROPOSED CONTOURS EXISTING CONTOURS 0 WOODLAND 0 EXISTING ROAD 0 EXISTING BUILDINGS NOTES: 1. SLOPE OF FILL TO MATCH EXISTING 3:1 SLOPES 2. SLOPES TO BE SEEDED AND MULCHED WITHIN 48 HOURS OF SUBSTANTIAL COMPLETION. 3. FOOT OF TOPSOIL TO BE PLACED ON ALL DISTURBED AREAS 4. SEED AND MULCH TO BE PLACE ON ALL DISTURBED AREA AS COMPLETED PROPERTY DESCRIPTION: P/0 GOVT LOT 2 & P/0 W1 /2 SEl /4 DESC AS: COMM AT NE CORN NW 1/4 SE1 /4 22 -116- 23 TH S 1320' TH W 66TH S38 *W 157.08' TH S73 *W 287.1' TH S36 *W 125.4' TH S17 *W 244.2 FR TH N82 *W 99' TH N 528' TO N LINE SWl /4 SE1 /4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 PROJECT LOACTION COUNTY: CARVER DISTRICT: 6 0 100 200 mAT'xI OWETZ CONSTRUCTION COMPANY I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KIDS DEG LER DISPOSAL SITE 5 -2 -14 I\ ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT IAM DRAWN: KDB END USER PLAN SHEET NO. 4 OF 6 SHEETS I 39696 COUNTS'ROAD 24 SLEEPY EYE, MN 56085 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE 1 LAWS OF THE STATE OF MINNESOTA. DATE: LIC NO. 26271 CHECKED: J_CA W:\MCC\PROJEUS\2014\209-countyProjects\14200Ca er CO18 \Ol- Proposal File Copy\ CUP \DEGLER DISPOSALSRE5- 2- 14 .dwg STORM WATER POLLUTION PREVENTION PLAN (SWPPP) P/O GOVT LOT 2 & P/0 W1/2 SE1 /4 DESC AS: COMM AT NE CORN NW1 14 SE1 /4 22 -116- 23 TH S 1320' TH W WITH S38 *W 157.08' TH S73 *W 287.1' TH S36 *W 1254TH S17 *W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1 /4 SE1 /4 TH S 10295TH SW TO A PT BEARING E 462'F SECTION: 22 TOWNSHIP: 116 RANGE: 23 LAND FEATURE CHANGES TOTAL PIT AREA = 8 ACRES EXISTING IMPERVIOUS AREA = 0 ACRES PROPOSED IMPERVIOUS AREA = 0 ACRES EXISTING PERVIOUS AREA = 8 ACRES PROPOSED PERVIOUS AREA = 8 ACRES RESPONSIBLE PARTIES MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR TRAINING REQUIREMENTS FOR PERMIT COMPLIANCE AND SUCCESSFUL IMPLEMENTATION OF THE INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS DURING ACTIVE CONSTRUCTION OPERATIONS AND UNTIL FINAL STABILIZATION HAS BEEN REACHED. THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE AND REPAIRS THAT MAY BE REQUIRED AFTER THE DISPOSAL AREA HAS BEEN RECLAIMED. PROJECT CONTACTS MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR THE IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION, AND SEDIMENT CONTROL BMP'S BEFORE AND DURING ACTIVE CONSTRUCTION OPERATIONS. THE OWNER IS RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF THE STATE STORM WATER MANAGEMENT SYSTEM. MPCA 24 HOUR EMERGENCY NOTIFICATION: 651 - 649 -5451 OR 800 - 422 -0798 EROSION CONTROL SUPERVISOR RANDY HUIRAS MATHIOWETZ CONSTRUCTION COMPANY 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 507- 920 -7081 OWNERS REPRESENTATIVE GAYLE DEGLER 602 EAST FOURTH STREET CHASKA, MN 55318 -2102 952 - 403 -7047 ENVIRONMENTAL COMPLIANCE / PERMIT ADMINISTRATION JULIEANDERSON - MATHIOWETZ CONSTRUCTION COMPANY 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 507- 829 -9185 - MPCA CONTACT THERESA HAUGEN 218- 316 -3920 STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES: 1. MATHIOWETZ CONSTRUCTION WILL NEED TO IDENTIFY A MN /DOT CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO WILL BE KNOWLEDGEABLE AND EXPERIENCE IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES. 2. THE EROSION CONTROL SUPERVISOR WILL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A QUALITY ASSURANCE PROGRAM FOR ALL CHEMICAL MANAGEMENT PROCESSES TO ENSURE PROPER OPERATION AND MAINTENANCE. 3. MATHIOWETZ CONSTRUCTION WILL COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION PREVENTION MANAGEMENT DURING ACTIVE CONSTRUCTION OPERATIONS, WHICH WILL INCLUDE THE SITE PLAN PROCESS, BUT NOT LIMITED TO: A. FUELING (PORTABLE AND INTERMITTENT) AND ASSOCIATED ABOVE - GROUND STORAGE TANKS AND DISPENSING SYSTEM EQUIPMENT B. VEHICLE AND EQUIPMENT MAINTENANCE C. SOLID WASTE COLLECTION AND REMOVAL D. SECONDARY CONTAINMENT E. HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS F. FUGITIVE DUST CONTROL G. DEWATERING 4. MATHIOWETZ CONSTRUCTION WILL FOLLOW THE PROCEDURES REGARDING SPILL PREVENTION AND HAVE A PLAN FOR RESPONDING TO SPILLS. THE PLAN INCLUDES, BUT IS NOT LIMITED TO: SPILL PREVENTION: A. USE OF DRIP PANS WHERE LEAK OR SPILLS OF FUEL CAN OCCUR B. KEEPING SPILL CLEANUP MATERIALS READILY AVAILABLE C. CLEAN UP SPILLS AND LEAK IMMEDIATELY D. PERFORM INSPECTION AND PREVENTATIVE MAINTENANCE ON FUEL STORAGE TANKS TO DETECT POTENTIAL LEAKS BEFORE THEY OCCUR E. AVOID TOPPING OFF FUEL TANKS F. REMOVE LOCKING DEVICES ON FUEL DISPENSING HANDLES SO THAT OPERATORS MUST HOLD THE HANDLE OPEN AND CANNOT WALK AWAY WHILE FILLING TANKS G. HAVE ABSORBENT MATERIALS AVAILABLE AT THE FUELING AREA FOR USE IN CLEANING UP SMALL SPILLS H. TRAIN PERSONAL ON PROPER FUELING PROCEDURES SPILL PREVENTION: A. STOP THE SOURCE OF THE SPILL IMMEDIATELY B. CONTAIN THE SPILL UNTIL CLEANUP IS COMPLETE C. DEPLOY OIL CONTAINMENT BOOMS IF THE SPILL MAY REACH WATERS OF THE STATE D. COVER THE SPILL WITH ABSORBENT MATERIAL E. DISPOSE OF CLEANUP MATERIALS PROPERLY F. REPORT THE SPILL, NOTIFY THE MINNESOTA DEPARTMENT OF PUBLIC SAFETY DUTY OFFICER AT (651) 469 -5451 WHEN THERE IS A RELEASE OF A REPORTABLE QUANTITY (FIVE GALLONS OR MORE FOR PETROLEUM SPILLS) SPILLS OF ALL OTHER CHEMICALS OR MATERIALS OF ANY QUANTITY MAY BE REPORTABLE. IF IN DOUBT, CALL THE DUTY OFFICER. G. FOR EMERGENCIES DIAL 911 MATHIOWETZCONSTRUCTIONCOMPANY IHEREBYCERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: Kos DEGLERDISPOSALSITE 5 -2 -14 BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM IN ALI, WE. DO, WE BUILD IT RIGHT! A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE DRAWN: Kos SWPPP SHEET NO. 5 OF 6 SHEETS 39676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 LAWS OF THE STATE OF MINNESOTA. DATE: LIC. NO. 26271 CHECKED: 1KA W: \MMPROJEa5 \2014\ zoo -Court, ProJens \14200 Carver To 18 \01- Proposal file Copy\ CUP \DEGLER DISPOSAL SITE 5- 2- 14.awg STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES (cont.): 5. THE EROSION CONTROL SUPERVISOR WILL CONDUCT ROUTINE INSPECTIONS OF THE SITE AND AT MINIMUM ONCE EVERY 7 DAYS DURING ACTIVE CONSTRUCTION OPERATIONS AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. RECORDS TO INCLUDE: A. DATE AND TIME OF INSPECTION B. NAME OF PERSON CONDUCTING INSPECTION C. FINDING OF INSPECTION INCLUDING CORRECTIVE ACTIONS NEEDED, DETAILS OF CORRECTIVE ACTIONS (DATE, TIME, PARTY COMPLETING MAINTENANCE) D. DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS E. DOCUMENTATION OF CHANGES TO SWPPP 6. THE SWPPP, ALL CHANGES TO IT AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING ACTIVE CONSTRUCTION OPERATIONS BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THE PORTION OF THE SITE. ALL OWNERS MUST KEEP THE SWPPP ON FILE FOR THREE (3) YEARS AFTER THE SUBMITTAL OF THE NOTICE OF TERMINATION, INCLUDING THE FOLLOWING INFORMATION: A. ALL OTHER PERMITS REQUIRED FOR THE PROJECT. B. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING ACTIVE MINING OPERATIONS. C. ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT -OF -WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE. MAINTENANCE WILL BE PERFORMED WITHIN A PERIOD OF 24 HOURS FROM A RAINFALL EVENT AND WILL BE COMPLETED WHEN A. PERIMETER CONTROL MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF THE DEVICES WITHIN 24 HOURS OF DISCOVERY B. INLET PROTECTION MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE CAPACITY OF THE DEVICE OR THE DEVICE BECOMES NON -FUCTIONAL C. TRACKED SEDIMENT TO BE REMOVED WITH 24 HOURS OF DISCOVERY.. D. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS REACHED FINAL STABILIZATION AND THE NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MPCA IN ACCORDANCE WITH PART 11.6.5 OF THE CONSTRUCTION GENERAL PERMIT. 8. ALL SEDIMENT DEPOSIT INTO A WATER OF THE STATE MUST BE REMOVED WITHIN 7 DAYS. 9. INLETS WILL BE PROTECTED BY APPROPRIATE MEASURES THROUGHOUT THE LIFE OF THE CONSTRUCTION OPERATIONS. F !. N'IATHIOR'ETZ CONSTRUCTION COMPANY I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KDS DEGLER DISPOSAL SITE 5 -2 -14 BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM SWPPP Continued SHEET NO. 6 OF 6 SHEETS IN ALL WE DO, WE BUILD IT RIGHT! - DRAWN: KD6 39676 COUNTS ROAD 24 SI=EYE, MN 56085 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. DATE: LC. NO. 26271 CHECKED: 7KA W: \MCQPROIERS \2014\ 200 -000nry Pmjeds \14200 Urver Cq lB \OS Proposal Fil¢ Copy\ CUP \DEGlE0. DISPOSAL SITE 5- 2-14.tlwg