D-2. Chanhassen Specialty GroceryCITY OF CHANHASSEN
PROPOSED MOTION:
PC DATE: October 7, 2014
CC DATE: October 27, 2014
REVIEW DEADLINE: November 4, 2014
CASE #: 2014 -29
BY: AF, RG, TH, TJ, ML, JM, JS
"The Chanhassen Planning Commission recommends that City Council approve the preliminary
plat for Villages on the Ponds 11' Addition and approve the site plan for Chanhassen Specialty
Grocery with a variance to the sign letter size on the north and west building elevations subject to
the conditions of the staff report, and adopts the Findings of Fact and Recommendation."
SUMMARY OF REQUEST: The developer is requesting preliminary plat approval to create
two lots and one Outlot and Site Plan Review for a 14,000 square -foot, one -story specialty grocery
store with a variance from the Planned Unit Development sign letter height to permit letters in
excess of 30 inches. 1540
LOCATION: Northwest Corner of Lake Drive and Main
Street
Outlot B, Villages on the Ponds 4' Addition
(PID 25- 8460030)
APPLICANT: Venture Pass Partners, LLC
19620 Waterford Court
Shorewood, MN 55331
(612) 801 -4313
rrauwerdink @venturepass.net
Owner: Northcott Company
250 Lake Drive East
Chanhassen, MN 55317
(952) 294 -5215
bschwen @northcotthospitality.com
PRESENT ZONING: Planned Unit Development (PUD)
(Villages on the Ponds)
2020 LAND USE PLAN
ACREAGE: 2.71 acres
Mixed Use
DENSITY: F.A.R. 0.29
Planning Commission
Villages on the Ponds I 11h Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 2 of 19
LEVEL OF CITY DISCRETION IN DECISION- MAHING:
The City's discretion in approving or denying a preliminary plat is limited to whether or not the
proposed plat meets the standards outlined in the Subdivision Regulations and Zoning
Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a
quasi-judicial decision.
The City's discretion in approving or denying a site plan is limited to whether or not the
proposed project complies with Zoning Ordinance requirements. If it meets these standards, the
City must then approve the site plan. This is a quasi-judicial decision.
The City's discretion in approving or denying a variance is limited to whether or not the
proposed project meets the standards in the Zoning Ordinance for a variance. The City has a
relatively high level of discretion with a variance because the applicant is seeking a deviation
from established standards. This is a quasi - judicial decision.
Notice of this public hearing has been mailed to all property owners within 500 feet.
PROPOSAL /SUMMARY
The development is located within Villages on the Ponds, a mixed -use development. The site
was rough graded as part of the overall development. The property is located within Sector I of
the Villages on the Ponds development. The applicant is requesting subdivision approval to
create two lots and one outlot and site plan approval. The proposed development consists of a
one -story, 14,000 square -foot retail building. A second building site is being platted along Lake
Drive, which will be developed in the future. The primary parking for the project is located in
the interior of the lot. Some on- street parking is also available along Lake Drive, Main Street
and Pond Promenade, which are all private streets. Within Villages on the Ponds there are
existing cross - access and cross - parking agreements that permit a portion of the parking to be
located off site. Parking requirements in excess of those specifically provided on site are through
shared parking.
The primary building material consists of dark brown and tan rock face block, single score
burnished block light brown accent bands with brown and reddish brown brick in columns and at
the entrance. Black awnings are proposed over individual windows. A white E.LF.S. cornice is
incorporated at the top of the walls. The roof is a lighter brown standing seam metal.
The proposed development is consistent with the comprehensive plan and the project's
development design standards. Staff is recommending approval of the project subject to the
conditions of this report.
Planning Commission
Villages on the Ponds I I' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 3 of 19
APPLICABLE REGULATIONS
Chapter 18, Subdivision
Chapter 20, Article II, Division 6, Site Plan
Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial and Office -
Institutional Development
Villages on the Ponds Development Design Standards
BACKGROUND
On December 9, 2002 the Chanhassen City Council approved Site Plan #2002 -9, plans prepared
by Truman Howell Architects and Associates, Inc., dated October 18, 2002, for a 70,873 square -
foot, three -story building consisting of street level commercial and upper level hotel rooms (not
constructed); and
A variance for the use of more than 15 percent EIFS on the building based upon the finding that
it is consistent with other buildings approved in the area (void since not used); and
A variance for signage in excess of 20 feet in height on the building based on the fact that it is
consistent with the approval given to the Community Bank of Chanhassen building (void since
not used).
On June 28, 1999, the City Council approved PUD 95 -2 granting Final Plat approval for Villages on
the Ponds Fourth Addition, creating one lot and two outlots. The lot is for the Peddler Cyclery,
a.k.a., Bokoo Bikes.
On September 23, 1996, the City Council approved PUD 95 -2, Villages on the Ponds, including a
Comprehensive Land Use Plan amendment from Office1ndustrial, Institutional, Residential
Medium Density, Residential Low Density to Mixed Use - Commercial, High Density Residential,
Institutional and Office; Preliminary planned unit development for up to 291,000 square feet of
commercial/office buildings, 100,000 square feet of institutional buildings, and 322 dwelling units;
Rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat
dated "Received September 19, 1996" for two lots and ten outlets and public right -of -way.
SUBDIVISION
The developer is proposing subdividing the property into two lots and one outlot. The initial phase
will only plat one lot for the specialty grocery building. Outlot A is for Pond Promenade. Outlet B
will be final platted in the future as a lot for another commercial building.
Planning Commission
Villages on the Ponds l I' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 4 of 19
.. .. ...
� '•iii.i. b,,;6: i:.. T :: i•ii:::
�:: � ,y a
� i xn�a . } . I r _
L ^TI
_
C s
R F
�.: E 7I.r1.'f Lull
,TH J
�f. 1 `"•`ail j �! ILf F � �! 'SHE rm w.$`
PRELIMINARY PLAT
Fees
The fees collected with the final plat are:
Surface Water Management fee
Park Dedication fee
GIS fee: $25 (plat) + ($10 /parcel x 3 parcels) _ $55
City water (WAC), City sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be
collected with the building permit and will be calculated based on the uses within the building.
The Surface Water Utility Charges are calculated based upon land use type and land area.
Credits may be applied based upon storm water practices being implemented. The following
table illustrates the Storm Water Utility Charges associated with the development of this parcel.
Area
Rate
Total
Water Quality
2.71 ac
$22,060/ac
$59,848.78
Water Quantity
2.71 ac
$8,560/ac
$23,223.28
Treatment BMP Credit
1.80 ac
$22,060(0.5)/ac
($19,854.00)
$63,218.06
Planning Commission
Villages on the Ponds l la' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 5of19
Outlot B will be developed with thirteen (13) parking stalls and a drive lane as well as storm
water improvements necessary for the development of the parcel. Because of these
improvements it will not be considered undeveloped and will be assessed a storm water
connection charge and will be assessed the quarterly surface water management fee at the rate
for commercial properties. If the applicant wishes to avoid these assessments Outlot B must be
reconfigured such that it contains no improvements and remains an undeveloped lot. The
assessments will then be deferred until such time as outlot B is developed.
PARKS
This property is located within the community park service area for Lake Susan Community Park
and the neighborhood park service area for Rice Marsh Lake Neighborhood Park. Employees and
visitors to the specialty grocery store will have convenient access to these publicly - maintained park
and recreation facilities. Lake Susan Park is 33 acres in size and features large playgrounds,
basketball court, picnic shelter, tennis courts, archery range, public water access, fishing pier and a
ball field. Ample off - street parking is available at the park.
Rice Marsh Lake Park is four acres in size and features a playground, ball field, basketball court,
volleyball court and a small picnic shelter. Off - street parking is available. No additional parkland
acquisition is being recommended as a condition of this subdivision.
TRAILS
The subject site has convenient access to the public trails along Great Plains Boulevard, the three -
mile Rice Marsh Lake Trail Loop and the Lakeside trail route to Lake Susan Park. No additional
trail construction is being recommended as a condition of this subdivision.
PARK AND TRAIL CONDITIONS OF APPROVAL
Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as
a condition of approval for Outlot B, Villages on the Ponds 0 Addition. The park fees will be
collected in full at the rate in force upon final plat submission and approval. Based upon the current
commercial park fee rate of $12,500 per acre, the total park fees would be $33,875.
UTILITIES
Public sanitary sewer and water main are within streets
surrounding the proposed development. The plat must
be revised to include a 20 -foot drainage and utility
easement centered over the public utilities within
Outlot A.
Planning Commission
Villages on the Ponds 11`h Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 6of19
The developer proposes to wet tap a 6 -inch diameter water service to the existing water main and
extend a sanitary sewer service from an existing sanitary sewer manhole northwest of the
building on Lot 1. These service connections will be inspected by the Building Department in
conjunction with the building/plumbing permit.
COMPLIANCE TABLE
GENERAL SITE PLAN /ARCHITECTURE
The applicant is proposing a one - story, 14,000 square -foot retail building.
Area (s . ft. )
Frontage ft.
Depth (ft. )
Notes
PUD
15,000
100
100
CBD District
Lot 1
48,595
130
354
1.12 acres
Outlot A
39,943
NA
NA
Pond Promenade, 0.92 acre
Outlot B
29,636
109
319
Future Development, 0.68 acre
118,174
2.71 acres
GENERAL SITE PLAN /ARCHITECTURE
The applicant is proposing a one - story, 14,000 square -foot retail building.
I
�
/
0
I
I rd^
6 '
I
i a.
wa
s U 31 -1- 1,� T
- -
=L11
,
+
- - - --°
+
+
LAKE DRIVE
Planning Commission
Villages on the Ponds 11' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 7 of 19
ARCHITECTURAL COMPLIANCE
CHANHASSEN SPECIALTY rxo EcTTenM
GROCERY n,
rll_ cM CVVAMo
Planning Commission
Villages on the Ponds l lth Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 8 of 19
Size Portion Placement
The building entrance is oriented to the west parking area and consists of a five -foot projected
tower structure of reddish -brown utility brick. Had his been a multi- tenant building, store
frontages would have been required on the Main Street elevation. The building elevations are
highly articulated with numerous openings, changes in materials, projections and recesses in the
building fagade and incorporation of various window treatments and styles.
Material and Detail and Color
The primary building material consists of dark brown and tan rock face block, single score
burnished, light brown accent bands with brown and reddish brown brick in columns and at the
entrance. Black awnings are proposed over individual windows. A white E.I.F.S. cornice is
incorporated at the top of the walls. The roof is a lighter brown standing seam metal.
Height and Roof Design
The tallest point of the entrance roof is 32 feet 10 inches. The top of wall is 25 feet 4 inches
which is topped with a dark brown aluminum cap flashing. The roof is a lighter brown standing
seam metal. Mechanical equipment is screened through placement and parapet walls.
Facade Transparency
Transparent windows and doors are located on the north and west building elevations. All other
areas shall include landscaping material and architectural detailing and articulation. For portions
of buildings with a use or function that does not readily allow windows, e.g., cooler or freezer
areas, mechanical rooms, security areas, storage areas or warehouse or manufacturing space in
commercial or industrial buildings, the fenestration standards may be reduced. However, the
architecture detailing must be provided by the use of upper level windows, the use of spandrel
glass or architectural detailing which provides arches, patterning, recesses and shadowing that
provide aesthetic interest. Landscaping shall be provided to the south of the building to provide
some relief to the blank expanse of wall and screen the loading dock area.
Site Furnishing
The applicant is providing bicycle racks in the northwest corner of the building and an eco mesh
green wall on the east side of the building. The developer shall consider a design change to the
ECO mesh green wall to be slightly curved to help break the monotony of the long, straight wall
along the street.
As part of the hardscape design for Villages on the Ponds, Main Street was to have two benches
east of the building. The applicant should also consider providing additional benches on site and
along Pond Promenade. The applicant shall provide benches similar to others provided
throughout Villages on the Ponds.
Planning Commission
Villages on the Ponds 11th Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 9 of 19
Lighting
The plan calls for the removal of the street lights on the East side. However, those lights have to
be preserved and operational when site construction is completed. The pedestrian component of
Villages on the Ponds incorporates the acorn -style lighting along Main Street and Lake Drive.
Parking area lighting is provided by 27.5 -foot tall, shoe -box style light fixtures. All fixtures
must be shielded, high - pressure sodium or light- emitting diode (LED), with a total cutoff angle
equal to or less than 90 degrees. Three styles of wall - mounted lighting fixtures are proposed
around the building. All wall - mounted light fixtures shall be shielded with a total cutoff angle
equal to or less than 90 degrees.
Loading Areas, Refuse Area, etc.
A trash and pallet enclosure is provided to the south of the building and consists of the same
material as proposed for the building. The loading dock is located along the south wall behind
the enclosure and shall be screened with additional landscape plantings.
Lot Frontage and Parking location
The site has frontage on three streets. Parking is primarily provided to the west of the building
with 67 spaces on site and 65 in Pond Promenade. Ten more spaces are located along Main
Street and ten on Lake Drive.
Signage
Wall signage is permitted on the north, east and west elevations of the building. One sign per
tenant is permitted on each of these elevations. While City Code would permit the signage
proposed by the developer, the PUD standards restrict the letters and logos to a maximum of 30
inches in height. A variance is being applied for to permit the 42 -inch letters shown on the exterior
elevations. A separate sign permit is required for each sign.
ACCESS
Pedestrian access is provided from Pond Promenade. With the future development of the lot
along Lake Drive, pedestrian access will be provided from the south and west.
The site lies within the Villages on the Pond Planned Unit Development located south of Trunk
Highway 5 between County Road 101 and Great Plains Boulevard. The streets within the
Villages development — Pond Promenade, Lake Drive and Main Street — are privately owned and
maintained. The site is on the northwest corner of Lake Drive and Main Street and will be
accessed from the north via Pond Promenade and from the west via the existing north -south
(unnamed) street between Lake Drive and Pond Promenade.
Planning Commission
Villages on the Ponds 11th Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 10 of 19
The developer proposes improvements along the private streets north and west of the site,
specifically installation of 90- degree parking stalls that will be paved and will have curb and
gutter. The western portion of Pond Promenade shall be at least 26 feet wide to meet the City's
minimum requirement for a private street serving two -way traffic.
Delivery access for the site will be from the access at Pond Promenade. The developer's
engineer submitted trunk turning movements to illustrate how a tractor - trailer unit would access
the delivery dock on the south side of the building. The developer's engineer is encouraged to
evaluate the turning movements to determine if the wheels would conflict with the curb line, and
make the necessary adjustments to the plan.
The plans indicate a potential layout on Outlot B for future development. Cross - access and /or
cross - parking agreements required for any future development would be addressed at the time of
final plat for Outlot B.
"No Parking Fire Lane" signs and yellow - painted curbing will be required. Contact Fire Marshal
for specifics.
GRADING
Site Characteristics
The site is an existing unimproved lot within the Villages on the Pond plat. There is currently an
area that acts to hold water on site. This area is a remnant from a previous attempt to excavate for
improvements on the site that was never completed. This area does not meet the criteria to be
classified as a jurisdictional wetland nor was intended for the purpose of storm water management.
The plan proposes to fill this area. A dewatering plan will be required for draining this pond. This
dewatering plan must assure that sediment -laden waters are not discharged from the site. It is
highly recommended that this area be used as a temporary sediment basin during site development.
The site has a gradual decrease in elevation from north to south and from east to west toward the
pond area. There are no bluffs or steep slopes located on the property that must be protected during
site development. The property is 1,200 feet from Lake Susan and 1,400 feet from Rice Marsh Lake
at the closest points. This is outside of the 1,000 -foot shoreland zone.
Soils on the site consist of Lester - Kilkenny loams as identified in the United States Department of
Agriculture Web Soil Survey. With the exception of an area approximately 40 feet in width
adjacent to Lake Drive, the soils on the site fall into the B hydrologic soils group and would be
conducive to infiltration. Approximately half the site does have a seasonally high water table that
could be restrictive to infiltration.
Planning Commission
Villages on the Ponds 11`h Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 11 of 19
Grading: Drainage
The site was mass graded when the surrounding
area was developed. The original plans for the site
included underground parking within the area now
shown as Outlot B. The underground parking was
sub -cut with the original site grading and has since
filled with surface water runoff. The developer
proposes to fill the majority of this area, with the
eastern portion of Outlot B being utilized for a sand
filter basin to treat storm water runoff from the
proposed development. A new storm sewer
manhole will be installed to connect the discharge
pipe from the sand filter basin to the existing storm
sewer within Lake Drive. This connection will be
inspected by the Building Department in
conjunction with the building/plumbing permit.
n
i
"._ s
I�.
The proposed design maintains the same overall drainage pattern with some minor alterations for
rate control and water quality treatment. The system will be private and will connect to a private
system internal to Villages on the Ponds before entering the public system at Main Street and
Great Plains Boulevard. The proposed drainage post development reduces runoff rates in the 2-
year, 10 -year and 100 -year return interval storm event conditions. This meets City requirements.
Grading: Erosion Prevention and Sediment Control
Because this will result in greater than one acre of new impervious, it must meet the
requirements set forth in the General Permit Authorization to Discharge Stormwater Associated
with Construction Activity Under the National Pollution Discharge Elimination System/State
Disposal System Program ( NPDES Construction Permit). As part of the NPDES the applicant
must develop or cause to be developed a Surface Water Pollution Prevention Plan ( SWPPP) with
all of the elements required under Part III of the permit. Section 18 -40 of Chanhassen city code
requires that the SWPPP be provided with the preliminary plat submittal. Section 19 -145 states
that this SWPPP must be a standalone document. The City will make available a checklist of the
required elements that can be used by the applicant to develop a SWPPP compliant with the
NPDES Construction Permit and Section 19 -145 of city code. The SWPPP should be a single
standalone document that assembles the required information in one place for ease of review,
inspection, maintenance, modification and assurance of compliance. City staff must have
reviewed and approved the SWPPP prior to the issuance of a grading permit or any other earth -
disturbing activities are allowed. This shall include, but not be limited to, installation of
perimeter BMPs, removal of vegetation, dewatering of the basin, removal of any structure or
improved surface as well as grading, excavating or placement of fill materials.
Planning Commission
Villages on the Ponds 11th Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 12 of 19
During construction, every reasonable effort must be made to protect the filtration area from
construction impacts. Any dewatering of the pond must have a dewatering plan, approved by the
city, prior to executing. This plan must assure that no sediment -laden water leaves the site and
shall be incorporated into the SWPPP. It is highly recommended that the pond be used as a
temporary sediment basin during site development.
Stormwater Management
This site will exceed the one (1) acre threshold triggering the National Pollution Discharge
Elimination System ( NPDES) permit. The project will need to meet the requirements of the
NPDES permits including the Municipal Separate Storm Sewer System (MS4) permit and the
General Permit Authorization to Discharge Stormwater Associated with Constriction Activity
Under the National Pollution Discharge Elimination System/State Disposal System Program
( NPDES Constriction Permit). In addition to erosion prevention and sediment control practices,
this includes permanent stormwater management as discussed in Part III.D of the NPDES
Constriction Permit and post - construction stormwater management as discussed in Part IILD.S of
the MS4 permit.
The NPDES permit program requires that the first inch of runoff from impervious surfaces is
retained on site. If infiltration is prohibited (see Construction Permit Part III.D.I j), other methods
of volume reduction should be evaluated. Volume reduction must occur to the "maximum extent
practicable ". In either case, the equivalent water quality volume must be treated. The applicant is
proposing a filtration basin in the southeast corner of the property.
The NPDES Construction Permit requires that "where a project's ultimate development replaces
vegetation... with one (1) or more acres of cumulative impervious surface, the Pennitee(s) must
design the project so the water quality volume of one (1) inch of runoff from the new impervious
surfaces ... is retained on site (i.e. infiltration or other volume reduction practices) and not discharged
to a surface water. "' When the site constraints are such that infiltration is prohibited as listed in Part
III.D.I J of the NPDES Construction Permit, "the Permitee shall consider other methods of volume
reduction and the water quality volume ... must be treated prior to the discharge of stormwater to
surface waters."
The applicant is providing rate control and water quality improvements through the installation of
an EcoStorm structure and a sand filtration system. The applicant is stating that volume reduction is
not possible on site due to the presence of soils in the D hydrologic group. However, they have
provided no evidence to support this assertion. The USDA has mapped much of the soil in the area
as belonging in the B hydrologic group which would be well suited to infiltration. It might be
possible to provide storage below the outlet for the sand filtration system to provide a partial
infiltration system. It may also be possible to utilize this feature to capture storm water for reuse on
landscape features. Minimal Impact Design Standards worldng group and others have developed a
number of practices beyond infiltration that may be used for volume reduction. The applicant shall
' Part III of General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge
Elimination System /State Disposal Program
Planning Commission
Villages on the Ponds l la' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 13 of 19
provide an evaluation of other methods of volume reduction to justify any permanent storm water
management practice employed. Even if there are limitations to volume reduction, the applicant
must still attempt to reduce volume to the maximum extent practicable and then treat an equivalent
water quality volume.
The applicant is stating the water quality requirements are met through the installation of these best
management practices. The applicant must provide modeling showing the proposed practices will
meet section 19 -144 (a)(3) of Chanhassen City code.
(3) Newly- constructed or modified detention basins shall provide storage volume below the
outlet (dead storage) to allow for water quality treatment in accordance with the following,
whichever is most restrictive:
a. Water quality features meeting the MPCA NPDES construction permit for permanent
stormwater management systems;
b. Water quality treatment consistent with NURP criteria (90 percent removal of TSS and
60 percent removal of TP for a standard NURP particle size distribution); and/or...
The applicant must provide water quality modeling showing that the water quality treatment
conditions are met for the required water quality volume. Acceptable modeling software are listed
in Section 19- 144(a)(1)c. of Chanhassen City Code.
Long -term maintenance of the facilities shall be privately owned and maintained. The City is
required under their MS4 permit to "provide for the establishment of legal mechanisms between the
permittee and owners or operators responsible for the long -term maintenance of structural
stormwater BMPs not owned or operated by the permitee..."
This system is considered private but assurances need to be put in place to assure that Chanhassen,
as a permittee under the MS4 can;
a) Conduct inspections, perform maintenance and assess costs when the permittee determines
that the owner and/or operator of the structureal stormwater BMP has not conducted
maintenance.
b) Include conditions that are designed to preserve the permittee's right to ensure maintenance
responsibility ... when those responsibilities are legally transferred to another parry.
c) Include conditions that are designed to protect/preserve structural stormwater BMPs and site
features that are implemented to comply with Part III.D.5.a(2). If site configurations or
structural stormwater BMPs change, causing decreased structural stormwater BMP
effectiveness, new or improved structural stormwater BMPs must be implemented to ensure
the conditions for post - construction stormwater management in Part III.D.5.a(2) continue to
be met
The applicant must record a drainage and utility easement over the Ecostorm and the sand filter
basin. This recorded easement must specifically address who is responsible to own and maintain
the system and must meet the requirements spelled out in Part III.D.5.(5) of the General Permit
Authorization to Discharge Stormwater Associated with Small Municipal Separate Storm Sewer
Planning Commission
Villages on the Ponds l Ph Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 14 of 19
Systems Under the National Pollution Discharge Elimination System/State Disposal System
(NPDES /SDS) Permit Program.
LANDSCAPING
Minimum requirements for landscaping at the specialty grocery store include 1,944 square feet
of landscaped area around the parking lot, three landscape islands or peninsulas, seven trees for
the parking lot. The applicant's proposed as compared to the requirements for landscape area
and parking lot trees is shown in the following table.
Applicant meets minimum
requirements for trees and interior
landscaping in the parking lot area.
To be consistent with landscaping
expectations within Villages on the
Ponds, staff recommends that
additional trees be planted within the
larger peninsulas located at the
northern entrance /exit drive, at the
northwest comer of the site in Pond
Promenade and at the corner of Lake
Drive and Pond Promenade.
The landscape plan shows small, but
multiple, inconsistencies. Staff
recommends that a corrected
landscape plan be supplied to the city prior to construction.
MISCELLANEOUS
µI
i7rc
The buildings are required to have automatic fire extinguishing systems. Building plans must be
prepared and signed by design professionals licensed in the State of Minnesota. Detailed
occupancy- related requirements will be addressed when complete building plans are submitted.
The owner and or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
Required
Proposed
Vehicular use landscape area
1,944 s . ft.
>1,944 s . ft.
Trees /parking lot
7 trees
7 trees
Islands or peninsulas /parking lot
3 islands /peninsulas
4 islands /peninsulas
Applicant meets minimum
requirements for trees and interior
landscaping in the parking lot area.
To be consistent with landscaping
expectations within Villages on the
Ponds, staff recommends that
additional trees be planted within the
larger peninsulas located at the
northern entrance /exit drive, at the
northwest comer of the site in Pond
Promenade and at the corner of Lake
Drive and Pond Promenade.
The landscape plan shows small, but
multiple, inconsistencies. Staff
recommends that a corrected
landscape plan be supplied to the city prior to construction.
MISCELLANEOUS
µI
i7rc
The buildings are required to have automatic fire extinguishing systems. Building plans must be
prepared and signed by design professionals licensed in the State of Minnesota. Detailed
occupancy- related requirements will be addressed when complete building plans are submitted.
The owner and or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
Planning Commission
Villages on the Ponds I 11h Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 15 of 19
COMPLIANCE TABLE
PUD Chanhassen Specialty Grocery (14,000 sf)
Building Height 3 stories 1 story
40 feet 29.5 feet
Building Setback N - 0' E - 0' N-5' E - 5' 3 %"
W -0' S -0' W -218' 5 -15'
Parking Stalls 70 stalls 152 stalls #
(Retail 1/200 square feet — 14,000/200 = 70 spaces (# 67 spaces on -site, 10 spaces on Main
Street, 10 spaces on Lake Drive, 65 spaces on Pond Promenade.
Parking Setback
Hard Surface Coverage
Lot Area
N- 0'E -0'
W- 0'S -0'
70%
15,000 square feet
N -0'E -142'
W- 0'S -0'
84 %#
48,595 sq. ft. (1.12 acres)
# Hard surface coverage must average 70 percent over the entire development. Individual lots
may exceed 70 percent site coverage.
VARIANCE
The applicant is requesting a variance from the sign standards in Villages on the Ponds which
limits letter height to 30 inches so that they may use 42 -inch letters. While City Code would
permit the signage proposed by the developer, the PUD standards restrict the letters and logos to a
maximum of 30 inches in height.
The PUD standards were established in 1996 when the concept for the development was a compact,
urban village with multi- storied buildings along both sides of the street. In such an environment,
signage size could be reduced because views would be limited to the street immediately adjacent to
the property. Reduced letter size is adequate in a pedestrian-type environment. The applicant is
proposing signage that will be visible from Highway 5 and Market Boulevard.
Staff is recommending approval of the variance to permit the 42 -inch letters on the north and
west building elevations only; however, larger signage is not necessary on the east elevation
because it is a pedestrian- oriented, compact urban design. It should be noted that the sign will
still comply with the City sign ordinance.
Planning Commission
Villages on the Ponds 11`n Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 16 of 19
RECOMMENDATION
Staff recommends that the Planning Commission approve the Villages on the Ponds 1111'
Addition and Chanhassen Specialty Grocery subject to the following conditions and adoption of
the attached Findings of Fact and Recommendation:
Subdivision
Engineering:
1. The plat must be revised to include a 20 -foot drainage and utility easement centered over the
public utilities within Outlot A.
2. The fees collected with the final plat are:
a. Surface Water Management fee
b. Park Dedication fee
c. GIS fee: $25 (plat) + ($10 /parcel x 3 parcels) = $55
3. City water (WAC), City sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will
be collected with the building permit and will be calculated based on the uses within the
building.
Parks:
1. Park fees shall be collected in full at the rate in force upon final plat submission and approval.
Water Resources:
The applicant must provide adequate evidence that there is no area on the subject property
suitable for infiltration. The discussion must include the practicality of altering the site
layout.
2. The applicant must provide volume control to the maximum extent practicable and must
provide a discussion of the feasibility of other methods of volume reduction.
3. The applicant must provide water quality modeling, acceptable under Section 19- 144(a)(1)c.
of Chanhassen City Code, showing that the water quality treatment conditions are met for the
required water quality volume from all new impervious surfaces.
4. A comprehensive, stand -alone SWPPP document with all elements required by Part III of the
NPDES construction permit and Section 19 -145 of city code shall be prepared and submitted
to the City for review and comment before any earth - disturbing activities, including but not
limited to dewatering of the pond, removal of any existing surfaces or structures, and
removal of vegetation.
Planning Commission
Villages on the Ponds 11`" Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 17 of 19
5. Any dewatering of the pond must have a dewatering plan, approved by the city, prior to
executing. This plan must assure that no sediment -laden water leaves the site and shall be
incorporated into the SWPPP.
6. The applicant must comply with the requirements of all other jurisdictional agencies with
authority over the project area.
7. The applicant will be responsible for procurement of any permission required by any other
agencies with authority over the project.
Site Plan with Variance
Building:
1. The buildings are required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State of
Minnesota.
3. Detailed occupancy- related requirements will be addressed when complete building plans are
submitted.
4. The owner and or their representative shall meet with the hispections Division as soon as
possible to discuss plan review and permit procedures.
Engineering:
1. The western portion of Pond Promenade shall be at least 26 feet wide to meet the City's
minimum requirement for a private street serving two -way traffic.
Fire Marshal:
1. "No Parking Fire Lane" signs and yellow - painted curbing will be required. Contact Fire
Marshal for specifics.
Natural Resource Specialist:
1. The applicant shall install trees in the larger landscape peninsulas located along Pond
Promenade on the north and west sides of the lot.
2. The applicant shall re- submit a corrected landscape plan to the city prior to construction.
Planning Commission
Villages on the Ponds 11"' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 18 of 19
Planning:
1. The applicant shall enter into a site plan agreement with the City and provide the necessary
security to guarantee erosion control, site restoration and landscaping.
Install two benches east of the building on Main Street. The applicant should also consider
providing additional benches on site and along Pond Promenade. The applicant shall provide
benches similar to others used in Villages on the Ponds.
3. Change the design of the ECO mesh green wall to be slightly curved (in footprint) to help
break the monotony of the long, straight wall along the street.
4. The street/sidewalk lights along Main Street have to be preserved and operational when the
site construction is completed.
5. Additional landscaping shall be provided to the south of the building.
Water Resources:
The applicant must record a drainage and utility easement, or other equivalent protection as
agreed to by the city, over the Ecostorm and the sand filter basin. This recorded easement
must specifically address who is responsible to own and maintain the system and must meet
the requirements spelled out in Part III.D.5.(5) of the General Permit Authorization to
Discharge Stormwater Associated with Small Municipal Separate Storm Sewer Systems
Under the National Pollution Discharge Elimination System/State Disposal System
(NPDES /SDS) Permit Program.
2. Outlet B shall be included in the quarterly SWMP fees and in the Storm Water Connection
charge and shall be charged at the commercial rate unless left fully undeveloped. If left fully
undeveloped the connection charge shall be delayed until such a time as Outlot B is
developed and the quarterly fee shall be that of an undeveloped lot.
3. Surface Water Management connection charges are estimated to be $63,218.06. This
connection charge will be due at the time of final plat.
Planning Commission
Villages on the Ponds 11"' Addition/Chanhassen Specialty Grocery
Planning Case 2014 -29
October 7, 2014
Page 19 of 19
ATTACHMENTS
1. Findings of Fact and Decision.
2. Development Review Application.
3. Project Narrative.
4. Request for Variance Narrative.
5. Reduced Copy Final Plat.
6. Reduced Copy Existing Conditions.
7. Reduced Copy Preliminary Plat.
8. Reduced Copy Civil Site Plan.
9. Reduced Copy Grading Plan.
10. Reduced Copy Erosion Control Plan — Phase I.
11. Reduced Copy Erosion Control Plan — Phase 11.
12. Reduced Copy Utility Plan.
13. Reduced Copy Site Plan - Phase 1.
14. Reduced Copy Landscape Plan.
15. Reduced Copy Site Lighting.
16. Reduced Copy Floor Plan.
17. Reduced Copy Roof Plan.
18. Reduced Copy Exterior Elevations with landscaping.
19. Reduced Copy Exterior Elevations.
20. Reduced Copy Exterior Perspectives.
21. Memo from Scott Sobiech and Candice Kantor to Robert Generous dated 9/24/14.
22. Email from Vemelle Clayton to Bob Generous dated 9/17/14.
23. Public Hearing Notice and Mailing List.
gAplan\2014 planning cases\2014 -29 chanhassen specialty grocery\staff report specialty grocery.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
IN RE:
Application of Venture Pass Partners, LLC and Northcott Company for Subdivision and Site
Plan approval with a variance for signage.
On October 7, 2014, the Chanhassen Planning Commission met at its regularly scheduled
meeting to consider the application of Venture Pass Partners, LLC and Northcott Company for
preliminary plat and site plan approval with a variance for sign letter size. The Planning
Commission conducted a public hearing on the proposed subdivision preceded by published and
mailed notice. The Planning Commission heard testimony from all interested persons wishing to
speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development, PUD.
2. The property is guided in the Land Use Plan for Office/Industrial.
3. The legal description of the property is: Outlot B, Villages on the Ponds Fourth Addition.
4. The Subdivision Ordinance directs the Planning Commission to consider seven possible
adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding
them are:
a. The proposed subdivision is consistent with the zoning ordinance and meets the standards
of the Village on the Ponds Planned Unit Development;
b. The proposed subdivision is consistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan since the site is guided for mixed
use development which includes commercial or multi- family residential;
c. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water
drainage are suitable for the proposed development;
d. The proposed subdivision makes adequate provision for water supply, storm drainage,
sewage disposal, streets, erosion control and all other improvements required by this
chapter;
e. The proposed subdivision will not cause environmental damage;
f. The proposed subdivision will not conflict with easements of record; and
g. The proposed subdivision is not premature since adequate infrastructure is available. A
subdivision is premature if any of the following exists:
1) Lack of adequate storm water drainage.
2) Lack of adequate roads.
3) Lack of adequate sanitary sewer systems.
4) Lack of adequate off -site public improvements or support systems.
5. Site Plan. In evaluating a site plan and building plan, the city shall consider the
development's compliance with the following:
a) The proposed project is consistent with the elements and objectives of the city's
development guides, including the comprehensive plan, official road mapping, and other
plans that maybe adopted;
b) The proposed project is consistent with the Site Plan Review requirements of City Code;
c) The proposed project preserves the site in its natural state to the extent practicable by
minimizing tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
d) The proposed project creates a harmonious relationship of building and open space with
natural site features and with existing and future buildings having a visual relationship to
the development;
e) The proposed project creates a functional and harmonious design for structures and site
features, with special attention to the following:
1. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
2. The amount and location of open space and landscaping;
3. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
4. Vehicular and pedestrian circulation, including walkways, interior drives and parking
in terms of location and number of access points to the public streets, width of interior
drives and access points, general interior circulation, separation of pedestrian and
vehicular traffic and arrangement and amount of parking.
f) The proposed project protects adjacent and neighboring properties through reasonable
provision for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations which
may have substantial effects on neighboring land uses.
6. Section 20 -1253. Variances.
The city council, upon the recommendation of the planning commission, may grant a
variance from the requirements of this article where it is shown that by reason of topography
or other conditions, strict compliance with the requirements of this article would cause a
hardship; provided that a variance maybe granted only if the variance does not adversely
affect the spirit or intent of this article.
City code only regulates the total sign area permitted for signage, not the individual size of
letters within the sign. The PUD standards for Villages on the Ponds limit the height of
letters to 30 inches. These standards were established in 1996 and envisioned a multi- storied,
dense urban -style streetscape of buildings and uses. In such an environment, sign height
would be less important since views would be limited to along the adjacent street. The 30-
inch height limitation is viable in a pedestrian- oriented environment. However, changing
economic conditions and rimes have altered the type of development taking place and the
developer is trying to provide views for further distances including Highway 5 and Market
Boulevard. Limiting the size of the letter is a hardship in this instance.
7. The planning report #2014 -29 dated October 7, 2014, prepared by Robert Generous, et al, is
incorporated herein.
The Planning Commission recommends that the City Council approve the Preliminary
Plat (Villages on the Ponds Eleventh Addition) and site plan with a variance for Chanhassen
Specialty Grocery.
ADOPTED by the Chanhassen Planning Commission this 7a' day of October, 2014.
CHANHASSEN PLANNING COMMISSION
WN
Its Chairman
COMMUNITY DEVELOPMENT DEPARTMENT CITY OF CHANHASSEN
Planning Division — 7700 Market Boulevard
Mailing Address — P.O. Box 147, Chanhassen, MN 55317
Phone: (952) 227 -1300 / Fax: (952) 227 -1110
APPLICATION FOR DEVELOPMENT REVIEW
Date Filed:9�5 —I'� 60 -Day Review Deadline: I`'— t-i—IY
Planner 'R>(=>
—Al #: o�1T
Section •p
• ••
apply)
❑ Zoning Ordinance Amendment . ........................... $500
❑
Comprehensive Plan Amendment .........................
$600 ❑�
Subdivision
❑✓ Create 3 lots
'Include number of existing
❑ Minor MUSA line for failing on -site sewers .....
$100
or less .......
............................... <E301
❑ Residential Districts .......... ............................... $500
(Refer to the appropriate Application Checklist for required submittal
❑
Create over 3 lots .......................$600
+ $15 per lot
❑
Conditional Use Permit
❑
Metes & Bounds .........................$300
+ $50 per lot
❑Q
❑ Single - Family Residence . ...............................
$325
❑
Consolidate Lots .............
................................. $150
❑✓
❑ All Others. ---- ......... ......................................
$425
❑
Lot Line Adjustment ..........
............................... $150
_
❑�
Final Plat'...........
$250
❑
Interim Use Permit
"Requires additional 50
scrowfor attorney costs.
❑ In conjunction with Single - Family Residence..
$325
Escrow willbe require r
development contract.
other applications through the
❑ All Others .......................... ...............................
$425
❑ Rezoning
❑ Planned Unit Development (PUD) .................. $750
❑ Minor Amendment to existing PUD .................$100
❑ All Others... ...... ....................................... ... $500
❑ Sign Plan Review .................... ............................... $150
❑ Vacation of Easements / Right -of- way ................... $300
(Additional recording fees may apply)
❑ Variance ................................ ............................... $200
❑ Wetland Alteration Permit
❑ Single- Family Residence ............................... $150
❑ All Others.. ........................ ............................ $275
Project Name: Chanhassen Specialty Grocery
Property Address or Location: OUtlot B, VILLAGES ON THE PONDS, 4th ADDITION
Parcel #: 258460030 Leaal Descriotion: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION
Total Acreage: 2.71 Wetlands Present? ❑ Yes ® No
Present Zoning: PUD Requested Zoning: Existing, PUD
Present Land Use Designation: PUD /Retail Requested Land Use Designation: Retail
Existing Use of Property: Vacant Land
Description of Proposal: 14,000 sf specialty grocery. Platting outlot for possible future phase 2 (8,100 sf retail strip).
Platting outlot underlying the Pond Promenade private road areas.
❑D Check box if separate narrative is attached
Site Plan Review
❑ Zoning Appeal ....................... ............................... $100
❑ Administrative ....................... ...........................$100
❑� Commercial /Industrial Districts* .......... 1` O±.. $500
❑ Zoning Ordinance Amendment . ........................... $500
Plus $10 per 1,000 square
feet of building aretljgq�!)•
NOTE: When multiple applications are processed concurrently,
'Include number of existing
employees:
the appropriate fee shall be charged for each application.
and number of new employees:
❑ Residential Districts .......... ............................... $500
(Refer to the appropriate Application Checklist for required submittal
Plus $5 per dwelling unit
information that must accompany this application)
AIOITIONAL REQUIRED FEES:
Notification Sign .................... ............................... 200
TOTAL FEES: $ �)C1�13 00
(City to install and remove)
1
!�
❑Q
`
Property Owners' List within 500'. ....... $3 per address 33 Received from: UPAA,,Y-P
� 'K] lnerSLLL-
(City to generate —fee determined at pre- application meeting)
❑✓
Escrow for Recording Documents.. $50 per document
Date Received: 9 -5- 4 Check Number: %094
(CUP /SPRNACNARM/AP /Metes & Bounds Subdivision) 100
f6' O �I •CM
WES rle fAtA
IZ3 -n`j 4s
Project Name: Chanhassen Specialty Grocery
Property Address or Location: OUtlot B, VILLAGES ON THE PONDS, 4th ADDITION
Parcel #: 258460030 Leaal Descriotion: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION
Total Acreage: 2.71 Wetlands Present? ❑ Yes ® No
Present Zoning: PUD Requested Zoning: Existing, PUD
Present Land Use Designation: PUD /Retail Requested Land Use Designation: Retail
Existing Use of Property: Vacant Land
Description of Proposal: 14,000 sf specialty grocery. Platting outlot for possible future phase 2 (8,100 sf retail strip).
Platting outlot underlying the Pond Promenade private road areas.
❑D Check box if separate narrative is attached
Section 3: Property Owner and Applicant Information
APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained
authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to
the right to object at the hearings on the application or during the appeal period. If this application has not been signed by
the property owner, I have attached separate documentation of full legal capacity to file the application. This application
should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this
application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I
further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to
any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct.
Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink
Address: 19620 Waterford Court Phone: (612) 801 -4313
City /State /Zip: Shorewood, MN 55331 / 1 Cell: (612) 801 -4313
Email: rra uwerai n KLvemurepass. net \ , yet— - -� Fax:
Signature:
Date: 9/5/14
PROPERTY OWNER: In signing this application, I, as erty owner, have full legal capacity to, and hereby do,
authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those
conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of
the deadlines for submission of material and the progress of this application. I further understand that additional fees may
be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the
study. I certify that the information and exhibits submitted are true and correct.
Name: LIDroc'm LAwA'-JV
Address: �'Sp V- 4 E44
City /State /Zip: _C. ltN' j� q � 1 1 _ML( � � 3 1
Email: tzt H t; 0 -fA I i) -i VK
Signature:
Contact: 6 n l -1 41 aG N{
Phone:
Cell:
Fax:
Date: q t ]<
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all
information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the
appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and
applicable procedural requirements.
A determination of completeness of the application shall be made within 15 business days of application submittal. A
written notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
PROJECT ENGINEER (if applicable)
Name: Sambatek
Address: 12800 Whitewater Drive Suite 300
City /State /Zip: Minnetonka, MN 55343
Contact: Mike Brandt
Phone: (763) 259 -6014
Cell: (612) 703 -0732
Email: MBrandt @sambatek.com Fax:
Section 4: Notification
Information
Who
should receive copies
of staff reports?
*Other Contact Information:
(]
Property Owner
Via:
❑✓
Email
❑ Mailed Paper Copy
Name: Andy Krenik- Tushie Montgomery Architects
❑�
Applicant
Via:
2
Email
❑ Mailed Paper Copy
Address:
Engineer
Via:
[D
Email
❑ Mailed Paper Copy
City /State /Zip:
Other*
Via:
2
Email
❑ Mailed Paper Copy
Email: AndyK @tmiarchtects.com
PROPOSED DEVELOPMENT - OUTLOT B VILLAGES ON THE PONDS 4T" ADDN
PROJECT SUMMARY NARRATIVE
Introduction
Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached
applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE
PONDS 4T" ADDITION. We are proposing to subdivide and plat this Outlot into a Phase One (Lot 1)
retail development consisting of a 14,000 sf specialty grocery store, as well as Outlot A which will
contain Pond Promenade Road improvements, and Outlot B which will be future Phase Two retail
development of approximately 8,100 sf building area and associated parking. The proposed Phase Two
Outlot B area will be initially left as green- area and will be an integral part of the stormwater design.
Sidewalk construction and improvements are proposed along the full perimeter extents of Pond
Promenade Road and Main Street as part of the Phase One improvements, enhancing the pedestrian
friendly character of the project.
Architecture and Design
The 14,000 sf single story building will be detailed with a varied pallet of warm toned materials for the
building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices,
standing seam metal roofing, aluminum windows, and fabric awnings.
Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of an
entrance tower with a hip roof and wrap around sloped metal roofing at portions of all four elevations.
Additional use of projecting fabric awnings and sculpted EIFS cornices provide increased relief within the
building facade.
The 50% building fenestration requirement is accomplished with an interplay of massing, color, and
material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS
cornices, brick piers, and fabric awnings provide a pedestrian scale and architectural detailing to each
elevation. Windows along the east elevation (Main Street) would be spandrel or translucent glass
highlighted with awnings. The exterior of the building is further enhanced with an emphasis to natural
plant materials using a green screen climbing landscape element at the east elevation (Main Street) and
extensive use of plantings varied in height along the north, east, and south elevations. The outdoor
trash storage and loading area is also screened by use of plant materials. Articulation of the south wall
elevation is also accomplished with the natural building steps resulting from the receiving appendage
and with the added layering and screening provided by the freestanding trash /pallet enclosure.
Tenant signage will be integrally lit channel letters and occur on the west, north, and east elevations per
city ordinance for allowable area. The exact location of one tenant sign on the west elevation (front of
building) is to be determined. The elevations show two possible locations for signage along the west
wall -each within the allowable area.
30AU NEL:
CHANHASSEN SPECIALTY GROCERY - Outlot B VILLAGES ON THE PONDS 4T "ADDN
REQUEST FOR VARIANCE TO PERMIT 42" WALL SIG NAG E LETTER HEIGHT
Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE
PONDS 4T" ADDN, including the development of a 14,000 sf specialty grocery store. The architectural design and exterior building
elevations as submitted incorporate wall signage on three allowable building elevations, as follow:
North - Fronting Pond Promenade and visible to Hwy 5 to the north.
West -Over main entrance and fronting the parking lot, also visible to Market Blvd.
East - Fronting Main Street
Signage on each elevation is proposed as individual internally illuminated channel letters, 42" in height, and placed in a consistent
fashion /signage band detail. The total area of each sign as proposed is well below the allowable signage area as per City ordinance,
more specifically as follows:
North -122 sf proposed, 189 sf allowable
West -122 sf or 157 sf proposed, 201 sf allowable
East -122 sf proposed, 217 sf allowable
A variance is required due to a clause in the VOP Development Design Standards, restricting wall letters to a maximum of 30" in
height. While this standard may be suitable for small shop space or for visibility and legibility from directly abutting streets or at
pedestrian scale, this is far too limiting and ineffective for our proposed use. We also feel that it is not of a scale consistent with the
massing and dimensions of our proposed building. It should also be noted that when the Pond Promenade PUD was approved in
1996 it was one of the pioneering new urbanism projects in the Metropolitan area. During this period communities and planners
had a general attitude that merchant signs should be minimal and generic. The current trend as evidenced by the relaxing of most
municipal sign codes is that adequate signage is not only critical to a merchants success but can add vibrant and creative design
elements to a project while adding distinction and variety to a neighborhood. Highly visible and legible signage is critical to the
success and viability of a grocery operation with a regional draw. This parcel as situated has critical sightlines to Hwy 5 and to
Market Blvd, however it is set back from Hwy 5 by approximately 550', and from Market Blvd by approximately 620'. Providing
effective identification and signage to passing motorists is essential. Signage, if restricted to 30" letter height, will prove entirely
ineffective and unacceptable to the user.
Research as compiled by the United States Sign Council, studying legibility of signage parallel to roadways from moving vehicles is
summarized in the table below. This table only calculates recommended letter heights up to a distance of 400' from the roadway,
however even at 400' (highlighted in yellow) the recommended legible sizes exceed 80" in height. The 42" height that we are
requesting is obviously well below this recommendation, but it will provide some level of effectiveness that could not be achieved
with the 30" restriction. The 42" height is also consistent with other locations of our tenant, and in keeping with their minimum
standards. For additional reference I also highlighted in red the effective distance for viewing signage with 30" letters. This
approximate 100' distance is consistent with my comments above, suggesting this sizing is suitable for pedestrian scale orviewing
from directly abutting roadways.
Parallel Signs
TYPICAL PARALLEL. SIGNS > ANGULAR VIEWS
GM
0
ROADWAY
Table 3. Parallel sign letter height lookup table.
Offset from Curb (R)
10
Letter Height in Inches
Number of Lanes
10 12
40 10 12 14 16 18
60
14
a
�_...
_...20
22
80
18
20
22
24
26
100
22
24
26
28
30
125
27
29
31
33
35
175 37 39 41 43 45
200 42 44 46 48 50
225 47 49 51 _ 53 55
250 52 54 56 58� 60
275
57
-59
61
63
65
300
62
64
66
68
70
^_— 325 —�
67
_ 69
71
73
75
350—
72
74
76
78
80
375
77
79
81
83
85
82 84 86 88 90
Additional research into the effective sizing of signage letters, from the basis of static straight on viewing also supports the 42"
sizing of the sign letters. Note on this table that from the distances we are offset from the major roadways, signage with the best
impact is 42" to 60" high. This does not take into account the limited viewing time that is possible when in a moving vehicle, or
whenonceentrating on driving the vehicle, as is accounted for in table above.
co
�, LETTER VISIBILITY CHART
STATIC PERPENDICULAR VIEWING
3"
Letter Height
(inches)
30'
Distance for Best
Impact (feet)
Max. Rea ;, ;u e
Distance ifeeti
3"
30'
100'
4"
40'
150'
6"
60'
200'
81,
80'
350'
9"
90'
400'
10"
100'
450'
12"
120'
625'
15"
150'
630'
1811
180'
750'
24"
240'
1000'
30"
300'
1250'
36"
360'
1500'
42"
420'
17501
48"
480'
2000'
54"
540'
2250'
60"
600'
2500'
—'P" I.s
Es J
T ELEVATION .... .. .. . . ......
NORTH ELEVATION
mcea uIU ft�K
EAST ELEVATION
I.."
I.,
50UTH ELEVATION
xs
\\ cnldOd 34! NG Sci�tl ? ?!A•
e
--------------------- - - - - -j L-
z
S i "
S 0 N 0 d Sri! NO S3EJtl??IAd
�- I eez ea
_ L
�om
m91 i5 dIi z0
I �
;z I
r - -- • "i 11 1 i iii 1 E
p
1 0 \ g \\ 111 \
2 C F \ \• d � p \ \1\ �`r \1\ \
a \
C
z o �q 11 ar Y gyp'
0
1 �
W .A
UJ
.• `• _ 4 � _
— — — — �— to — \� i._ an:Iwox ~4,``AO�i SzW
5 Z Ij I anti iFF" Qa
0A muj
N a I OW
1
W }
e.J a 1 6 :fry j 8
s �3'
S i E °g >3 � %➢ f I
v
RR a s i
Y � F
gs.frg
H
Wl
a % 0
8a ? 6 ? B s s ? ra s ?F
a
C3
d
g
WE
a
a
x
W
Z
U
210
ZO ¢ >
72 sod ,• =aw g = 0 Sj�= m t g! 1—H2V Z i, J 9 � �I� d 2 C s`s m Qw� m Q `6 >_7 .J EYq p wln2 6 ^E a` V ui t7 U y?sil d 1 j M. 1 0u .n �% a`
y $ -
Yy i
gl ° §3a3sa� 3 ci ;� pvs
z 3
Moo
fT YTiYle.
ol
ziFl a pa se9e�`7 W 3 563: by �
B §H§$ '� 1 3S i9 AIL 3E
V I :nn e l � /ffia�l� I ..
l� l� n � �i � v I / Pis II '•I � '9
� ` „c ��1� `I I vv / 1;4• ' ail` 6 I, I.
C rI
It
U.
Lil
iij
LIi
\
i
I
II
x\
\
i
s
I
3
t
W
Z
Z
U
CO)
E pEg
Z
g
e
4 N e~
N
VN
C F'i
HP ki
33
ON1_
7 0
a
C
>
iill
R;
Q
O sev
pjt'raS
{
YCZC N
^8 fie:
�
S J
Yi ZQ
w
_Q
O Z
V a�:�
:. e;
Ei-
sr d99;IE
%
N5
j_G ci m
�g�=
Z Q
2
ZK es
Zw
N,
di2 E`N
a�E
CCf
V
�
a a
� 3 r
ON
`v p
!
I ,
/ }' I / ., - ~ ✓ tl1PT1f10 to a- e1n°°"w,
\ c a ,• r\
• r$ r
r �w v_8x
6 /
I - I
•� €Ili_
c
,�II ¢t i�yp�eur I
I
Q
W
Z
Q
U
U
BIZ- .8 zQV oZ
zz ss v ¢WO ¢z
u uai l�7 ° u
O10 R s �_§S , z_ .
fv Sx ,
B$�$'z�
§�26$�
3 b j
i S
@ 5 z
All, M
�`x °sa!555
� e•' =g �: °n� 3 3: 3 3 §a? "r °a' � 3a: €s73 F �43 3 Y � ? y 3
133ats wvw
,Re`.. V r �• _
lo o
r
!i 444
'AEI .' ` \�• - .
-- °
I
I �
i
v
i
W
Z
Q
N
c�� gyp:
Le'(i Pry N2 a d �
SO 3eg z°
zu" ° z c3E@ '€ E-r € @• = „� ro z� n
012fG °s Qw0 m6Z raga. 55{ 'x
y u >a ^. A a` u0ID -u2 u ?!,1 is €i, NeE z vti l7 HV a`
aiq: aiE P 8c F, 3' = z f a 9 eaai sa. i ' s a o s�s
H4' s
M
� R, 3;� @ €Sj9
°$3aiY s ° �? @i. ai a- veil '@ :�$ A' @�ag °. 13E - � °s_3a� F;SS•, s `� 9 fi� .3� �&
pp33 +vgtl t ep.p se a § es ee z 5' l @e
JJ§ €sa9 a B€ F353 e3 pi P3 31 ifia § ; =gRa €a R @Si E 4Y5if @q Ea9k
t 9 ae3 $ %fi e'9. @' i4a53 aEa a se gib %a @E5 fi @€ 5 @. aESRa s:3 2g e6 F a
I @fi
@ 3zE2 se �e@
I fi° E 3 5a,' Jig's ` S € °' =ps a a @ Him a, a: ;_:, s .3' "dig^ e. sSP _ g g 3s Mg a@
• "v''l n s_ .i F _7 a 8- gfE= :29 : ; e ' -' e.... {o @ i °x €I.a..3i - e€e'8 9c 4ie 3= 35' a =if§ 'ee
ai,y qa s " 1 Sa:l@ - e "3- s i9 " 3e -
° P i £3 E ifi£ 5 58E E "! R R °S
s� a Eia€ Lf "'l �" ii 4' 9p'p$:" s z
1 z : i3 e'f @@ SEIi i a Sa 1 5 9 e -?�= ea §a i @e3Pi3s pa 5egs[ el i'aae
HIP l i @ @ €$a -§ i" @ c" _� F @!4 @3i °_ i s @
et�3_. a3 3 e € @ e :Y a:,. 'f= y Be ?_' E€ isc P
E M3 °: 9f
' iSb
i - =
�e l € ?
se f $ $ € €q 3sa
�i? � 5 l of � i II � 9l E °s°sz 3 E'➢i SS �� F�i E §EE§ 2le °. 9$fi i - eF9[� zP ?�l f�if €e @3 ?'3i^ e:33ls� 1ez ? ' ” fi§ $tl8 : &3
A.
f A f I \
I
B a \ \ 133tlE5 NItlW � A I I
I�
I
>`a
d � �
9 y
s
�i
x
LLI
Z
Z
Q
V/
Y ;gi$
a� Z
588 J
.[ dN �� N vN 0
�F sum o§ �' =;ZOW o`er d
7 Z 1 9; an d p m
jCq F-I- 'g g' �' Zuu Z �_ {cs; E1.
C Z 1 3 d Q Q N Q ) b Z d N
Y W R p W Z S.' 1iq€ j Fes° 2 s" O x :�
Q S xa S eF f`- qq z $ v v
u" ?i6 �'EBs° z: t`.iw Ou ai vti V o
a.
Qo� = �za8e
bl -- �� � ., y<y ;$3 u�° �F z�H$EwEd Q z• ¢ �3e
I�=� s9;�1 � agaiy3t� �Gaa A ?i °oa` -x�ZS s ��. =• g ',
o= p
4 li 3 Fe
z . s a p
° -`
i - 5 ri £ i3 z sw &w EpEr� �3� &o4 2s as z3o o egely °d € o p�
� §e35"3_`ps ���ee =QZ g3F� ey yep O_4 °88:i "a's8•id d °e4f3a� " =_��ci�q??p8 °$ !8?
� \ 1
y A • —� 133H15'NItlW��� — �..��'
V
\ \j
1! 1 1
s`li ff � 111 �1I�• 1'1 I �r
I d I � pllt •111 P /
I
I
� w. W
_/ 1 • / /; ;•,11',1, \` \\ \ s
1vII;V 3 s e
4 !
am
6
N
l+3: ip�
z
z
ai
Ali:
r=
o
3xiBf
g
=
3g�i
1'W `o �
aJaC� .
Q
Yd ia
r All
_€
_da
0 W
C
giJ'}`
QUO
Wa
O/:
;� .G .9'V
Z1S
Cd W a J j
O
[ [xO i
J
i
Z,w o=
tOON
d
O
N
eaa
5HIM g
g€s5
9¢3s. � -
y
HUM
a� �.,s.
H g
I.�yngq�l e�_�3 �� q9 ���i 3�' g� °��g� a �
�16
§:ea
' o 13 8 X82 G aex, ^yE °a d u;�?a HIM .eata c —s?
E i E; zn5 a C Y Ypp df °a' =a F'w o � y s'2' "$
e2y$6Y8 B`g=. .a 33ase Sic � aep�08- a ,o§ a
3G €S�xa =k�83tl rie6 a4£B 8 Bet`2 R�E88 =Y@Yai'°Cii'":SGtl:F °ilS 9'4x9 �, ?E
�..l�!l F3 o£.a.. =d= .$: :�3 I iwwm.^ •ne i..... ^n. ^^ Ie5z.8
S9' =_
\ 8
� , .fig : �s •-�. —' ,� —°—
1 I
' rl �Vgg
s \ a
_
_ _
�� IIV�E33 g3�3s
Z
V
N
i{3pp N j
Z
Z
6:
tm"i=
ZOU
O
y Z
S
ifF 3
.
o= 1 C
e
�d£
`
33 NA<E Ks°
N
g 3 Y
a§e€d'pSs te§xaeop 3es�°i3pp$ . c i ee E a]47 - p Y lHq8e pp i� x p w g%l� j'a3 W .. Mwi
s€ ;e s °
$ e
$a.q e �€�333gz ja A§ eY pp
gA o�s §�el pe
�l€ o�lx aa59�>sia � �'`i - IM
Hoees £ v €3: s
eial I
sa � x %$% z „s e
III x§ 2i E.aa• 6x' p�., -rg s„ a 3 5e'ss4 §
le9i sa ' 3 €yss�i qoe 1 Y6 E $: lg' �Hq� ;7
II = gg
ail ae� = gs�gz'za 3 :gf a §g@�kS gw §$i
W � e °y's `3x=xapf j� lfRe �aa•e$s �Be �l €° 1531 ¥l F
—? l$ i s p4eo'yep i °s ii6ee :lsp H
it $6° E5$z35 :9
millins � I 1
� I I
� I I
I I xl
I I
° co
° tl101N0�
s i
s a E E i 1
IH
gc a 9 III
W
�.
• \ \ x
” 1 ;�
-------- - - - - --
W
7r
U
N
a
w
Z
Z
Q
U
U
y7GQyZ
LLESS elosauugry 'uasseyue4o
'7SuPIN
—mu 3a,
B'jaa�el
Z OF' -5ai
zUFgo
N3SS`dHNHHJ
a'
�g�z�a6Sgxp
MAIN 5TREB
s
F
aA
N
°
a
gin
N�
O U
p O
j
r
z
a
o
�
Q
U
W
I
Y
o
i
z
!,
h
6.4
6 b
e
5
'ne
N
8
°
P
y
pp
y
£
L
N
Z
3183
Hamm
VC--.
6Q
Q
a
¢
9
F
Yl
dg�
�
g
ded�
MY�6
aam
42
dl
o_
;p
MIR
3
mcii
J
S
e��
Cm"3`.LL
€sE
cI
gYg
3£m
inldH:7g5553s:�:
{gfie
�gji
3
5
y7GQyZ
WaF °e:io L LESS eaoseuwW'Ue Ss LIue40 d: 5218 y
'}g U18114 13 i4 aHel 9Pa as e2`s3pa sotJ a
xOf iy55y€ a3�oa� l�vi�3ds F:gg£3 €¢fig$: 3 € o
�zU 'x N3SS`dHNVHO a sg �� � ;; x _ � $ d °
MILE=
s
93�4�
d AA AAA FA
55 y5°
,�ggggggpgg qq ' @3@��
,854a5�2i� � � CHC6 6
l i JU
a- q..
is" 2�c9 � g3
a' E yvyi
k Jim
a arra J Y�rcj —r7.
MAIN ST STREET ] i s ♦ ��)) y J a
,s3 N Me 3 � i 51
i ZJ�
oa >
}J
I� a� P
w s5 OuOe I' 'Y�;.k N
o z uJ
\a' p
s N =.
3�a
. e 1
A.
q i
W
Z
U
L 1099 elo89uuiW'uesseyueyo
.19 uievq V'Al 9�e1
Nof ��,�
�a3ooao u�dio3ds �
ga;g���z��g�, 1 g
� o� �_
►
Z�° =
N3SSVHNHHJ
_
0
I
I
I
JAS
I
I
.can
ca
m
-----------
I
-----------
----_ — _ — _
— - -
pq
Og
IL
$4y
-
P
f
sy
9
s
g3 3
55
e P5 @E €= � g p
11
1H
e �8v9v I aJ °4 �1
,Ug=h
__
5 mill �e � —I gg 99
F
pq
d
� 5
N
O
N
O
N
O
UUgi��!
UUS��gs
UUgr��t
N
M
Q
P
0
W
z
WsW aloe L L699 elosauwW 'uasseyue140 +&; ;8�'e;
�paeg3 g;�ap g° 6
-is Ul
UA Is 'JO GWI
z�d1 N3SSHHNHHO €$�;
oac�< g gy5 55 � SgPSggg pp
-
- -I
I
I I}
I I I
4 Irl, I 11$ ^F I
as: ,
— - - - - - — -- - - - - -- - - - - --
I I
�✓ I _ I I
I
I
I I I
I
I
8;
ter.
I b
6 ITI_I
I I —III
All
MI
11111
v
I� II
III= o
= 2
I �o � a e =NNq�a����n�}
II I k tl '�sd �Y" p
II- m e9 3 aa'a �ftz $ o- °ens �
AI, Q
w �
ICI jm `e3 �N Nu Gw �h > >N ix
III= f= .St IL- IL-
III ( OE 0
O m 8 033
N o K� KNM .
z � o�CB
35 d� �b N ttl Q N N
OA' ?
i
W
Z
Q
)
2
e
\
!
;
}•
$
(
(��
( ;!)!Q,
•
\
!/
n
a(!
lRR�j
gg
!•!
g
USE
wow e:-, W ' 4 4'J 'IhO�2 &a g
cF _9qo LLESS elosauui uasse ue ��: n x w
"w� "a '1S uieW 9'J4 aalel�aaas$s'sk
`a
s AH300aJ l lIV103dS V' s € a4 ;s
❑zuE° ; N3SSdHNdHO fa%KYNg
0a31ga, ig�s:a'si g e
3'j
P
2- R n g B r E " Q Q 3 p tQ y p Q
§8 —ta
39 _
0
�t
i _rz�a 1�
4
i
7%
�a
a � �
8�
N § @N3g
1y�
pro
3 '1 8 °G u 1�G�m
p tls 9Y 1 x
�Y- ..!�
rwr Yi33� 91
D
z
U
� °9 �
���tlY y
qt3$ �
���8 &
&��9 4
4 §
§����9
tl4 �
�8tl q
y5y��tl3 y
yy3 t
z
U
z__mn__< , m
/
s _ < a
v
:
§ |
r
y
��oe�lv&�d
@•
ƒ)
%,
I %
• »»
A
�A��HO
f
9 4.
`�
�0
Cj
Ul
0.
t
\ ) §�
\
\
m
E
_. .�.
��.
.
\<
resourceful. naturally. BA RR
engineering and environmental consultants -
Memorandum
To: Robert Generous, AICP, Senior Planner; City of Chanhassen
From: Scott Sobiech, PE and Candice Kantor
Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed
District
Date: September 24, 2014
c: Claire Bleser; Administrator Riley- Purgatory -Bluff Creek Watershed District
The Riley- Purgatory-Bluff Creek Watershed District (RPBCWD) is in the process of implementing
watershed district rules. The draft rules were released for public review and comment earlier this spring.
The District is currently reviewing comments and anticipates implementing the permitting program this
fall. Because the draft rules have not been adopted, the District does not currently have an official
permitting program. We appreciate the opportunity to provide comments on the project relative to the
draft rules and your willingness to work with the District in advance of the permitting program. The
following is a summary of RPBCWD review comments for the Chanhassen Specialty Grocery development
at the northwest corner of the intersection of Lake Drive and Main Street. The most current version of the
draft rules are available for download on the RPBCWD website: htto: / /www.rpbcwd.org /permits /. The
following comments are based on the draft rules that would likely apply to this project and highlight the
areas where revisions or additional information would be needed to fully meet the draft rules.
Rule C: Erosion and Sediment Control
Rule C: Erosion and Sediment Control applies if a project disturbs more than 5,000 square feet or more
than 50 cubic yards. Based on the submitted design plans and supporting documents, the project will
disturb more than 5,000 square feet and excavate more than 50 cubic yards. In this case Rule C would
apply, and the comments below should be reflected in the plans.
• Provide an erosion and sediment control plan in accordance with Section 4 (requirements of the
erosion and sediment control plan submittal) and meeting the criteria established in Section 3 of
Rule C.
• Main components of the erosion and sediment control plan include but are not limited to:
o The intensity and duration of disturbance at the site shall be minimized by the use of
construction phasing.
o Final site stabilization should include specifying that at least six inches of topsoil or
organic matter be spread and incorporated into the underlying soil during final site
treatment wherever topsoil has been removed.
Bare Engineering Co. 4700 West 771h Street, Suite 200, Minneapolis, MN 55435 952.832.2400 w - 6orr,com
To: Robert Generous, AICP, Senior Planner; City of Chanhassen
From: Scott Sobiech, PE and Candice Kantor
Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District
Date: September 24, 2014
Page: 2
o Soil surfaces disturbed or compacted during construction and remaining pervious upon
completion of construction must be decompacted through soil amendment and /or
ripping to a depth of 18 inches.
• Inlet protection shall be installed prior to any site disturbance.
• Silt fences shall be installed prior to any site disturbance.
• The silt fence and silt dike at the southwestern corner of the site should be constructed
such that no sediment laden water can leave the site.
o A construction entrance should be shown for the Phase 2 construction.
Rule J: Stormwater Management
Rule J: Stormwater Management applies if a project disturbs 5,000 square feet or more or disturbs 50
cubic yards or more. Based on the submitted design plans and supporting documents, the project will
disturb more than 5,000 square feet and excavate more than 50 cubic yards. Because the project will
increase the imperviousness of the parcel by more than 50 percent, the criteria will apply to the entire
parcel. The following criteria would apply.
• Rate Control: Documentation must be provided showing that the project does not increase runoff
rates for all points where stormwater leaves the site for the 2 -, 10-, and 100 -year storm events,
and the 100 -year frequency, 10 -day snowmelt event. This analysis must be done using Atlas 14
reference data using a nested storm distribution.
o A stormwater analysis was provided that addressed rate control for the 2 -, 10 -, and 100 -
year storm events. The events used Atlas 14 precipitation depths; however it used the SCS
Type II distribution. The modeling should be revised to use a nested storm distribution
based on the Atlas 14 precipitation.
o The draft RPBCWD rules require that the project not increase runoff rates for all points
where stormwater leaves the site. To accurately comply with the draft rules, the existing
and proposed conditions modeling should be split to represent that there are multiple
points where stormwater leaves the site, and documentation should be provided showing
that the runoff rates do not increase at any location.
o The existing condition modeling does not represent existing site conditions. According to
the draft rules, existing conditions are defined as follows: "Site conditions at the time of
consideration of a permit application by the District, before any of the work for which a
permit is sought has commenced, except that when impervious surfaces have been fully
or partially removed from a previously developed parcel but no intervening use has been
legally or practically established, "existing conditions' denotes the previously established
developed use and condition of the parcel ". Therefore the existing pond, land cover, and
drainage patterns on the parcel must be modeled.
To: Robert Generous, AICP, Senior Planner; City of Chanhassen
From: Scott Sobiech, PE and Candice Kantor
Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District
Date: September 24, 2014
• Provide information documenting the existing and proposed time of concentration
estimates. The time of concentration should vary based on watershed size and
characteristics rather than being the same for all subwatersheds and land cover
conditions. The recommended minimum time of concentration in TR -55 is 6 minutes.
• The existing conditions HydroCAD model lists paved parking as HSG C. The proposed
conditions HydroCAD model lists paved parking as HSC D. Review and revise for
consistency.
• The pipe length and slope for the pipe leaving the sand filter used in the HydroCAD
modeling does not match the design plans. Review and revise for consistency.
• The proposed conditions HydroCAD modeling indicates that all three 6" draintile are
connected to the outlet structure which is inconsistent with the plan set. Review and
revise for consistency.
o Applicant may want to consider incorporating a portion of the downstream storm sewer
system into the HydroCAD modeling to accurately predict the flood levels on the site as
they may be influenced by tailwater effects from the downstream trunk storm sewer
system.
• Provide a detail on the plans for the outlet control structure.
• Provide a detail on the plans for the Triton system.
o Provide a section view on the plans showing the combined sand filter and Triton system.
Volume Control: Stormwater management features must provide abstraction for 1.1 inches of
runoff from all impervious surface of the parcel because the project increases the imperviousness
of the parcel by more than 50 %.
o The proposed project includes filtration of runoff but does not include any of the
required runoff abstraction, thus not meeting the RPBCWD draft rules.
o The applicant must demonstrate that the District abstraction standard cannot practicably
be met in order for the property to be considered a restricted site due to underlying soil
conditions. If the applicate demonstrates the abstraction cannot be met the criteria in
Rule J, Section 3.3 would apply to the project. However, Section 3.3 still requires
abstraction to the maximum extent practicable.
o The proposed design routes most, but not all of the proposed impervious surface to the
sand filter for treatment. RPBCWD draft rules require that the project provide treatment
for the entire parcel.
• Water Quality: Stormwater management features must provide an annual total phosphorus
removal of at least 75% and an annual total suspended solids removal of at least 90% from all site
runoff. However, if the applicant demonstrates the District abstraction standard cannot practicably
be met the water quality treatment criteria in Section 3.3 would apply to the project.
To: Robert Generous, AICP, Senior Planner; City of Chanhassen
From: Scott Sobiech, PE and Candice Kantor
Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District
Dote: September 24, 2014
Paae: 4
o Calculations must be provided that verify that the proposed treatment system provides
the required level of water quality treatment. No water quality computations were
provided.
o Provide a detail on the plans for the EcoStorm system.
• General Comments:
• All stormwater management structures and facilities must be designed for maintenance
access and properly maintained in perpetuity. A maintenance and inspection plan must
be provided.
• Upon completion of site work, submit as -built drawings demonstrating that at the time of
final stabilization, stormwater facilities conform to design specifications as approved by
the District.
Summary
Based on the information provided to date, the proposed design would not fully meet the RPBCWD draft
rules once implemented. Depending on the timing of the project and the official implementation date of
the draft rules, the project could be required to obtain Erosion and Sediment Control and Stormwater
Management permits from RPBCWD.
Generous, Bob
From: Vernelle Clayton [vernelle @visi.com]
Sent: Wednesday, September 17, 2014 7:25 PM
To: Generous, Bob
Subject: FW: VOP, Architectural Review Committee's Review Report for "Chanhassen Specialty
Grocery "
Follow Up Flag: Follow up
Flag Status: Flagged
Bob - Below is Mika Milo's review of the Chanhassen Specialty Grocery submission on behalf of the Architectural Review
Committee of the Village on the Ponds Association.
To: Village on the Ponds Association
c/o Vernelle Clayton, the manager of the Association.
Re. VOP- Architectural Review Committee review of :
" Chanhassen Specialty Grocery" proposed development plans.
By: Venture Pass Partners
Date issued: 9/17/2014
Dear Vernelle,
It is our understanding that the proposed specialty grocery store will be a very welcome addition both to the City, as well
as for the VOP community, and is expected to generate a more dynamic business environment for the whole area. And
this is at the core of the concept for our Village: a wide range of uses that together create pedestrian oriented streets
and a vibrant urban setting.
In that respect we look favorably at the proposed development, even though it is not providing for a more mix of uses
(retail, residential, office ... )on this one specific site along the Main Street. Also, the main entry is not oriented towards
the Main Street, as called for in the VOP Guidelines, assuming some office or residential uses housed on the upper
floors.
However, we recognize that in this case of a large, single level grocery store, in order to be successful in operation, the
main entry needs to be oriented and as close as possible to the parking. Especially in case of very cold winters we have
in our Minnesota.
Consideration of the addition of another entry (but not necessarily an exit)door towards the street, would be very
helpful. It would create a highly welcome break in the long straight rear wall along the Main street. That would spare the
customers coming from the street to take a long walk around the building to reach the front door. Or worst, possibly cut
across the unimproved site along the loading area to get to the front door.
Also, we hope that the "second phase ", would offer more opportunities along that line by the nature of the uses
involved (like a cafe, restaurant, office or...), which would provide a stronger integration with the street life.
In regard t some other specifics:
c. - -- Sheet L1.0- Site plan, calls for the removal of the street lights on the East side. However, those lights have to be
preserved and operational at the construction completion.
d.--- Sheet 1-3- Landscape plan, calls for the existing 5 street trees to remain, which is of essence. Especially due to a very
tight space between the wall and the street parking, allowing only nominal new landscaping to be planted along the
wall. Also, consider a design change to the ECO mesh green wall, to be slightly curved(in footprint)to help break the
monotony of the long, straight wall along the street.
e.--- Sheets A2.1; A2.2- Aarchitectural Elevations:
- -- Signage: we recognize the need for the store to be well exposed to the freeway, including its signage, but they
appear to be too large and too pronounced. Especially above the front entry area. Consider placing the signs over the
brick directly, or at least, to color the EIFS sign panel in a way to blend better with the brick around it.
- -- Roof line, sheet metal roof above the main entry tower: instead to be shallow in its depth just like all other perimeter
sloped roofs, consider to extend far behind over the flat roof areas, to provide for a better integration with the overall
building, and less of a "fake" appearance. Possibly to extend it upwards to a full "pyramid" form, thus visually better
connecting with the roofs of the proposed next door "Villages" retail.
- -- Materials and colors: (based on the drawings review only) seem to be acceptable, but more use of the brick vs. cmu
blocks, would further enhance and provide greater variety on the large elevation walls.
The above comments were based on our review of the set of preliminary plans (with a focus on architectural and
landscape plans) as provided to us on 9/10/14. We hope this report would be of some help, along with all City's reviews
and hearings, towards a successful completion and integration of this development into the VOP and City of
Chanhassen urban core.
Please let us know if we can be of any further assistance. Thank you,
Mika Milo, r. architect
For VOP Architectural Review Committee.
-- This email is free from viruses and malware because avast! Antivirus protection is active.
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on
September 25, 2014, the duly qualified and acting Deputy Clerk of the City of Chanhassen,
Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public
Hearing for Specialty Grocery Store — Planning Case 2014 -29 to the persons named on
attached Exhibit "A ", by enclosing a copy of said notice in an envelope addressed to such owner,
and depositing the envelopes addressed to all such owners in the United States mail with postage
fully prepaid thereon; that the names and addresses of such owners were those appearing as such
by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate
records.
Subscribed and sworn to before me
thi' day o6�, )w y- , 2014.
Notary P blic
K en J. Enepardt, D uty Clerk
KIM T. MEUWISSEN
3' Notary Public - Minnesota
9' ^ - - -� My Commisalon Expos Jan 31. 2015
C
d
d
2
IM O
C M
.0
d E
SE
U O
�U
a c
C C
C
u R
ua
O C
Z d
N
N
R
L
s
R
L
V
U
C
d
2
MO
C N
d E
= E
V O
.—p U
= C
O C
s
d R
U O.
Z 0
R
s
e
R
t
V
N
"O
>1 !2
6 v `o w i
W
0- m
w
M M y-= d
C
N
M 0
> O 0 @✓ _ Y
«
p a d V¢ 0« N O
W
c
oJ0
d U N
C
0
cv o `o
Qa ivnm m3 x .@O
Emwm>mvw
mO
O
_
@ y6CON
c
°r `O =:C
E
TcJ
c 9
N
p.
O C U
p M GI O
p N C
o6 .
—. c°
3 = -« O W d
yJc
w d
'L- 6
0O
@
O. N 0
a0 N
O O
O @ E' .
Mn 0
0
m
d m«
tLr
>.2
m
M
Y
C
C CEO>
0 )
w« 0 c 0
E
d
m
0 '0 0
O
CC0
ti
Ma _
O E N O N= E
p
U M"
5 E >
o
Eat vW v
0n �
,ya
0acd
N
M
M 0
C O
O
p a= L E
O 7 O
E >O. @ Np 9 H
•C 0
m m 2m v a E w c E
y Lav EO --c --a -ow
v
EU>-
@
N C
U O
-02
O N 0 C p_
O
_ E
C 'q3 L
w V E
c m E w «oy Em L- uw c o
3 a
�vcv°.
0.02
co
@'c
-Q 0
N 0. 0)@ M
, >~
a
o ° s °d
N � �
�
O
CO
> p
o
O
E
M
O V @ 0-0 N d L
o E m °
wE a�
nvcm°m_
O
h
(
� d
E a O -0
(p O C
N +
O C
N O
a c L m
m
� M
ot'mcTm°'
01�
w
NO-
-0 m
� -
Nd Lo N c
O=
0 Co OCD �
a) CN C 0
EN- 0E n °nwEv m3 >
QEY Q o n
v c
acE
ULm
@
3 U
U
c0
0
L0 N0"O
U _ d
m N co M O N
L O
L n c
E a o k in
UH
V
`N
�a>
N
-j
J
a a)
0)
6
O E
°m>
m
�E3�9Et`wQ n a
t Hva
O
i_
E
E
J
O `
L Q
] U
a O. L 0.0 C
L
d v �
2
a
N
C13 �a
�
.
@❑
0 _
U .
-
e
a ow n N y
I� •L
L)
16 o
L)
0
C
C
$
O 3
`6
o NN
0 E 0
w
N cc
aa
m
M O
t �
> GO) @ @
owordE
j a ,o
p a8- 'N a 3 0
o >d
C
� N �N
d
E@
Od
0U-60)0).2 M.O
MN @
L Nk 0E
0 c �>
ava3o - E
o nw
- uUNw J£E
do
0
0
-
-3
0 c
M
O
@ Oc
—a cD
M c'
0' 0
N@ a3
(n "
a_
>n • f ='m
i
o -
Qc
U
o
wN
d
�)
>
O . E O
_@ @ � CD
E L , O
doM
3 ad
v0 rn- t
cvCL r
�tc
,
f6
c
R
.
N
�..r
O
m 0
0
cc N _
@E 4)
�U
E E cv
Ndw
N �S
=
QO G
C
L
V (nHUd E
N N
0
¢
�N � „
=o
N E 0 M
N
O
5.2
a O
co E c
4)
a E o '
F
o F>
>Z
Z
OQ
I- N N (E. N M 7
N L E N s
N o
vmo
= _
E0
i
.-NMV
�> wU sE Oo a
<c o m ~
m yLa�° v°Eww�`�
muv�1a
�c3
N
o i co oE
v 0 nmi E oo f vS vZ
wv
C
„mvo
�c c .
sEE
d
E
d..
0 d
tf
M
a
3 mmw�vdc=vl:0a
pw
oo0 E o H 0 , v
~
J
C
T C
0
o m o 0
a U
c 60 n �c
O
N
R`
`
O
=
0 0)
E
3cmo
0 O a £ c
c aO
m o c Cw'
d
R
6
.0
l0
l0 L
'�
c° EEU um ° wdc i
anm
D
O
o
CL
3
O
L
3 O
.rnw`
12
wp L 00 ¢mmw
5 dUU
J
IL
QOO.J
O
.J
R
OV
v
N
N
O
M
w 0
M M y-= d
m o 2mn
«o
L-p M
> O 7 @ E O -M=
a;ta 9 E- O. v Q °5 cL E
c
m
@0 d
L U
O U C C+O"
N C
acoo Emw m j, �,
E
.M..00
U
@m= N N
w@, O
N 0) EC00`
mnma
miy EaOV.CL_va2
�c
0 j N
O c 3 E U a
0' BOO >, O'>O 'M c
?i cwo d� aE nEm Nww y d w
O @
TN'(0 CL a) O
O) N 1] 0 @ E C O.
u`mw mvmac �,va °r 3m cc5
tm
>.2
m
E.L..L "00 M
C.± ma 0
C m CCEO>`
3 0d' R
wc'^ aca5mo °c =ta .�.Fo MJ
Ouv m E%
OF
Lim
OOD.
E'�p
d
d0EO
M U'
0
O
7UM -ECi NV
-5 EL v v> ,Ua
E`na o3a °4"" -L'mo0 £o cry
.�n
O
N'
N O.
M
C O
O
C O.C.. M a)
c n E
O co d d �
E ?+ 3 d
=m m mv2'v va E°I °" (Jc
JL L E o -� m v
d
Ev
co
@
0 C C
O
d
"O
`� O O 7
0 0) — '- C O. O
C c.. E y10 7
O tH
O E' -r 'EL
cmv C m•-B" l0� E vv
G N d N W E C V N O L C
am5 nW E•-o cvm A a -0
p_o�
@ C m
._
'O�
rq a.- M d p 4)
.L-. U C E @ 0 >r
o
m =`o `�m u`oc OL ma m -om
OtO
@
>O
Q,«
LO01._O,_
C N C M.L.. N
C „L„
N N N NLj 0.N R d
1MMMNNdL
mdmmc - -Ev° 3yt wy �e °'
- 20,cvua�E max•- m paC
O"OI�L
o
r
wo
N'
� d
c c_ 3w (6 E
E O 0 0.00 C
@
O 7 @ M "O. .+
O N O�
d d'aC
0� cEbalEa�w95 vm m
°-
'vv °o avi vo °mm°'v .yin
O 3 ND-
M=
'O d
c0
ND O 3 Ew @
-i-.,
f6 L w0
L a C Ni U� d
N
om3 >o
n.NLC 12m oE� nQ Ucc
oac
@EM
30
U
O
L0 N0"O
O
MO)NU @M ON 3d0
U «t m.E «Cv>v
N
m N E E
J
a a)
U 0 0) 0 Z M R N
C@> m L O -p R E
�n E; a v E° t d o E v o
Q dL
Q'� O) N
J
@ `
�.O C" � � N 0
0'
D.CL UL a> N•0 c
U
y¢Yd �Uw -° �90
N
C13 �a
�
L-. y
0 U
0.c 0 O) 0
@ CJ 0
_
N E D.0 O `O y
(D 7 U O.R W
voam cwcm �Ecm cat �° mom£
K o -c0 n.bv v m :5. t.
I� •L
C C 0
(6 U
0
C
C
Ct„
O c
tl) 3
y O@
..L..
.L.. C (q N
O M O N- _ W
0� C
ou
cU Env L'� °vc�E: ='mw °m ya•um..
uL v 6E
N cc
.o N j.0
d 0. N
@@
M O
O)
N U L N C@ C
N r M w 3.L+ d
N U M O` - O ..+ E
c!°n�oa� n =c
> R= 0 c v -«
.0 i'V
0 d
C
M
L N Q
d
E@
N d
O%'-
"- 0 d" > R
O O' 0) U.M. @
O O)
M N@ E N
L 000 O•H E
O C > w
dysmc Eva o THE a- 5;V. .33
M Ju mL v, mm m�vN>O vow
v
U d
060
7
0
0. =
(n O C@
M
0
6
W
d N C ._ C 0 0
M O.'� - 0- L
O O C m M 0
@@ I L fn t' y U
Q _' '«. E_ 0 w v- a L E a 6 :. m
T
o C n¢ =� 5 m w 'b o d
c
o'O N�
d
�)
> E
N
p M M@ 3 O.E U O
@
O.
C L m 1 O
d 1 p Qi
an d N L 0 C = N O
f6
C
in @
d
�..r
O
C
m O
O.
p �.L-.L O Ea
@ _V% O
>i �._ c (6N O)y �' C
N ._ ._ n
oGc2 del -.N'�rc i"'v�r_cg o. °04m mo
N �S
O O C.3.
L
O
0. U j Ufn H(..)d.L..
0Ci U N Nw.... d C
�_9m ydoE JC mw °nE-_ dvo tir'm
N E 0 M
N
O
J-
L Oa.a7
�'d p E N d fY0 O I�CO
oao� vn9�U° Ww�Edy os a'E c6
F
Oed
>Z
OQF
@ @O.
�=•L -' MN0) EN60.
m o`Wa
.m Q,)
.-NMV
?No a.m o o n3d
E N d
N
d L 0¢ O> O~ .0 i r °I -
C
= c d m n w u N o m" '9 9 5 5 o E v w
CC
aRn�a Lv�'v uv °Ma ooHOC c5
d
E
d..
0 d
w
oa oE3 m`mmapdx� wav aa'T@�v
?NCN 00
J
C
TC
d
M
C c
O 60 0.0 dv3c n9�v
Lw0st no
C9 &6
cow
O
N
@
`
't O
=
O N
3
dnoc
d'w wwo vY v L c c
o -30n0 J-w E_
M ti
d
R
6
.2
O.0
l0 L
W E
as
�O
ACn r --N oN so E2.c vvvo>.E
D
O
o
n
3
O 0
O
L V
3:
7O
CiV
n '3 .0 W d O'S t0 v m C d W c O
2`MKa mMFSS 2Q! UUg3nm¢`m nmmv
J
O.
QOO.J
R
v
CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP
16505 75TH AVE N 16505 75TH AVE N 16505 75TH AVE N
OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP
16505 75TH AVE N
OSSEO, MN 55311 -2783
CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP
16505 75TH AVE N 16505 75TH AVE N 16505 75TH AVE N
OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783