Plansr� 1i T MF R 1 � L WE
L v
19i MATHIOWl;"CL CONSTRUCTION COMPANY I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED - JULIE ANDERSON DESIGNED: KDB IN ALL WE DO, EVE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM DRAWN: KDB
34676 COUNTY ROAD 24 SLEEPY EYE, MN 56095 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
I LAWS OF THE STATE OF MINNESOTA. - DATE: LIC. N0_26271 CHECKED: 1KA I w \MCC \PR01Ei7S \2014 \2o0
INDEX
SHEET NO.
DESCRIPTION
1
- - - - -- TITLE PAGE
2
- - - - -- MAP A- CURRENT CONDITIONS
3
- - - - -- MAP B - OPERATIONS
4
- - - - -- MAP C - END USER PLAN
STORM WATER POLLUTION
S
PREVENTION PLAN (SWPPP)
THIS PERMIT SUBMITTAL CONTAINS 6 SHEETS TOTAL
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
EXISTING CONTOURS
DESIGN CONTOURS
PROPERTY DESCRIPTION
P/0 GOVT LOT 2 & P/O WI /2 SE1 /4 DESC AS:
COMM AT NE CORN NW1 /4 SEI /4 22 -116- 23
TH S 1320' TH W 66' TH S38 *W 157.08' TH
S73 *W 287.1' TH S36 *W 125.4' TH S17 *W
244.2 FR TH N82 *W 99' TH N 528' TO N LINE
S W 1/4 SEI /4 TH S 1029.5' TH SW TO A PT
BEARING E 462'F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
PROJECT LOACTION
COUNTY: CARVER
DISTRICT: 6
0 500 1000
w
DEGLER DISPOSAL SITE 5 -2 -14
TITLE PAGE SHEET NO. 1 of 6 SHEETS
- County P,oiec \14100 Carve, Co 18 \01- Pmpoaal File Wpy\ CUP \DEGLER DISPOSAL SITE 5- 2- 14.dwg
LEGEND KEY
NOTE:
1. TOPSOIL TO BE STRIPPED ATONE FOOT
DEPTH
PROPERTY DESCRIPTION:
P/0 GOVT LOT 2 & P/O WI/2 SEI /4 DESC AS:
COMM AT NE CORN NWI /4 SEI /4 22 -116- 23
TH 5 1320' TH W 66' TH S38 *W 157.08' TH
S73 *W 287.1' TH S36 *W 125.4' TH S17 *W
244.2 FR TH N82* W 99' TH N 528' TO N LINE
SW 1/4 SE1 /4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
PROJECT LOACTION
COUNTY: CARVER
DISTRICT: 6
0 100 200
N
MATHIOWL17 CONSTRUCTION COMPANY I HEREBY CERTIFYTHAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KDB DEG LER DISPOSAL SITE 5 -2 -14
IN ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM - DRAWN: KDB
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE CURRENT CONDITIONS SHEET NO. 2 OF 6 SHEETS
I
30676 COUNT4 -ROAD 24 SLEEPY EYE, MN 66085 LAWS OF THE STATE OF MINNESOTA. DATE: LIC. NO. 26271 CHECKED: JKA W: \MCC\PF01ECT5\ 2014 \200 - County Project\14200 Carver Co 18 \01- Proposal File CopACUP\DEOLER DISPOSAL SITE 5- 2- 14.dw,
PROPERTY LINE
CONSTRUCTION LIMITS
--
EXISTING CONTOURS
0
WOODLAND
'Y
FARM FIELD
aL
WETIAND
EXISTING BUILDINGS
0
EXISTING ROADS
NOTE:
1. TOPSOIL TO BE STRIPPED ATONE FOOT
DEPTH
PROPERTY DESCRIPTION:
P/0 GOVT LOT 2 & P/O WI/2 SEI /4 DESC AS:
COMM AT NE CORN NWI /4 SEI /4 22 -116- 23
TH 5 1320' TH W 66' TH S38 *W 157.08' TH
S73 *W 287.1' TH S36 *W 125.4' TH S17 *W
244.2 FR TH N82* W 99' TH N 528' TO N LINE
SW 1/4 SE1 /4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
PROJECT LOACTION
COUNTY: CARVER
DISTRICT: 6
0 100 200
N
MATHIOWL17 CONSTRUCTION COMPANY I HEREBY CERTIFYTHAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KDB DEG LER DISPOSAL SITE 5 -2 -14
IN ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM - DRAWN: KDB
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE CURRENT CONDITIONS SHEET NO. 2 OF 6 SHEETS
I
30676 COUNT4 -ROAD 24 SLEEPY EYE, MN 66085 LAWS OF THE STATE OF MINNESOTA. DATE: LIC. NO. 26271 CHECKED: JKA W: \MCC\PF01ECT5\ 2014 \200 - County Project\14200 Carver Co 18 \01- Proposal File CopACUP\DEOLER DISPOSAL SITE 5- 2- 14.dw,
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
v WOODLAND
aL WETLAND
SILT FENCE
EXISTING BUILDINGS
O EXISTING ROADS
ACCESS ROAD
® PHASE 1 MATERIAL PLACEMENT
® PHASE 2 MATERIAL PLACEMENT
® PHASE 3 MATERIAL PLACEMENT
® TOPSOIL BERM (ADDITIONAL BMP)
NOTE:
1. SILT FENCE TO BE PLACED BEFORE ANY
CONSTRUCTION BEGINS.
2. TOPSOIL BERM TO BE PLACED AS ADDED
PROTECTION FOR EROSION AND SEDIMENT
CONTROL. (TO BE SEEDED AND MULCHED
IMMEDIATELY AFTER CONSTRUCTION)
3, FILL MATERIAL TO BE PLACED IN THREE
PHASES ACCORDING TO THE HATCHING
PATTERNS DEFINED. (TOPSOIL STAGED
BESIDE FILL AREAS)
4. INLET PROTECTION TO BE PLACE ON PIPE
UNDER PROPOSED ACCESS ROAD.
5. EQUIPMENT TO BE STAGED IN NE CORNER
OF CONSTRUCTION AREA
PROPERTY DESCRIPTION:
P/O GOVT LOT 2 & P/0 W1 /2 SEI /4 DESC AS:
COMM AT NE CORN NWI /4 SEI /4 22 -116- 23
THS 1320' TH W 66' TH S38 *W 157.08' TH
S73* W 287.1' TH S36 *W 125.4' TH S17 *W
244.2 FR TH N82 *W 99' TH N 528' TO N LINE
SW 1/4 SEI /4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
PROJECT LOACTION
COUNTY: CARVER
DISTRICT: 6
0 100 200
M
9
MATHIOWET'LCONSTRUCTIONCOMPANY I. HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: Q;B DEGLER DISPOSAL SITE 5 -2 -14
IN ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT AM DRAWN: RUB PROPOSED OPERATIONS SHEET NO. 3 OF 6 SHEETS
fat aW76 COUNTY ROAD 24 SLEEPY EYE, MN 56085 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA. DATE: LIC. No 26271 CHECKED: m w: \MCC\PRo;EM \2014\ zoo -rounry Prelern \14200 Carver Do 18 \01- Proposal vile Copy \CUP\DECEER IsvosgLSrtE 5 2- 14.awg
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
PROPOSED CONTOURS
EXISTING CONTOURS
0 WOODLAND
0 EXISTING ROAD
0 EXISTING BUILDINGS
NOTES:
1. SLOPE OF FILL TO MATCH EXISTING 3:1
SLOPES
2. SLOPES TO BE SEEDED AND MULCHED
WITHIN 48 HOURS OF SUBSTANTIAL
COMPLETION.
3. FOOT OF TOPSOIL TO BE PLACED ON ALL
DISTURBED AREAS
4. SEED AND MULCH TO BE PLACE ON ALL
DISTURBED AREA AS COMPLETED
PROPERTY DESCRIPTION:
P/0 GOVT LOT 2 & P/0 W1 /2 SEl /4 DESC AS:
COMM AT NE CORN NW 1/4 SE1 /4 22 -116- 23
TH S 1320' TH W 66TH S38 *W 157.08' TH
S73 *W 287.1' TH S36 *W 125.4' TH S17 *W
244.2 FR TH N82 *W 99' TH N 528' TO N LINE
SWl /4 SE1 /4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
PROJECT LOACTION
COUNTY: CARVER
DISTRICT: 6
0 100 200
mAT'xI
OWETZ CONSTRUCTION COMPANY I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KIDS DEG LER DISPOSAL SITE 5 -2 -14
I\ ALL WE DO, WE BUILD IT RIGHT! BY ME OR UNDER MY DIRECT SUPERVISION AND THAT IAM DRAWN: KDB END USER PLAN SHEET NO. 4 OF 6 SHEETS
I 39696 COUNTS'ROAD 24 SLEEPY EYE, MN 56085 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
1 LAWS OF THE STATE OF MINNESOTA. DATE: LIC NO. 26271 CHECKED: J_CA W:\MCC\PROJEUS\2014\209-countyProjects\14200Ca er CO18 \Ol- Proposal File Copy\ CUP \DEGLER DISPOSALSRE5- 2- 14 .dwg
STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
P/O GOVT LOT 2 & P/0 W1/2 SE1 /4 DESC AS: COMM AT NE CORN NW1 14 SE1 /4 22 -116- 23 TH S 1320' TH W WITH S38 *W 157.08' TH
S73 *W 287.1' TH S36 *W 1254TH S17 *W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1 /4 SE1 /4 TH S 10295TH SW TO A PT
BEARING E 462'F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
LAND FEATURE CHANGES
TOTAL PIT AREA = 8 ACRES
EXISTING IMPERVIOUS AREA = 0 ACRES
PROPOSED IMPERVIOUS AREA = 0 ACRES
EXISTING PERVIOUS AREA = 8 ACRES
PROPOSED PERVIOUS AREA = 8 ACRES
RESPONSIBLE PARTIES
MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR TRAINING REQUIREMENTS FOR PERMIT COMPLIANCE AND SUCCESSFUL
IMPLEMENTATION OF THE INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT
CONTROL BMPS DURING ACTIVE CONSTRUCTION OPERATIONS AND UNTIL FINAL STABILIZATION HAS BEEN REACHED.
THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE AND REPAIRS THAT MAY BE REQUIRED AFTER THE
DISPOSAL AREA HAS BEEN RECLAIMED.
PROJECT CONTACTS
MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR THE IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION
AND MAINTENANCE OF THE EROSION, AND SEDIMENT CONTROL BMP'S BEFORE AND DURING ACTIVE CONSTRUCTION
OPERATIONS. THE OWNER IS RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF THE STATE STORM WATER
MANAGEMENT SYSTEM. MPCA 24 HOUR EMERGENCY NOTIFICATION: 651 - 649 -5451 OR 800 - 422 -0798
EROSION CONTROL SUPERVISOR
RANDY HUIRAS
MATHIOWETZ CONSTRUCTION COMPANY
30676 COUNTY ROAD 24
SLEEPY EYE, MN 56085
507- 920 -7081
OWNERS REPRESENTATIVE
GAYLE DEGLER
602 EAST FOURTH STREET
CHASKA, MN 55318 -2102
952 - 403 -7047
ENVIRONMENTAL COMPLIANCE / PERMIT ADMINISTRATION
JULIEANDERSON -
MATHIOWETZ CONSTRUCTION COMPANY
30676 COUNTY ROAD 24
SLEEPY EYE, MN 56085
507- 829 -9185 -
MPCA CONTACT
THERESA HAUGEN
218- 316 -3920
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES:
1. MATHIOWETZ CONSTRUCTION WILL NEED TO IDENTIFY A MN /DOT CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD
STANDING WHO WILL BE KNOWLEDGEABLE AND EXPERIENCE IN THE APPLICATION OF EROSION PREVENTION AND
SEDIMENT CONTROL BEST MANAGEMENT PRACTICES.
2. THE EROSION CONTROL SUPERVISOR WILL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A QUALITY
ASSURANCE PROGRAM FOR ALL CHEMICAL MANAGEMENT PROCESSES TO ENSURE PROPER OPERATION AND
MAINTENANCE.
3. MATHIOWETZ CONSTRUCTION WILL COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION PREVENTION
MANAGEMENT DURING ACTIVE CONSTRUCTION OPERATIONS, WHICH WILL INCLUDE THE SITE PLAN PROCESS, BUT NOT
LIMITED TO:
A. FUELING (PORTABLE AND INTERMITTENT) AND ASSOCIATED ABOVE - GROUND STORAGE TANKS AND DISPENSING
SYSTEM EQUIPMENT
B. VEHICLE AND EQUIPMENT MAINTENANCE
C. SOLID WASTE COLLECTION AND REMOVAL
D. SECONDARY CONTAINMENT
E. HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS
F. FUGITIVE DUST CONTROL
G. DEWATERING
4. MATHIOWETZ CONSTRUCTION WILL FOLLOW THE PROCEDURES REGARDING SPILL PREVENTION AND HAVE A PLAN FOR
RESPONDING TO SPILLS. THE PLAN INCLUDES, BUT IS NOT LIMITED TO:
SPILL PREVENTION:
A. USE OF DRIP PANS WHERE LEAK OR SPILLS OF FUEL CAN OCCUR
B. KEEPING SPILL CLEANUP MATERIALS READILY AVAILABLE
C. CLEAN UP SPILLS AND LEAK IMMEDIATELY
D. PERFORM INSPECTION AND PREVENTATIVE MAINTENANCE ON FUEL STORAGE TANKS TO DETECT POTENTIAL
LEAKS BEFORE THEY OCCUR
E. AVOID TOPPING OFF FUEL TANKS
F. REMOVE LOCKING DEVICES ON FUEL DISPENSING HANDLES SO THAT OPERATORS MUST HOLD THE HANDLE
OPEN AND CANNOT WALK AWAY WHILE FILLING TANKS
G. HAVE ABSORBENT MATERIALS AVAILABLE AT THE FUELING AREA FOR USE IN CLEANING UP SMALL SPILLS
H. TRAIN PERSONAL ON PROPER FUELING PROCEDURES
SPILL PREVENTION:
A. STOP THE SOURCE OF THE SPILL IMMEDIATELY
B. CONTAIN THE SPILL UNTIL CLEANUP IS COMPLETE
C. DEPLOY OIL CONTAINMENT BOOMS IF THE SPILL MAY REACH WATERS OF THE STATE
D. COVER THE SPILL WITH ABSORBENT MATERIAL
E. DISPOSE OF CLEANUP MATERIALS PROPERLY
F. REPORT THE SPILL, NOTIFY THE MINNESOTA DEPARTMENT OF PUBLIC SAFETY DUTY OFFICER AT (651) 469 -5451
WHEN THERE IS A RELEASE OF A REPORTABLE QUANTITY (FIVE GALLONS OR MORE FOR PETROLEUM SPILLS)
SPILLS OF ALL OTHER CHEMICALS OR MATERIALS OF ANY QUANTITY MAY BE REPORTABLE. IF IN DOUBT, CALL
THE DUTY OFFICER.
G. FOR EMERGENCIES DIAL 911
MATHIOWETZCONSTRUCTIONCOMPANY IHEREBYCERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: Kos DEGLERDISPOSALSITE 5 -2 -14
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
IN ALI, WE. DO, WE BUILD IT RIGHT! A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE DRAWN: Kos SWPPP SHEET NO. 5 OF 6 SHEETS
39676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 LAWS OF THE STATE OF MINNESOTA. DATE: LIC. NO. 26271 CHECKED: 1KA W: \MMPROJEa5 \2014\ zoo -Court, ProJens \14200 Carver To 18 \01- Proposal file Copy\ CUP \DEGLER DISPOSAL SITE 5- 2- 14.awg
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES (cont.):
5. THE EROSION CONTROL SUPERVISOR WILL CONDUCT ROUTINE INSPECTIONS OF THE SITE AND AT MINIMUM ONCE EVERY
7 DAYS DURING ACTIVE CONSTRUCTION OPERATIONS AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN
0.5 INCHES IN 24 HOURS. RECORDS TO INCLUDE:
A. DATE AND TIME OF INSPECTION
B. NAME OF PERSON CONDUCTING INSPECTION
C. FINDING OF INSPECTION INCLUDING CORRECTIVE ACTIONS NEEDED, DETAILS OF CORRECTIVE ACTIONS (DATE,
TIME, PARTY COMPLETING MAINTENANCE)
D. DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS
E. DOCUMENTATION OF CHANGES TO SWPPP
6. THE SWPPP, ALL CHANGES TO IT AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING
ACTIVE CONSTRUCTION OPERATIONS BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THE PORTION OF THE
SITE. ALL OWNERS MUST KEEP THE SWPPP ON FILE FOR THREE (3) YEARS AFTER THE SUBMITTAL OF THE NOTICE OF
TERMINATION, INCLUDING THE FOLLOWING INFORMATION:
A. ALL OTHER PERMITS REQUIRED FOR THE PROJECT.
B. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING ACTIVE MINING OPERATIONS.
C. ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL
RIGHT -OF -WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL
MAINTENANCE.
MAINTENANCE WILL BE PERFORMED WITHIN A PERIOD OF 24 HOURS FROM A RAINFALL EVENT AND WILL BE COMPLETED
WHEN
A. PERIMETER CONTROL MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF THE
DEVICES WITHIN 24 HOURS OF DISCOVERY
B. INLET PROTECTION MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE CAPACITY OF THE
DEVICE OR THE DEVICE BECOMES NON -FUCTIONAL
C. TRACKED SEDIMENT TO BE REMOVED WITH 24 HOURS OF DISCOVERY..
D. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS
REACHED FINAL STABILIZATION AND THE NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MPCA IN
ACCORDANCE WITH PART 11.6.5 OF THE CONSTRUCTION GENERAL PERMIT.
8. ALL SEDIMENT DEPOSIT INTO A WATER OF THE STATE MUST BE REMOVED WITHIN 7 DAYS.
9. INLETS WILL BE PROTECTED BY APPROPRIATE MEASURES THROUGHOUT THE LIFE OF THE CONSTRUCTION OPERATIONS.
F !. N'IATHIOR'ETZ CONSTRUCTION COMPANY I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED JULIE ANDERSON DESIGNED: KDS DEGLER DISPOSAL SITE 5 -2 -14
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM SWPPP Continued SHEET NO. 6 OF 6 SHEETS
IN ALL WE DO, WE BUILD IT RIGHT! - DRAWN: KD6
39676 COUNTS ROAD 24 SI=EYE, MN 56085 A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA. DATE: LC. NO. 26271 CHECKED: 7KA W: \MCQPROIERS \2014\ 200 -000nry Pmjeds \14200 Urver Cq lB \OS Proposal Fil¢ Copy\ CUP \DEGlE0. DISPOSAL SITE 5- 2-14.tlwg