Loading...
PC Staff Report 10-07-2014CITY OF CHANHASSEN PROPOSED MOTION: PC DATE: October 7, 2014 CC DATE: October 27, 2014 REVIEW DEADLINE: November 4, 2014 CASE #: 2014 -29 BY: AF, RG, TH, TJ, ML, JM, JS "The Chanhassen Planning Commission recommends that City Council approve the preliminary plat for Villages on the Ponds 11' Addition and approve the site plan for Chanhassen Specialty Grocery with a variance to the sign letter size on the north and west building elevations subject to the conditions of the staff report, and adopts the Findings of Fact and Recommendation." SUMMARY OF REQUEST: The developer is requesting preliminary plat approval to create two lots and one Outlot and Site Plan Review for a 14,000 square -foot, one -story specialty grocery store with a variance from the Planned Unit Development sign letter height to permit letters in excess of 30 inches. 1540 LOCATION: Northwest Corner of Lake Drive and Main Street Outlot B, Villages on the Ponds 4' Addition (PID 25- 8460030) APPLICANT: Venture Pass Partners, LLC 19620 Waterford Court Shorewood, MN 55331 (612) 801 -4313 rrauwerdink @venturepass.net Owner: Northcott Company 250 Lake Drive East Chanhassen, MN 55317 (952) 294 -5215 bschwen @northcotthospitality.com PRESENT ZONING: Planned Unit Development (PUD) (Villages on the Ponds) 2020 LAND USE PLAN ACREAGE: 2.71 acres Mixed Use DENSITY: F.A.R. 0.29 Planning Commission Villages on the Ponds I 11h Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 2 of 19 LEVEL OF CITY DISCRETION IN DECISION- MAHING: The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision. The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. The City's discretion in approving or denying a variance is limited to whether or not the proposed project meets the standards in the Zoning Ordinance for a variance. The City has a relatively high level of discretion with a variance because the applicant is seeking a deviation from established standards. This is a quasi - judicial decision. Notice of this public hearing has been mailed to all property owners within 500 feet. PROPOSAL /SUMMARY The development is located within Villages on the Ponds, a mixed -use development. The site was rough graded as part of the overall development. The property is located within Sector I of the Villages on the Ponds development. The applicant is requesting subdivision approval to create two lots and one outlot and site plan approval. The proposed development consists of a one -story, 14,000 square -foot retail building. A second building site is being platted along Lake Drive, which will be developed in the future. The primary parking for the project is located in the interior of the lot. Some on- street parking is also available along Lake Drive, Main Street and Pond Promenade, which are all private streets. Within Villages on the Ponds there are existing cross - access and cross - parking agreements that permit a portion of the parking to be located off site. Parking requirements in excess of those specifically provided on site are through shared parking. The primary building material consists of dark brown and tan rock face block, single score burnished block light brown accent bands with brown and reddish brown brick in columns and at the entrance. Black awnings are proposed over individual windows. A white E.LF.S. cornice is incorporated at the top of the walls. The roof is a lighter brown standing seam metal. The proposed development is consistent with the comprehensive plan and the project's development design standards. Staff is recommending approval of the project subject to the conditions of this report. Planning Commission Villages on the Ponds I I' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 3 of 19 APPLICABLE REGULATIONS Chapter 18, Subdivision Chapter 20, Article II, Division 6, Site Plan Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial and Office - Institutional Development Villages on the Ponds Development Design Standards BACKGROUND On December 9, 2002 the Chanhassen City Council approved Site Plan #2002 -9, plans prepared by Truman Howell Architects and Associates, Inc., dated October 18, 2002, for a 70,873 square - foot, three -story building consisting of street level commercial and upper level hotel rooms (not constructed); and A variance for the use of more than 15 percent EIFS on the building based upon the finding that it is consistent with other buildings approved in the area (void since not used); and A variance for signage in excess of 20 feet in height on the building based on the fact that it is consistent with the approval given to the Community Bank of Chanhassen building (void since not used). On June 28, 1999, the City Council approved PUD 95 -2 granting Final Plat approval for Villages on the Ponds Fourth Addition, creating one lot and two outlots. The lot is for the Peddler Cyclery, a.k.a., Bokoo Bikes. On September 23, 1996, the City Council approved PUD 95 -2, Villages on the Ponds, including a Comprehensive Land Use Plan amendment from Office1ndustrial, Institutional, Residential Medium Density, Residential Low Density to Mixed Use - Commercial, High Density Residential, Institutional and Office; Preliminary planned unit development for up to 291,000 square feet of commercial/office buildings, 100,000 square feet of institutional buildings, and 322 dwelling units; Rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat dated "Received September 19, 1996" for two lots and ten outlets and public right -of -way. SUBDIVISION The developer is proposing subdividing the property into two lots and one outlot. The initial phase will only plat one lot for the specialty grocery building. Outlot A is for Pond Promenade. Outlet B will be final platted in the future as a lot for another commercial building. Planning Commission Villages on the Ponds l I' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 4 of 19 .. .. ... � '•iii.i. b,,;6: i:.. T :: i•ii::: �:: � ,y a � i xn�a . } . I r _ L ^TI _ C s R F �.: E 7I.r1.'f Lull ,TH J �f. 1 `"•`ail j �! ILf F � �! 'SHE rm w.$` PRELIMINARY PLAT Fees The fees collected with the final plat are: Surface Water Management fee Park Dedication fee GIS fee: $25 (plat) + ($10 /parcel x 3 parcels) _ $55 City water (WAC), City sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. The Surface Water Utility Charges are calculated based upon land use type and land area. Credits may be applied based upon storm water practices being implemented. The following table illustrates the Storm Water Utility Charges associated with the development of this parcel. Area Rate Total Water Quality 2.71 ac $22,060/ac $59,848.78 Water Quantity 2.71 ac $8,560/ac $23,223.28 Treatment BMP Credit 1.80 ac $22,060(0.5)/ac ($19,854.00) $63,218.06 Planning Commission Villages on the Ponds l la' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 5of19 Outlot B will be developed with thirteen (13) parking stalls and a drive lane as well as storm water improvements necessary for the development of the parcel. Because of these improvements it will not be considered undeveloped and will be assessed a storm water connection charge and will be assessed the quarterly surface water management fee at the rate for commercial properties. If the applicant wishes to avoid these assessments Outlot B must be reconfigured such that it contains no improvements and remains an undeveloped lot. The assessments will then be deferred until such time as outlot B is developed. PARKS This property is located within the community park service area for Lake Susan Community Park and the neighborhood park service area for Rice Marsh Lake Neighborhood Park. Employees and visitors to the specialty grocery store will have convenient access to these publicly - maintained park and recreation facilities. Lake Susan Park is 33 acres in size and features large playgrounds, basketball court, picnic shelter, tennis courts, archery range, public water access, fishing pier and a ball field. Ample off - street parking is available at the park. Rice Marsh Lake Park is four acres in size and features a playground, ball field, basketball court, volleyball court and a small picnic shelter. Off - street parking is available. No additional parkland acquisition is being recommended as a condition of this subdivision. TRAILS The subject site has convenient access to the public trails along Great Plains Boulevard, the three - mile Rice Marsh Lake Trail Loop and the Lakeside trail route to Lake Susan Park. No additional trail construction is being recommended as a condition of this subdivision. PARK AND TRAIL CONDITIONS OF APPROVAL Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for Outlot B, Villages on the Ponds 0 Addition. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of $12,500 per acre, the total park fees would be $33,875. UTILITIES Public sanitary sewer and water main are within streets surrounding the proposed development. The plat must be revised to include a 20 -foot drainage and utility easement centered over the public utilities within Outlot A. Planning Commission Villages on the Ponds 11`h Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 6of19 The developer proposes to wet tap a 6 -inch diameter water service to the existing water main and extend a sanitary sewer service from an existing sanitary sewer manhole northwest of the building on Lot 1. These service connections will be inspected by the Building Department in conjunction with the building/plumbing permit. COMPLIANCE TABLE GENERAL SITE PLAN /ARCHITECTURE The applicant is proposing a one - story, 14,000 square -foot retail building. Area (s . ft. ) Frontage ft. Depth (ft. ) Notes PUD 15,000 100 100 CBD District Lot 1 48,595 130 354 1.12 acres Outlot A 39,943 NA NA Pond Promenade, 0.92 acre Outlot B 29,636 109 319 Future Development, 0.68 acre 118,174 2.71 acres GENERAL SITE PLAN /ARCHITECTURE The applicant is proposing a one - story, 14,000 square -foot retail building. I � / 0 I I rd^ 6 ' I i a. wa s U 31 -1- 1,� T - - =L11 , + - - - --° + + LAKE DRIVE Planning Commission Villages on the Ponds 11' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 7 of 19 ARCHITECTURAL COMPLIANCE CHANHASSEN SPECIALTY rxo EcTTenM GROCERY n, rll_ cM CVVAMo Planning Commission Villages on the Ponds l lth Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 8 of 19 Size Portion Placement The building entrance is oriented to the west parking area and consists of a five -foot projected tower structure of reddish -brown utility brick. Had his been a multi- tenant building, store frontages would have been required on the Main Street elevation. The building elevations are highly articulated with numerous openings, changes in materials, projections and recesses in the building fagade and incorporation of various window treatments and styles. Material and Detail and Color The primary building material consists of dark brown and tan rock face block, single score burnished, light brown accent bands with brown and reddish brown brick in columns and at the entrance. Black awnings are proposed over individual windows. A white E.I.F.S. cornice is incorporated at the top of the walls. The roof is a lighter brown standing seam metal. Height and Roof Design The tallest point of the entrance roof is 32 feet 10 inches. The top of wall is 25 feet 4 inches which is topped with a dark brown aluminum cap flashing. The roof is a lighter brown standing seam metal. Mechanical equipment is screened through placement and parapet walls. Facade Transparency Transparent windows and doors are located on the north and west building elevations. All other areas shall include landscaping material and architectural detailing and articulation. For portions of buildings with a use or function that does not readily allow windows, e.g., cooler or freezer areas, mechanical rooms, security areas, storage areas or warehouse or manufacturing space in commercial or industrial buildings, the fenestration standards may be reduced. However, the architecture detailing must be provided by the use of upper level windows, the use of spandrel glass or architectural detailing which provides arches, patterning, recesses and shadowing that provide aesthetic interest. Landscaping shall be provided to the south of the building to provide some relief to the blank expanse of wall and screen the loading dock area. Site Furnishing The applicant is providing bicycle racks in the northwest corner of the building and an eco mesh green wall on the east side of the building. The developer shall consider a design change to the ECO mesh green wall to be slightly curved to help break the monotony of the long, straight wall along the street. As part of the hardscape design for Villages on the Ponds, Main Street was to have two benches east of the building. The applicant should also consider providing additional benches on site and along Pond Promenade. The applicant shall provide benches similar to others provided throughout Villages on the Ponds. Planning Commission Villages on the Ponds 11th Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 9 of 19 Lighting The plan calls for the removal of the street lights on the East side. However, those lights have to be preserved and operational when site construction is completed. The pedestrian component of Villages on the Ponds incorporates the acorn -style lighting along Main Street and Lake Drive. Parking area lighting is provided by 27.5 -foot tall, shoe -box style light fixtures. All fixtures must be shielded, high - pressure sodium or light- emitting diode (LED), with a total cutoff angle equal to or less than 90 degrees. Three styles of wall - mounted lighting fixtures are proposed around the building. All wall - mounted light fixtures shall be shielded with a total cutoff angle equal to or less than 90 degrees. Loading Areas, Refuse Area, etc. A trash and pallet enclosure is provided to the south of the building and consists of the same material as proposed for the building. The loading dock is located along the south wall behind the enclosure and shall be screened with additional landscape plantings. Lot Frontage and Parking location The site has frontage on three streets. Parking is primarily provided to the west of the building with 67 spaces on site and 65 in Pond Promenade. Ten more spaces are located along Main Street and ten on Lake Drive. Signage Wall signage is permitted on the north, east and west elevations of the building. One sign per tenant is permitted on each of these elevations. While City Code would permit the signage proposed by the developer, the PUD standards restrict the letters and logos to a maximum of 30 inches in height. A variance is being applied for to permit the 42 -inch letters shown on the exterior elevations. A separate sign permit is required for each sign. ACCESS Pedestrian access is provided from Pond Promenade. With the future development of the lot along Lake Drive, pedestrian access will be provided from the south and west. The site lies within the Villages on the Pond Planned Unit Development located south of Trunk Highway 5 between County Road 101 and Great Plains Boulevard. The streets within the Villages development — Pond Promenade, Lake Drive and Main Street — are privately owned and maintained. The site is on the northwest corner of Lake Drive and Main Street and will be accessed from the north via Pond Promenade and from the west via the existing north -south (unnamed) street between Lake Drive and Pond Promenade. Planning Commission Villages on the Ponds 11th Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 10 of 19 The developer proposes improvements along the private streets north and west of the site, specifically installation of 90- degree parking stalls that will be paved and will have curb and gutter. The western portion of Pond Promenade shall be at least 26 feet wide to meet the City's minimum requirement for a private street serving two -way traffic. Delivery access for the site will be from the access at Pond Promenade. The developer's engineer submitted trunk turning movements to illustrate how a tractor - trailer unit would access the delivery dock on the south side of the building. The developer's engineer is encouraged to evaluate the turning movements to determine if the wheels would conflict with the curb line, and make the necessary adjustments to the plan. The plans indicate a potential layout on Outlot B for future development. Cross - access and /or cross - parking agreements required for any future development would be addressed at the time of final plat for Outlot B. "No Parking Fire Lane" signs and yellow - painted curbing will be required. Contact Fire Marshal for specifics. GRADING Site Characteristics The site is an existing unimproved lot within the Villages on the Pond plat. There is currently an area that acts to hold water on site. This area is a remnant from a previous attempt to excavate for improvements on the site that was never completed. This area does not meet the criteria to be classified as a jurisdictional wetland nor was intended for the purpose of storm water management. The plan proposes to fill this area. A dewatering plan will be required for draining this pond. This dewatering plan must assure that sediment -laden waters are not discharged from the site. It is highly recommended that this area be used as a temporary sediment basin during site development. The site has a gradual decrease in elevation from north to south and from east to west toward the pond area. There are no bluffs or steep slopes located on the property that must be protected during site development. The property is 1,200 feet from Lake Susan and 1,400 feet from Rice Marsh Lake at the closest points. This is outside of the 1,000 -foot shoreland zone. Soils on the site consist of Lester - Kilkenny loams as identified in the United States Department of Agriculture Web Soil Survey. With the exception of an area approximately 40 feet in width adjacent to Lake Drive, the soils on the site fall into the B hydrologic soils group and would be conducive to infiltration. Approximately half the site does have a seasonally high water table that could be restrictive to infiltration. Planning Commission Villages on the Ponds 11`h Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 11 of 19 Grading: Drainage The site was mass graded when the surrounding area was developed. The original plans for the site included underground parking within the area now shown as Outlot B. The underground parking was sub -cut with the original site grading and has since filled with surface water runoff. The developer proposes to fill the majority of this area, with the eastern portion of Outlot B being utilized for a sand filter basin to treat storm water runoff from the proposed development. A new storm sewer manhole will be installed to connect the discharge pipe from the sand filter basin to the existing storm sewer within Lake Drive. This connection will be inspected by the Building Department in conjunction with the building/plumbing permit. n i "._ s I�. The proposed design maintains the same overall drainage pattern with some minor alterations for rate control and water quality treatment. The system will be private and will connect to a private system internal to Villages on the Ponds before entering the public system at Main Street and Great Plains Boulevard. The proposed drainage post development reduces runoff rates in the 2- year, 10 -year and 100 -year return interval storm event conditions. This meets City requirements. Grading: Erosion Prevention and Sediment Control Because this will result in greater than one acre of new impervious, it must meet the requirements set forth in the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination System/State Disposal System Program ( NPDES Construction Permit). As part of the NPDES the applicant must develop or cause to be developed a Surface Water Pollution Prevention Plan ( SWPPP) with all of the elements required under Part III of the permit. Section 18 -40 of Chanhassen city code requires that the SWPPP be provided with the preliminary plat submittal. Section 19 -145 states that this SWPPP must be a standalone document. The City will make available a checklist of the required elements that can be used by the applicant to develop a SWPPP compliant with the NPDES Construction Permit and Section 19 -145 of city code. The SWPPP should be a single standalone document that assembles the required information in one place for ease of review, inspection, maintenance, modification and assurance of compliance. City staff must have reviewed and approved the SWPPP prior to the issuance of a grading permit or any other earth - disturbing activities are allowed. This shall include, but not be limited to, installation of perimeter BMPs, removal of vegetation, dewatering of the basin, removal of any structure or improved surface as well as grading, excavating or placement of fill materials. Planning Commission Villages on the Ponds 11th Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 12 of 19 During construction, every reasonable effort must be made to protect the filtration area from construction impacts. Any dewatering of the pond must have a dewatering plan, approved by the city, prior to executing. This plan must assure that no sediment -laden water leaves the site and shall be incorporated into the SWPPP. It is highly recommended that the pond be used as a temporary sediment basin during site development. Stormwater Management This site will exceed the one (1) acre threshold triggering the National Pollution Discharge Elimination System ( NPDES) permit. The project will need to meet the requirements of the NPDES permits including the Municipal Separate Storm Sewer System (MS4) permit and the General Permit Authorization to Discharge Stormwater Associated with Constriction Activity Under the National Pollution Discharge Elimination System/State Disposal System Program ( NPDES Constriction Permit). In addition to erosion prevention and sediment control practices, this includes permanent stormwater management as discussed in Part III.D of the NPDES Constriction Permit and post - construction stormwater management as discussed in Part IILD.S of the MS4 permit. The NPDES permit program requires that the first inch of runoff from impervious surfaces is retained on site. If infiltration is prohibited (see Construction Permit Part III.D.I j), other methods of volume reduction should be evaluated. Volume reduction must occur to the "maximum extent practicable ". In either case, the equivalent water quality volume must be treated. The applicant is proposing a filtration basin in the southeast corner of the property. The NPDES Construction Permit requires that "where a project's ultimate development replaces vegetation... with one (1) or more acres of cumulative impervious surface, the Pennitee(s) must design the project so the water quality volume of one (1) inch of runoff from the new impervious surfaces ... is retained on site (i.e. infiltration or other volume reduction practices) and not discharged to a surface water. "' When the site constraints are such that infiltration is prohibited as listed in Part III.D.I J of the NPDES Construction Permit, "the Permitee shall consider other methods of volume reduction and the water quality volume ... must be treated prior to the discharge of stormwater to surface waters." The applicant is providing rate control and water quality improvements through the installation of an EcoStorm structure and a sand filtration system. The applicant is stating that volume reduction is not possible on site due to the presence of soils in the D hydrologic group. However, they have provided no evidence to support this assertion. The USDA has mapped much of the soil in the area as belonging in the B hydrologic group which would be well suited to infiltration. It might be possible to provide storage below the outlet for the sand filtration system to provide a partial infiltration system. It may also be possible to utilize this feature to capture storm water for reuse on landscape features. Minimal Impact Design Standards worldng group and others have developed a number of practices beyond infiltration that may be used for volume reduction. The applicant shall ' Part III of General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination System /State Disposal Program Planning Commission Villages on the Ponds l la' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 13 of 19 provide an evaluation of other methods of volume reduction to justify any permanent storm water management practice employed. Even if there are limitations to volume reduction, the applicant must still attempt to reduce volume to the maximum extent practicable and then treat an equivalent water quality volume. The applicant is stating the water quality requirements are met through the installation of these best management practices. The applicant must provide modeling showing the proposed practices will meet section 19 -144 (a)(3) of Chanhassen City code. (3) Newly- constructed or modified detention basins shall provide storage volume below the outlet (dead storage) to allow for water quality treatment in accordance with the following, whichever is most restrictive: a. Water quality features meeting the MPCA NPDES construction permit for permanent stormwater management systems; b. Water quality treatment consistent with NURP criteria (90 percent removal of TSS and 60 percent removal of TP for a standard NURP particle size distribution); and/or... The applicant must provide water quality modeling showing that the water quality treatment conditions are met for the required water quality volume. Acceptable modeling software are listed in Section 19- 144(a)(1)c. of Chanhassen City Code. Long -term maintenance of the facilities shall be privately owned and maintained. The City is required under their MS4 permit to "provide for the establishment of legal mechanisms between the permittee and owners or operators responsible for the long -term maintenance of structural stormwater BMPs not owned or operated by the permitee..." This system is considered private but assurances need to be put in place to assure that Chanhassen, as a permittee under the MS4 can; a) Conduct inspections, perform maintenance and assess costs when the permittee determines that the owner and/or operator of the structureal stormwater BMP has not conducted maintenance. b) Include conditions that are designed to preserve the permittee's right to ensure maintenance responsibility ... when those responsibilities are legally transferred to another parry. c) Include conditions that are designed to protect/preserve structural stormwater BMPs and site features that are implemented to comply with Part III.D.5.a(2). If site configurations or structural stormwater BMPs change, causing decreased structural stormwater BMP effectiveness, new or improved structural stormwater BMPs must be implemented to ensure the conditions for post - construction stormwater management in Part III.D.5.a(2) continue to be met The applicant must record a drainage and utility easement over the Ecostorm and the sand filter basin. This recorded easement must specifically address who is responsible to own and maintain the system and must meet the requirements spelled out in Part III.D.5.(5) of the General Permit Authorization to Discharge Stormwater Associated with Small Municipal Separate Storm Sewer Planning Commission Villages on the Ponds l Ph Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 14 of 19 Systems Under the National Pollution Discharge Elimination System/State Disposal System (NPDES /SDS) Permit Program. LANDSCAPING Minimum requirements for landscaping at the specialty grocery store include 1,944 square feet of landscaped area around the parking lot, three landscape islands or peninsulas, seven trees for the parking lot. The applicant's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Applicant meets minimum requirements for trees and interior landscaping in the parking lot area. To be consistent with landscaping expectations within Villages on the Ponds, staff recommends that additional trees be planted within the larger peninsulas located at the northern entrance /exit drive, at the northwest comer of the site in Pond Promenade and at the corner of Lake Drive and Pond Promenade. The landscape plan shows small, but multiple, inconsistencies. Staff recommends that a corrected landscape plan be supplied to the city prior to construction. MISCELLANEOUS µI i7rc The buildings are required to have automatic fire extinguishing systems. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. Detailed occupancy- related requirements will be addressed when complete building plans are submitted. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Required Proposed Vehicular use landscape area 1,944 s . ft. >1,944 s . ft. Trees /parking lot 7 trees 7 trees Islands or peninsulas /parking lot 3 islands /peninsulas 4 islands /peninsulas Applicant meets minimum requirements for trees and interior landscaping in the parking lot area. To be consistent with landscaping expectations within Villages on the Ponds, staff recommends that additional trees be planted within the larger peninsulas located at the northern entrance /exit drive, at the northwest comer of the site in Pond Promenade and at the corner of Lake Drive and Pond Promenade. The landscape plan shows small, but multiple, inconsistencies. Staff recommends that a corrected landscape plan be supplied to the city prior to construction. MISCELLANEOUS µI i7rc The buildings are required to have automatic fire extinguishing systems. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. Detailed occupancy- related requirements will be addressed when complete building plans are submitted. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Planning Commission Villages on the Ponds I 11h Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 15 of 19 COMPLIANCE TABLE PUD Chanhassen Specialty Grocery (14,000 sf) Building Height 3 stories 1 story 40 feet 29.5 feet Building Setback N - 0' E - 0' N-5' E - 5' 3 %" W -0' S -0' W -218' 5 -15' Parking Stalls 70 stalls 152 stalls # (Retail 1/200 square feet — 14,000/200 = 70 spaces (# 67 spaces on -site, 10 spaces on Main Street, 10 spaces on Lake Drive, 65 spaces on Pond Promenade. Parking Setback Hard Surface Coverage Lot Area N- 0'E -0' W- 0'S -0' 70% 15,000 square feet N -0'E -142' W- 0'S -0' 84 %# 48,595 sq. ft. (1.12 acres) # Hard surface coverage must average 70 percent over the entire development. Individual lots may exceed 70 percent site coverage. VARIANCE The applicant is requesting a variance from the sign standards in Villages on the Ponds which limits letter height to 30 inches so that they may use 42 -inch letters. While City Code would permit the signage proposed by the developer, the PUD standards restrict the letters and logos to a maximum of 30 inches in height. The PUD standards were established in 1996 when the concept for the development was a compact, urban village with multi- storied buildings along both sides of the street. In such an environment, signage size could be reduced because views would be limited to the street immediately adjacent to the property. Reduced letter size is adequate in a pedestrian-type environment. The applicant is proposing signage that will be visible from Highway 5 and Market Boulevard. Staff is recommending approval of the variance to permit the 42 -inch letters on the north and west building elevations only; however, larger signage is not necessary on the east elevation because it is a pedestrian- oriented, compact urban design. It should be noted that the sign will still comply with the City sign ordinance. Planning Commission Villages on the Ponds 11`n Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 16 of 19 RECOMMENDATION Staff recommends that the Planning Commission approve the Villages on the Ponds 1111' Addition and Chanhassen Specialty Grocery subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: Subdivision Engineering: 1. The plat must be revised to include a 20 -foot drainage and utility easement centered over the public utilities within Outlot A. 2. The fees collected with the final plat are: a. Surface Water Management fee b. Park Dedication fee c. GIS fee: $25 (plat) + ($10 /parcel x 3 parcels) = $55 3. City water (WAC), City sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. Parks: 1. Park fees shall be collected in full at the rate in force upon final plat submission and approval. Water Resources: The applicant must provide adequate evidence that there is no area on the subject property suitable for infiltration. The discussion must include the practicality of altering the site layout. 2. The applicant must provide volume control to the maximum extent practicable and must provide a discussion of the feasibility of other methods of volume reduction. 3. The applicant must provide water quality modeling, acceptable under Section 19- 144(a)(1)c. of Chanhassen City Code, showing that the water quality treatment conditions are met for the required water quality volume from all new impervious surfaces. 4. A comprehensive, stand -alone SWPPP document with all elements required by Part III of the NPDES construction permit and Section 19 -145 of city code shall be prepared and submitted to the City for review and comment before any earth - disturbing activities, including but not limited to dewatering of the pond, removal of any existing surfaces or structures, and removal of vegetation. Planning Commission Villages on the Ponds 11`" Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 17 of 19 5. Any dewatering of the pond must have a dewatering plan, approved by the city, prior to executing. This plan must assure that no sediment -laden water leaves the site and shall be incorporated into the SWPPP. 6. The applicant must comply with the requirements of all other jurisdictional agencies with authority over the project area. 7. The applicant will be responsible for procurement of any permission required by any other agencies with authority over the project. Site Plan with Variance Building: 1. The buildings are required to have automatic fire extinguishing systems. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Detailed occupancy- related requirements will be addressed when complete building plans are submitted. 4. The owner and or their representative shall meet with the hispections Division as soon as possible to discuss plan review and permit procedures. Engineering: 1. The western portion of Pond Promenade shall be at least 26 feet wide to meet the City's minimum requirement for a private street serving two -way traffic. Fire Marshal: 1. "No Parking Fire Lane" signs and yellow - painted curbing will be required. Contact Fire Marshal for specifics. Natural Resource Specialist: 1. The applicant shall install trees in the larger landscape peninsulas located along Pond Promenade on the north and west sides of the lot. 2. The applicant shall re- submit a corrected landscape plan to the city prior to construction. Planning Commission Villages on the Ponds 11"' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 18 of 19 Planning: 1. The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. Install two benches east of the building on Main Street. The applicant should also consider providing additional benches on site and along Pond Promenade. The applicant shall provide benches similar to others used in Villages on the Ponds. 3. Change the design of the ECO mesh green wall to be slightly curved (in footprint) to help break the monotony of the long, straight wall along the street. 4. The street/sidewalk lights along Main Street have to be preserved and operational when the site construction is completed. 5. Additional landscaping shall be provided to the south of the building. Water Resources: The applicant must record a drainage and utility easement, or other equivalent protection as agreed to by the city, over the Ecostorm and the sand filter basin. This recorded easement must specifically address who is responsible to own and maintain the system and must meet the requirements spelled out in Part III.D.5.(5) of the General Permit Authorization to Discharge Stormwater Associated with Small Municipal Separate Storm Sewer Systems Under the National Pollution Discharge Elimination System/State Disposal System (NPDES /SDS) Permit Program. 2. Outlet B shall be included in the quarterly SWMP fees and in the Storm Water Connection charge and shall be charged at the commercial rate unless left fully undeveloped. If left fully undeveloped the connection charge shall be delayed until such a time as Outlot B is developed and the quarterly fee shall be that of an undeveloped lot. 3. Surface Water Management connection charges are estimated to be $63,218.06. This connection charge will be due at the time of final plat. Planning Commission Villages on the Ponds 11"' Addition/Chanhassen Specialty Grocery Planning Case 2014 -29 October 7, 2014 Page 19 of 19 ATTACHMENTS 1. Findings of Fact and Decision. 2. Development Review Application. 3. Project Narrative. 4. Request for Variance Narrative. 5. Reduced Copy Final Plat. 6. Reduced Copy Existing Conditions. 7. Reduced Copy Preliminary Plat. 8. Reduced Copy Civil Site Plan. 9. Reduced Copy Grading Plan. 10. Reduced Copy Erosion Control Plan — Phase I. 11. Reduced Copy Erosion Control Plan — Phase 11. 12. Reduced Copy Utility Plan. 13. Reduced Copy Site Plan - Phase 1. 14. Reduced Copy Landscape Plan. 15. Reduced Copy Site Lighting. 16. Reduced Copy Floor Plan. 17. Reduced Copy Roof Plan. 18. Reduced Copy Exterior Elevations with landscaping. 19. Reduced Copy Exterior Elevations. 20. Reduced Copy Exterior Perspectives. 21. Memo from Scott Sobiech and Candice Kantor to Robert Generous dated 9/24/14. 22. Email from Vemelle Clayton to Bob Generous dated 9/17/14. 23. Public Hearing Notice and Mailing List. gAplan\2014 planning cases\2014 -29 chanhassen specialty grocery\staff report specialty grocery.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Venture Pass Partners, LLC and Northcott Company for Subdivision and Site Plan approval with a variance for signage. On October 7, 2014, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Venture Pass Partners, LLC and Northcott Company for preliminary plat and site plan approval with a variance for sign letter size. The Planning Commission conducted a public hearing on the proposed subdivision preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Planned Unit Development, PUD. 2. The property is guided in the Land Use Plan for Office/Industrial. 3. The legal description of the property is: Outlot B, Villages on the Ponds Fourth Addition. 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance and meets the standards of the Village on the Ponds Planned Unit Development; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan since the site is guided for mixed use development which includes commercial or multi- family residential; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; e. The proposed subdivision will not cause environmental damage; f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature since adequate infrastructure is available. A subdivision is premature if any of the following exists: 1) Lack of adequate storm water drainage. 2) Lack of adequate roads. 3) Lack of adequate sanitary sewer systems. 4) Lack of adequate off -site public improvements or support systems. 5. Site Plan. In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: a) The proposed project is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that maybe adopted; b) The proposed project is consistent with the Site Plan Review requirements of City Code; c) The proposed project preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; d) The proposed project creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; e) The proposed project creates a functional and harmonious design for structures and site features, with special attention to the following: 1. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; 2. The amount and location of open space and landscaping; 3. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 4. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. f) The proposed project protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. 6. Section 20 -1253. Variances. The city council, upon the recommendation of the planning commission, may grant a variance from the requirements of this article where it is shown that by reason of topography or other conditions, strict compliance with the requirements of this article would cause a hardship; provided that a variance maybe granted only if the variance does not adversely affect the spirit or intent of this article. City code only regulates the total sign area permitted for signage, not the individual size of letters within the sign. The PUD standards for Villages on the Ponds limit the height of letters to 30 inches. These standards were established in 1996 and envisioned a multi- storied, dense urban -style streetscape of buildings and uses. In such an environment, sign height would be less important since views would be limited to along the adjacent street. The 30- inch height limitation is viable in a pedestrian- oriented environment. However, changing economic conditions and rimes have altered the type of development taking place and the developer is trying to provide views for further distances including Highway 5 and Market Boulevard. Limiting the size of the letter is a hardship in this instance. 7. The planning report #2014 -29 dated October 7, 2014, prepared by Robert Generous, et al, is incorporated herein. The Planning Commission recommends that the City Council approve the Preliminary Plat (Villages on the Ponds Eleventh Addition) and site plan with a variance for Chanhassen Specialty Grocery. ADOPTED by the Chanhassen Planning Commission this 7a' day of October, 2014. CHANHASSEN PLANNING COMMISSION WN Its Chairman COMMUNITY DEVELOPMENT DEPARTMENT CITY OF CHANHASSEN Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227 -1300 / Fax: (952) 227 -1110 APPLICATION FOR DEVELOPMENT REVIEW Date Filed:9�5 —I'� 60 -Day Review Deadline: I`'— t-i—IY Planner 'R>(=> —Al #: o�1T Section •p • •• apply) ❑ Zoning Ordinance Amendment . ........................... $500 ❑ Comprehensive Plan Amendment ......................... $600 ❑� Subdivision ❑✓ Create 3 lots 'Include number of existing ❑ Minor MUSA line for failing on -site sewers ..... $100 or less ....... ............................... <E301 ❑ Residential Districts .......... ............................... $500 (Refer to the appropriate Application Checklist for required submittal ❑ Create over 3 lots .......................$600 + $15 per lot ❑ Conditional Use Permit ❑ Metes & Bounds .........................$300 + $50 per lot ❑Q ❑ Single - Family Residence . ............................... $325 ❑ Consolidate Lots ............. ................................. $150 ❑✓ ❑ All Others. ---- ......... ...................................... $425 ❑ Lot Line Adjustment .......... ............................... $150 _ ❑� Final Plat'........... $250 ❑ Interim Use Permit "Requires additional 50 scrowfor attorney costs. ❑ In conjunction with Single - Family Residence.. $325 Escrow willbe require r development contract. other applications through the ❑ All Others .......................... ............................... $425 ❑ Rezoning ❑ Planned Unit Development (PUD) .................. $750 ❑ Minor Amendment to existing PUD .................$100 ❑ All Others... ...... ....................................... ... $500 ❑ Sign Plan Review .................... ............................... $150 ❑ Vacation of Easements / Right -of- way ................... $300 (Additional recording fees may apply) ❑ Variance ................................ ............................... $200 ❑ Wetland Alteration Permit ❑ Single- Family Residence ............................... $150 ❑ All Others.. ........................ ............................ $275 Project Name: Chanhassen Specialty Grocery Property Address or Location: OUtlot B, VILLAGES ON THE PONDS, 4th ADDITION Parcel #: 258460030 Leaal Descriotion: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION Total Acreage: 2.71 Wetlands Present? ❑ Yes ® No Present Zoning: PUD Requested Zoning: Existing, PUD Present Land Use Designation: PUD /Retail Requested Land Use Designation: Retail Existing Use of Property: Vacant Land Description of Proposal: 14,000 sf specialty grocery. Platting outlot for possible future phase 2 (8,100 sf retail strip). Platting outlot underlying the Pond Promenade private road areas. ❑D Check box if separate narrative is attached Site Plan Review ❑ Zoning Appeal ....................... ............................... $100 ❑ Administrative ....................... ...........................$100 ❑� Commercial /Industrial Districts* .......... 1` O±.. $500 ❑ Zoning Ordinance Amendment . ........................... $500 Plus $10 per 1,000 square feet of building aretljgq�!)• NOTE: When multiple applications are processed concurrently, 'Include number of existing employees: the appropriate fee shall be charged for each application. and number of new employees: ❑ Residential Districts .......... ............................... $500 (Refer to the appropriate Application Checklist for required submittal Plus $5 per dwelling unit information that must accompany this application) AIOITIONAL REQUIRED FEES: Notification Sign .................... ............................... 200 TOTAL FEES: $ �)C1�13 00 (City to install and remove) 1 !� ❑Q ` Property Owners' List within 500'. ....... $3 per address 33 Received from: UPAA,,Y-P � 'K] lnerSLLL- (City to generate —fee determined at pre- application meeting) ❑✓ Escrow for Recording Documents.. $50 per document Date Received: 9 -5- 4 Check Number: %094 (CUP /SPRNACNARM/AP /Metes & Bounds Subdivision) 100 f6' O �I •CM WES rle fAtA IZ3 -n`j 4s Project Name: Chanhassen Specialty Grocery Property Address or Location: OUtlot B, VILLAGES ON THE PONDS, 4th ADDITION Parcel #: 258460030 Leaal Descriotion: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION Total Acreage: 2.71 Wetlands Present? ❑ Yes ® No Present Zoning: PUD Requested Zoning: Existing, PUD Present Land Use Designation: PUD /Retail Requested Land Use Designation: Retail Existing Use of Property: Vacant Land Description of Proposal: 14,000 sf specialty grocery. Platting outlot for possible future phase 2 (8,100 sf retail strip). Platting outlot underlying the Pond Promenade private road areas. ❑D Check box if separate narrative is attached Section 3: Property Owner and Applicant Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink Address: 19620 Waterford Court Phone: (612) 801 -4313 City /State /Zip: Shorewood, MN 55331 / 1 Cell: (612) 801 -4313 Email: rra uwerai n KLvemurepass. net \ , yet— - -� Fax: Signature: Date: 9/5/14 PROPERTY OWNER: In signing this application, I, as erty owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: LIDroc'm LAwA'-JV Address: �'Sp V- 4 E44 City /State /Zip: _C. ltN' j� q � 1 1 _ML( � � 3 1 Email: tzt H t; 0 -fA I i) -i VK Signature: Contact: 6 n l -1 41 aG N{ Phone: Cell: Fax: Date: q t ]< This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Sambatek Address: 12800 Whitewater Drive Suite 300 City /State /Zip: Minnetonka, MN 55343 Contact: Mike Brandt Phone: (763) 259 -6014 Cell: (612) 703 -0732 Email: MBrandt @sambatek.com Fax: Section 4: Notification Information Who should receive copies of staff reports? *Other Contact Information: (] Property Owner Via: ❑✓ Email ❑ Mailed Paper Copy Name: Andy Krenik- Tushie Montgomery Architects ❑� Applicant Via: 2 Email ❑ Mailed Paper Copy Address: Engineer Via: [D Email ❑ Mailed Paper Copy City /State /Zip: Other* Via: 2 Email ❑ Mailed Paper Copy Email: AndyK @tmiarchtects.com PROPOSED DEVELOPMENT - OUTLOT B VILLAGES ON THE PONDS 4T" ADDN PROJECT SUMMARY NARRATIVE Introduction Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE PONDS 4T" ADDITION. We are proposing to subdivide and plat this Outlot into a Phase One (Lot 1) retail development consisting of a 14,000 sf specialty grocery store, as well as Outlot A which will contain Pond Promenade Road improvements, and Outlot B which will be future Phase Two retail development of approximately 8,100 sf building area and associated parking. The proposed Phase Two Outlot B area will be initially left as green- area and will be an integral part of the stormwater design. Sidewalk construction and improvements are proposed along the full perimeter extents of Pond Promenade Road and Main Street as part of the Phase One improvements, enhancing the pedestrian friendly character of the project. Architecture and Design The 14,000 sf single story building will be detailed with a varied pallet of warm toned materials for the building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices, standing seam metal roofing, aluminum windows, and fabric awnings. Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of an entrance tower with a hip roof and wrap around sloped metal roofing at portions of all four elevations. Additional use of projecting fabric awnings and sculpted EIFS cornices provide increased relief within the building facade. The 50% building fenestration requirement is accomplished with an interplay of massing, color, and material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS cornices, brick piers, and fabric awnings provide a pedestrian scale and architectural detailing to each elevation. Windows along the east elevation (Main Street) would be spandrel or translucent glass highlighted with awnings. The exterior of the building is further enhanced with an emphasis to natural plant materials using a green screen climbing landscape element at the east elevation (Main Street) and extensive use of plantings varied in height along the north, east, and south elevations. The outdoor trash storage and loading area is also screened by use of plant materials. Articulation of the south wall elevation is also accomplished with the natural building steps resulting from the receiving appendage and with the added layering and screening provided by the freestanding trash /pallet enclosure. Tenant signage will be integrally lit channel letters and occur on the west, north, and east elevations per city ordinance for allowable area. The exact location of one tenant sign on the west elevation (front of building) is to be determined. The elevations show two possible locations for signage along the west wall -each within the allowable area. 30AU NEL: CHANHASSEN SPECIALTY GROCERY - Outlot B VILLAGES ON THE PONDS 4T "ADDN REQUEST FOR VARIANCE TO PERMIT 42" WALL SIG NAG E LETTER HEIGHT Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE PONDS 4T" ADDN, including the development of a 14,000 sf specialty grocery store. The architectural design and exterior building elevations as submitted incorporate wall signage on three allowable building elevations, as follow: North - Fronting Pond Promenade and visible to Hwy 5 to the north. West -Over main entrance and fronting the parking lot, also visible to Market Blvd. East - Fronting Main Street Signage on each elevation is proposed as individual internally illuminated channel letters, 42" in height, and placed in a consistent fashion /signage band detail. The total area of each sign as proposed is well below the allowable signage area as per City ordinance, more specifically as follows: North -122 sf proposed, 189 sf allowable West -122 sf or 157 sf proposed, 201 sf allowable East -122 sf proposed, 217 sf allowable A variance is required due to a clause in the VOP Development Design Standards, restricting wall letters to a maximum of 30" in height. While this standard may be suitable for small shop space or for visibility and legibility from directly abutting streets or at pedestrian scale, this is far too limiting and ineffective for our proposed use. We also feel that it is not of a scale consistent with the massing and dimensions of our proposed building. It should also be noted that when the Pond Promenade PUD was approved in 1996 it was one of the pioneering new urbanism projects in the Metropolitan area. During this period communities and planners had a general attitude that merchant signs should be minimal and generic. The current trend as evidenced by the relaxing of most municipal sign codes is that adequate signage is not only critical to a merchants success but can add vibrant and creative design elements to a project while adding distinction and variety to a neighborhood. Highly visible and legible signage is critical to the success and viability of a grocery operation with a regional draw. This parcel as situated has critical sightlines to Hwy 5 and to Market Blvd, however it is set back from Hwy 5 by approximately 550', and from Market Blvd by approximately 620'. Providing effective identification and signage to passing motorists is essential. Signage, if restricted to 30" letter height, will prove entirely ineffective and unacceptable to the user. Research as compiled by the United States Sign Council, studying legibility of signage parallel to roadways from moving vehicles is summarized in the table below. This table only calculates recommended letter heights up to a distance of 400' from the roadway, however even at 400' (highlighted in yellow) the recommended legible sizes exceed 80" in height. The 42" height that we are requesting is obviously well below this recommendation, but it will provide some level of effectiveness that could not be achieved with the 30" restriction. The 42" height is also consistent with other locations of our tenant, and in keeping with their minimum standards. For additional reference I also highlighted in red the effective distance for viewing signage with 30" letters. This approximate 100' distance is consistent with my comments above, suggesting this sizing is suitable for pedestrian scale orviewing from directly abutting roadways. Parallel Signs TYPICAL PARALLEL. SIGNS > ANGULAR VIEWS GM 0 ROADWAY Table 3. Parallel sign letter height lookup table. Offset from Curb (R) 10 Letter Height in Inches Number of Lanes 10 12 40 10 12 14 16 18 60 14 a �_... _...20 22 80 18 20 22 24 26 100 22 24 26 28 30 125 27 29 31 33 35 175 37 39 41 43 45 200 42 44 46 48 50 225 47 49 51 _ 53 55 250 52 54 56 58� 60 275 57 -59 61 63 65 300 62 64 66 68 70 ^_— 325 —� 67 _ 69 71 73 75 350— 72 74 76 78 80 375 77 79 81 83 85 82 84 86 88 90 Additional research into the effective sizing of signage letters, from the basis of static straight on viewing also supports the 42" sizing of the sign letters. Note on this table that from the distances we are offset from the major roadways, signage with the best impact is 42" to 60" high. This does not take into account the limited viewing time that is possible when in a moving vehicle, or whenonceentrating on driving the vehicle, as is accounted for in table above. co �, LETTER VISIBILITY CHART STATIC PERPENDICULAR VIEWING 3" Letter Height (inches) 30' Distance for Best Impact (feet) Max. Rea ;, ;u e Distance ifeeti 3" 30' 100' 4" 40' 150' 6" 60' 200' 81, 80' 350' 9" 90' 400' 10" 100' 450' 12" 120' 625' 15" 150' 630' 1811 180' 750' 24" 240' 1000' 30" 300' 1250' 36" 360' 1500' 42" 420' 17501 48" 480' 2000' 54" 540' 2250' 60" 600' 2500' —'P" I.s Es J T ELEVATION .... .. .. . . ...... NORTH ELEVATION mcea uIU ft�K EAST ELEVATION I.." I., 50UTH ELEVATION xs \\ cnldOd 34! NG Sci�tl ? ?!A• e --------------------- - - - - -j L- z S i " S 0 N 0 d Sri! NO S3EJtl??IAd �- I eez ea _ L �om m91 i5 dIi z0 I � ;z I r - -- • "i 11 1 i iii 1 E p 1 0 \ g \\ 111 \ 2 C F \ \• d � p \ \1\ �`r \1\ \ a \ C z o �q 11 ar Y gyp' 0 1 � W .A UJ .• `• _ 4 � _ — — — — �— to — \� i._ an:Iwox ~4,``AO�i SzW 5 Z Ij I anti iFF" Qa 0A muj N a I OW 1 W } e.J a 1 6 :fry j 8 s �3' S i E °g >3 � %➢ f I v RR a s i Y � F gs.frg H Wl a % 0 8a ? 6 ? B s s ? ra s ?F a C3 d g WE a a x W Z U 210 ZO ¢ > 72 sod ,• =aw g = 0 Sj�= m t g! 1—H2V Z i, J 9 � �I� d 2 C s`s m Qw� m Q `6 >_7 .J EYq p wln2 6 ^E a` V ui t7 U y?sil d 1 j M. 1 0u .n �% a` y $ - Yy i gl ° §3a3sa� 3 ci ;� pvs z 3 Moo fT YTiYle. ol ziFl a pa se9e�`7 W 3 563: by � B §H§$ '� 1 3S i9 AIL 3E V I :nn e l � /ffia�l� I .. l� l� n � �i � v I / Pis II '•I � '9 � ` „c ��1� `I I vv / 1;4• ' ail` 6 I, I. C rI It U. Lil iij LIi \ i I II x\ \ i s I 3 t W Z Z U CO) E pEg Z g e 4 N e~ N VN C F'i HP ki 33 ON1_ 7 0 a C > iill R; Q O sev pjt'raS { YCZC N ^8 fie: � S J Yi ZQ w _Q O Z V a�:� :. e; Ei- sr d99;IE % N5 j_G ci m �g�= Z Q 2 ZK es Zw N, di2 E`N a�E CCf V � a a � 3 r ON `v p ! I , / }' I / ., - ~ ✓ tl1PT1f10 to a- e1n°°"w, \ c a ,• r\ • r$ r r �w v_8x 6 / I - I •� €Ili_ c ,�II ¢t i�yp�eur I I Q W Z Q U U BIZ- .8 zQV oZ zz ss v ¢WO ¢z u uai l�7 ° u O10 R s �_§S , z_ . fv Sx , B$�$'z� §�26$� 3 b j i S @ 5 z All, M �`x °sa!555 � e•' =g �: °n� 3 3: 3 3 §a? "r °a' � 3a: €s73 F �43 3 Y � ? y 3 133ats wvw ,Re`.. V r �• _ lo o r !i 444 'AEI .' ` \�• - . -- ° I I � i v i W Z Q N c�� gyp: Le'(i Pry N2 a d � SO 3eg z° zu" ° z c3E@ '€ E-r € @• = „� ro z� n 012fG °s Qw0 m6Z raga. 55{ 'x y u >a ^. A a` u0ID -u2 u ?!,1 is €i, NeE z vti l7 HV a` aiq: aiE P 8c F, 3' = z f a 9 eaai sa. i ' s a o s�s H4' s M � R, 3;� @ €Sj9 °$3aiY s ° �? @i. ai a- veil '@ :�$ A' @�ag °. 13E - � °s_3a� F;SS•, s `� 9 fi� .3� �& pp33 +vgtl t ep.p se a § es ee z 5' l @e JJ§ €sa9 a B€ F353 e3 pi P3 31 ifia § ; =gRa €a R @Si E 4Y5if @q Ea9k t 9 ae3 $ %fi e'9. @' i4a53 aEa a se gib %a @E5 fi @€ 5 @. aESRa s:3 2g e6 F a I @fi @ 3zE2 se �e@ I fi° E 3 5a,' Jig's ` S € °' =ps a a @ Him a, a: ;_:, s .3' "dig^ e. sSP _ g g 3s Mg a@ • "v''l n s_ .i F _7 a 8- gfE= :29 : ; e ' -' e.... {o @ i °x €I.a..3i - e€e'8 9c 4ie 3= 35' a =if§ 'ee ai,y qa s " 1 Sa:l@ - e "3- s i9 " 3e - ° P i £3 E ifi£ 5 58E E "! R R °S s� a Eia€ Lf "'l �" ii 4' 9p'p$:" s z 1 z : i3 e'f @@ SEIi i a Sa 1 5 9 e -?�= ea §a i @e3Pi3s pa 5egs[ el i'aae HIP l i @ @ €$a -§ i" @ c" _� F @!4 @3i °_ i s @ et�3_. a3 3 e € @ e :Y a:,. 'f= y Be ?_' E€ isc P E M3 °: 9f ' iSb i - = �e l € ? se f $ $ € €q 3sa �i? � 5 l of � i II � 9l E °s°sz 3 E'➢i SS �� F�i E §EE§ 2le °. 9$fi i - eF9[� zP ?�l f�if €e @3 ?'3i^ e:33ls� 1ez ? ' ” fi§ $tl8 : &3 A. f A f I \ I B a \ \ 133tlE5 NItlW � A I I I� I >`a d � � 9 y s �i x LLI Z Z Q V/ Y ;gi$ a� Z 588 J .[ dN �� N vN 0 �F sum o§ �' =;ZOW o`er d 7 Z 1 9; an d p m jCq F-I- 'g g' �' Zuu Z �_ {cs; E1. C Z 1 3 d Q Q N Q ) b Z d N Y W R p W Z S.' 1iq€ j Fes° 2 s" O x :� Q S xa S eF f`- qq z $ v v u" ?i6 �'EBs° z: t`.iw Ou ai vti V o a. Qo� = �za8e bl -- �� � ., y<y ;$3 u�° �F z�H$EwEd Q z• ¢ �3e I�=� s9;�1 � agaiy3t� �Gaa A ?i °oa` -x�ZS s ��. =• g ', o= p 4 li 3 Fe z . s a p ° -` i - 5 ri £ i3 z sw &w EpEr� �3� &o4 2s as z3o o egely °d € o p� � §e35"3_`ps ���ee =QZ g3F� ey yep O_4 °88:i "a's8•id d °e4f3a� " =_��ci�q??p8 °$ !8? � \ 1 y A • —� 133H15'NItlW��� — �..��' V \ \j 1! 1 1 s`li ff � 111 �1I�• 1'1 I �r I d I � pllt •111 P / I I � w. W _/ 1 • / /; ;•,11',1, \` \\ \ s 1vII;V 3 s e 4 ! am 6 N l+3: ip� z z ai Ali: r= o 3xiBf g = 3g�i 1'W `o � aJaC� . Q Yd ia r All _€ _da 0 W C giJ'}` QUO Wa O/: ;� .G .9'V Z1S Cd W a J j O [ [xO i J i Z,w o= tOON d O N eaa 5HIM g g€s5 9¢3s. � - y HUM a� �.,s. H g I.�yngq�l e�_�3 �� q9 ���i 3�' g� °��g� a � �16 §:ea ' o 13 8 X82 G aex, ^yE °a d u;�?a HIM .eata c —s? E i E; zn5 a C Y Ypp df °a' =a F'w o � y s'2' "$ e2y$6Y8 B`g=. .a 33ase Sic � aep�08- a ,o§ a 3G €S�xa =k�83tl rie6 a4£B 8 Bet`2 R�E88 =Y@Yai'°Cii'":SGtl:F °ilS 9'4x9 �, ?E �..l�!l F3 o£.a.. =d= .$: :�3 I iwwm.^ •ne i..... ^n. ^^ Ie5z.8 S9' =_ \ 8 � , .fig : �s •-�. —' ,� —°— 1 I ' rl �Vgg s \ a _ _ _ �� IIV�E33 g3�3s Z V N i{3pp N j Z Z 6: tm"i= ZOU O y Z S ifF 3 . o= 1 C e �d£ ` 33 NA<E Ks° N g 3 Y a§e€d'pSs te§xaeop 3es�°i3pp$ . c i ee E a]47 - p Y lHq8e pp i� x p w g%l� j'a3 W .. Mwi s€ ;e s ° $ e $a.q e �€�333gz ja A§ eY pp gA o�s §�el pe �l€ o�lx aa59�>sia � �'`i - IM Hoees £ v €3: s eial I sa � x %$% z „s e III x§ 2i E.aa• 6x' p�., -rg s„ a 3 5e'ss4 § le9i sa ' 3 €yss�i qoe 1 Y6 E $: lg' �Hq� ;7 II = gg ail ae� = gs�gz'za 3 :gf a §g@�kS gw §$i W � e °y's `3x=xapf j� lfRe �aa•e$s �Be �l €° 1531 ¥l F —? l$ i s p4eo'yep i °s ii6ee :lsp H it $6° E5$z35 :9 millins � I 1 � I I � I I I I xl I I ° co ° tl101N0� s i s a E E i 1 IH gc a 9 III W �. • \ \ x ” 1 ;� -------- - - - - -- W 7r U N a w Z Z Q U U y7GQyZ LLESS elosauugry 'uasseyue4o '7SuPIN —mu 3a, B'jaa�el Z OF' -5ai zUFgo N3SS`dHNHHJ a' �g�z�a6Sgxp MAIN 5TREB s F aA N ° a gin N� O U p O j r z a o � Q U W I Y o i z !, h 6.4 6 b e 5 'ne N 8 ° P y pp y £ L N Z 3183 Hamm VC--. 6Q Q a ¢ 9 F Yl dg� � g ded� MY�6 aam 42 dl o_ ;p MIR 3 mcii J S e�� Cm"3`.LL €sE cI gYg 3£m inldH:7g5553s:�: {gfie �gji 3 5 y7GQyZ WaF °e:io L LESS eaoseuwW'Ue Ss LIue40 d: 5218 y '}g U18114 13 i4 aHel 9Pa as e2`s3pa sotJ a xOf iy55y€ a3�oa� l�vi�3ds F:gg£3 €¢fig$: 3 € o �zU 'x N3SS`dHNVHO a sg �� � ;; x _ � $ d ° MILE= s 93�4� d AA AAA FA 55 y5° ,�ggggggpgg qq ' @3@�� ,854a5�2i� � � CHC6 6 l i JU a- q.. is" 2�c9 � g3 a' E yvyi k Jim a arra J Y�rcj —r7. MAIN ST STREET ] i s ♦ ��)) y J a ,s3 N Me 3 � i 51 i ZJ� oa > }J I� a� P w s5 OuOe I' 'Y�;.k N o z uJ \a' p s N =. 3�a . e 1 A. q i W Z U L 1099 elo89uuiW'uesseyueyo .19 uievq V'Al 9�e1 Nof ��,� �a3ooao u�dio3ds � ga;g���z��g�, 1 g � o� �_ ► Z�° = N3SSVHNHHJ _ 0 I I I JAS I I .can ca m ----------- I ----------- ----_ — _ — _ — - - pq Og IL $4y - P f sy 9 s g3 3 55 e P5 @E €= � g p 11 1H e �8v9v I aJ °4 �1 ,Ug=h __ 5 mill �e � —I gg 99 F pq d � 5 N O N O N O UUgi��! UUS��gs UUgr��t N M Q P 0 W z WsW aloe L L699 elosauwW 'uasseyue140 +&; ;8�'e; �paeg3 g;�ap g° 6 -is Ul UA Is 'JO GWI z�d1 N3SSHHNHHO €$�; oac�< g gy5 55 � SgPSggg pp - - -I I I I} I I I 4 Irl, I 11$ ^F I as: , — - - - - - — -- - - - - -- - - - - -- I I �✓ I _ I I I I I I I I I 8; ter. I b 6 ITI_I I I —III All MI 11111 v I� II III= o = 2 I �o � a e =NNq�a����n�} II I k tl '�sd �Y" p II- m e9 3 aa'a �ftz $ o- °ens � AI, Q w � ICI jm `e3 �N Nu Gw �h > >N ix III= f= .St IL- IL- III ( OE 0 O m 8 033 N o K� KNM . z � o�CB 35 d� �b N ttl Q N N OA' ? i W Z Q ) 2 e \ ! ; }• $ ( (�� ( ;!)!Q, • \ !/ n a(! lRR�j gg !•! g USE wow e:-, W ' 4 4'J 'IhO�2 &a g cF _9qo LLESS elosauui uasse ue ��: n x w "w� "a '1S uieW 9'J4 aalel�aaas$s'sk `a s AH300aJ l lIV103dS V' s € a4 ;s ❑zuE° ; N3SSdHNdHO fa%KYNg 0a31ga, ig�s:a'si g e 3'j P 2- R n g B r E " Q Q 3 p tQ y p Q §8 —ta 39 _ 0 �t i _rz�a 1� 4 i 7% �a a � � 8� N § @N3g 1y� pro 3 '1 8 °G u 1�G�m p tls 9Y 1 x �Y- ..!� rwr Yi33� 91 D z U � °9 � ���tlY y qt3$ � ���8 & &��9 4 4 § §����9 tl4 � �8tl q y5y��tl3 y yy3 t z U z__mn__< , m / s _ < a v : § | r y ��oe�lv&�d @• ƒ) %, I % • »» A �A��HO f 9 4. `� �0 Cj Ul 0. t \ ) §� \ \ m E _. .�. ��. . \< resourceful. naturally. BA RR engineering and environmental consultants - Memorandum To: Robert Generous, AICP, Senior Planner; City of Chanhassen From: Scott Sobiech, PE and Candice Kantor Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District Date: September 24, 2014 c: Claire Bleser; Administrator Riley- Purgatory -Bluff Creek Watershed District The Riley- Purgatory-Bluff Creek Watershed District (RPBCWD) is in the process of implementing watershed district rules. The draft rules were released for public review and comment earlier this spring. The District is currently reviewing comments and anticipates implementing the permitting program this fall. Because the draft rules have not been adopted, the District does not currently have an official permitting program. We appreciate the opportunity to provide comments on the project relative to the draft rules and your willingness to work with the District in advance of the permitting program. The following is a summary of RPBCWD review comments for the Chanhassen Specialty Grocery development at the northwest corner of the intersection of Lake Drive and Main Street. The most current version of the draft rules are available for download on the RPBCWD website: htto: / /www.rpbcwd.org /permits /. The following comments are based on the draft rules that would likely apply to this project and highlight the areas where revisions or additional information would be needed to fully meet the draft rules. Rule C: Erosion and Sediment Control Rule C: Erosion and Sediment Control applies if a project disturbs more than 5,000 square feet or more than 50 cubic yards. Based on the submitted design plans and supporting documents, the project will disturb more than 5,000 square feet and excavate more than 50 cubic yards. In this case Rule C would apply, and the comments below should be reflected in the plans. • Provide an erosion and sediment control plan in accordance with Section 4 (requirements of the erosion and sediment control plan submittal) and meeting the criteria established in Section 3 of Rule C. • Main components of the erosion and sediment control plan include but are not limited to: o The intensity and duration of disturbance at the site shall be minimized by the use of construction phasing. o Final site stabilization should include specifying that at least six inches of topsoil or organic matter be spread and incorporated into the underlying soil during final site treatment wherever topsoil has been removed. Bare Engineering Co. 4700 West 771h Street, Suite 200, Minneapolis, MN 55435 952.832.2400 w - 6orr,com To: Robert Generous, AICP, Senior Planner; City of Chanhassen From: Scott Sobiech, PE and Candice Kantor Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District Date: September 24, 2014 Page: 2 o Soil surfaces disturbed or compacted during construction and remaining pervious upon completion of construction must be decompacted through soil amendment and /or ripping to a depth of 18 inches. • Inlet protection shall be installed prior to any site disturbance. • Silt fences shall be installed prior to any site disturbance. • The silt fence and silt dike at the southwestern corner of the site should be constructed such that no sediment laden water can leave the site. o A construction entrance should be shown for the Phase 2 construction. Rule J: Stormwater Management Rule J: Stormwater Management applies if a project disturbs 5,000 square feet or more or disturbs 50 cubic yards or more. Based on the submitted design plans and supporting documents, the project will disturb more than 5,000 square feet and excavate more than 50 cubic yards. Because the project will increase the imperviousness of the parcel by more than 50 percent, the criteria will apply to the entire parcel. The following criteria would apply. • Rate Control: Documentation must be provided showing that the project does not increase runoff rates for all points where stormwater leaves the site for the 2 -, 10-, and 100 -year storm events, and the 100 -year frequency, 10 -day snowmelt event. This analysis must be done using Atlas 14 reference data using a nested storm distribution. o A stormwater analysis was provided that addressed rate control for the 2 -, 10 -, and 100 - year storm events. The events used Atlas 14 precipitation depths; however it used the SCS Type II distribution. The modeling should be revised to use a nested storm distribution based on the Atlas 14 precipitation. o The draft RPBCWD rules require that the project not increase runoff rates for all points where stormwater leaves the site. To accurately comply with the draft rules, the existing and proposed conditions modeling should be split to represent that there are multiple points where stormwater leaves the site, and documentation should be provided showing that the runoff rates do not increase at any location. o The existing condition modeling does not represent existing site conditions. According to the draft rules, existing conditions are defined as follows: "Site conditions at the time of consideration of a permit application by the District, before any of the work for which a permit is sought has commenced, except that when impervious surfaces have been fully or partially removed from a previously developed parcel but no intervening use has been legally or practically established, "existing conditions' denotes the previously established developed use and condition of the parcel ". Therefore the existing pond, land cover, and drainage patterns on the parcel must be modeled. To: Robert Generous, AICP, Senior Planner; City of Chanhassen From: Scott Sobiech, PE and Candice Kantor Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District Date: September 24, 2014 • Provide information documenting the existing and proposed time of concentration estimates. The time of concentration should vary based on watershed size and characteristics rather than being the same for all subwatersheds and land cover conditions. The recommended minimum time of concentration in TR -55 is 6 minutes. • The existing conditions HydroCAD model lists paved parking as HSG C. The proposed conditions HydroCAD model lists paved parking as HSC D. Review and revise for consistency. • The pipe length and slope for the pipe leaving the sand filter used in the HydroCAD modeling does not match the design plans. Review and revise for consistency. • The proposed conditions HydroCAD modeling indicates that all three 6" draintile are connected to the outlet structure which is inconsistent with the plan set. Review and revise for consistency. o Applicant may want to consider incorporating a portion of the downstream storm sewer system into the HydroCAD modeling to accurately predict the flood levels on the site as they may be influenced by tailwater effects from the downstream trunk storm sewer system. • Provide a detail on the plans for the outlet control structure. • Provide a detail on the plans for the Triton system. o Provide a section view on the plans showing the combined sand filter and Triton system. Volume Control: Stormwater management features must provide abstraction for 1.1 inches of runoff from all impervious surface of the parcel because the project increases the imperviousness of the parcel by more than 50 %. o The proposed project includes filtration of runoff but does not include any of the required runoff abstraction, thus not meeting the RPBCWD draft rules. o The applicant must demonstrate that the District abstraction standard cannot practicably be met in order for the property to be considered a restricted site due to underlying soil conditions. If the applicate demonstrates the abstraction cannot be met the criteria in Rule J, Section 3.3 would apply to the project. However, Section 3.3 still requires abstraction to the maximum extent practicable. o The proposed design routes most, but not all of the proposed impervious surface to the sand filter for treatment. RPBCWD draft rules require that the project provide treatment for the entire parcel. • Water Quality: Stormwater management features must provide an annual total phosphorus removal of at least 75% and an annual total suspended solids removal of at least 90% from all site runoff. However, if the applicant demonstrates the District abstraction standard cannot practicably be met the water quality treatment criteria in Section 3.3 would apply to the project. To: Robert Generous, AICP, Senior Planner; City of Chanhassen From: Scott Sobiech, PE and Candice Kantor Subject: Chanhassen Specialty Grocery Plan Review by Riley- Purgatory-Bluff Creek Watershed District Dote: September 24, 2014 Paae: 4 o Calculations must be provided that verify that the proposed treatment system provides the required level of water quality treatment. No water quality computations were provided. o Provide a detail on the plans for the EcoStorm system. • General Comments: • All stormwater management structures and facilities must be designed for maintenance access and properly maintained in perpetuity. A maintenance and inspection plan must be provided. • Upon completion of site work, submit as -built drawings demonstrating that at the time of final stabilization, stormwater facilities conform to design specifications as approved by the District. Summary Based on the information provided to date, the proposed design would not fully meet the RPBCWD draft rules once implemented. Depending on the timing of the project and the official implementation date of the draft rules, the project could be required to obtain Erosion and Sediment Control and Stormwater Management permits from RPBCWD. Generous, Bob From: Vernelle Clayton [vernelle @visi.com] Sent: Wednesday, September 17, 2014 7:25 PM To: Generous, Bob Subject: FW: VOP, Architectural Review Committee's Review Report for "Chanhassen Specialty Grocery " Follow Up Flag: Follow up Flag Status: Flagged Bob - Below is Mika Milo's review of the Chanhassen Specialty Grocery submission on behalf of the Architectural Review Committee of the Village on the Ponds Association. To: Village on the Ponds Association c/o Vernelle Clayton, the manager of the Association. Re. VOP- Architectural Review Committee review of : " Chanhassen Specialty Grocery" proposed development plans. By: Venture Pass Partners Date issued: 9/17/2014 Dear Vernelle, It is our understanding that the proposed specialty grocery store will be a very welcome addition both to the City, as well as for the VOP community, and is expected to generate a more dynamic business environment for the whole area. And this is at the core of the concept for our Village: a wide range of uses that together create pedestrian oriented streets and a vibrant urban setting. In that respect we look favorably at the proposed development, even though it is not providing for a more mix of uses (retail, residential, office ... )on this one specific site along the Main Street. Also, the main entry is not oriented towards the Main Street, as called for in the VOP Guidelines, assuming some office or residential uses housed on the upper floors. However, we recognize that in this case of a large, single level grocery store, in order to be successful in operation, the main entry needs to be oriented and as close as possible to the parking. Especially in case of very cold winters we have in our Minnesota. Consideration of the addition of another entry (but not necessarily an exit)door towards the street, would be very helpful. It would create a highly welcome break in the long straight rear wall along the Main street. That would spare the customers coming from the street to take a long walk around the building to reach the front door. Or worst, possibly cut across the unimproved site along the loading area to get to the front door. Also, we hope that the "second phase ", would offer more opportunities along that line by the nature of the uses involved (like a cafe, restaurant, office or...), which would provide a stronger integration with the street life. In regard t some other specifics: c. - -- Sheet L1.0- Site plan, calls for the removal of the street lights on the East side. However, those lights have to be preserved and operational at the construction completion. d.--- Sheet 1-3- Landscape plan, calls for the existing 5 street trees to remain, which is of essence. Especially due to a very tight space between the wall and the street parking, allowing only nominal new landscaping to be planted along the wall. Also, consider a design change to the ECO mesh green wall, to be slightly curved(in footprint)to help break the monotony of the long, straight wall along the street. e.--- Sheets A2.1; A2.2- Aarchitectural Elevations: - -- Signage: we recognize the need for the store to be well exposed to the freeway, including its signage, but they appear to be too large and too pronounced. Especially above the front entry area. Consider placing the signs over the brick directly, or at least, to color the EIFS sign panel in a way to blend better with the brick around it. - -- Roof line, sheet metal roof above the main entry tower: instead to be shallow in its depth just like all other perimeter sloped roofs, consider to extend far behind over the flat roof areas, to provide for a better integration with the overall building, and less of a "fake" appearance. Possibly to extend it upwards to a full "pyramid" form, thus visually better connecting with the roofs of the proposed next door "Villages" retail. - -- Materials and colors: (based on the drawings review only) seem to be acceptable, but more use of the brick vs. cmu blocks, would further enhance and provide greater variety on the large elevation walls. The above comments were based on our review of the set of preliminary plans (with a focus on architectural and landscape plans) as provided to us on 9/10/14. We hope this report would be of some help, along with all City's reviews and hearings, towards a successful completion and integration of this development into the VOP and City of Chanhassen urban core. Please let us know if we can be of any further assistance. Thank you, Mika Milo, r. architect For VOP Architectural Review Committee. -- This email is free from viruses and malware because avast! Antivirus protection is active. CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on September 25, 2014, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Specialty Grocery Store — Planning Case 2014 -29 to the persons named on attached Exhibit "A ", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subscribed and sworn to before me thi' day o6�, )w y- , 2014. Notary P blic K en J. Enepardt, D uty Clerk KIM T. MEUWISSEN 3' Notary Public - Minnesota 9' ^ - - -� My Commisalon Expos Jan 31. 2015 C d d 2 IM O C M .0 d E SE U O �U a c C C C u R ua O C Z d N N R L s R L V U C d 2 MO C N d E = E V O .—p U = C O C s d R U O. Z 0 R s e R t V N "O >1 !2 6 v `o w i W 0- m w M M y-= d C N M 0 > O 0 @✓ _ Y « p a d V¢ 0« N O W c oJ0 d U N C 0 cv o `o Qa ivnm m3 x .@O Emwm>mvw mO O _ @ y6CON c °r `O =:C E TcJ c 9 N p. O C U p M GI O p N C o6 . —. c° 3 = -« O W d yJc w d 'L- 6 0O @ O. N 0 a0 N O O O @ E' . Mn 0 0 m d m« tLr >.2 m M Y C C CEO> 0 ) w« 0 c 0 E d m 0 '0 0 O CC0 ti Ma _ O E N O N= E p U M" 5 E > o Eat vW v 0n � ,ya 0acd N M M 0 C O O p a= L E O 7 O E >O. @ Np 9 H •C 0 m m 2m v a E w c E y Lav EO --c --a -ow v EU>- @ N C U O -02 O N 0 C p_ O _ E C 'q3 L w V E c m E w «oy Em L- uw c o 3 a �vcv°. 0.02 co @'c -Q 0 N 0. 0)@ M , >~ a o ° s °d N � � � O CO > p o O E M O V @ 0-0 N d L o E m ° wE a� nvcm°m_ O h ( � d E a O -0 (p O C N + O C N O a c L m m � M ot'mcTm°' 01� w NO- -0 m � - Nd Lo N c O= 0 Co OCD � a) CN C 0 EN- 0E n °nwEv m3 > QEY Q o n v c acE ULm @ 3 U U c0 0 L0 N0"O U _ d m N co M O N L O L n c E a o k in UH V `N �a> N -j J a a) 0) 6 O E °m> m �E3�9Et`wQ n a t Hva O i_ E E J O ` L Q ] U a O. L 0.0 C L d v � 2 a N C13 �a � . @❑ 0 _ U . - e a ow n N y I� •L L) 16 o L) 0 C C $ O 3 `6 o NN 0 E 0 w N cc aa m M O t � > GO) @ @ owordE j a ,o p a8- 'N a 3 0 o >d C � N �N d E@ Od 0U-60)0).2 M.O MN @ L Nk 0E 0 c �> ava3o - E o nw - uUNw J£E do 0 0 - -3 0 c M O @ Oc —a cD M c' 0' 0 N@ a3 (n " a_ >n • f ='m i o - Qc U o wN d �) > O . E O _@ @ � CD E L , O doM 3 ad v0 rn- t cvCL r �tc , f6 c R . N �..r O m 0 0 cc N _ @E 4) �U E E cv Ndw N �S = QO G C L V (nHUd E N N 0 ¢ �N � „ =o N E 0 M N O 5.2 a O co E c 4) a E o ' F o F> >Z Z OQ I- N N (E. N M 7 N L E N s N o vmo = _ E0 i .-NMV �> wU sE Oo a <c o m ~ m yLa�° v°Eww�`� muv�1a �c3 N o i co oE v 0 nmi E oo f vS vZ wv C „mvo �c c . sEE d E d.. 0 d tf M a 3 mmw�vdc=vl:0a pw oo0 E o H 0 , v ~ J C T C 0 o m o 0 a U c 60 n �c O N R` ` O = 0 0) E 3cmo 0 O a £ c c aO m o c Cw' d R 6 .0 l0 l0 L '� c° EEU um ° wdc i anm D O o CL 3 O L 3 O .rnw` 12 wp L 00 ¢mmw 5 dUU J IL QOO.J O .J R OV v N N O M w 0 M M y-= d m o 2mn «o L-p M > O 7 @ E O -M= a;ta 9 E- O. v Q °5 cL E c m @0 d L U O U C C+O" N C acoo Emw m j, �, E .M..00 U @m= N N w@, O N 0) EC00` mnma miy EaOV.CL_va2 �c 0 j N O c 3 E U a 0' BOO >, O'>O 'M c ?i cwo d� aE nEm Nww y d w O @ TN'(0 CL a) O O) N 1] 0 @ E C O. u`mw mvmac �,va °r 3m cc5 tm >.2 m E.L..L "00 M C.± ma 0 C m CCEO>` 3 0d' R wc'^ aca5mo °c =ta .�.Fo MJ Ouv m E% OF Lim OOD. E'�p d d0EO M U' 0 O 7UM -ECi NV -5 EL v v> ,Ua E`na o3a °4"" -L'mo0 £o cry .�n O N' N O. M C O O C O.C.. M a) c n E O co d d � E ?+ 3 d =m m mv2'v va E°I °" (Jc JL L E o -� m v d Ev co @ 0 C C O d "O `� O O 7 0 0) — '- C O. O C c.. E y10 7 O tH O E' -r 'EL cmv C m•-B" l0� E vv G N d N W E C V N O L C am5 nW E•-o cvm A a -0 p_o� @ C m ._ 'O� rq a.- M d p 4) .L-. U C E @ 0 >r o m =`o `�m u`oc OL ma m -om OtO @ >O Q,« LO01._O,_ C N C M.L.. N C „L„ N N N NLj 0.N R d 1MMMNNdL mdmmc - -Ev° 3yt wy �e °' - 20,cvua�E max•- m paC O"OI�L o r wo N' � d c c_ 3w (6 E E O 0 0.00 C @ O 7 @ M "O. .+ O N O� d d'aC 0� cEbalEa�w95 vm m °- 'vv °o avi vo °mm°'v .yin O 3 ND- M= 'O d c0 ND O 3 Ew @ -i-., f6 L w0 L a C Ni U� d N om3 >o n.NLC 12m oE� nQ Ucc oac @EM 30 U O L0 N0"O O MO)NU @M ON 3d0 U «t m.E «Cv>v N m N E E J a a) U 0 0) 0 Z M R N C@> m L O -p R E �n E; a v E° t d o E v o Q dL Q'� O) N J @ ` �.O C" � � N 0 0' D.CL UL a> N•0 c U y¢Yd �Uw -° �90 N C13 �a � L-. y 0 U 0.c 0 O) 0 @ CJ 0 _ N E D.0 O `O y (D 7 U O.R W voam cwcm �Ecm cat �° mom£ K o -c0 n.bv v m :5. t. I� •L C C 0 (6 U 0 C C Ct„ O c tl) 3 y O@ ..L.. .L.. C (q N O M O N- _ W 0� C ou cU Env L'� °vc�E: ='mw °m ya•um.. uL v 6E N cc .o N j.0 d 0. N @@ M O O) N U L N C@ C N r M w 3.L+ d N U M O` - O ..+ E c!°n�oa� n =c > R= 0 c v -« .0 i'V 0 d C M L N Q d E@ N d O%'- "- 0 d" > R O O' 0) U.M. @ O O) M N@ E N L 000 O•H E O C > w dysmc Eva o THE a- 5;V. .33 M Ju mL v, mm m�vN>O vow v U d 060 7 0 0. = (n O C@ M 0 6 W d N C ._ C 0 0 M O.'� - 0- L O O C m M 0 @@ I L fn t' y U Q _' '«. E_ 0 w v- a L E a 6 :. m T o C n¢ =� 5 m w 'b o d c o'O N� d �) > E N p M M@ 3 O.E U O @ O. C L m 1 O d 1 p Qi an d N L 0 C = N O f6 C in @ d �..r O C m O O. p �.L-.L O Ea @ _V% O >i �._ c (6N O)y �' C N ._ ._ n oGc2 del -.N'�rc i"'v�r_cg o. °04m mo N �S O O C.3. L O 0. U j Ufn H(..)d.L.. 0Ci U N Nw.... d C �_9m ydoE JC mw °nE-_ dvo tir'm N E 0 M N O J- L Oa.a7 �'d p E N d fY0 O I�CO oao� vn9�U° Ww�Edy os a'E c6 F Oed >Z OQF @ @O. �=•L -' MN0) EN60. m o`Wa .m Q,) .-NMV ?No a.m o o n3d E N d N d L 0¢ O> O~ .0 i r °I - C = c d m n w u N o m" '9 9 5 5 o E v w CC aRn�a Lv�'v uv °Ma ooHOC c5 d E d.. 0 d w oa oE3 m`mmapdx� wav aa'T@�v ?NCN 00 J C TC d M C c O 60 0.0 dv3c n9�v Lw0st no C9 &6 cow O N @ ` 't O = O N 3 dnoc d'w wwo vY v L c c o -30n0 J-w E_ M ti d R 6 .2 O.0 l0 L W E as �O ACn r --N oN so E2.c vvvo>.E D O o n 3 O 0 O L V 3: 7O CiV n '3 .0 W d O'S t0 v m C d W c O 2`MKa mMFSS 2Q! UUg3nm¢`m nmmv J O. QOO.J R v CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP 16505 75TH AVE N 16505 75TH AVE N 16505 75TH AVE N OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP 16505 75TH AVE N OSSEO, MN 55311 -2783 CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP CLOUTIER PROPERTIES CORP 16505 75TH AVE N 16505 75TH AVE N 16505 75TH AVE N OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783 OSSEO, MN 55311 -2783