Loading...
Engineer Comments 6-8-04 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen. MN 55317 Administration Phone 952.227.1100 Fax: 952.227.1110 BUilding Inspections Phone 952.227.1180 Fax: 952.227.1190 Engineering Phone 952.227.1160 Fax 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax 952.227.1404 Planning & Natural Resources Phone 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax 952.227.1110 Web Site VNA'I. ci .chanhassen. mn .us ~/// MEMORANDUM TO: Bob Generous, Senior Planner FROM: Matt Saam, Assistant City Engineer M1 DATE: June 8, 2004 SUBJ: Site Plan Review of CVS Pharmacy Land Use Review File No. 04-06 Upon review of the plans dated May 20, 2004 prepared by Anderson Engineering, I offer the following comments and recommendations: GRADING, DRAINAGE & EROSION CONTROL The site was previously rough graded as part of the Galpin Business Park development. Only minor grading remains to prepare the site for a building pad elevation of 966.5. The site is designed to drain away from the building to proposed catch basins on all sides. These catch basins will connect to an existing storm sewer system which drains to an existing NURP pond just east of the K wik Trip store. The NURP pond has been previously sized to accommodate drainage from this site. No additional ponding improvements are necessary. Storm sewer sizing calculations will need to be submitted for review prior to building permit approval. A retaining wall, ranging from 0' to 16' in height, is proposed along the east comer of the site. Due to its height, this wall must be designed by a registered structural engineer and a permit from the Building Department must be obtained for its construction. Erosion control measures and site restoration must be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff would recommend that the City's type II silt fence be used adjacent to the wetland on the east side of the site. In addition, a 75-foot minimum rock construction entrance must be included at the main access drive to the site. UTILITIES Municipal sanitary sewer and water is available to the site from the existing private drive to the north. The applicant is proposing to connect to existing sewer and water lines on the north side of the site and extend private services to the proposed pharmacy building. According to the City's Finance Department records, the site was previously assessed for utilities. The remaining assessment due payable to the City at the time of building The City of Chanhassen · A growing community with clean lakes, quality schools, a charming dO\'lnlown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Bob Generous June 8, 2004 Page 2 permit application is $10,479. In addition, sanitary sewer and water hook-up charges along with the Met Council's SAC fee will be due at the time of building permit issuance. The 2004 trunk utility hook-up charge is $1,458 per unit for sanitary sewer and $2,814 per unit for water. The 2002 SAC fee is $1,425 per unit. The hook-up charges and SAC fee are based on the number of SAC units assigned by the Met Council. The applicant is responsible for obtaining permits from the appropriate regulatory agency including, but not limited to: Carver County, the Riley-Purgatory-Bluff Creek Watershed Distlict, and the MPCA. STREETS! ACCESS No public streets are proposed with this project. Full site access will be gained off of the existing private driveway just north of the site. There is an existing cross-access easement for this private driveway. Overall development accesses include a right- inhight-out access on Galpin Boulevard, a right-in access on W. 78th Street, and a full access on W. 78th Street. Due to the large number of u-turns at the intersection of Galpin BoulevardIW. 78th Street from traffic exiting the site onto Galpin Boulevard and wanting to get to TH 5, staff will be communicating with Carver County on the installation of a "No U-Turn" sign at the intersection. RECOMMENDED CONDITIONS OF APPROVAL 1. Show the location of the accessible ramps on the plans. 2. All final plans must be signed by a registered civil engineer. 3. Add all applicable 2004 City of Chanhassen detail plates to the plans. 4. On the Grading Plan: a. Show all existing and proposed easements. b. Show the location of the existing silt fence. c. Show the existing topography of the site. 5. The retaining wall must be designed by a registered structural engineer and a permit from the Building Department must be obtained for its construction. 6. The City's type II silt fence must be used adjacent to the wetland on the east side of the site. In addition, a 75-foot minimum rock construction entrance must be included at the main access drive to the site. 7. The remaining assessment due payable to the City at the time of building permit application is $10,479. In addition, sanitary sewer and water hook-up Bob Generous June 8, 2004 Page 3 charges along with the Met Council's SAC fee will be due at the time of building permit issuance. The 2004 trunk utility hook-up charge is $1,458 per unit for sanitary sewer and $2,814 per unit for water. The 2004 SAC fee is $1,425 per unit. The hook-up charges and SAC fee are based on the number of SAC units assigned by the Met Council. 8. The applicant is responsible for obtaining permits from the appropriate regulatory agency including, but not limited to: Carver County, the Riley- Purgatory-Bluff Creek Watershed District, and the MPCA. 9. Storm sewer sizing calculations will need to be submitted for review prior to building permit approval. Jms c: Paul Oehme, Director of Public Works/City Engineer Bill Bement, Engineering Technician IV g:\eng\projects\galpin business park\cvs pharmacy spr.doc