DEGLER DISPOSAL SITE PLANS 6-13-14INDEX
SHEET NO.DESCRIPTION
1 - - - - - -TITLE PAGE
2 - - - - - -MAP A - CURRENT CONDITIONS
3 - - - - - -MAP B - OPERATIONS
4 - - - - - -MAP C - END USER PLAN
5 - - - - - -STORM WATER POLLUTION
PREVENTION PLAN (SWPPP)
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
EXISTING CONTOURS
DESIGN CONTOURS
SHEET NO.
PROPERTY DESCRIPTION:
PROJECT LOACTION
COUNTY:
DISTRICT:
MATHIOWETZ CONSTRUCTION COMPANY
IN ALL WE DO, WE BUILD IT RIGHT!
30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085
OF SHEETS
I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
DESIGNED:
DRAWN:
CHECKED:
JULIE ANDERSON
26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA
KDB
KDB
61
5-2-14
TITLE PAGE
DEGLER DISPOSAL SITE
6
CARVER
10005000
P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS:
COMM AT NE CORN NW1/4 SE1/4 22-116- 23
TH S 1320' TH W 66' TH S38*W 157.08' TH
S73*W 287.1' TH S36*W 125.4' TH S17*W
244.2 FR TH N82*W 99' TH N 528' TO N LINE
SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
DEGLER DISPOSAL SITE
THIS PERMIT SUBMITTAL CONTAINS 6 SHEETS TOTAL
CSAH 18 / LYMAN BLVD
BLUFF CREEK
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
EXISTING CONTOURS
WOODLAND
FARM FIELD
WETLAND
EXISTING BUILDINGS
EXISTING ROADS
SHEET NO.
PROPERTY DESCRIPTION:
PROJECT LOACTION
COUNTY:
DISTRICT:
MATHIOWETZ CONSTRUCTION COMPANY
IN ALL WE DO, WE BUILD IT RIGHT!
30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085
OF SHEETS
I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
DESIGNED:
DRAWN:
CHECKED:26271
JULIE ANDERSON DEGLER DISPOSAL SITE
CURRENT CONDITIONS
5-2-14
2 6
KDB
KDB
JKA W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwg
0 100 200
CARVER
6
P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS:
COMM AT NE CORN NW1/4 SE1/4 22-116- 23
TH S 1320' TH W 66' TH S38*W 157.08' TH
S73*W 287.1' TH S36*W 125.4' TH S17*W
244.2 FR TH N82*W 99' TH N 528' TO N LINE
SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
NOTE:
1.TOPSOIL TO BE STRIPPED AT ONE FOOT
DEPTH
CSAH 18 / LYMAN BLVD
INLET PROTECTION DETAIL:
x PLASTIC PIPE TO BE PLACED INSIDE APRON WITH FILTER CLOTH AT OPENING
x 3/4" ROCK (CLEAN) TO BE PLACED AROUND PLASTIC PIPE AND APRON
x RISER PIPE HAS 1/4" DRILL HOLES WITH AN OPEN TOP FOR EXTREME RAIN
EVENTS
BLUFF CREEK
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
WOODLAND
WETLAND
SILT FENCE
EXISTING BUILDINGS
EXISTING ROADS
ACCESS ROAD
PHASE 1 MATERIAL PLACEMENT
PHASE 2 MATERIAL PLACEMENT
PHASE 3 MATERIAL PLACEMENT
TOPSOIL BERM (ADDITIONAL BMP)
SHEET NO.
PROPERTY DESCRIPTION:
PROJECT LOACTION
COUNTY:
DISTRICT:
MATHIOWETZ CONSTRUCTION COMPANY
IN ALL WE DO, WE BUILD IT RIGHT!
30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085
OF SHEETS
I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
DESIGNED:
DRAWN:
CHECKED:
JULIE ANDERSON
26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA
KDB
KDB
63
5-2-14
PROPOSED OPERATIONS
DEGLER DISPOSAL SITE
2001000
CARVER
6
P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS:
COMM AT NE CORN NW1/4 SE1/4 22-116- 23
TH S 1320' TH W 66' TH S38*W 157.08' TH
S73*W 287.1' TH S36*W 125.4' TH S17*W
244.2 FR TH N82*W 99' TH N 528' TO N LINE
SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
NOTE:
1.SILT FENCE TO BE PLACED AND INSPECTED
BEFORE ANY CONSTRUCTION BEGINS.
2.TOPSOIL BERM TO BE PLACED AS ADDED
PROTECTION FOR EROSION AND SEDIMENT
CONTROL. (TO BE SEEDED AND MULCHED
IMMEDIATELY AFTER CONSTRUCTION)
3.FILL MATERIAL TO BE PLACED IN THREE
PHASES ACCORDING TO THE HATCHING
PATTERNS DEFINED. (TOPSOIL STAGED
BESIDE FILL AREAS)
4.INLET PROTECTION TO BE PLACE ON PIPE
UNDER PROPOSED ACCESS ROAD.
5.EQUIPMENT TO BE STAGED IN NE CORNER
OF CONSTRUCTION AREA
CSAH 18 / LYMAN BLVD
BLUFF CREEK
LEGEND KEY
PROPERTY LINE
CONSTRUCTION LIMITS
PROPOSED CONTOURS
EXISTING CONTOURS
WOODLAND
EXISTING ROAD
EXISTING BUILDINGS
KDB DESIGNED:
SHEET NO.
PROPERTY DESCRIPTION:
PROJECT LOACTION
COUNTY:
DISTRICT:
MATHIOWETZ CONSTRUCTION COMPANY
IN ALL WE DO, WE BUILD IT RIGHT!
30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085
OF SHEETS
I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
DRAWN:
CHECKED:
JULIE ANDERSON
26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA
KDB 64END USER PLAN
DEGLER DISPOSAL SITE 5-2-14
2001000
CARVER
6
P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS:
COMM AT NE CORN NW1/4 SE1/4 22-116- 23
TH S 1320' TH W 66' TH S38*W 157.08' TH
S73*W 287.1' TH S36*W 125.4' TH S17*W
244.2 FR TH N82*W 99' TH N 528' TO N LINE
SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
NOTES:
1.SLOPE OF FILL TO MATCH EXISTING 3:1
SLOPES
2.SLOPES TO BE SEEDED AND MULCHED
WITHIN 48 HOURS OF SUBSTANTIAL
COMPLETION.
3.FOOT OF TOPSOIL TO BE PLACED ON ALL
DISTURBED AREAS
4.SEED AND MULCH TO BE PLACE ON ALL
DISTURBED AREA AS COMPLETED
5.SILT FENCE SHALL BE USED TO DELINEATE
THE DRIP LINE OF TREES LOCATED IN THE
SOUTHEAST PORTION OF THE PROPOSED
SITE.
6.NO FILL WILL BE ALLOWED INSIDE THE DRIP
LINE OF EXISTING TRESS LOCATED IN THE
SOUTH EAST PORTION OF THE PROPOSED
SITE.
7.THIS INTERIM USE PERMIT EXPIRES UPON
ACHIEVING SUBSTANTIAL COMPLETION ON
THE LYMAN BLVD CONSTRUCTION PROJECT.
STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
PIT DESCRIPTION/LOCATION
P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS: COMM AT NE CORN NW1/4 SE1/4 22-116- 23 TH S 1320' TH W 66' TH S38*W 157.08' TH
S73*W 287.1' TH S36*W 125.4' TH S17*W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT
BEARING E 462' F
SECTION: 22
TOWNSHIP: 116
RANGE: 23
LAND FEATURE CHANGES
TOTAL PIT AREA = 8 ACRES
EXISTING IMPERVIOUS AREA = 0 ACRES
PROPOSED IMPERVIOUS AREA = 0 ACRES
EXISTING PERVIOUS AREA = 8 ACRES
PROPOSED PERVIOUS AREA = 8 ACRES
RESPONSIBLE PARTIES
MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR TRAINING REQUIREMENTS FOR PERMIT COMPLIANCE AND SUCCESSFUL
IMPLEMENTATION OF THE INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT
CONTROL BMPS DURING ACTIVE CONSTRUCTION OPERATIONS AND UNTIL FINAL STABILIZATION HAS BEEN REACHED.
THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE AND REPAIRS THAT MAY BE REQUIRED AFTER THE
DISPOSAL AREA HAS BEEN RECLAIMED.
PROJECT CONTACTS
MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR THE IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION
AND MAINTENANCE OF THE EROSION, AND SEDIMENT CONTROL BMP'S BEFORE AND DURING ACTIVE CONSTRUCTION
OPERATIONS. THE OWNER IS RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF THE STATE STORM WATER
MANAGEMENT SYSTEM. MPCA 24 HOUR EMERGENCY NOTIFICATION: 651-649-5451 OR 800-422-0798
EROSION CONTROL SUPERVISOR ENVIRONMENTAL COMPLIANCE / PERMIT ADMINISTRATION
RANDY HUIRAS JULIE ANDERSON
MATHIOWETZ CONSTRUCTION COMPANY MATHIOWETZ CONSTRUCTION COMPANY
30676 COUNTY ROAD 24 30676 COUNTY ROAD 24
SLEEPY EYE, MN 56085 SLEEPY EYE, MN 56085
507-920-7081 507-829-9185
OWNERS REPRESENTATIVE MPCA CONTACT
GAYLE DEGLER THERESA HAUGEN
602 EAST FOURTH STREET 218-316-3920
CHASKA, MN 55318-2102
952-403-7047
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES:
1.MATHIOWETZ CONSTRUCTION WILL NEED TO IDENTIFY A MN/DOT CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD
STANDING WHO WILL BE KNOWLEDGEABLE AND EXPERIENCE IN THE APPLICATION OF EROSION PREVENTION AND
SEDIMENT CONTROL BEST MANAGEMENT PRACTICES.
2.THE EROSION CONTROL SUPERVISOR WILL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A QUALITY
ASSURANCE PROGRAM FOR ALL CHEMICAL MANAGEMENT PROCESSES TO ENSURE PROPER OPERATION AND
MAINTENANCE.
3.MATHIOWETZ CONSTRUCTION WILL COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION PREVENTION
MANAGEMENT DURING ACTIVE CONSTRUCTION OPERATIONS, WHICH WILL INCLUDE THE SITE PLAN PROCESS, BUT NOT
LIMITED TO:
A.FUELING (PORTABLE AND INTERMITTENT) AND ASSOCIATED ABOVE-GROUND STORAGE TANKS AND DISPENSING
SYSTEM EQUIPMENT
B.VEHICLE AND EQUIPMENT MAINTENANCE
C.SOLID WASTE COLLECTION AND REMOVAL
D.SECONDARY CONTAINMENT
E.HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS
F.FUGITIVE DUST CONTROL
G.DEWATERING
4.MATHIOWETZ CONSTRUCTION WILL FOLLOW THE PROCEDURES REGARDING SPILL PREVENTION AND HAVE A PLAN FOR
RESPONDING TO SPILLS. THE PLAN INCLUDES, BUT IS NOT LIMITED TO:
SPILL PREVENTION:
A.USE OF DRIP PANS WHERE LEAK OR SPILLS OF FUEL CAN OCCUR
B.KEEPING SPILL CLEANUP MATERIALS READILY AVAILABLE
C.CLEAN UP SPILLS AND LEAK IMMEDIATELY
D.PERFORM INSPECTION AND PREVENTATIVE MAINTENANCE ON FUEL STORAGE TANKS TO DETECT POTENTIAL
LEAKS BEFORE THEY OCCUR
E.AVOID TOPPING OFF FUEL TANKS
F.REMOVE LOCKING DEVICES ON FUEL DISPENSING HANDLES SO THAT OPERATORS MUST HOLD THE HANDLE
OPEN AND CANNOT WALK AWAY WHILE FILLING TANKS
G.HAVE ABSORBENT MATERIALS AVAILABLE AT THE FUELING AREA FOR USE IN CLEANING UP SMALL SPILLS
H.TRAIN PERSONAL ON PROPER FUELING PROCEDURES
SPILL PREVENTION:
A.STOP THE SOURCE OF THE SPILL IMMEDIATELY
B.CONTAIN THE SPILL UNTIL CLEANUP IS COMPLETE
C.DEPLOY OIL CONTAINMENT BOOMS IF THE SPILL MAY REACH WATERS OF THE STATE
D.COVER THE SPILL WITH ABSORBENT MATERIAL
E.DISPOSE OF CLEANUP MATERIALS PROPERLY
F.REPORT THE SPILL. NOTIFY THE MINNESOTA DEPARTMENT OF PUBLIC SAFETY DUTY OFFICER AT (651) 469-5451
WHEN THERE IS A RELEASE OF A REPORTABLE QUANTITY (FIVE GALLONS OR MORE FOR PETROLEUM SPILLS)
SPILLS OF ALL OTHER CHEMICALS OR MATERIALS OF ANY QUANTITY MAY BE REPORTABLE. IF IN DOUBT, CALL
THE DUTY OFFICER.
G.FOR EMERGENCIES DIAL 911
SHEET NO.
MATHIOWETZ CONSTRUCTION COMPANY
IN ALL WE DO, WE BUILD IT RIGHT!
30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085
OF SHEETS
I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
DESIGNED:
DRAWN:
CHECKED:
JULIE ANDERSON
26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA
KDB
KDB
65
5-2-14
SWPPP
DEGLER DISPOSAL SITE
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES (cont.):
5.THE EROSION CONTROL SUPERVISOR WILL CONDUCT ROUTINE INSPECTIONS OF THE SITE AND AT MINIMUM ONCE EVERY
7 DAYS DURING ACTIVE CONSTRUCTION OPERATIONS AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN
0.5 INCHES IN 24 HOURS. RECORDS TO INCLUDE:
A. DATE AND TIME OF INSPECTION
B.NAME OF PERSON CONDUCTING INSPECTION
C.FINDING OF INSPECTION INCLUDING CORRECTIVE ACTIONS NEEDED, DETAILS OF CORRECTIVE ACTIONS (DATE,
TIME, PARTY COMPLETING MAINTENANCE)
D.DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS
E.DOCUMENTATION OF CHANGES TO SWPPP
6.THE SWPPP, ALL CHANGES TO IT AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING
ACTIVE CONSTRUCTION OPERATIONS BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THE PORTION OF THE
SITE. ALL OWNERS MUST KEEP THE SWPPP ON FILE FOR THREE (3) YEARS AFTER THE SUBMITTAL OF THE NOTICE OF
TERMINATION, INCLUDING THE FOLLOWING INFORMATION:
A.ALL OTHER PERMITS REQUIRED FOR THE PROJECT.
B.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING ACTIVE MINING OPERATIONS.
C.ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL
RIGHT-OF-WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL
MAINTENANCE.
7.MAINTENANCE WILL BE PERFORMED WITHIN A PERIOD OF 24 HOURS FROM A RAINFALL EVENT AND WILL BE COMPLETED
WHEN:
A. PERIMETER CONTROL MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF THE
DEVICES WITHIN 24 HOURS OF DISCOVERY
B.INLET PROTECTION MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE CAPACITY OF THE
DEVICE OR THE DEVICE BECOMES NON-FUCTIONAL
C.TRACKED SEDIMENT TO BE REMOVED WITH 24 HOURS OF DISCOVERY..
D.CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS
REACHED FINAL STABILIZATION AND THE NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MPCA IN
ACCORDANCE WITH PART II.B.5 OF THE CONSTRUCTION GENERAL PERMIT.
8.ALL SEDIMENT DEPOSIT INTO A WATER OF THE STATE MUST BE REMOVED WITHIN 7 DAYS.
9.INLETS WILL BE PROTECTED BY APPROPRIATE MEASURES THROUGHOUT THE LIFE OF THE CONSTRUCTION OPERATIONS.
10.MATHIOWETZ CONSTRUCTION WILL PROVIDE A $1,500 EROSION CONTROL ESCROW PRIOR TO GRADING OPERATIONS.
11.SILT FENCE INSTALLATION REQUIRES THE USE OF METAL T-POSTS.
12.BLUFF CREEK IS DESIGNATED AS A TURBIDITY IMPAIRED WATER.
SHEET NO.
MATHIOWETZ CONSTRUCTION COMPANY
IN ALL WE DO, WE BUILD IT RIGHT!
30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085
OF SHEETS
I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO.
DESIGNED:
DRAWN:
CHECKED:
JULIE ANDERSON
26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA
KDB
KDB
66
5-2-14
SWPPP (Continued)
DEGLER DISPOSAL SITE