Loading...
DRAFT Sample of Operations & Maintenance Plan and Inspection ChecklistsSample: Operations & Maintenance Plan and Inspection Checklists Prepared by: Carver County Water Management Organization in cooperation with Carver Soil and Water Conservation district C t CARVER COUNTY Carver County ,, � w Water Management Organization ;JIRV E R Operations and Maintenance Plan Carver county Courthouse Porous Paving + Biofiltration Legal Description: Lot 1, Block 1, and Outlot A. COURTHOUSE CAMPUS TWO. PID# 301490010 Contact: Kevin Maas (952) - 361 -1557 600 E 4th St Chaska, MN 55318 Project Description /: This project was installed during the fall of 2008 as a demonstration site for the Purpose use of porous paving and planted filtration trench within Carver County, The project serves to treat the stormwater prior to entering into the adjacent East Chaska Creek. The approximate drainage area is - 37,000 sq ft. Maintenance is necessary to the functionality and long -term success of the project. Features include: • Porous bituminous pavement w/ underdrain • Planted Biofiltration w/ underdrain All underdrains are connected to adjacent catch basin w/ manhole. Inspections of the connection into the catch basin will indicate that the underdrain is functioning. Maintenance Tasks — Courthouse Porous Paving + Biofiltration Timeline Task Personnel February ➢ Schedule porous pavement sweeper for April, July and ➢ Facilities Dept. Manager October April ➢ Remove dead plant material (if not completed in the fall) ➢ Facilities Dept. Staff ➢ Sweep porous pavement with a regenerative air ➢ Contracted Services & Facilities Dept. Manager vacuum sweeper ➢ Replace and dead plants w/ new plugs or transplants May ➢ Add mulch swale as needed ➢ Facilities Dept. Staff ➢ Mow grass buffer around swale ➢ Contracted Services & Facilities Dept. Manager June ➢ Mow grass buffer around swale ➢ Contracted Services & Facilities Dept. Manager ➢ Weed swale ➢ Facilities Dept. Staff (Planning & Water Mngt staff are available to assist with plant identification) July ➢ Weed swale ➢ Facilities Dept. Staff (PWM staff available to assist) ➢ Mow grass buffer around swaie ➢ Contracted Services & Facilities Dept. Manager ➢ Sweep porous pavement with a regenerative air ➢ Contracted Services & Facilities Dept. Manager vacuum sweeper August ➢ Mow grass buffer around swale ➢ Contracted Services & Facilities Dept. Manager ➢ Weed swale ➢ Facilities Dept. Staff (PWM staff are available to assist with plant identification) September ➢ Mow grass buffer around swale ➢ Contracted Services & Facilities Dept. Manager October ➢ Mowing & fixing any erosion /gullying formed during ➢ Facilities Dept. Staff season Early ➢ Remove dead plant material (could also wait until ➢ Facilities Dept. Staff November spring) ➢ Contracted Services & Facilities Dept. Manager ➢ Sweep porous pavement with a regenerative air vacuum sweeper Additional No sand (de- icing) is to be used at any time on or around the porous pavement. Salt use for de -icing should follow the guidelines laid out by the Minnesota Pollution Control Agency. Site aerial N C .0 C7 m N 7 O CL yW 6 FZ N wp tll W 42 p0pN WV f� 12 -P ' � f - I t I /-BINMINOUS PAVEMENT 13 15 / C5.1 C5.7 18.1 I, EXISTING SUBGRAOE 1 INFILTRATION BASIN PLANTINGS Common Name Scientific Name Y Aster novae- angliae Iris versicolor LLB" Prairie Bla ngs ar Liatris pychnostachya RF Black Eyed Susan Rudbeckia hirta SOD QTY. 74 76 28 25 \ �-Ipl 2 -6- DIAMETER DRAINTRES -REFER TO DRAWINGS FOR LOCATION .J ANOINVERT 1 - - -- '. - �- PRESCRIBED TOPSOIL MEDIUM F . p Ny C$.1 C5.1 BITUMINOUS PAVEMENT -� 4'41" $00 SECTION - PROVIDE EOG ER TO SPECIFICATIONS REFER TO SHEET 1.1.1 FOR _ ARTING / SEEDING THIS AREA EROSION CONTROL 1 __ BLANKET T y� ISO' l \ �-Ipl 2 -6- DIAMETER DRAINTRES -REFER TO DRAWINGS FOR LOCATION .J ANOINVERT 1 - - -- '. - �- PRESCRIBED TOPSOIL MEDIUM F . p Ny Flower Leaf Juvenile RF C ro T w V Biofiltration (Rain Garden) Maintenance Inspection Checklist Inspector: Date: Time: Weather: Rainfall over previous 2 -3 days? Reading from closest NOAA reporting station: " Rain Garden Location: Mark items in the table below using the following key: X Needs immediate attention Not Applicable ✓ Okay ? Clarification Required. Rain Garden Components: Items Inspected Checked Maintenance Needed Inspection Frequency DEBRIS CLEANOUT Y N Y N M 1. Rain gardens and contributing areas clean of debris 2. No dumping of yard wastes into rain garden 3. Litter (trash, debris, etc.) have been removed VEGETATION M 4. No evidence of erosion 5. Is plant composition still according to approved plans 6. No placement of inappropriate plants DEWATERING AND SEDIMENTATION A,AMS 7. Rain garden dewaters between storms 8. No evidence of standing water 9. No evidence of surface clogging 10. Sediments should not be greater than 20% of Swale design depth OUTLETS /OVERFLOW SPILLWAY A, AMS 11. Good condition, no need for repair 12. No evidence of erosion 13. No evidence of any blockages INTEGRITY OF BIOFILTER M 14. Raingarden has not been blocked or filled inappropriately 15. Mulch layer is still in place (depth of at least 3 ") 16. Noxious plants or weeds removed Inspection Frequency Key A= Annual, M= Monthly, AMS= After Major Storm Comments: OVERALL CONDITION OF FACILITY: In accordance with approved design plans? Y / N In accordance with As Built plans? Y / N Dimension on as built: Field Verified Dimension: Maintenance required as detailed above? Y / N Compliance with other consent conditions? Y / N Comments: Dates by which maintenance must be completed: Dates by which outstanding information as per consent conditions is required by: : Inspector's signature: Consent Holder/Engineer/Agent's Consent Holder/Engineer /Agent's name Porous Paving Maintenance Inspection Checklist Inspector: Date: Time: Weather: Rainfall over previous 2 -3 days? Site Conditions: Mark items in the table below using the following key: X Needs immediate attention — Not Applicable ✓ Okay ? Clarification Required. Porous Pnvinv C:mmnanentae Items Inspected Checked Maintenane e Needed Inspection Frequency PAVEMENT SURFACE Y N Y N M 1. Signs of clogging (e.. standing water)? 2. Debris accumulation (mulch, sticks, trash)? 3. Sediment accumulation? 4. Standing water present? ADJACENT AREAS A, AMS 5. Erosion from underdrain outlet? 6. Exposed soil in areas discharging to porous — paving? 7. Is porous pavement adversely affected by any adjacent site feature? DEWATERING A, AMS 8. Does runoff discharge from pavement area within 48hrs? OUTLETS /OVERFLOW A, AMS 9. Is outlet for storm sewer system free from debris and in good working order? OTHER 10. Have there been complaints? A 11. Public Hazard noted? 12. Other: Inspection Frequency Key A= Annual, M= Monthly, AMS= After Major Storm Comments: OVERALL CONDITION OF FACILITY: In accordance with approved design plans? Y / N In accordance with As -Built plans? Y / N Dimension on as built: Y / N Field Verified Dimension: Y / N Maintenance required as detailed above? Y / N Compliance with other consent conditions? Y / N Dates by which maintenance must be completed: Dates by which outstanding information as per consent conditions is required by:: Inspector's Consent Holder/Engineer /Agent's Consent Holder/Engineer /Agent's name