Loading...
Approval Letter Final Plat 06-18-2014CITY OF 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax 952.2271110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.c i.chan hassen.m n. us June 18, 2014 Mr. Todd Simning Dogwood Road, LLC P. O. Box 218 Chanhassen, MN 55317 Re: Arbor Cove — Planning Case #2014 -06 Dear Mr. Simning: This letter is to confirm that on June 9, 2014, the Chanhassen City Council approved the following: 1. Final plat for Arbor Cove subject to the conditions of the staff report; 2. Development contract for Arbor Cove; 3. Plans and specifications for Arbor Cove; and 4. Vacation of easements in conjunction with Arbor Cove. The final plat was approved subject to the following conditions: Parks & Recreation 1. Full park dedication fees of $23,200.00 shall be collected prior to recording the final plat. Building 1. Final grading plans and soil reports must be submitted to the Inspections Division before building permits will be issued. 2. Engineered design and building permits are required for retaining walls exceeding four feet in height. 3. Each lot must be provided with a separate sewer and water service. 4. Demolition permits must be obtained before demolishing any existing structures. Natural Resources 1. The applicant shall plant a total of 29 trees in the development. 2. Prior to any grading, the applicant shall install tree preservation fencing using metal stakes around tree #33 on Lot 4. The fencing shall be placed at the dripline or the furthest point possible from the trunk and no closer than 20 feet. Within the fencing, the applicant shall spread a 3 to 4 -inch layer of woodchips to protect the root zone. These protections shall remain in effect until construction is completed. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Todd Simning June 18, 2014 Page 2 3. A tree preservation easement shall be recorded east of the grading limits on Lot 1, over the rear 85 feet of Lots 2 through 3 and over the rear 75 feet of Lot 4. The applicant shall supply a legal description for the easement. 4. Easement signage shall be placed on the lot lines at the point of intersection with the easement on Lots 2 through 4. Signage shall be placed at points of directional change on Lot 1. Signs shall be approved by the city. En ineering 1. No slope shall be steeper than 3:1. 2. The EOF shall be noted with arrows showing the direction of the overflow. 3. Include a lot benching detail in the plans. 4. Draintile service must be provided for Lots 3 and 4, which have drainage flows from the back to the front of the lot. 5. Proposed stockpile areas must be identified in the plans. 6. All existing easements shown in the plans must be properly referenced with the document number or plat they were dedicated under. 7. A preservation easement shall be dedicated along the back of Lots 2, 3 and 4 as well as the east corner of Lot 1. 8. A drainage and utility easement shall be dedicated over the filtration basin and the channel on Lot 1 which will provide the City access to these stormwater facilities. 9. The following retaining wall materials are prohibited: smooth face, poured in place concrete (stamped or patterned is acceptable), masonry, railroad ties and timber.. 10. Grading must include a swale at the top of the retaining walls for drainage. 11. The topography shown must include elevation contours for Dogwood Road adjacent to the proposed lots. The centerline gradients must be labeled. 12. At the time of final plat, the Dogwood Road improvements assessment must be paid or reassessed. 13. Partial water and sewer hookup fees must be paid at the time of final plat. 14. The driveway slope from Lot 4, Block 1 shall be revised to a grade between 0.5% and 10 %. Water Resources The filtration feature shall be constructed prior to the construction of any houses. It shall be called out on both grading plans that steps shall be taken to prevent compaction and siltation of the area resulting from construction activities on the site Mr. Todd Simning June 18, 2014 Page 3 2. The underdrain shall be smooth walled and have a tracer wire. The feature shall be kept offline until the vegetation has been established. Plans and the SWPPP must include this information and describe the methodology to be used to achieve this. 4. A detailed planting plan and schedule must be developed and included in plan set for approval. 5. The in -situ soils shall be ripped to a depth of 12 inches prior placing the amended filtration soils. 6. The developer shall be responsible for the construction of the biofiltration feature and shall make assurances that the plant materials, mulch and side slopes into biofiltration feature are maintained throughout the life of the feature. This is most typically accomplished though a Homeowners Association. The city will be responsible for maintenance of the underdrain, outlet pipe and inlet protection device at the curb. An operations and maintenance manual shall be developed describing how the feature will be maintained and by who will be responsible for the maintenance. This shall be recorded against the property. The SWPPP as well as the erosion control plan must indicate how the conveyance from the wetland will be permanently stabilized. 8. A detail of the rock checks must be included. This shall be consistent with Technical Supplement 14C to Part 654 of the National Engineering Handbook. 9. Surface water management connection fee of $14,066.50 will be due with the final plat. 10. The plans must meet all requirements set forth by other agencies with authority over the site. The applicant is responsible to procure all necessary approvals and permissions. This includes, among others, the MN Pollution Control Agency and the Minnehaha Creek Watershed District. 11. The Construction Sequencing section of the SWPPP must discuss the following elements: a. Channel grading and stabilization; b. Timing of the curb cuts; c. Installation of the rain guardian. 12. The SWPPP must indicate who is responsible for the maintenance of the permanent stormwater management practices on the site and a maintenance plan to assure performance of the practice as listed in Part IIIA 5 k. The developer must assume responsibility of the maintenance initially. This can transfer with property ownership but must be disclosed to any subsequent owner in writing. Mr. Todd Simning June 18, 2014 Page 4 Plannine Lots 1 through 4 are the only lots included in the land use map amendment from Public /Semi- Public to Residential Low Density. 2. Lots 1 through 4 are the only lots included in the rezoning from Office Institutional District to Single - Family Residential. Two signed mylar copies of the final plat shall be submitted to our office for signatures. One 1 " =200' scale mylar reduction of the final plat and one 1 " =200' scale paper reduction of the final plat with just street names and lot and block numbers shall be submitted. The executed development contract and the required fees ($52,347.70) and security ($176,227.42) specified therein shall be submitted to the City. The executed preservation easement and declaration, operation and maintenance of rain garden shall be submitted to the city. In addition, a digital copy in .dxf format and a digital copy in .tif fonnat (pdf compatible) in Carver County coordinates of the final plat shall be submitted. The City will submit all the necessary documents to Carver County for recording. Processing of the final plat documents prior to recording usually takes approximately two weeks upon receipt by the city. All current year taxes must be paid in full and any delinquent property taxes or green acres taxes must also be paid. Once everything is submitted, please contact Steve Ferraro at 952- 227 -1166 to coordinate the preconstruction meeting. Should you have any questions, please contact me at (952) 227 -1131 or by email at bgenerousna ci.chanhassen.mn.us. Sinc , Robert Generous, AICP Senior Planner Enclosure ec: Kate Aanenson, Community Development Director Stephanie Bartels, Project Engineer Steve Ferraro, Construction Manager /Engineering Tech IV Todd Gerhardt, City Manager Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official c: Westwood Church \ \cfs5 \cfs5\shared_ data \plan\2014 planning cases\2014 -06 arbor cove \final plat documents \approval leamdoc