Loading...
Memo from Matt Saam 1-10-05 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax 952.227.1170 Finance Phone 952.227.1140 Fax 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Couller Boulevard Phone 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site l'tlA'!. ci. chan hassen. mn. us MEMORANUDM TO: Kate Aanenson, Community Development Director Matt Saam, Assistant City Engineer fv\~ FROM: DATE: January 10,2005 SUBJ: Update to City Council on Sanitary Sewer Alignment for Pinehurst Land Use Review File No. 04-08 Previously, staff and the developer had differences of opinion on the proposed sanitary sewer alignment for this project. The differences centered on a proposed western sewer line which would serve the western two-thirds of this property. Staff was concerned with the proposal for the following reasons: a. Sewer alignment routed the line through a City-owned parcel south of the development. This parcel was Oliginally acquired as a possible future well site and the location of the line through the center of the parcel could limit the placement of a well on-site. b. The alignment made two, sharp 90° bends in addition to having a steep pipe grade (9%+). This caused concerns with future maintenance and premature degradation of the manhole interiors. c. The alignment routed the sewer down a steep slope of 3: 1 and greater. The concern here was 10ng-telID stabilization of the slope on the City's prope11y after construction. d. The alignment required the open-cutting of Lake Lucy Road in order to drain the sewer to an existing manhole in Lake Lucy Road. The concern was to try and limit the open-cutting of Lake Lucy Road. Staff met with the developer and presented these concerns. The developer has now come back with an alternate proposal (see attachment). The alternate proposal includes: directional boring of the sewer line on a more "straight shot" alignment which eliminates the two 90° bends; dropping the pipe slope from a steep 9%+ to a more common 7% maximum slope; and moving the proposed pipe alignment over to the east so that it doesn't bisect the City property in the center. In addition, by direction ally bOling the pipe, the concern over long-term stabilization of the hill slope goes away and no additional trees need to be removed. While Lake Lucy Road will still have to be cut into, staff believes that the developer has done all that can be expected to address our concerns. We are now The City 01 Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Kate Aanenson January 10, 2005 Page 2 recommending approval of the revised western sanitary sewer alignment as proposed. The only condition staff is recommending is to revise the east property line of Lot 16 so that it follows the proposed sewer line. Staff has confirmed that this revision will still provide sufficient lot area for the abutting Lots 17 and 18. RECOMMENDED CONDITIONS OF APPROVAL 1. Delete Condition 5.q. of the staff report. 2. Revise the eastern property line of Lot 16 to follow the proposed sanitary sewer line. Attachment: Alternate Sewer Alignment dated 1/7/05. c: Paul Oehme, City Engineer/Dir. of Public Works Nathan Franzen, Plowshares Development g:\eng\projects\pinehurst (mancino prop.)\update l-1O-05.doc ~/~:/ ~// // "'-. - ~.'11 -<J~ .~_.~-------..--- <J -/ ______ V ~==-- --=--- I M,^,-"",., ~-~---- - 7 ~---.:,~_ . - 0 ~114 _ / . / / /' \ \ / ,_ '" - -~~-+'~:-::/~L-: ) "'ì / ---=-===-~~ -- --- --- ---,--- --- --- ___ ~I \Me. r I ~~1:.~~___ I