Loading...
DEGLER DISPOSAL SITE PLANS 6-13-14INDEX SHEET NO.DESCRIPTION 1 - - - - - -TITLE PAGE 2 - - - - - -MAP A - CURRENT CONDITIONS 3 - - - - - -MAP B - OPERATIONS 4 - - - - - -MAP C - END USER PLAN 5 - - - - - -STORM WATER POLLUTION PREVENTION PLAN (SWPPP) LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS EXISTING CONTOURS DESIGN CONTOURS SHEET NO. PROPERTY DESCRIPTION: PROJECT LOACTION COUNTY: DISTRICT: MATHIOWETZ CONSTRUCTION COMPANY IN ALL WE DO, WE BUILD IT RIGHT! 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 OF SHEETS I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO. DESIGNED: DRAWN: CHECKED: JULIE ANDERSON 26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA KDB KDB 61 5-2-14 TITLE PAGE DEGLER DISPOSAL SITE 6 CARVER 10005000 P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS: COMM AT NE CORN NW1/4 SE1/4 22-116- 23 TH S 1320' TH W 66' TH S38*W 157.08' TH S73*W 287.1' TH S36*W 125.4' TH S17*W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 DEGLER DISPOSAL SITE THIS PERMIT SUBMITTAL CONTAINS 6 SHEETS TOTAL CSAH 18 / LYMAN BLVD BLUFF CREEK LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS EXISTING CONTOURS WOODLAND FARM FIELD WETLAND EXISTING BUILDINGS EXISTING ROADS SHEET NO. PROPERTY DESCRIPTION: PROJECT LOACTION COUNTY: DISTRICT: MATHIOWETZ CONSTRUCTION COMPANY IN ALL WE DO, WE BUILD IT RIGHT! 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 OF SHEETS I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO. DESIGNED: DRAWN: CHECKED:26271 JULIE ANDERSON DEGLER DISPOSAL SITE CURRENT CONDITIONS 5-2-14 2 6 KDB KDB JKA W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwg 0 100 200 CARVER 6 P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS: COMM AT NE CORN NW1/4 SE1/4 22-116- 23 TH S 1320' TH W 66' TH S38*W 157.08' TH S73*W 287.1' TH S36*W 125.4' TH S17*W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 NOTE: 1.TOPSOIL TO BE STRIPPED AT ONE FOOT DEPTH CSAH 18 / LYMAN BLVD INLET PROTECTION DETAIL: x PLASTIC PIPE TO BE PLACED INSIDE APRON WITH FILTER CLOTH AT OPENING x 3/4" ROCK (CLEAN) TO BE PLACED AROUND PLASTIC PIPE AND APRON x RISER PIPE HAS 1/4" DRILL HOLES WITH AN OPEN TOP FOR EXTREME RAIN EVENTS BLUFF CREEK LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS WOODLAND WETLAND SILT FENCE EXISTING BUILDINGS EXISTING ROADS ACCESS ROAD PHASE 1 MATERIAL PLACEMENT PHASE 2 MATERIAL PLACEMENT PHASE 3 MATERIAL PLACEMENT TOPSOIL BERM (ADDITIONAL BMP) SHEET NO. PROPERTY DESCRIPTION: PROJECT LOACTION COUNTY: DISTRICT: MATHIOWETZ CONSTRUCTION COMPANY IN ALL WE DO, WE BUILD IT RIGHT! 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 OF SHEETS I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO. DESIGNED: DRAWN: CHECKED: JULIE ANDERSON 26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA KDB KDB 63 5-2-14 PROPOSED OPERATIONS DEGLER DISPOSAL SITE 2001000 CARVER 6 P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS: COMM AT NE CORN NW1/4 SE1/4 22-116- 23 TH S 1320' TH W 66' TH S38*W 157.08' TH S73*W 287.1' TH S36*W 125.4' TH S17*W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 NOTE: 1.SILT FENCE TO BE PLACED AND INSPECTED BEFORE ANY CONSTRUCTION BEGINS. 2.TOPSOIL BERM TO BE PLACED AS ADDED PROTECTION FOR EROSION AND SEDIMENT CONTROL. (TO BE SEEDED AND MULCHED IMMEDIATELY AFTER CONSTRUCTION) 3.FILL MATERIAL TO BE PLACED IN THREE PHASES ACCORDING TO THE HATCHING PATTERNS DEFINED. (TOPSOIL STAGED BESIDE FILL AREAS) 4.INLET PROTECTION TO BE PLACE ON PIPE UNDER PROPOSED ACCESS ROAD. 5.EQUIPMENT TO BE STAGED IN NE CORNER OF CONSTRUCTION AREA CSAH 18 / LYMAN BLVD BLUFF CREEK LEGEND KEY PROPERTY LINE CONSTRUCTION LIMITS PROPOSED CONTOURS EXISTING CONTOURS WOODLAND EXISTING ROAD EXISTING BUILDINGS KDB DESIGNED: SHEET NO. PROPERTY DESCRIPTION: PROJECT LOACTION COUNTY: DISTRICT: MATHIOWETZ CONSTRUCTION COMPANY IN ALL WE DO, WE BUILD IT RIGHT! 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 OF SHEETS I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO. DRAWN: CHECKED: JULIE ANDERSON 26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA KDB 64END USER PLAN DEGLER DISPOSAL SITE 5-2-14 2001000 CARVER 6 P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS: COMM AT NE CORN NW1/4 SE1/4 22-116- 23 TH S 1320' TH W 66' TH S38*W 157.08' TH S73*W 287.1' TH S36*W 125.4' TH S17*W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 NOTES: 1.SLOPE OF FILL TO MATCH EXISTING 3:1 SLOPES 2.SLOPES TO BE SEEDED AND MULCHED WITHIN 48 HOURS OF SUBSTANTIAL COMPLETION. 3.FOOT OF TOPSOIL TO BE PLACED ON ALL DISTURBED AREAS 4.SEED AND MULCH TO BE PLACE ON ALL DISTURBED AREA AS COMPLETED 5.SILT FENCE SHALL BE USED TO DELINEATE THE DRIP LINE OF TREES LOCATED IN THE SOUTHEAST PORTION OF THE PROPOSED SITE. 6.NO FILL WILL BE ALLOWED INSIDE THE DRIP LINE OF EXISTING TRESS LOCATED IN THE SOUTH EAST PORTION OF THE PROPOSED SITE. 7.THIS INTERIM USE PERMIT EXPIRES UPON ACHIEVING SUBSTANTIAL COMPLETION ON THE LYMAN BLVD CONSTRUCTION PROJECT. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PIT DESCRIPTION/LOCATION P/O GOVT LOT 2 & P/O W1/2 SE1/4 DESC AS: COMM AT NE CORN NW1/4 SE1/4 22-116- 23 TH S 1320' TH W 66' TH S38*W 157.08' TH S73*W 287.1' TH S36*W 125.4' TH S17*W 244.2 FR TH N82*W 99' TH N 528' TO N LINE SW1/4 SE1/4 TH S 1029.5' TH SW TO A PT BEARING E 462' F SECTION: 22 TOWNSHIP: 116 RANGE: 23 LAND FEATURE CHANGES TOTAL PIT AREA = 8 ACRES EXISTING IMPERVIOUS AREA = 0 ACRES PROPOSED IMPERVIOUS AREA = 0 ACRES EXISTING PERVIOUS AREA = 8 ACRES PROPOSED PERVIOUS AREA = 8 ACRES RESPONSIBLE PARTIES MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR TRAINING REQUIREMENTS FOR PERMIT COMPLIANCE AND SUCCESSFUL IMPLEMENTATION OF THE INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS DURING ACTIVE CONSTRUCTION OPERATIONS AND UNTIL FINAL STABILIZATION HAS BEEN REACHED. THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE AND REPAIRS THAT MAY BE REQUIRED AFTER THE DISPOSAL AREA HAS BEEN RECLAIMED. PROJECT CONTACTS MATHIOWETZ CONSTRUCTION IS RESPONSIBLE FOR THE IMPLEMENTATION OF THE SWPPP AND INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION, AND SEDIMENT CONTROL BMP'S BEFORE AND DURING ACTIVE CONSTRUCTION OPERATIONS. THE OWNER IS RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF THE STATE STORM WATER MANAGEMENT SYSTEM. MPCA 24 HOUR EMERGENCY NOTIFICATION: 651-649-5451 OR 800-422-0798 EROSION CONTROL SUPERVISOR ENVIRONMENTAL COMPLIANCE / PERMIT ADMINISTRATION RANDY HUIRAS JULIE ANDERSON MATHIOWETZ CONSTRUCTION COMPANY MATHIOWETZ CONSTRUCTION COMPANY 30676 COUNTY ROAD 24 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 SLEEPY EYE, MN 56085 507-920-7081 507-829-9185 OWNERS REPRESENTATIVE MPCA CONTACT GAYLE DEGLER THERESA HAUGEN 602 EAST FOURTH STREET 218-316-3920 CHASKA, MN 55318-2102 952-403-7047 STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES: 1.MATHIOWETZ CONSTRUCTION WILL NEED TO IDENTIFY A MN/DOT CERTIFIED EROSION CONTROL SUPERVISOR IN GOOD STANDING WHO WILL BE KNOWLEDGEABLE AND EXPERIENCE IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES. 2.THE EROSION CONTROL SUPERVISOR WILL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A QUALITY ASSURANCE PROGRAM FOR ALL CHEMICAL MANAGEMENT PROCESSES TO ENSURE PROPER OPERATION AND MAINTENANCE. 3.MATHIOWETZ CONSTRUCTION WILL COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION PREVENTION MANAGEMENT DURING ACTIVE CONSTRUCTION OPERATIONS, WHICH WILL INCLUDE THE SITE PLAN PROCESS, BUT NOT LIMITED TO: A.FUELING (PORTABLE AND INTERMITTENT) AND ASSOCIATED ABOVE-GROUND STORAGE TANKS AND DISPENSING SYSTEM EQUIPMENT B.VEHICLE AND EQUIPMENT MAINTENANCE C.SOLID WASTE COLLECTION AND REMOVAL D.SECONDARY CONTAINMENT E.HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS F.FUGITIVE DUST CONTROL G.DEWATERING 4.MATHIOWETZ CONSTRUCTION WILL FOLLOW THE PROCEDURES REGARDING SPILL PREVENTION AND HAVE A PLAN FOR RESPONDING TO SPILLS. THE PLAN INCLUDES, BUT IS NOT LIMITED TO: SPILL PREVENTION: A.USE OF DRIP PANS WHERE LEAK OR SPILLS OF FUEL CAN OCCUR B.KEEPING SPILL CLEANUP MATERIALS READILY AVAILABLE C.CLEAN UP SPILLS AND LEAK IMMEDIATELY D.PERFORM INSPECTION AND PREVENTATIVE MAINTENANCE ON FUEL STORAGE TANKS TO DETECT POTENTIAL LEAKS BEFORE THEY OCCUR E.AVOID TOPPING OFF FUEL TANKS F.REMOVE LOCKING DEVICES ON FUEL DISPENSING HANDLES SO THAT OPERATORS MUST HOLD THE HANDLE OPEN AND CANNOT WALK AWAY WHILE FILLING TANKS G.HAVE ABSORBENT MATERIALS AVAILABLE AT THE FUELING AREA FOR USE IN CLEANING UP SMALL SPILLS H.TRAIN PERSONAL ON PROPER FUELING PROCEDURES SPILL PREVENTION: A.STOP THE SOURCE OF THE SPILL IMMEDIATELY B.CONTAIN THE SPILL UNTIL CLEANUP IS COMPLETE C.DEPLOY OIL CONTAINMENT BOOMS IF THE SPILL MAY REACH WATERS OF THE STATE D.COVER THE SPILL WITH ABSORBENT MATERIAL E.DISPOSE OF CLEANUP MATERIALS PROPERLY F.REPORT THE SPILL. NOTIFY THE MINNESOTA DEPARTMENT OF PUBLIC SAFETY DUTY OFFICER AT (651) 469-5451 WHEN THERE IS A RELEASE OF A REPORTABLE QUANTITY (FIVE GALLONS OR MORE FOR PETROLEUM SPILLS) SPILLS OF ALL OTHER CHEMICALS OR MATERIALS OF ANY QUANTITY MAY BE REPORTABLE. IF IN DOUBT, CALL THE DUTY OFFICER. G.FOR EMERGENCIES DIAL 911 SHEET NO. MATHIOWETZ CONSTRUCTION COMPANY IN ALL WE DO, WE BUILD IT RIGHT! 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 OF SHEETS I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO. DESIGNED: DRAWN: CHECKED: JULIE ANDERSON 26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA KDB KDB 65 5-2-14 SWPPP DEGLER DISPOSAL SITE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NOTES (cont.): 5.THE EROSION CONTROL SUPERVISOR WILL CONDUCT ROUTINE INSPECTIONS OF THE SITE AND AT MINIMUM ONCE EVERY 7 DAYS DURING ACTIVE CONSTRUCTION OPERATIONS AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. RECORDS TO INCLUDE: A. DATE AND TIME OF INSPECTION B.NAME OF PERSON CONDUCTING INSPECTION C.FINDING OF INSPECTION INCLUDING CORRECTIVE ACTIONS NEEDED, DETAILS OF CORRECTIVE ACTIONS (DATE, TIME, PARTY COMPLETING MAINTENANCE) D.DATE AND AMOUNT OF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS E.DOCUMENTATION OF CHANGES TO SWPPP 6.THE SWPPP, ALL CHANGES TO IT AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING ACTIVE CONSTRUCTION OPERATIONS BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THE PORTION OF THE SITE. ALL OWNERS MUST KEEP THE SWPPP ON FILE FOR THREE (3) YEARS AFTER THE SUBMITTAL OF THE NOTICE OF TERMINATION, INCLUDING THE FOLLOWING INFORMATION: A.ALL OTHER PERMITS REQUIRED FOR THE PROJECT. B.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING ACTIVE MINING OPERATIONS. C.ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT-OF-WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE. 7.MAINTENANCE WILL BE PERFORMED WITHIN A PERIOD OF 24 HOURS FROM A RAINFALL EVENT AND WILL BE COMPLETED WHEN: A. PERIMETER CONTROL MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF THE DEVICES WITHIN 24 HOURS OF DISCOVERY B.INLET PROTECTION MAINTENANCE TO BE PERFORMED WHEN SEDIMENT REACHES 1/3 THE CAPACITY OF THE DEVICE OR THE DEVICE BECOMES NON-FUCTIONAL C.TRACKED SEDIMENT TO BE REMOVED WITH 24 HOURS OF DISCOVERY.. D.CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN COMPLETED, SITE HAS REACHED FINAL STABILIZATION AND THE NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MPCA IN ACCORDANCE WITH PART II.B.5 OF THE CONSTRUCTION GENERAL PERMIT. 8.ALL SEDIMENT DEPOSIT INTO A WATER OF THE STATE MUST BE REMOVED WITHIN 7 DAYS. 9.INLETS WILL BE PROTECTED BY APPROPRIATE MEASURES THROUGHOUT THE LIFE OF THE CONSTRUCTION OPERATIONS. 10.MATHIOWETZ CONSTRUCTION WILL PROVIDE A $1,500 EROSION CONTROL ESCROW PRIOR TO GRADING OPERATIONS. 11.SILT FENCE INSTALLATION REQUIRES THE USE OF METAL T-POSTS. 12.BLUFF CREEK IS DESIGNATED AS A TURBIDITY IMPAIRED WATER. SHEET NO. MATHIOWETZ CONSTRUCTION COMPANY IN ALL WE DO, WE BUILD IT RIGHT! 30676 COUNTY ROAD 24 SLEEPY EYE, MN 56085 OF SHEETS I HEREBY CERTIFY THAT THIS DOCUMENT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.DATE:LIC. NO. DESIGNED: DRAWN: CHECKED: JULIE ANDERSON 26271 W:\MCC\PROJECTS\2014\200 - County Projects\14200 Carver Co 18\01 - Proposal File Copy\CUP\DEGLER DISPOSAL SITE 5-2-14.dwgJKA KDB KDB 66 5-2-14 SWPPP (Continued) DEGLER DISPOSAL SITE