Loading...
Chanhassen Specialty Grocery - Engineer's EstimateStorm Sewer QUANTITY UNIT UNIT PRICE TOTAL 1 12" HDPE Storm Sewer 47 LF $20.00 $940.00 2 6" Perforated HDPE Draintile 257 LF $10.00 $2,570.00 3 6" HDPE Cleanout 4 EA $500.00 $2,000.00 4 Mn/Dot Class 3 Rip Rap 24 CY $75.00 $1,800.00 5 Connect to Existing Storm Sewer 1 EA $700.00 $700.00 6 Cleaning & Maintenance 1 LS $5,000.00 $5,000.00 7 Sand Borrow For Filtration Basin 250 CY $25.00 $6,250.00 SUBTOTAL STORM SEWER $19,260.00 Landscaping QUANTITY UNIT UNIT PRICE TOTAL 1 Deciduous Tree 17 EA $250.00 $4,250.00 2 Coniferous Tree 6 EA $250.00 $1,500.00 3 Shrubs 72 EA $40.00 $2,880.00 4 Perennials 463 EA $10.00 $4,630.00 5 Seed & Mulch 0.6 AC $250.00 $150.00 6 Sod 200 SY $3.00 $600.00 SUBTOTAL LANDSCAPING $14,010.00 Erosion Control QUANTITY UNIT UNIT PRICE TOTAL 1 Rock Construction Entrance 1 EA $1,500.00 $1,500.00 2 Inlet Protection-Type A 6 EA $150.00 $900.00 3 Install/Maintain/Remove Silt Fence 340 LF $2.00 $680.00 4 Tree Protection Fence 50 LF $2.00 $100.00 SUBTOTAL EROSION CONTROL $3,180.00 SUMMARY STORM SEWER $19,260.00 LANDSCAPING $14,010.00 EROSION CONTROL $3,180.00 TOTAL $36,450.00 Project: Chanhassen Specialty Grocery Date: 10/13/14 Project No.: VEN20145 Completed By: Mike Bultman Construction Phase: 1 ENGINEER'S COST ESTIMATE OF IMPROVEMENTS