Loading...
Plans Revised 10-09-2014Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:00pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C1.01-TITLE.dwg C1.01 TITLE SHEET GEOTECHNICAL BRAUN INTERTEC 11001 HAMPSHIRE AVE S. MINNEAPOLIS, MN 55438 TEL 952-995-2000 FAX 952-995-2020 CONTACT: JOSH VAN ABEL DEVELOPER/OWNER THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 TEL 612-313-0105 FAX 612-338-8971 CONTACT: VINCE DRIESSEN ARCHITECT MOHAGEN HANSEN ARCHITECTURAL GROUP 1000 TWELVE OAKS CENTER DRIVE #200 WAYZATA, MN 55391 TEL 952-426-7400 FAX952-426-7440 CONTACT: JENNIFER KAPLAN, AIA CIVIL ENGINEER SAMBATEK, INC. 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: MARK ANDERSON, PE LANDSCAPE ARCHITECT SAMBATEK, INC. 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: WILLIAM DELANEY, RLA SURVEYOR SAMBATEK, INC. 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: MARCUS HAMPTON, RLS for Site Development Plans Dakota Retail The Driessen Group, LLC Chanhassen, Minnesota Presented by: NO SCALE VICINITY MAP SITE CONSULTANT CONTACT LIST: SHEET INDEX SHEET DESCRIPTION C1.01 TITLE SHEET C2.01 EXISTING CONDITIONS C2.02 DEMOLITION PLAN C3.01 CIVIL SITE PLAN C4.01 GRADING AND DRAINAGE PLAN C5.01 EROSION & SEDIMENT CONTROL PLAN - PHASE I C5.02 EROSION & SEDIMENT CONTROL PLAN - PHASE II C5.03 EROSION & SEDIMENT CONTROL PLAN - DETAILS C5.04 EROSION & SEDIMENT CONTROL PLAN - SWPPP C5.05 EROSION & SEDIMENT CONTROL PLAN - SWPPP C6.01 UTILITY PLAN C9.01 CONSTRUCTION DETAILS C9.02 CONSTRUCTION DETAILS L1.01 SITE LANDSCAPE PLAN L1.02 SITE LANDSCAPE DETAILS L2.01 IRRIGATION DESIGN BUILD PARAMETERS S1.01 PPRELIMINARY PLAT SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:00pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C2.01-EXCON.dwg C2.01 EXISTING CONDITIONS FOUND MONUMENT SET MONUMENT ELECTRIC METER LIGHT SANITARY SEWER STORM SEWER WATERMAIN FLARED END SECTION ELECTRIC TRANSFORMERAIR CONDITIONER GUY ANCHOR HANDICAP STALL UTILITY POLE GUARD POST BOLLARD SIGN TELEPHONE PEDESTAL UE UT UG GAS METER OVERHEAD WIREOW CHAIN LINK FENCE IRON FENCE WIRE FENCE WOOD FENCE EASEMENT LINE SETBACK LINE RIGHT OF ACCESS BUILDING LINE BUILDING CANOPY CONCRETE CURB BITUMINOUS SURFACE CONCRETE SURFACE LANDSCAPE SURFACE DECIDUOUS TREE CONIFEROUS TREE LEGEND NOTE: THE BACKGROUND TOPOGRAPHIC INFORMATION WAS PROVIDED BY: ADVANCE SURVEYING & ENGINEERING, CO. 5200 S. HWY. No. 101 MINNETONKA, MN 55345 PHONE: (952) 474-7964 FAX: (952) 474-7964 DATED: 12-11-2007 REFER TO PLAT PERFORMED BY SAMBATEK FOR BOUNDARY AND PROPERTY INFORMATION. SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:00pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C2.01-EXCON.dwg C2.02 DEMOLITION PLAN FOUND MONUMENT SET MONUMENT ELECTRIC METER LIGHT SANITARY SEWER STORM SEWER WATERMAIN FLARED END SECTION ELECTRIC TRANSFORMERAIR CONDITIONER GUY ANCHOR HANDICAP STALL UTILITY POLE GUARD POST BOLLARD SIGN TELEPHONE PEDESTAL UE UT UG GAS METER OVERHEAD WIREOW CHAIN LINK FENCE IRON FENCE WIRE FENCE WOOD FENCE EASEMENT LINE SETBACK LINE RIGHT OF ACCESS BUILDING LINE BUILDING CANOPY CONCRETE CURB BITUMINOUS SURFACE CONCRETE SURFACE LANDSCAPE SURFACE DECIDUOUS TREE CONIFEROUS TREE LEGEND1.DEMOLITION NOTES ARE FOR CLARIFICATION ONLY AND ARE SHOWN FOR THE CONTRACTOR'S BENEFIT. THESE NOTES ARE NOT INTENDED TO TO BE COMPREHENSIVE. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL ON SITE UTILITIES AND REMOVE OR RELOCATE ALL EXISTING ON-SITE IMPROVEMENTS NECESSARY TO ACCOMMODATE THE PROPOSED CONSTRUCTION. 2.THE DESIGN SHOWN IS BASED UPON THE ENGINEER'S UNDERSTANDING OF THE EXISTING CONDITIONS. IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, HE SHALL HAVE MADE, AT HIS OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW. 3.THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSING IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES AND IN ACCORDANCE WITH APPLICABLE CODES, OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. REFER TO THE GEOTECHNICAL REPORT PERFORMED BY BRAUN INTERTEC FOR BACKFILLING AND COMPACTION REQUIREMENTS. 4.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. 5.THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE RIGHT OF WAY DURING CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. 6.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION FOR ON-SITE LOCATIONS OF EXISTING UTILITIES. 7.ALL EXISTING SEWERS, PIPING, AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. UTILITIES DETERMINED TO BE ABANDONED SHALL BE REMOVED IF UNDER THE BUILDING INCLUDING 10' BEYOND FOUNDATIONS. 8.CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES. IF CONTINUOUS ACCESS CANNOT BE MAINTAINED, THE PROPERTY OWNER OR MANAGER SHALL BE NOTIFIED A MINIMUM OF 48-HOURS IN ADVANCE OF INTERRUPTION. ALL ACCESS INTERRUPTING ACTIVITIES SHALL TAKE PLACE DURING OFF-PEAK TIMES. 9.PRIOR TO DEMOLITION OCCURRING, EROSION CONTROL DEVICES ARE TO BE INSTALLED. 10.SHOULD REMOVAL AND/OR RELOCATION ACTIVITIES DAMAGE FENCING, LIGHTING AND/OR STORM INLET STRUCTURES, THE CONTRACTOR SHALL PROVIDE NEW MATERIALS/STRUCTURES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. EXCEPT FOR MATERIALS DESIGNED TO BE RELOCATED ON THIS PLAN, ALL OTHER CONSTRUCTION MATERIALS SHALL BE NEW. 11.CONTRACTOR SHALL LIMIT SAW-CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. 12.CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. DAMAGE TO ANY EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. 13.WATER AND SEWER SERVICES TO BE REMOVED TO THE MAIN. RESTORE STREET TO EXISTING CONDITIONS. DEMOLITION NOTES POWER POLE RELOCATED BY OTHERS CONTRACTOR TO COORDINATE REMOVE EXISTING BUILDING/PAVEMENT/FEATURE SAWCUT EXISTING PAVEMENT REMOVE EXISTING FEATURE CURB TO BE REMOVED DEMOLITION LEGEND SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments EXISTING USE INTENDED USE EXISTING ZONING AREA SUMMARY SIZE OF PARCEL GROSS FLOOR AREA BUILDING COVERAGE (8,000 SF) PERCENT COVERED BY PARKING / SIDEWALK (33,976 SF) TOTAL IMPERVIOUS SURFACE COVERAGE PROJECTED NUMBER OF EMPLOYEES NUMBER OF SEATS FOR RESTAURANT PARKING STALLS REQUIRED (1/200 SF) PARKING STALLS PROVIDED HEIGHT OF BUILDING STRUCTURE BUILDING USES 1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT. 2.ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. BACK OF CURB IS SHOWN GRAPHICALLY ONLY. 3.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. 4.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED. 5.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 6.SEE ARCHITECTURAL PLANS FOR PYLON SIGN DETAILS 7.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT POLE. 8.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS. 9.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS ISLE SHALL BE 2.08% (1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. 10.SEE ARCHITECTURAL PLAN FOR BOLLARD LOCATION AND DETAILS. LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL SAWCUT LINE NUMBER OF PARKING STALLS PER ROW SIGN PIPE BOLLARD HEAVY DUTY ASPHALT PAVING STANDARD DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED KEY NOTE DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES WETLAND LIMITS TREELINE A.BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS. B.B-612 CONCRETE CURB AND GUTTER. C.B-618 6CONCRETE CURB AND GUTTER. D.HANDRAIL. E.CONCRETE APRON F.SEGMENTAL BLOCK RETAINING WALL. G.ACCESSIBLE RAMP. H.CONCRETE STEPS. SEE ARCHITECTURAL. I.DUMPSTER ENCLOSURE. SEE ARCHITECTURAL. J.OUTDOOR SEATING. BY OTHERS. K."NOT AN EXIT" SIGN. L."ONE WAY / DO NOT ENTER" SIGN. M.CONCRETE SIDEWALK. N.CURB STOP BLOCKS. O.HANDICAP PARKING SIGN. P.INTEGRAL CURB. Q.STOP SIGN. R.FENCE. SEE ARCHITECTURAL. S.CROSS WALK STRIPING. T.NO PARKING TURN AROUND AREA SIGN. RETAIL RETAIL BH 65,996 SF 8,000 SF 12.12% 51.48% 63.60% UNKNOWN UNKNOWN 40 STALLS 53 STALLS 19 FEET ALL RETAIL Oct 10, 2014 - 3:00pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C3.01-SITE.dwg C3.01 CIVIL SITE PLAN APPLICANT: VINCE DRIESSEN THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MINNESOTA 55410 CIVIL ENGINEER: SAMBATEK, INC. 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 OWNER OF RECORD: IC JOHN, LLC SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:00pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C4.01-GRADE.dwg C4.01 GRADING AND DRAINAGE PLAN BUILDING RETAINING WALL PROPERTY LIMIT EXISTINGPROPOSED LEGEND WETLAND LIMITS TREELINE STORM SEWER 902 SOIL BORINGS 1042.56 ST 5 GRADING NOTES DRAINTILE THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. D A.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE. B.KEdZdKZ^,>>Zs/tWsDEd'Z/EdEKE^dZhd͞'hddZKhd͟t,ZtdZZ/E^tz&ZKD hZ͘>>Kd,ZZ^^,>>KE^dZhd^͞'hddZ/E͟hZ͘ C.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE IN 2.08% (1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. D.d,KEdZdKZ/^hd/KEd,d͞d,^h^hZ&hd/>/dz/E&KZDd/KE^,KtEKEd,^W>E^/^hd/>/dz QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02 TITLED ͞^dEZ'h/>/E^&KZd,K>>d/KEEW/d/KEK&y/^d/E'^h^hZ&hd/>/dzd͘͟d, CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA AT 1-800-252-1166). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. E.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. F.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. G.THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY: COMPANY: BRAUN INTERTEC CORPORATION ADDRESS: 11001 Hampshire Avenue South Minneapolis, MN 55438 PHONE: 952.995.2000 DATED: July 30, 2014 THE CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT. H.THE CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION. I.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. J.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER. K.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. L.THE TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO THE CONTRACTOR'S OPERATIONS. HE WILL BE REQUIRED TO PROTECT THE TREES WHICH ARE TO BE SAVED TO BE SURE THAT EQUIPMENT IS NOT NEEDLESSLY OPERATED UNDER NEARBY TREES AND SHALL EXERCISE EXTREME CAUTION IN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, HE SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF OPERATION. SHOULD THE CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY LASTING DAMAGE TO THE TREE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE MADE. M.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 4 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 4 INCHES. N.dZE,KZZKtKE^dZhd/KE͗/&>>Ktzd,KtEZ͕d,KEdZdKZDzKDW>d͞dZE,KZZKt͟ EXCAVATION IN AREAS DIRECTED BY THE ENGINEER IN ORDER TO OBTAIN STRUCTURAL MATERIAL. TRENCH BORROW EXCAVATION SHALL BE COMPLETED IN GREEN SPACE AREAS. TRENCH BORROW CONSTRUCTION SHALL BE COMPLETED ONLY WITHIN THE PLAT BOUNDARIES. TREES SHALL NOT BE REMOVED OR DAMAGED AS A RESULT OF THE EXCAVATION, UNLESS APPROVED BY THE ENGINEER. THE EXCAVATION SHALL COMMENCE A MINIMUM OF 10 FEET FROM THE LIMIT OF THE BUILDING PAD. THE EXCAVATION FROM THIS LIMIT SHALL EXTEND AT A MINIMUM SLOPE OF 1 FOOT HORIZONTAL TO 1 FOOT VERTICAL (1:1) DOWNWARD AND OUTWARD FROM THE FINISHED SURFACE GRADE ELEVATION. THE TRENCH BORROW EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED FINISHED GRADE ELEVATION, AND SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE QUALITY COMPACTION METHOD AS OUTLINED IN MN/DOT SPECIFICATION 2105.3F2. SNOW FENCE SHALL BE FURNISHED AND PLACED ALONG THE PERIMETER OF THE TRENCH BORROW AREA WHERE THE SLOPES EXCEED 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1). O.FINISHED GRADING SHALL BE COMPLETED, THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. P.TOLERANCES 1.THE RESIDENTIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 2.THE COMMERCIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 3.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE. 4.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 5.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. R.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE. S.THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE ^/d'Z/E'KE^dZhd/KEE^,>>/E/d,h>ZK^KEZK^/KEE^/DEdKEdZK>͞^/dDW͘͟ THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. THE CONTRACTOR SHALL POST WHATEVER SECURITY, AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY. T.IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT REVIEW, DISCUSSION AND APPROVAL FROM THE PROJECT ENGINEER. U.RETAINING WALL(S) SHALL BE CONSTRUCTED OF MODULAR BLOCK) MATERIAL. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND LOCAL AUTHORITY CERTIFIED ENGINEERING DRAWINGS, DESIGN CALCULATIONS AND SOIL BORINGS. THE CERTIFIED ENGINEER FOR THE RETAINING WALL(S) SHALL PROVIDE CONSTRUCTION OBSERVATIONS OF THE RETAINING WALL IMPROVEMENT, AND A LETTER CERTIFYING THE INSTALLATION OF THE WALL(S) WAS CONSTRUCTED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. 962.5 X 962.5 X 902 SPOT ELEVATION CONTOUR RIP RAP OVERFLOW ELEV. CURB & GUTTER SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:01pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.01 EROSION & SEDIMENT CONTROL PLAN - PHASE I TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPPP) TEMPORARY STORAGE AND PARKING AREA DIRECTION OF OVERLAND FLOW TEMPORARY DIVERSION DITCH LIMITS OF DRAINAGE SUB-BASIN INLET PROTECTION DEVICE 1 INLET PROTECTION DEVICE 2 TEMPORARY STONE CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT BASIN LIMITS OF DISTURBANCE OVERFLOW ELEV. 902902CONTOUR RIP RAP CHECK DAM PA-10 SILT FENCE SOIL BORINGS ST-9 EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE PHASE I: 1.INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2.PREPARE TEMPORARY PARKING AND STORAGE AREA. 3.CONSTRUCT THE SILT FENCES ON THE SITE. 4. CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS. 5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 6. CLEAR AND GRUB THE SITE. 7. BEGIN GRADING THE SITE. 8. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1.TEMPORARILY SEED DENUDED AREAS. 2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3.INSTALL RIP RAP AROUND OUTLET STRUCTURES. 4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. 5.PREPARE SITE FOR PAVING. 6.PAVE SITE. 7.INSTALL INLET PROTECTION DEVICES. 8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. 9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE. TSM TS SB SILT DIKE BIO-ROLL LEGEND SEQUENCE OF CONSTRUCTION NOTE TO CONTRACTOR D SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:01pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.02 EROSION & SEDIMENT CONTROL PLAN - PHASE II TEMPORARY STABILIZATION MEASURES (SEED, MULCH, MATS OR BLANKETS AS OUTLINED IN THE SWPPP) TEMPORARY STORAGE AND PARKING AREA DIRECTION OF OVERLAND FLOW TEMPORARY DIVERSION DITCH LIMITS OF DRAINAGE SUB-BASIN INLET PROTECTION DEVICE 1 INLET PROTECTION DEVICE 2 TEMPORARY STONE CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT BASIN LIMITS OF DISTURBANCE OVERFLOW ELEV. 902902CONTOUR RIP RAP CHECK DAM PA-10 SILT FENCE SOIL BORINGS ST-9 EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE PHASE I: 1.INSTALL STABILIZED CONSTRUCTION ENTRANCES. 2.PREPARE TEMPORARY PARKING AND STORAGE AREA. 3.CONSTRUCT THE SILT FENCES ON THE SITE. 4. CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS. 5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. 6. CLEAR AND GRUB THE SITE. 7. BEGIN GRADING THE SITE. 8. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. PHASE II: 1.TEMPORARILY SEED DENUDED AREAS. 2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS. 3.INSTALL RIP RAP AROUND OUTLET STRUCTURES. 4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES. 5.PREPARE SITE FOR PAVING. 6.PAVE SITE. 7.INSTALL INLET PROTECTION DEVICES. 8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. 9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE. TSM TS SB SILT DIKE BIO-ROLL LEGEND SEQUENCE OF CONSTRUCTION NOTE TO CONTRACTOR D Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:01pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.03 EROSION & SEDIMENT CONTROL PLAN - DETAILS CROSS BRACE MI N . 15 " 18 " MA X . 2" X 4" STAKE 3' M I N . DROP INLET WITH GRATE 2" X 4" WOOD FRAME (TYP.) 5' MIN. SECURELY FASTEN OVERLAPPING ENDS OF SILT FENCE MATERIAL TO ADJACENT STAKES WITH THREE WIRE TIES OR OTHER FASTENERS ATTACH THE WOVEN WIRE FENCE TO EACH POST WITH THREE WIRE TIES OR OTHER FASTENERS (SEE NOTE 1) 1. ATTACH THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE (SPACED EVERY 30") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8" OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1" VERTICALLY APART. 2. WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED ACROSS TWO POSTS. 3. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS MAY NOT EXCEED ONE-HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE-HALF THE HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE. 4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT. OVERLAP 5' MIN. SILT FENCE MATERIAL TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH THREE TIES SPACED AT 30" ON CENTER (SEE NOTE 1) DEFLECTOR PLATE OVERFLOW 2 - TOP OF CURB BOX OVERFLOW 1 - CENTER OF FILTER ASSEMBLY 10" FILTER ASSEMBLY CURB CG 3067 HIGH-FLOW FABRIC MIRAFI FF101 ROAD DRAIN CASTING APPLICABILTY x NEENAH R-3067 x NEENAH R-3512 NOT TO SCALE CONSTRUCT 2' HIGH BERM WITH MAXIMUM SIDE SLOPE OF 4:1 2" TO 3" GRAVEL NOTE: THE ROCK ENTRANCES SHALL BE INSTALLED PRIOR TO THE START OF ANY SITE WORK THE ROCK ENTRANCES SHALL BE INSPECTED FOLLOWING EACH RAINFALL. MAINTENANCE OF THE ROCK ENTRANCES SHALL INCLUDE A TOP DRESSING OF NEW GRAVEL, OR REMOVAL AND REPLACEMENT OF THE GRAVEL AS NEEDED, TO KEEP THE ENTRANCE FREE FROM COLLECTED MUD. AS REQU I R E D UNDISTURBED SOIL BACKFILL 6" X 6" TRENCH WOVEN MONOFILAMENT GEOTEXTILE MATERIAL DIRECTION OF DRAINAGE 2" X 2" WOOD OR STEEL T-POSTS 12 " M I N . 8' X 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA 2'-0" MIN BERM AROUND PERIMETER GROUND SURFACE 12" MIN 12" MIN COMPACTED EMBANKMENT MATERIAL (TYP.)3:1 OR FLATTER SIDE SLOPES NOTES: 1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. 2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC LINER. 3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. 4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. 7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. WOVEN WIRE FENCE WITH SILT FENCE MATERIAL COVER EXTEND WIRE FENCE A MIN. OF 3" INTO GROUND EXTEND SILT FENCE MATERIAL A MIN. OF 1'-0" INTO GROUND EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP" SITE LOCATION MAP NOT TO SCALE USGS MAP NOT TO SCALE ROCK ENTRANCE DRIVE NOT TO SCALE SILT FENCE DETAIL NOT TO SCALE CONCRETE WASHOUT AREA ROAD DRAIN INLET PROTECTION (IP-2)SILT FENCE INLET PROTECTION (IP-1) NOT TO SCALE POSTS: 2 X 4 WOODEN STAKE FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. NOT TO SCALE Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:01pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.04 EROSION & SEDIMENT CONTROL PLAN - SWPPP SECTION 1: SITE EVALUATION, ASSESSMENT, AND PLANNING 1.1 PROJECT/SITE INFORMATION NPDES PERMIT NUMBER: 1.2 CONTACT INFORMATION/RESPONSABLE PARTIES OWNER: THE DRIESSEN GROUP, LLC CONTACT NAME: VINCE DRIESSEN ADDRESS: 4999 FRANCE AVE. S., SUITE 216 CITY, STATE, ZIP CODE: EDINA, MN 55410 TELEPHONE NUMBER: 612-313-0105 FAX/EMAIL: 612-338-8971 GENERAL CONTRACTOR (TO BE COMPLETED BY GENERAL CONTRACTOR): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: INSERT AREA OF CONTROL (IF MORE THAN ONE OPERATOR AT SITE): THE GENERAL CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PERMIT PROGRAM (GENERAL PERMIT) ATTACHED AS APPENDIX C. THE GENERAL CONTRACTOR MUST COMPLY WITH ANY LOCAL GOVERNING AGENCY (LGU) HAVING JURISDICTION CONCERNING EROSION AND SEDIMENT CONTROL. THE GENERAL CONTRACTOR SHALL BE REQUIRED TO BE A CO-APPLICANT WITH THE OWNER. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL DEVICES. d,͞WW>/d/KE&KZ'EZ>^dKZDͲtdZWZD/d&KZKE^dZhd/KEd/s/dz;DE ZϭϬϬϬϬϭͿ͟&KhE/EWWE/y^,>>KDW>dzd,'EZ>KEdZdKZE SENT, ALONG WITH THE REQUIRED APPLICATION FEE, BY THE GENERAL CONTRACTOR TO: MINNESOTA POLLUTION CONTROL AGENCY REM DIVISION, CONSTRUCTION STORM-WATER PERMIT PROGRAM 520 LAFAYETTE ROAD NORTH ST. PAUL, MINNESOTA, 55155-4194 NOTE: ALL PROJECTS UNDER 50 ACRES MUST SUBMIT THE PERMIT APPLICATION USING THE ONLINE PROCESS. MAILED APPLICATIONS ARE ONLY ACCEPTED FOR PROJECTS THAT DISTURB 50 OR MORE ACRES. UNLESS NOTIFIED BY THE MINNESOTA POLLUTION CONTROL AGENCY (MPCA) TO THE CONTRARY, APPLICANTS WHO SUBMIT A COMPLETE APPLICATION FORM IN ACCORDANCE WITH THE REQUIREMENTS OF THE GENERAL PERMIT ARE AUTHORIZED TO DISCHARGE STORM WATER FROM THE CONSTRUCTION SITE UNDER THE TERMS AND CONDITIONS OF THIS PERMIT SEVEN (7) CALENDAR DAYS AFTER THE POSTMARKED DATE OF THE COMPLETED APPLICATION, OR SEVEN (7) CALENDAR DAYS AFTER THE ONLINE APPLICATION PROCESS IS COMPLETE (HTTPS://NETWEB.PCA.STATE.MN.US/PRIVATE/ ). ADDITIONALLY, AUTHORIZATION WILL BE DELAYED UNDER THE FOLLOWING CIRCUMSTANCES: *IF THE PROJECT DISTURBS 50 ACRES OR MORE AND HAS A DISCHARGE POINT WITHIN 1 MILE AND FLOWS TO AN IMPAIRED OR SPECIAL WATER WHOSE DISCHARGE MAY REACH AN IMPAIRED OR SPECIAL WATER LISTED IN APPENDIX A OF THE GENERAL PERMIT THE APPLICANT SHALL SUBMIT THE STORM WATER POLLUTION PREVENTION PLAN AND A COMPLETED APPLICATION AT LEAST 30 CALENDAR DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. UNLESS NOTIFIED BY THE MPCA TO THE CONTRARY, COVERAGE BECOMES EFFECTIVE 30 CALENDAR DAYS AFTER THE POSTMARKED DATE OF THE COMPLETED APPLICATION. *IF THE PROJECT INCLUDES ALTERNATIVE METHODS THE APPLICATION AND TWO ALTERNATIVE TREATMENT PLANS MUST BE SUBMITTED A MINIMUM OF 90 DAY BEFORE CONSTRUCTION STARTS. EROSION & SEDIMENT CONTROL SUBCONTRACTOR (RESPONSIBLE FOR IMPLEMENTING & UPDATING SWPPP - TO BE COMPLETED BY CONTRACTOR): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: EROSION & SEDIMENT CONTROL INSPECTOR (SEE PART 5.1 OF THIS SWPPP FOR MORE INFORMATION ON INSPECTION RESPONSIBILITIES- TO BE COMPLETED BY CONTRACTOR): COMPANY/ORGANIZATION NAME: CONTACT NAME: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: GROUND DISTURBING SUBCONTRACTOR(S): THE GENERAL CONTRACTOR SHALL PROVIDE NAMES AND ADDRESSES OF ALL SUBCONTRACTORS IN THE FORM PROVIDED IN APPENDIX G WORKING ON THIS PROJECT WHO WILL BE INVOLVED WITH CONSTRUCTION ACTIVITIES THAT DISTURB SITE SOIL, ALONG WITH A CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON THE SITE TO ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN EFFECT UNTIL THE CONSTRUCTION PROJECT IS COMPLETE AND THE NOT SUBMITTED. THIS SWPPP WAS PREPARED BY: COMPANY/ORGANIZATION NAME: SAMBATEK, INC. CONTACT NAME: MARK ANDERSON ADDRESS: 12800 WHITEWATER DRIVE, SUITE 300 CITY, STATE, ZIP CODE: MINNETONKA, MN 55343 TELEPHONE NUMBER: 763-476-6010 FAX/EMAIL: 763-476-8532 1.3 NATURE OF CONSTRUCTION ACTIVITY NATURE OF CONSTRUCTION: THIS SWPPP HAS BEEN PREPARED FOR MAJOR ACTIVITIES ASSOCIATED WITH CONSTRUCTION OF DAKOTA RETAIL, SOUTH OF STATE HIGHWAY 5 AT THE INTERSECTION OF LAKE DRIVE EAST AND DAKOTA AVENUE. CONSTRUCTION ACTIVITY WILL INCLUDE MASS GRADING AND UTILITY INSTALLATION, AS WELL AS STRUCTURE ERECTION, PAVING AND LANDSCAPING. APPROXIMATE TIMELINES: ESTIMATED PROJECT START DATE: 09/01/14 ESTIMATED PROJECT COMPLETION DATE:08/01/15 1.4 SOILS, SLOPES, VEGETATION, AND CURRENT DRAINAGE PATTERNS SOIL TYPE(S): (DESCRIBE THE SOILS, INCLUDING A RANGE OF ANTICIPATED PARTICLE SIZE, EXPECTED TO BE FOUND DURING CONSTRUCTION BASED ON THE GEOTECH REPORT AND SOIL SURVEY INFORMATION) SLOPES: CURRENTLY THE SITE SLOPES WEST TO EAST, WITH AN AREA OF SLOPES THAT ARE VERY NEAR 3:1 (HORIZONTAL:VERTICAL). GRADING ACTIVITIES WILL MAINTAIN THE SITES HIGH POINT ON THE WEST SIDE, BUT RUNOFF WILL BE COLLECTED AND CONVEYED TO AN ON SITE STORMWATER POND. DRAINAGE PATTERNS: DRAINAGE FLOWS FROM WEST TO EAST AND ON TO CITY STREETS FOR COLLECTION. PROPOSED GRADES WILL CAPTURE MORE ONSITE RUNOFF AND TREAT STORMWATER PRIOR TO ITS ENTRY INTO THE PUBLIC STORMWATER CONVEYANCE SYSTEM. VEGETATION: THE EXISTING SITE IS COMPOSED OF THE IMPERVIOUS SURFACING ASSOCIATED WITHT THE GAS AND BAIT SHOP, WITH THE SURROUNDING AREA BEING MADE UP OF GRASS. THERE ARE VERY FEW TREES ONSITE. RAINFALL INFORMATION: Z/E&>>/E&KZDd/KEʹd,sZ'dKd>EEh>WZ/W/dd/KE/^KhdϮϴ͘ϯϮ INCHES. OF THIS ABOUT 17.31 INCHES, OR 61 PERCENT, USUALLY FALLS IN MAY THROUGH SEPTEMBER. THE AVERAGE ANNUAL SNOWFALL IS 57.3 INCHES. (DESCRIBE THE TYPICAL YEARLY RAINFALL PATTERN FOR THE SITE IF DIFFERENT FROM ABOVE, WHICH IS FOR THE TWIN CITIES. ,KtDh,͕t,Ed,Z/EdzW/>>z&>>^͕d͙Ϳ 1.6 RECEIVING WATERS CONSTRUCTION PHASE STORM WATER SYSTEM DESCRIPTION: THE STORMWATER POND AT THE LOW POINT OF THE SITE CAN BE UTILIZED AS A TEMPORARY SEDIMENTATION BASIN PRIOR TO OUTLET. DESCRIPTION OF RECEIVING WATERS: THIS SITE IS WITHIN ONE MILE OF TWO IMPAIRED LAKES: LAKE SUSAN AND LOTUS LAKE. 1.7 SITE FEATURES AND SENSITIVE AREAS TO BE PROTECTED NONE 1.8 POTENTIAL SOURCES OF POLLUTION POTENTIAL SOURCES OF SEDIMENT AND OTHER POLLUTANTS TO STORMWATER RUNOFF: CONSTRUCTION PHASE POLLUTANT SOURCES ANTICIPATED AT THE SITE ARE DISTURBED (BARE) SOIL, VEHICLE FUELS AND LUBRICANTS, CHEMICALS ASSOCIATED WITH BUILDING CONSTRUCTION, AND BUILDING MATERIALS. WITHOUT ADEQUATE CONTROL THERE IS THE POTENTIAL FOR EACH TYPE OF POLLUTANT TO BE TRANSPORTED BY STORM WATER.AS THIS SITE WAS A FUELING STATION, ADDITION MEASURES MAY NEED TO BE TAKEN TO ENSURE THAT ANY CONTAMINATED SOILS IN THE FUELING AREA ARE DEALT WITH PROPERLY. 1.9 ENDANGERED/THREATENED SPECIES NO KNOWN THREATENED OR ENDANGERED SPECIES ARE PRESENT ON SITE. 1.10 HISTORIC PRESERVATION THERE ARE NO KNOWN HISTORIC SITES ON OR NEAR THE CONSTRUCTION SITE. 1.11 APPLICABLE FEDERAL, TRIBAL, STATE OR LOCAL PROGRAMS LOCAL GOVERNING UNIT (LGU) REQUIREMENTS:CITY OF CHANHASSEN - RATE CONTROL AND WATER QUALITY. SECTION 2: EROSION AND SEDIMENT CONTROL BMPS APPROPRIATE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION MUST BE PLANNED FOR AND IMPLEMENTED. ALL EXPOSED AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION, BUT IN NO CASE LATER THAN 7 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G. CLEAN AGGREGATED STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT, BUT MUST COMPLY WITH SECTION 2.7 OF THIS SWPPP (PART IV.C.5 OF THE GENERAL PERMIT). IF THE DOWN GRADIENT TREATMENT SYSTEM IS OVERLOADED, THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING ADDITIONAL UP GRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND MUST AMEND THE SWPPP TO IDENTIFY THE ADDITIONAL PRACTICES. SEDIMENT CONTROL PRACTICES MUST ALWAYS BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS AND BE LOCATED UPGRADIENT OF ANY BUFFER ZONES. THE PERIMETER SEDIMENT CONTROL PRACTICES MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES MUST REMAIN IN PLACE UNTIL FINAL STABILIZATION IS ACHIEVED (SEE SECTION 7 OF THIS SWPPP). THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES MUST BE RE-INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT RAIN EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE. 2.2 PRESERVE 50 FOOT NATURAL BUFFER THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. THE CONTRACTOR IS NOT REQUIRED TO ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE BUFFER OR PROVIDE VEGETATION IF NONE EXISTS. 2.3 CONTROL STORMWATER FLOWING ONTO AND THROUGH THE PROJECT D^hZ^^,Kh>d<EdKE^hZd,d͞>E͟ZhEK&&&ZKDK&&^/d/^/sZd AROUND DISTURBED AREAS ON SITE. CARE SHOULD BE TAKEN THAT RE-ROUTING OFF SITE RUNOFF DOES NOT RESULT IN FLOODING OR OTHER ISSUES ON ADJACENT PROPERTIES. (DESCRIBE ANTICIPATED AREAS OF OFF-SITE STORMWATER RUN ON; DESCRIBE BMPS, SUCH AS DIVERSION BERMS AND/OR DITCHES USES TO DIVERT FLOWS AROUND DISTURBED AREAS. INCLUDE ROCK CHECK DAMS WHERE APPROPRIATE) BMP DESCRIPTION: TEMPORARY DIVERSION DITCH INSTALLATION SCHEDULE: INSTALL TEMPORARY DIVERSION DITCHES AS SHOWN ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO UP GRADIENT GROUND DISTURBING ACTIVITIES MAINTENANCE AND INSPECTION REQUIREMENTS: THE WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. THIS STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 7 DAYS OF CONNECTING TO A SURFACE WATER AND AFTER CONSTRUCTION HAS CEASED. TEMPORARY OR PERMANENT DITCHES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DO NOT NEED TO BE STABILIZED, BUT MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. DITCHES MUST BE INSPECTED EVERY 7 DAYS, AND WITHIN 24 HOURS AFTER Ϭ͘ϱ͟ϮϰͲ,KhZZ/EsEd͘Ez^/DEdWK^/d/E/sZ^/KE DITCHES MUST BE REMOVED AND ANY EXPOSED SOILS STABILIZED WITHIN 7 DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. IF PRECLUDED, NOTE REASON FOR DELAY ON MAINTENANCE LOG. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.4 STABILIZE SOILS 1.dDWKZZz^/E'ʹ/^dhZZ^d,dZEKdzdd&/E>'Zhdd,d WILL NOT BE ACTIVELY WORKED FOR 7 DAYS OR MORE MUST BE TEMPORARILY STABILIZED. TEMPORARY STABILIZATION MUST BE INITIATED IMMEDIATELY WHERE WORK HAS TEMPORARILY CEASED AND MUST BE COMPLETED NO LATER THAN 14 CALENDAR DAYS AFTER WORK IN THAT PORTION OF THE SITE HAS TEMPORARILY CEASE. TEMPORARY SEEDING SHALL BE IN ACCORDANCE WITH MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING (SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY, HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH. 2.WZDEEd^d/>/d/KEʹ>>Z^d&/E>'ZDh^d^d/>/t/d,/Eϳ DAYS AFTER COMPLETION OF THE MAJOR CONSTRUCTION ACTIVITY. PERMANENT STABILIZATION MUST BE INITIATED IMMEDIATELY WERE WORK HAS PERMANENTLY CEASED AND MUST BE COMPLETED NO LATER THAN 7 CALENDAR DAYS AFTER CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS PERMANENTLY CEASED. SEEDED AREAS SHALL BE PROTECTED WITH MULCH. PERMANENT MULCH SHALL CONFORM TO MN/DOT SPECIFICATION 3882, TYPE 3 AT 2 TONS/ACRE AND SHALL BE DISK ANCHORED. HYDRAULIC SOIL STABILIZER MAY BE USED IN PLACE OF MULCH IF APPROVED BY CIVIL ENGINEER. IF HYDRAULIC SOIL STABILIZER IS USED, IT SHALL BE MN/DOT TYPE 6. (DESCRIBE THE PERMANENT STABILIZATION). 2.5 PROTECT SLOPES ^dW^>KWZ^ʹd,KEdZdKZDh^dD/E/D/d,E&KZ/^dhZEK& PORTIONS OF THE PROJECT THAT HAVE STEEP SLOPES (3:1 OR GREATER).CONTRACTOR MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES, SUCH AS SLOPE DRAINING AND TERRACING. SLOPES STEEPER THAN 3:1 MUST BE PROTECTED BY EROSION CONTROL BLANKETS. BMP DESCRIPTION: EROSION CONTROL BLANKET INSTALLATION SCHEDULE: INSTALL EROSION CONTROL BLANKETS AS SHOWN ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, WITHIN THE TIMEFRAME ALLOWED FOR STABILIZATION AFTER WORK HAS CEASED IN AN AREA, DEPENDING ON THE LOCATION (I.E. 24 HOURS, 7 DAYS, 14 DAYS) MAINTENANCE AND INSPECTION REQUIREMENTS: TO FUNCTION PROPERLY, EROSION CONTROL BLANKETS MUST BE IN CONTACT WITH THE SOIL BENEATH THE BLANKET. BLANKETS MUST BE SECURED PER THE CONSTRUCTION DETAIL PROVIDED WITH THE SWPPP PLAN SHEETS. /E^Wd>E<d^sZzϳz^KZt/d,/EϮϰ,KhZ^&dZϬ͘ϱ͟ 24-HOUR RAIN EVENT. REPAIR OR REPLACE NON-FUNCTIONAL BLANKETS WITHIN 24 HOURS AFTER DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.6 PROTECT STORM DRAIN INLETS ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE MEANS DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (STREET FLOODING/FREEZING) HAS BEEN IDENTIFIED AND PERMITTEE(S) HAVE RECEIVED WRITTEN CORRESPONDENCE FROM THE JURISDICTIONAL AUTHORITY (E.G. CITY/COUNTY/TOWNSHIP/MNDOT/ETC.) VERIFYING THE NEED FOR REMOVAL. THE WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THIS SWPPP. BMP DESCRIPTION: J-HOOK CURB TRAP INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT J-HOOK CURB TRAPS EVERY 7 DAYS OR WITHIN 24 HOURS AFTER Ϭ͘ϱ͟ϮϰͲ,KhZZ/EsEd͘:Ͳ,KK<hZdZW^^,Kh>>E OUT WHEN THE SEDIMENT BUILD-UP REACHED 1/3 THE HEIGHT OF THE TRAP. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: WIMCO (OR APPROVED EQUAL) INLET PROTECTION INSTALLATION SCHEDULE: INSTALL INLET PROTECTION IN EXISTING STRUCTURES AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO BEGINNING GROUND DISTURBING ACTIVITIES UP GRADIENT OF THE INLET. INSTALL INLET PROTECTION ON NEW STRUCTURES AS SOON AS THE STRUCTURES ARE PUT INTO USE. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT INLET PROTECTION EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A Ϭ͘ϱ͟ϮϰͲ,KhZZ/EsEd͘^/DEdhDh>d/KE^^,Kh> REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE CAPACITY OF THE DEVICE, OR, IF MORE STRINGENT, IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.7 ESTABLISH PERIMETER CONTROLS AND SEDIMENT BARRIERS ALL STRUCTURAL SEDIMENT CONTROLS INTENDED TO RECEIVE AND TREAT CONSTRUCTION RUNOFF MUST BE IN PLACE BEFORE ANY UP GRADIENT LAND ALTERATION CAN BEGIN AND MUST STAY IN OPERATION UNTIL FINAL STABILIZATION OF THE SITE HAS BEEN ACHIEVED. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND CANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER. BMP DESCRIPTION: SILT FENCE INSTALLATION SCHEDULE: INSTALL SILT FENCE AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT LAND DISTURBING ACTIVITIES. MAINTENANCE AND INSPECTION REQUIREMENTS: /E^Wd^/>d&EsZzϳz^KZt/d,/EϮϰ,KhZ^&dZϬ͘ϱ͟ 24-HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE SILT FENCE. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: BIOLOGS INSTALLATION SCHEDULE: INSTALL BIOLOGS AS DIRECTED ON THE SWPPP PLAN SHEETS, AND AS NEEDED THROUGHOUT CONSTRUCTION, PRIOR TO COMMENCING UP GRADIENT LAND DISTURBING ACTIVITIES. MAINTENANCE AND INSPECTION REQUIREMENTS: /E^Wd/K>K'^sZzϳz^KZt/d,/EϮϰ,KhZ^&dZϬ͘ϱ͟ϮϰͲ HOUR RAIN EVENT. SEDIMENT ACCUMULATIONS SHOULD BE REMOVED WHEN SEDIMENT BUILD-UP REACHES 1/2 THE HEIGHT OF THE BIOLOG. THIS MAINTENANCE MUST BE COMPLETED WITHIN 24 HOURS OF DISCOVERY. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.8 RETAIN SEDIMENT ON-SITE ANY OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACT (E.G. FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS). TEMPORARY SEDIMENTATION BASINS AND SEDIMENT TRAPS ARE TO BE UTILIZED DURING CONSTRUCTION TO CAPTURE AND TREAT SEDIMENT LADED RUN OFF. THE TEMPORARY SEDIMENTATION BASINS HAVE BEEN DESIGNED TO[RETAIN THE RUNOFF FROM A 2 YEAR, 24 HOUR STORM EVENT, EXCEPT THAT IN NO CASE SHALL THE BASIN PROVIDE LESS THAN 1,800 CUBIC FEET OF LIVE STORAGE OR PROVIDE 3,600 CUBIC FEET OF STORAGE BELOW THE OUTLET PIPE PER ACRE DRAINED TO THE BASIN IN ACCORDANCE WITH PART III.C OF THE GENERAL PERMIT. (MODIFY TO BE IN ACCORDANCE WITH APPENDIX A OF THE PERMIT IF APPLICABLE) BMP DESCRIPTION: TEMPORARY SEDIMENTATION BASIN INSTALLATION SCHEDULE: INSTALL TEMPORARY SEDIMENTATION BASIN PRIOR TO BEGINNING UPSLOPE LAND DISTURBING ACTIVITIES. IF THIS IS NOT POSSIBLE DUE TO EXISTING TOPOGRAPHY, LIMIT DISTURBANCE TO ONLY THOSE AREAS NECESSARY TO INSTALL TEMPORARY SEDIMENTATION BASIN. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT TEMPORARY SEDIMENTATION BASINS EVERY 7 DAYS OR WITHIN Ϯϰ,KhZ^&dZϬ͘ϱ͟ϮϰͲ,KhZZ/EsEd͘dDWKZZzE PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE VOLUME OF SEDIMENT COLLECTED IN d,^/EZ,^Ъd,^dKZ'sK>hD͘d,/^D/EdEEDh^d BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. IF CONDITIONS DO NOT ALLOW MAINTENANCE TO BE PERFORMED WITHIN 72 HOURS, DOCUMENT THE CAUSE OF DELAY ON THE MAINTENANCE FORM. REFER TO SECTION 3.8 OF THIS SWPPP FOR BASIN DRAINING GUIDELINES. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.9 ESTABLISH STABILIZED CONSTRUCTION EXITS ROCK CONSTRUCTION EXITS HAVE BEEN DESIGNED TO PREVENT SEDIMENT TRACK OFF. IF THERE IS EVIDENCE OF SEDIMENT TRACKING FROM VEHICLES IN PAVED AREAS, THE SEDIMENT MUST BE REMOVED BY STREET SWEEPING OR OTHER METHOD AS SOON AS FEASIBLY POSSIBLE, BUT NO LONGER THAN 24 HOURS AFTER DISCOVERY. [DESCRIBE ADDITIONAL BMPS USED TO MINIMIZE VEHICLE TRACKING] BMP DESCRIPTION: ROCK EXIT DRIVE INSTALLATION SCHEDULE: INSTALL ROCK EXITS AS SHOWN ON THE SWPPP PLAN SHEETS AS SOON AS POSSIBLE AT THE BEGINNING OF CONSTRUCTION ACTIVITIES. INSTALL ADDITIONAL ROCK EXIT DRIVES AS NEEDED THROUGHOUT CONSTRUCTION. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT ROCK EXIT DRIVES EVERY 7 DAYS OR WITHIN 24 HOURS AFTER A Ϭ͘ϱ͟ϮϰͲ,KhZZ/EsEd͘ZK<y/dZ/s^Dh^dWZ/K/>>z ͚Z&Z^,͛dKE^hZWZKWZ&hEd/KE>/dz͘D/EdEE^,Kh> BE PERFORMED WHEN THE EXIT APPEARS SMOOTH AND COMPACTED OR WHEN THE ROCK EXIT DRIVE CEASES TO FUNCTION PROPERLY. EXIT LOCATIONS SHOULD BE INSPECTED FOR SIGNS OF OFF-SITE SEDIMENT TRACKING. TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY. STREET SWEEPING MUST BE USED IF ROCK EXIT DRIVES ARE NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.10 CONTROL STORMWATER DISCHARGE POINTS PIPE OR OTHER TEMPORARY OR PERMANENT OUTLETS MUST BE STABILIZED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. DRAINAGE DITCHES OR SWALES WITHIN 200 FEET OF THE PROPERTY EDGE MUST BE STABILIZED WITHIN 24 HOURS OF CONNECTION TO A SURFACE WATER. THE REMAINDER OF THE DITCH MUST BE STABILIZED WITHIN 14 DAYS OF CONNECTION. BMP DESCRIPTION: RIPRAP INSTALLATION SCHEDULE: INSTALL RIPRAP AS SHOWN ON SWPPP PLANS AND/OR GRADING PLANS. INSTALLATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. MAINTENANCE AND INSPECTION REQUIREMENTS: /E^WdKhd>d^sZzϳz^KZt/d,/EϮϰ,KhZ^&dZϬ͘ϱ͟ϮϰͲ HOUR RAIN EVENT. REPAIR, REPLACE OR SUPPLEMENT NON-FUNCTIONING RIPRAP ENERGY DISSIPATION WITHIN 24 HOURS OF DISCOVERY. ANY OFF SITE ACCUMULATION OF SEDIMENT MUST BE REMOVED IN MANNER AND AT A FREQUENCY TO MINIMIZE OFF-SITE IMPACTS. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): 2.11 ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS MUST BE APPLIED AFTER CONVENTIONAL EROSION AND SEDIMENT CONTROL DEVICES ARE UTILIZED. CHEMICALS MAY ONLY BE APPLIED WHERE TREATED STORMWATER IS DIRECTED TO A SEDIMENT CONTROL SYSTEM WHICH ALLOWS FOR FILTRATION OR SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. CONSIDERATION MUST BE GIVEN WHEN SELECTING CHEMICALS TO THE EXPECTED SOIL TYPES TO BE EXPOSED DURING CONSTRUCTION, AND TO THE EXPECTED TURBIDITY, pH, AND FLOW RATE OF STORMWATER FLOWING INTO THE CHEMICAL TREATMENT SYSTEM OR AREA. IF CHEMICALS ARE PART OF THE EROSION CONTROL PLAN, THEY MUST BE USED IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICE, AND WITH DOSING SPECIFICATION AND SEDIMENT REMOVAL DESIGN SPECIFICATIONS PROVIDED BY THE MANUFACTURER OR PROVIDER/SUPPLIER OF THE APPLICABLE CHEMICALS. 2.12 ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS [DESCRIBE ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS USED] BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) SECTION 3: DEWATERING AND BASIN DRAINING 3.1 DEWATERING AND BASIN DRAINING ALLOWABLE NON-STORMWATER DISCHARGES, AS DEFINED BY THE GENERAL PERMIT, ARE LIMITED TO DEWATERING AND BASIN DRAINING. DEWATERING OR BASIN DRAINING THAT MAY HAVE TURBID OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE WHENEVER POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE APPROPRIATE BMPS, SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER OR DOWNSTREAM LANDOWNERS. THE CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. ALL WATER FROM DEWATERING OR BASIN DRAINING MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WETLAND IF THE CONTRACTOR ELECTS TO UTILIZE FILTERS WITH BACKWASH WATER, THE CONTRACTOR MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION. THE CONTRACTOR MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN DEWATERING DEVICES. ( PROJECT SPECIFIC DEWATERING PROCESS MUST BE DEFINED) BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) SECTION 4: GOOD HOUSEKEEPING BMPS 4.1 MATERIAL HANDLING AND WASTE MANAGEMENT 1.^K>/t^d/^WK^>ʹEK^K>/DdZ/>^͕/E>h/E'KE^dZhd/KEE DEMOLITION MATERIALS, COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, SHALL BE ALLOWED TO BE CARRIED FROM THE SITE WITH STORM WATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. THE CONTAINERS WILL BE EMPTIED PERIODICALLY BY A CONTRACT TRASH DISPOSAL SERVICE AND HAULED AWAY FROM THE SITE. DISPOSAL OF SOLID WASTES MUST COMPLY WITH MPCA REQUIREMENTS. 2.'ZKhEtdZWZKdd/KEʹ^h^dE^d,d,sd,WKdEd/>&KZWK>>hd/E' SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT WITH THE IMPACT THEY REPRESENT 3.^E/dZz&/>/d/^ʹ>>WZ^KEE>/EsK>st/d,KE^dZhd/KEd/s/d/^Dh^d COMPLY WITH STATE AND LOCAL SANITARY SEPTIC SYSTEM REGULATIONS. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT THE SITE THROUGHOUT THE CONSTRUCTION PHASE WHERE REQUIRED BY STATE OR LOCAL REGULATIONS. THEY MUST BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND BE SERVICED BY A COMMERCIAL OPERATOR. 4.2 ESTABLISH PROPER STORAGE, HANDLING AND DISPOSAL PRACTICES HAZARDOUS MATERIALS AND TOXIC WASTE (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT SOLVENTS, PERTOLEUM-BASE PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) MUST BE STORED IN WATERPROOF CONTAINERS WITH SECONDARY CONTAINMENT, AND THEIR LOCATION(S) MUST BE NOTED ON THE SWPPP MAP. EXCEPT DURING APPLICATION, THE CONTENTS MUST BE KEPT IN TRUCKS OR WITHIN STORAGE FACILITIES WITH RESTRICTED ACCESS TO PREVENT VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MCPA REGULATIONS. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM THE SITE, TREATED, AND DISPOSED AT AN APPROVED SOLID WASTE OR CHEMICAL DISPOSAL FACILITY.BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS AND PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS AND LANDSCAPE MATERIALS MUST BE UNDER COVER BY PLASTIC SHEETING OR TEMPORARY ROOFS TO PREVENT DISCHARGE, OR PROTECTED BY SIMILAR EFFECTIVE MEANS TO PREVENT CONTACT WITH STORMWATER. 4.3 DESIGNATE WASHOUT AREAS THE CONTRACTOR SHALL DESIGNATE AREAS FOR CONCRETE WASHOUT, AND NOTE THE LOCATIONS ON THE SITE MAP. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK PROOF CONTAINMENT FACILITY OR IMPERMEABLE LAYER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTE MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE PROPER FACILITIES. BMP DESCRIPTION: CONCRETE WASHOUT INSTALLATION SCHEDULE: PRIOR TO CONCRETE WORK. MAINTENANCE AND INSPECTION REQUIREMENTS: INSPECT CONCRETE WASHOUTS FOR EVIDENCE OF DISCHARGE EVERY 7 z^KZt/d,/EϮϰ,KhZ^&dZϬ͘ϱ͟ϮϰͲ,KhZZ/EsEd͘ZW/Z͕ REPLACE OR SUPPLEMENT NON-FUNCTIONING CONCRETE WASHOUTS WITHIN 24 HOURS OR PRIOR TO NEXT USE. RESPONSIBLE STAFF (CONTRACTOR TO COMPLETE): Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:01pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C5.01-EROS.dwg C5.05 EROSION & SEDIMENT CONTROL PLAN - SWPPP 4.4 ESTABLISH PROPER EQUIPMENT/VEHICLE FUELING AND MAINTENANCE PRACTICES THE CONTRACTOR SHALL DESIGNATE AREAS FOR EQUIPMENT FUELING, CLEANING, MAINTENANCE AND REPAIR, AND NOTE THE LOCATION(S) ON THE SWPPP SITE MAPS. RUNOFF MUST BE CONTAINED WITHIN THE DESIGNATED AREAS (I.E. THROUGH USE OF A TEMPORARY BERM). THE AREAS MUST NOT BE LOCATED IN ANY SURFACE WATER. SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE THAT ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. NO ENGINE DEGREASING IS ALLOWED ON SITE. 4.5 CONTROL EQUIPMENT/VEHICLE WASHING THE CONTRACTOR SHALL DESIGNATE LOCATION(S) FOR VEHICLE WASHING, AND NOTE THE LOCATION(S) ON THE SWPPP SITE MAP. RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST PROPERLY USE AND STORE SOAPS, DETERGENTS AND SOLVENTS. THE USE OF DETERGENTS FOR LARGE-SCALE WASHING IS PROHIBITED (I.E. VEHICLES, BUILDINGS, PAVEMENT SURFACES, ETC.). ENGINE DEGREASING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES IS ALSO PROHIBITED. BMP DESCRIPTION: INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: BMP DESCRIPTION: INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) BMP DESCRIPTION: INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) 3.6 SPILL PREVENTION AND CONTROL PLAN 1./Ed>^W/>>ʹ/^,Z'K&K/>KZKd,Z,ZKh^^h^dE^/^^h:ddK REPORTING AND CLEAN UP REQUIREMENTS. IN CASE OF AN ACCIDENTAL SPILL, THE MINNESOTA POLLUTION CONTROL AGENCY IS TO BE NOTIFIED AT THEIR 24-HOUR TELEPHONE NUMBER: 651-649-5451. REFER TO SECTION V, ITEM C OF THE GENERAL PERMIT. 2.'ZKhEtdZWZKdd/KEʹ^h^dE^d,d,sd,WKdEd/>&KZWK>>hd/E' SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY WHATEVER MEANS NECESSARY IN ORDER TO ENSURE THAT THEY DO NOT DISCHARGE FROM THE SITE. AS AN EXAMPLE, SPECIAL CARE MUST BE EXERCISED DURING EQUIPMENT FUELING AND SERVICING OPERATIONS. IF A SPILL OCCURS, IT MUST BE CONTAINED AND DISPOSED OF SO THAT IT WILL NOT FLOW FROM THE SITE OR ENTER GROUNDWATER, EVEN IF THIS REQUIRES REMOVAL, TREATMENT, AND DISPOSAL OF SOIL. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHOULD BE HANDLED IN A MANNER CONSISTENT WITH THE IMPACT THEY REPRESENT. BMP DESCRIPTION: INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) BMP DESCRIPTION: INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) 3.7 ANY ADDITIONAL BMPS BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) BMP DESCRIPTION: (ADD BMPS OR DELETE THIS SECTION) INSTALLATION SCHEDULE: MAINTENANCE AND INSPECTION REQUIREMENTS: RESPONSIBLE STAFF: (CONTRACTOR TO COMPLETE) (CONTRACTOR TO COMPLETE) SECTION 5: POST-CONSTRUCTION BMPS RATE CONTROL IS ACCOMPLISHED BY THE USE OF AN OUTLET CONTROL STRUCTURE PRIOR TO ENTERING THE PUBLIC STORM SEWER. SUMP MANHOLES AND A FILTRATION TRENCH ARE UTILIZED TO ACCOMPLISH WATER QUALITY CONTROL. SECTION 6: INSPECTIONS 6.1 INSPECTIONS 1.INSPECTION FREQUENCY AND RESPONSIBILITY ΀KWd/KEϭʹKEdZdKZZ^WKE^/>&KZ/E^Wd/KE^΁ BETWEEN THE TIME THIS SWPPP IS IMPLEMENTED AND FINAL SITE STABILIZATION IS ACHIEVED AND THE NOTICE OF TERMINATION FILED WITH THE MPCA, ALL DISTURBED AREAS AND POLLUTANT CONTROLS MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER. THE PURPOSE OF SITE INSPECTIONS IS TO ASSESS PERFORMANCE OF POLLUTANT CONTROLS. THE INSPECTIONS WILL BE KEhdzd,KEdZdKZ͛^^/'EdZWZ^Edd/s͘^KEd,^ INSPECTIONS, THE CONTRACTOR WILL DECIDE WHETHER IT IS NECESSARY TO MODIFY THIS SWPPP, ADD OR RELOCATE STRUCTURAL BMPS, OR WHATEVER ELSE MAY BE NEEDED IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER RUNOFF. IF THE SWPPP REQUIRES MODIFICATION, THOSE CHANGES TO THE SWPPP MUST BE DOCUMENTED. THE CONTRACTOR HAS THE DUTY TO CAUSE POLLUTANT CONTROL MEASURES TO BE REPAIRED, MODIFIED, MAINTAINED, SUPPLEMENTED, OR WHATEVER ELSE IS NECESSARY IN ORDER TO ACHIEVE EFFECTIVE POLLUTANT CONTROL. ΀KWd/KEϮʹKtEZZ^WKE^/>&KZ/E^Wd/KE^΁ BETWEEN THE TIME THIS SWPPP IS IMPLEMENTED AND FINAL SITE STABILIZATION IS ACHIEVED AND THE NOTICE OF TERMINATION FILED WITH THE MPCA, ALL DISTURBED AREAS AND POLLUTANT CONTROLS MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR GREATER. THE PURPOSE OF SITE INSPECTIONS IS TO ASSESS PERFORMANCE OF POLLUTANT CONTROLS. THE INSPECTIONS WILL BE KEhdzd,KtEZ͛^^/'EdZWZ^Edd/s͘^KEd,^/E^Wd/KE^͕ THE CONTRACTOR WILL DECIDE WHETHER IT IS NECESSARY TO MODIFY THIS SWPPP, ADD OR RELOCATE STRUCTURAL BMPS, OR WHATEVER ELSE MAY BE NEEDED IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER RUNOFF. IF THE SWPPP REQUIRES MODIFICATION, THOSE CHANGES TO THE SWPPP MUST BE DOCUMENTED. THE CONTRACTOR HAS THE DUTY TO CAUSE POLLUTANT CONTROL MEASURES TO BE REPAIRED, MODIFIED, MAINTAINED, SUPPLEMENTED, OR WHATEVER ELSE IS NECESSARY IN ORDER TO ACHIEVE EFFECTIVE POLLUTANT CONTROL. Ϯ͘/E^Wd/KEWZKhZ^ʹyDW>^K&WZd/h>Z/dD^dKs>hdhZ/E'^/d INSPECTIONS ARE LISTED BELOW. THIS LIST IS NOT INTENDED TO BE COMPREHENSIVE. DURING EACH INSPECTION THE INSPECTOR MUST EVALUATE OVERALL POLLUTANT CONTROL SYSTEM PERFORMANCE AS WELL AS PARTICULAR DETAILS OF INDIVIDUAL SYSTEM COMPONENTS. ADDITIONAL FACTORS SHOULD BE CONSIDERED AS APPROPRIATE TO THE CIRCUMSTANCES. A. PRE-INSPECTION PREPARATION: 1. INSPECTORS SHOULD BE FAMILIAR WITH THE SWPPP, INCLUDING THE EROSION AND SEDIMENT CONTROL PLANS, PAST INSPECTION REPORTS, AND MAINTENANCE LOGS. 2. [DELETE THIS NOTE IF THE SITE DOES NOT HAVE SPECIAL DISCHARGE REQUIREMENTS] PAY SPECIAL ATTENTION TO STORM WATER DISCHARGE TO SPECIAL/IMPAIRED WATERS AND WETLANDS; DISCHARGES TO SPECIAL/IMPAIRED WATERS AND WETLANDS HAVE ADDITIONAL REQUIREMENTS THAT ARE DESCRIBED IN APPENDIX A OF THE GENERAL PERMIT, AND ADDRESSED IN THIS SWPPP. B. SITE ENTRY: 1. BEFORE ENTERING THE SITE, OBSERVE THE SURROUNDINGS AND VARIOUS STAGES OF CONSTRUCTION. NOTE AREAS FOR IN-DEPTH REVIEW AND ANY POTENTIAL ISSUES. 2. THIS IS A GOOD TIME TO VIEW CONSTRUCTION SITE VEHICLE EXIT LOCATIONS AND PERIMETER CONTROLS. C. RECORDS REVIEW: 1. VERIFY THAT A COPY OF THE SWPPP AND APPLICATION FOR THE NPDES STORM WATER PERMIT, AND COPIES OF ALL CONSTRUCTION SITE INSPECTIONS ARE ON SITE. 2. VERIFY THAT THE TIMING FOR INSTALLATION OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, AS WELL AS CONSTRUCTION PHASING, IS GENERALLY BEING FOLLOWED. 3. SWPPPS ARE INTENDED TO BE DYNAMIC DOCUMENTS, VERIFY THAT AMENDMENTS OR CHANGES TO THE SWPPP ARE BEING MADE WHEN: A. A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVE A SIGNIFICANT EFFECT ON STORM WATER DISCHARGES B. INSPECTIONS INDICATE THE SWPPP IS NOT EFFECTIVE C. THE SWPPP IS NOT CONSISTENT WITH THE TERMS OF THE GENERAL PERMIT D. SITE INSPECTION (NOTE TIMELINES FOR MAINTENANCE INCLUDED IN INSPECTION/MAINTENANCE REPORT; REFER TO APPENDIX E FOR INSPECTION REPORT/MAINTENANCE FORM) 1. INSPECT DISCHARGE POINTS DOWNSTREAM AND OFF-SITE AREAS FOR SIGNS OF IMPACT. 2. INSPECT PERIMETER CONTROLS: A. HAVE PERIMETER CONTROLS BEEN PROPERLY INSTALLED AND MAINTAINED? B. ARE CONSTRUCTION ENTRANCES/EXITS FUNCTIONING PROPERLY? ARE ADDITIONAL ENTRANCES/EXITS BEING USED THAT ARE NOT STABILIZED? C. ALL STORM DRAINS MUST BE PROTECTED AND TEMPORARY STOCKPILES MUST HAVE SEDIMENT CONTROLS INSTALLED. D. ALL EXPOSED SOILS MUST HAVE TEMPORARY OR PERMANENT EROSION PROTECTION WITHIN 7 DAYS OF INACTIVITY. 3. COMPARE BMPS IN THE SWPPP WITH CONSTRUCTION SITE CONDITIONS: ARE REQUIRED BMPS IN PLACE; ARE ADDITIONAL BMPS NEEDED; ARE BMPS IN PLACE PROPERLY INSTALLED AND MAINTAINED? 4. INSPECT AREAS THAT HAVE BEEN DISTURBED AND ARE NOT CURRENTLY BEING WORKED. ANY UNSEEDED OR UNMULCHED BARE AREAS THAT HAVE BEEN IDLE FOR 2 WEEKS SHOULD BE NOTED. 5. INSPECT AREAS WITH FINAL STABILIZATION. IN ORDER FOR FINAL STABILIZATION TO BE ACHIEVED, AREAS MUST HAVE A UNIFORM COVER WITH A DENSITY OF 70% OVER ENTIRE AREA. TEMPORARY BMPS SHOULD BE REMOVED AND AREAS DISTURBED BY REMOVAL SEEDED AS NECESSARY. E. EXIT INTERVIEW: 1. DEBRIEF THE PERSON IN CHARGE. EXPLAIN THE IDENTIFIED DEFICIENCIES AND ANY AREAS OF CONCERN. F. A COPY OF THE COMPLETED INSPECTION REPORT MUST BE KEPT WITH THE SWPPP ON SITE. IF AN INSPECTION FORM OTHER THAN THE ONE PROVIDED IN SECTION 02370 IS USED, THE INSPECTION REPORT USED SHOULD INCLUDE, AT A MINIMUM, THE FOLLOWING: *DATE & TIME OF INSPECTION *NAME OF INSPECTOR(S) *FINDINGS OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE ACTIONS *CORRECTIVE ACTIONS TAKEN, INCLUDING DATES, TIMES AND NAMES OF PARTY COMPLETING MAINTENANCE *DATE & AMOUNT OF RAINFALL *RECORD OF ALL POINTS OF DISCHARGE FROM THE PROPERTY AND DESCRIPTION OF DISCHARGE *NOTE TO UPDATE THE SWPPP 6.2 DELEGATION OF AUTHORITY DULY AUTHORIZED REPRESENTATIVE(S) OR POSITION(S): COMPANY OR ORGANIZATION NAME: NAME: POSITION: ADDRESS: CITY, STATE, ZIP CODE: TELEPHONE NUMBER: FAX/EMAIL: A COPY OF THE SIGNED DELEGATION OF AUTHORITY FORM IS ATTACHED IN APPENDIX J. 6.3 CORRECTIVE ACTION LOG THE INSPECTION/MAINTENANCE FORM ATTACHED AS APPENDIX E INCORPORATES BOTH INSPECTION AND MAINTENANCE REPORTING INTO A SINGLE FORM. THIS FORM ALSO SPECIFIES THE TIME ALLOWED FOR CORRECTIONS TO BE PERFORMED. IF THE PARTY PERFORMING INSPECTIONS CHOOSES TO USE ANOTHER INSPECTION FORM, A SEPARATE CORRECTIVE ACTION LOG MUST BE PROVIDED. SECTION 7: RECORDKEEPING AND TRAINING 7.1 RECORDKEEPING ZKZZdEd/KEʹd,KtEZDh^d<Wd,^tWWW/E>h/E'>>,E'^DdK IT DURING CONSTRUCTION (SEE SECTION 6.2), ALONG WITH THE FOLLOWING ADDITIONAL RECORDS ON FILE FOR THREE YEARS AFTER COMPLETION OF THE CONSTRUCTION PROJECT (FINAL STABILIZATION AND NOTICE OF TERMINATION): 1. ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT 2. RECORDS OF ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION 3. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE 4. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS 7.2 LOG OF CHANGES TO THE SWPPP A COPY OF THE SWPPP UPDATE LOG FORM IS ATTACHED IN APPENDIX F. DK/&/d/K^dKd,^tWWWʹd,/^^tWWW/EdE^dKKEdZK>tdZͲKZEE>/Yh/ POLLUTANT DISCHARGES BY SOME COMBINATION OF INTERCEPTION, FILTRATION, AND CONTAINMENT. THE GENERAL CONTRACTOR AND SUBCONTRACTORS IMPLEMENTING THIS SWPPP MUST REMAIN ALERT TO THE NEED TO PERIODICALLY REFINE AND UPDATE THE SWPPP IN ORDER TO ACCOMPLISH THE INTENDED GOALS. THIS SWPPP MUST BE AMENDED AS NECESSARY DURING THE COURSE OF CONSTRUCTION IN ORDER TO KEEP IT CURRENT WITH THE POLLUTANT CONTROL MEASURES UTILIZED AT THE SITE. AMENDING THE SWPPP DOES NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, NEW SECTIONS, AND/OR REVISED DRAWINGS. THIS SWPPP MUST BE UPDATED AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS, SUCH AS ADDITIONAL OR MODIFIED BMPS, DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER: 1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS. 2. INSPECTIONS OR INVESTIGATIONS BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS OR THAT THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCES. 3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF CONTROLLING POLLUTANTS IN STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, OR THE SWPPP IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE GENERAL PERMIT. ϰ͘d,DW,^dZD/Ed,dd,WZK:d͛^^dKZDtdZ/^,Z'^Dzh^ OR CONTRIBUTE TO NON-ATTAINMENT OF ANY APPLICABLE WATER STANDARD, OR THAT THE SWPPP DOES NOT INCORPORATE REQUIREMENTS RELATED TO AN APPROVED TOTAL MAXIMUM DAILY LOAD (TMDL) IMPLEMENTATION PLAN. IN THIS CASE, THE SWPPP MUST BE UPDATED OR A SUPPLEMENTAL BMP ACTION PLAN DEVELOPED TO ADDRESS THE IDENTIFIED CONCERNS. 7.3 TRAINING THE PERMITTEE(S) MUST FULFILL TRAINING REQUIREMENTS AND INCLUDE RECORDS OF TRAINING IN THE SWPPP. REFRESHER TRAINING MUST BE ATTENDED EVERY THREE YEARS, STARTING THREE YEARS FROM THE ISSUANCE OF THE 2013 GENERAL PERMIT (ISSUED 8/1/13) INDIVIDUALS REQUIRED TO BE TRAINED INCLUDE: 1.INDIVIDUALS PREPARING THE SWPPP 2.INDIVIDUALS OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND INDIVIDUALS PERFORMING INSPECTIONS. ONE OF THESE INDIVIDUALS MUST BE AVAILABLE FOR AN ON SITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA. 3.INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES. d,KEdEdEydEdK&dZ/E/E'Dh^dKDDE^hZdt/d,d,/E/s/h>͛^ JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THE GENERAL PERMIT. AT LEAST ONE INDIVIDUAL TRAINED IN THE JOB DUTIES LISTED ABOVE MUST BE PRESENT ON THE SITE OR AVAILABLE TO THE SITE IN 72 HOURS. TRAINING DOCUMENTATION MUST INCLUDE: 1.NAMES OF PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED 2.DATES OF TRAINING AND NAMES OF INSTRUCTOR AND ENTITY PROVIDING TRAINING 3.CONTENT OF TRAINING COURSE, INCLUDING NUMBER OF HOURS OF TRAINING DOCUMENTATION MUST BE KEPT WITH THE SWPPP. COPIES OF TRAINING RECORDS/CERTIFICATIONS ARE ATTACHED IN APPENDIX I. INDIVIDUALS MUST BE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL, OR PERMANENT STORMWATER MANAGEMENT SUCH AS THE UNIVERSITY OF MINNESOTA, MINNESOTA EROSION CONTROL ASSOCIATION, SOIL AND WATER CONSERVATION DISTRICTS, OR THE MPCA. SECTION 8: FINAL STABILIZATION &/E>^d/>/d/KEʹdK,/s&/E>^d/>/d/KEK&d,^/d͕d,KEdZdKZt/>> IMPLEMENT THE FOLLOWING MEASURES AFTER ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED. 1. ALL SOILS MUST BE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OVER THE ENTIRE PERVIOUS SURFACE AREA, OR BY OTHER EQUIVALENT MEANS NECESSARY TO PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS. REFER TO LANDSCAPING PLANS/SPECIFICATIONS FOR TYPE OF VEGETATIVE COVER. 2. THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL REQUIREMENTS IN PART III.D OF THE GENERAL PERMIT AND IS OPERATING AS DESIGNED. TEMPORARY OR PERMANENT SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS HAVE BEEN CLEANED OF ANY ACCUMULATED SEDIMENT. ALL SEDIMENT HAS BEEN REMOVED FROM CONVEYANCE SYSTEMS AND DITCHES ARE STABILIZED WITH PERMANENT COVER. [MODIFY THIS ITEM TO BE SITE SPECIFIC - DELETE REFERENCES TO PERMANENT OR TEMPORARY SEDIMENTATION BASINS IF NONE ARE DESIGNED] 3. ALL DRAINAGE DITCHES CONSTRUCTED TO DRAIN WATER FROM THE SITE AFTER CONSTRUCTION IS COMPLETE MUST BE STABILIZED TO PRECLUDE EROSION. [DELETE IF THERE ARE NO PERMANENT DRAINAGE DITCHES AS PART OF THE DESIGN] 4. ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED. 5. FOR CONSTRUCTION PROJECTS ON LAND USED FOR AGRICULTURAL PURPOSES FINAL STABILIZATION MAY BE ACCOMPLISHED BY RETURNING THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE. 6.COVERAGE MAY BE TERMINATED PRIOR TO COMPLETION OF ALL CONSTRUCTION ACTIVITY IF ALL OF THE FOLLOWING CONDITIONS ARE MET IN ADDITION TO NUMBERS 3 & 4 ABOVE: a.CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS b.AT LEAST 90% (BY AREA) OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS BEEN COMPLETED AND PERMANENT COVER ESTABLISHED ON THOSE AREAS c.ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED 7. FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY STABILIZED IF THE STRUCTURE(S) ARE FINISHED AND TEMPORARY EROSION PROTECTION AND DOWNGRADIENT PERIMETER CONTROL HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOLD TO THE HOMEOWNER. ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED THE MPCA'S "HOMEOWNER FACT SHEET" TO THE HOMEOWNER TO INFORM THE HOMEOWNER OF THE NEED FOR, AND BENEFITS OF PERMANENT COVER. SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:01pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C6.01-UTIL.dwg C6.01 UTILITY PLAN THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO ACTIVE DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. A.THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE SPECIFICATIONS. 1.ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE TO CITY REQUIREMENTS. 2.CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE THE LIABILITY OF THE CONTRACTOR. INSTALLATION OF NEW WATER AND SEWER SERVICES MUST BE COORDINATED WITH CITY STAFF, INCLUDING ADVANCED NOTIFICATION OF THE PARTIAL STREET CLOSURE, THE TIMING OF THE WORK TO MINIMIZE TRAFFIC DISRUPTION, AND THE ON-SITE INSPECTION OF THE UTILITY CONNECTIONS. 3.A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN (BUILDING, STORM AND SANITARY) CROSSINGS. B.ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. 1.ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. 2.ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE. 3.ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, WITH 7.5 FEET MINIMUM COVER. 4.ALL STORM SEWER PIPE TO BE REINFORCED CONCRETE PIPE WITH R-4 JOINTS, AND RUBBER GASKETS. 5.RIP RAP SHALL BE Mn/DOT CLASS 3. C.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULE, EXIT PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. D.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE LOCATIONS OF SMALL UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR, BY CALLING GOPHER STATE ONE CALL AT 454-0002. E.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. F.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. G.ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH THE SOD. H.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. I.ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: COMPANY: BRAUN INTERTEC CORPORATION ADDRESS: 11001 HAMPSHIRE AVE. SO MINNEAPOLIS, MN 55438 PHONE: 952.995.2000 DATED: JULY 30, 2014 THE CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. J.PRIOR TO PLACEMENT OF AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. (OPTIONAL) K.THE TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME CONCERN TO THE CONTRACTOR'S OPERATIONS. HE WILL BE REQUIRED TO PROTECT THE TREES WHICH ARE TO BE SAVED TO BE SURE THAT EQUIPMENT IS NOT NEEDLESSLY OPERATED UNDER NEARBY TREES AND SHALL EXERCISE EXTREME CAUTION IN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, HE SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF THE OPERATION. SHOULD THE CONTRACTORS' OPERATIONS RESULT IN THE BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO MINIMIZE ANY DAMAGE. COSTS FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE MADE. L.THE CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUCTURES TO SAMBATEK. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING REVIEW. M.THE CONTRACTOR AND THEIR SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. TELEPHONE ELECTRIC GAS LINE FORCEMAIN (SAN.) EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE D S S SLS LEGENDUTILITY CONSTRUCTION NOTES GEOTEXTILE FABRIC MNDOT (3733-TYPE I) ON THE BOTTOM & SIDES OF TRENCH. 2' 3:1 M A X POND NWL = 934.00 6" PERFORATED HDPE DRAINTILE10:1 BEN C H CATEGORY III EROSION CONTROL BLANKET & 4" TOP SOIL 3' NOT TO SCALE FILTRATION TRENCH CROSS-SECTION NATIVE SOIL, SCARIFY TO A 1 FT DEPTH ON BOTTOM AND BACKSIDE PRIOR TO PLACEMENT OF IMPORTED SECTION. 4' COURSE FILTER AGGREGATE MNDOT (3149.2H) SEE GRADING PLAN FOR SEDIMENTATION BASIN SLOPE GALVANIZED GRATE (SPLIT) 4"X4" OPENINGS 6" DRAINTILE FROM FILTRATION TRENCH N.T.S. 01 ELEV=932.00 OCS-301 DETAIL ELEV= 934.3 ELEV= 935.1 OUTLET ON DOWNSTREAM SIDE OF WEIR WALL ELEV= 933.80 REPAIR STREET TO EXISTING PAVEMENT SECTION 02 ELEV=936.00 934.45 935.22 935.55 SLOPE 3/4" PER FT. 1 3 C-01 12/11 NO SCALE B612 CONCRETE CURB AND GUTTER MODIFIED B612 CONC. CURB & GUTTER (ALONG SIDEWALK) 13 - 1 / 2 " 6" 6" 6"8"12" 3" R 7" 2"2" 2" 1/2" R 1/2" R 2 - #4 REINFORCING RODS AT CATCH BASINS 20 FEET IN LENGTH, CENTERED ON THE STRUCTURE 8"12"4"6" 1 3 13 - 1 / 2 " 6" 6"3" R 1/2" R 7" TIP OUT SLOPE 1/4" PER FT. CLASS 5 BASE SUBGRADE *THE THICKNESS SHALL BE INCREASED TO A MINIMUM DEPTH OF 1 INCHES AT DRIVEWAY CROSSINGS. GENERAL NOTES FOR CONCRETE CONSTRUCTION: 1.THE CONCRETE SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF MN/DOT "STANDARD SPECIFICATIONS FOR CONSTRUCTION". 2.SIDEWALK CONTROL JOINTS SHALL BE LOCATED AT 5 FEET ON CENTER. SIDEWALK EXPANSION JOINTS SHALL BE LOCATED AT A MAXIMUM OF 100 FEET ON CENTER, AND WHERE SIDEWALK ABUTS CURB, STRUCTURES, AND OTHER FIXED OBJECTS. SEAL ALL EXPANSION JOINTS. BROOM FINISH SHALL BE PERPENDICULAR TO THE LINE OF TRAFFIC. A A 4" P.C. CONCRETE* C-14 12/11 NO SCALE CONCRETE SIDEWALK DETAIL SECTION A-A 4" CLASS 5 4" P.C. CONCRETE 5'-0" MIN WIDTH 2.00% A ELEVATION C-12A 12/11 NO SCALE PEDESTRIAN CURB RAMP OPTION FRONT FACE OF CURB PARALLEL RAMP SECTION A-A PARALLEL RAMP PLAN VIEW OPTIONAL PARALLEL RAMP (FOR NARROW SIDEWALKS ADJACENT TO CURB) ISOMETRIC VIEW 4'-0" M I N 0.08 F T . / F T . S L O P E M A X 0.05 F T . / F T . S L O P E P R E F E R R E D 0.08 FT. / F T . S L O P E M A X 0.05 FT. / F T . S L O P E P R E F E R R E D 15'-0" M A X POSSIBLE CURB TO HOLD ADJACENT GROUND0. 0 2 F T . / F T . M A X C R O S S S L O P E POSSIBLE CURB TO HOLD ADJACENT GROUND 24 " WA L K 4 ' M I N 10'-0"4'-0" MIN 10'-0" 10'-0" (6" CURB) 6'8" (4" CURB) 4'-0" MIN 10'-0" (6" CURB) 6'8" (4" CURB) ROUND ALL SLOPED INTERSECTIONS POSSIBLE CURB TO HOLD ADJACENT GROUND 0.05 FT/FT SLOPE PREFERRED 0.08 FT/FT SLOPE MAX THESE ARE OPTIONAL PEDESTRIAN SIDEWALK ACCESS DETAILS THAT ARE NOT REQUIRED BY CURRENT ADA REGULATIONS CURB OR CURB AND GUTTER POSSIBLE CURB TO HOLD ADJACENT GROUNDSIDEWALK WIDTH MAX CROSS SLOPE OF WALK IS 0.02 FT/FTCONCRETE WALK NOTES: 1.1/2 INCH PREFORMED JOINT FILLER MATERIAL, AASHTO M 213. FRONT FACE OF CURB A Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:02pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C9.01 DETL.dwg C9.01 CONSTRUCTION DETAILS EXPANSION JOINT DESIGN GUTTER LINE GRADE TOP CURB NEENAH R-3067 FRAME AND COVER, OR EQUAL, WITH TYPE DL, DR OR VANE GRATE. SURMOUNTABLE CONCRETE CURB AND GUTTER 2 NO. 4 REBARS ON EACH SIDE OF CASTING 10 FOOT IN LENGTH EXPANSION JOINT N.T.S. CATCH BASIN CASTING AND CURB NOTE: TIE LAST 3 JOINTS ON INLET AND OUTLET. IF NO APRON IS USED, TIE LAST 3 SECTIONS OF PIPE. USE 2 TIE BOLT &^dEZ^WZ:K/Ed/E^d>>dϲϬΣ FROM TOP OR BOTTOM OF PIPE. USE 5/8" TIES FOR PIPE SIZES 12" TO 27". USE 3/4" TIES FOR PIPE SIZES 30" TO 66". USE 1" TIES FOR PIPE SIZES OVER 72". NUTS AND WASHERS ARE NOT REQUIRED ON PIPE SIZES LESS THAN 21". INDIVIDUAL STONES, EXCEPT THOSE USED FOR CHINKING, SHALL NOT WEIGHT LESS THAN 50 LBS. EACH. PLACE RIPRAP AROUND SIDES AND OVER TOP OF FLARED END SECTIONS. GEOFABRIC REQUIRED UNDER RIPRAP (MIRAFI 500 OR EQUAL). TRASH GUARDS WILL BE REQUIRED ON 12" OR LARGER PIPES. IN PLACE OF TRASH GUARDS, ENERGY DISSIPATORS (MN/DOT STANDARD PLATE NO. 5201 B) MAY BE USED. HAND-PLACED RIPRAP, 1 FOOT DEEP NOTE: ONE CU. YD. IS APPROXIMATELY 1.4 TONS. SIZE OF PIPE RIPRAP REQUIRED 54" & Over 20-24 CU. YD. 36" to 48"10-13 CU. YD. 27" to 33"6-8 CU. YD. 24" & Less 4-6 CU. YD. N.T.S. FLARED END SECTION 9' M I N I M U M 4' M I N LE S S T H A N 1 2 ' D E P T H PAY LENGTH SEWER MAIN N.T.S. SANITARY SEWER SERVICE CONNECTION N.T.S. 6' - 0" 4" 6 1/2" 9" 1/2" R N.T.S. B618 CONCRETE CURB & GUTTER 2" BITUMINOUS WEAR COURSE, MN/DOT SPWE B340E* N.T.S. PAVEMENT SECTIONS 8" 16 " ϰϱ Σ Ζ *6 " 2"VARIES SLOPE @ 2.00% 4" 4" N.T.S. INTEGRAL SIDEWALK CURB TRENCH AND BEDDING DETAILS TYPICAL CLEANOUT DETAIL Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek, Inc., Minnetonka, MN office. Date:23450 Mark C. Anderson 08/25/2014 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:02pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-C9.01 DETL.dwg C9.02 CONSTRUCTION DETAILS FLOW AS N E E D E D 48" 27" 1' - 4 " 4' 7" SECTION A-A SECTION B-B B B A A STEPS 16" O.C. ON DOWNSTREAM SIDE NOTES: 1.WHERE WATER MAY STAND, TOP OF MANHOLE SHALL BE 2 FEET ABOVE GROUND, AND/OR 2 FEET ABOVE THE 100 YEAR STORM WATER ELEVATION. 2.ON MANHOLES 8' DEEP AND GREATER, A ONE FOOT FOUR INCH (1'-4") PRECAST SECTION SHALL BE PLACED IMMEDIATELY BELOW THE CONE SECTION. 3.ALL JOINTS BETWEEN SECTIONS SHALL HAVE "O" RING RUBBER GASKETS. 4.MINIMUM SLAB THICKNESS, 6" FOR 14' DEPTH. INCREASE THICKNESS 1" FOR EACH 4' OF DEPTH GREATER THAN 14' AND REINFORCE WITH 6"X6" 10/10 MESH. MANHOLE CASTING AND COVER, NEENAH R-1642-B, ESS BROS. 309, OR APPROVED EQUAL WITH MACHINED BEARING SURFACES AND TWO (2) CONCEALED PICK HOLES. 20" TO SPRING LINE (MAX.) GASKETED FLEXIBLE WATERTIGHT CONNECTION (TYP) FULL BED OF MORTAR BETWEEN RINGS, CASTING AND ON OUTSIDE OF RINGS. 2" ADJUSTING RINGS AS REQUIRED (MIN. 2, MAX. 4) ADJUST CASTING TO 1/2" BELOW FINISHED BITUMINOUS GRADE. SLOPE 2"/FOOT N.T.S. 02 STANDARD SANITARY SEWER MANHOLE 4' DIA. M.H.-9" IN FROM BACK OF CURB 6' DIA. M.H.-3" BEHIND BACK OF CURB 8' DIA. M.H.-15" BEHIND BACK OF CURB DIMENSION FROM BACK OF CURB TO CENTER OF PIPE. FOR A 24" GRATE OPENING. 24"X 36" SLAB OPENING PROVIDE 27" DIAMETER OPENING IF ROUND CASTING TO BE PROVIDED. SEE STORM SEWER STRUCTURE SCHEDULE FOR DIMENSIONS FROM BACK OF CURB TO CENTER OF STRUCTURE. NOTE: SEE STORM SEWER STRUCTURE SCHEDULE FOR CASTING TYPE. ALL JOINTS IN MANHOLE TO HAVE "O" RING RUBBER GASKETS. DOGHOUSES SHALL BE GROUTED ON BOTH THE OUTSIDE AND THE INSIDE. PIPE D I A M E T E R VA R I A B L E 6" 6" VARIABLE 5" 1' - 4 " 9" N.T.S. 01 CATCH BASIN MANHOLE 6" OVERLAP 12" 18 " 4"4" 12 " M I N . 2" 6" DRAIN TILE PACK PERFORATED DRAIN TILE PIPE REFER TO MnDOT THERMOPLASTIC PIPE 3245 COARSE FILTER AGGREGATE MnDOT 3149.2H FILTER FABRIC MnDOT 3733 TYPE 1 EXTERIOR CONCRETE SLAB OR SIDEWALK SECTION BITUMINOUS PAVEMENT SECTION NON-FROST-SUSCEPTIBLE GRANULAR MATERIAL HAVING LESS THAN 50% PASSING THE NO. 40 SIEVE AND LESS THAN 7% PASSING THE NO. 200 SIEVE. 3:1 TAPER INVERT OF DRAINTILE PIPE VARIES DRAINTILE PACK BUILDING FOOTING FLOOR SLAB VARIES 2' MIN. SLOPE TO DRAIN BO T . O F F O O T O R 5 ' M A X 4' NOTES: 1. NON-FROST-SUSCEPTIBLE (NFS) GRANULAR MATERIAL SHALL BE PLACED IN THIN LIFTS AND COMPACTED TO AT LEAST 95% OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY. 2.REFER TO UTILITY AND GRADING PLANS FOR PROPOSED SURFACE GRADES AND DRAINTILE INVERTS AROUND BUILDING. N.T.S. 1' 12" GRANULAR MATERIAL AS SPECIFIED BY SOILS ENGINEER. 4" POLYETHYLENE PERFORATED UNDERDRAIN WRAPPED WITH GEOTEXTILE MNDOT SPEC. 3773, TYPE 1.INSTALL AT EACH CATCH BASIN LOW POINT. EXTEND TILE 25 FEET EACH WAY FROM CATCH BASIN. CONTRACTOR TO INSTALL 4" UNDERDRAIN PIPE INTO STORM SEWER MANHOLE STRUCTURE AND GROUT OPENING AS REQUIRED. BITUMINOUS AND AGGREGATE BASE SECTION N.T.S. DRAINTILE BEHIND CURB & GUTTER RESIDENTIAL 3 FT 5 FT"B" PL EX I S T I N G D R I V E W A Y A NOTE: SPACE CONTROL JOINTS SUCH THAT NO PANEL IS GREATER THAN 100 SQUARE FEET. CONCRETE SLAB 6" MIN. THICKNESS FOR RESIDENTIAL SECTION, 8" MIN. THICKNESS FOR COMMERCIAL SECTION. BOTH SECTIONS TO BE REINFORCED WITH 6 x 6 10/10 STEEL MESH AND HAVE 6" OF COMPACTED GRANULAR SUBBASE. (SEE SPECIFICATIONS) SECTION A-A VARIABLE (5' MIN) VARIA B L E ( 5 ' M I N ) 12' M I N "B" "B" "B" A COMMERCIAL N.T.S. CONCRETE DRIVEWAY APRON SCALE IN FEET 0 4020 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed LANDSCAPE ARCHITECT under the laws of the State of Minnesota. This certification is not valid unless wet signed in blue ink. If applicable, contact us for a wet signed copy of this survey which is available upon request at MFRA, Inc., Plymouth, MN office. Date:40252 William Delaney 10/09/14 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:02pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-L1.01-LAND .dwg L1.01 SITE LANDSCAPE PLAN QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. BOTANICAL NAME DECIDUOUS TREES KEY COMMON NAME 2.5"BB 3 SIZE ROOT QTY. 2.5"BB 5 Gleditsia triacanthos SKYLINE HONEYLOCUST 2.5"BB 2Celtis occidentalis HACKBERRY 2.5"BB 3Acer rubrum 'Nothwoods'NORTHHWOODS MAPLE var. inermis 'Skyline'HL BL HB RM Tilia americana 'Boulevard' BOULEVARD LINDEN RIVER BIRCH 1.5"BB 9 ORNAMENTAL TREES Betula nigra AUTUMN BRILLIANCE 1.5"BB 13Amelanchier x grandiflora 'Autumn Brilliance' RB SB ST R A I T L E A D E R NO " V " C R O T C H SPRING SNOW CRABAPPLE 1.5"BB 11Malus x 'Spring Snow'SS LANDSCAPE LEGEND CL U M P FO R M ST R A I T L E A D E R N O " V " C R O T C H 2.5"BB 5Acer saccharum'Bailsta'FALL FIESTA SUGAR MAPLESM JAPANESE TREE LILAC 1.5"BB 17Syringa ReticulataTL INSTALL HEIGHT MATURE HEIGHT 10'50' 15'60' 15'50' 14'50' 14'50' SERVICEBERRY 8'25' 8'20' 8'20' 8'25' WETLAND FRINGE MN SEED MIX 35-621 (OLD BWSR U6) WITH 'NO MOW FESCUE' COMMERCIAL TURF - SOD HIGHLAND SOD COMMERCIAL TURF - SEED MN SEED MIX 25-131 (OLD MNDOT 260) W/ "NO MOW FESCUE MIX" HARDWOOD MULCH (NATURAL COLOR) SHREADED HARDWOOD MULCH ** NO MOW SEED FORMULA FROM SPECIALTY TURF & AG INC, FREEDOM MIX, AT 200LB/ACRE OR APPROVED EQUAL. - WWW.SPECIALTYTURFAG.COM - 188-685-4521 SEED MIX LEGEND (FOR ALL SHEETS) SEED MIXTYPESYM. x PROJECT VALUE / MINIMUM LANDSCAPE VALUE xx PROJECT VALUE +/- $1,500,000 = $30,000 LANDSCAPE VALUE xx BUFFERYARD "A" BETWEEN COM AND COM PER 100' xx (North Property Line 500') xx (East Property Line 250') xxx 1 CANOPY TREES xxx 2 UNDERSTORY TREES xxx 3 SHRUBS xx BUFFERYARD "C" BETWEEN COM AND MD PER 100' xx (South Property Line 500') xxx 3 CANOPY TREES xxx 6 UNDERSTORY TREES xxx 9 SHRUBS CITY LANDSCAPE CODE A.0DLQWDLQLQJ1DWLYH*UDVV$UHDVZLWK³1R0RZ6HHG´ 1.The native grass areas will require regular management to become established and dominated by native, non-invasive vegetation. This is critical in the first two to three years and should be recognized as a component to the success of native grass areas. Management will include both eliminating non-native and invasive vegetation along with creating ideal conditions for native plants to flourish. 2.Some invasive plants are strong competitors and without management, could hamper establishment the native planting. Invasive wetland species such as purple loosestrife, reed canary grass, and cattail exist in many urban wetlands, and may contribute seed to the created areas. 3.Non-native plant removal/management and careful monitoring is vital during the early stages of development. As native plants slowly grow and spread over the years, and as thatch builds, the site will become less vulnerable to non-native and invasive species. Without non-native and invasive plant removal/management it is highly unlikely that a diverse native plant community will become established. 4.Methods: a. Mowing/Weed Whipping 1)During the first two years of plant establishment mowing/weed whipping at a height of 6 to 10 inches where feasible, during the growing season, will reduce competition from annual weeds. Mowing/weed whipping events should occur twice a year mid-July and again in early September) prior to the seed head development of reed canary grass. Mowing/weed whipping allows light to reach the small native seedlings and reduces competition from weeds for water and soil nutrients. b.Spot application of herbicide 1)Individual invasive plants (including cattail) can be eradicated through wick application or spraying of herbicide. Rodeo or other Minnesota Department of Natural Resources approved herbicides for use near /in water bodies should be applied by a licensed applicator at the appropriate times to control individual plants. c.Eradicate large infestations with herbicide 1)The most effective method of eradicating large colonies of plants is to wick-apply or spray them with herbicide. Use Rodeo when spray may come in contact with water and Roundup in upland situations. Repeated application will probably be necessary. Apply to green, actively growing foliage. Herbicides can effectively control herbaceous non-native vegetation when applied in spring or fall. Take great care not to apply herbicide to surrounding native plants. A very small amount of herbicide can kill a plant. 5.Schedule: a.Year 1: After planting, annual weeds should be mowed/weed whipped (before seed set) where feasible, to a height of six to ten inches or removed as needed. The site will likely require one to two mowing/weed whip events (mid-July and again in early September). Spot herbicide application, or hand removal, of aggressive weeds such as; purple loosestrife, reed canary grass, and cattails should also occur when the management crew is at the site to mow/weed whip. Also, at the beginning of the maintenance period any shrubs in the native grass areas should be sprayed with an appropriate herbicide. 1)July (middle) - Mow/weed whip wetland (where feasible) at a height of six to ten inches. 2)September (early)- Mow/weed whip wetland at a height of six to ten inches, spot spray invasive species. b.Year 2: Conduct an initial site visit in May to evaluate status of restoration and determine management tasks for the year. These will likely include: 1)May - Spot spray invasive species. Mow/weed whip wetland at a height of six to ten inches (mowing may not be needed or possible depending on wetness and condition). Re-seed areas that do not meet the performance standards stated below. 2)September - Spot spray invasive species. c.Year 3 (Contract may be fulfilled with this time) Conduct an initial site visit in May with to evaluate status of restoration and determine management tasks for the year. These will likely include: a)May - Spot spray invasive species. Re-seed areas that do not meet the performance standards stated below. b)June/July - Spot spray invasive species. c)September - Spot spray invasive species. d.Year 4 and beyond: Inspect wetland annually to assess its condition. 1)May-September - Apply herbicide to invasive species. This should be required only once per year. 6.Maintenance Responsibility a.The applicant is responsible for completing the items of the Maintenance Plan and Performance Standards. Monitoring of the wetland mitigation areas will be completed by the applicant for a period of three years or until the mitigation basins exhibit wetland characteristics as proposed in the Wetland Permit Application. If the presence of an invasive, non-native plant species is observed during the annual monitoring event, the applicant is responsible for immediate removal of the invasive, non-native plant species following the procedures outlined in this plan. b.Mow the ³1R 0RZ´ grass to a height of ´ twice a year. The first mowing will be in early June, the second shall be in early October. c.)HUWLOL]H³1R0RZ´LQWKHIDOO A.Native seed around site shall conform to Minnesota Board of Water and Soil Resource with the use of mix number u6 at 20lbs per acre and W3 at 15lbs per acre. 1.Seeded areas shall incorporate a no mow seed mix to aid in the establishment of the BWSR mixes. 2.The no mow mix shall include 30% Sheep Fescue, 30% Gotham Hard Fescue, 20% Chewing Fescue and 20% Miser Creeping Red Fescue spread at 175lbs per acre. SCALE IN FEET 0 2010 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed LANDSCAPE ARCHITECT under the laws of the State of Minnesota. This certification is not valid unless wet signed in blue ink. If applicable, contact us for a wet signed copy of this survey which is available upon request at MFRA, Inc., Plymouth, MN office. Date:40252 William Delaney 10/09/14 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:02pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-L1.01-LAND .dwg L1.02 SITE LANDSCAPE DETAILS Forsythia 'Sunrise'SUNRISE FORSYTHIA #5 CONT.TEC - Euonymus alatus 'Compactus'DWARF BURNING BUSH #5 CONT.DBB 45 SHRUBS BOTANICAL NAMEKEY COMMON NAME SIZE ROOT QTY. Rhus aromatica 'Gro-Low'GRO-LOW FRAGRANT SUMAC #5 CONT.GLS 26 #5 CONT.SVJ - #5 CONT.SMS 30 #5 CONT.40 Spiraea x bumalda 'Anthony Waterer'ANTHONY WATERER SPIREA #5 CONT.45AWS #5 CONT.24DBW Juniperious Horizoantalis 'Savin'SAVIN JUNIPER Salix purpurea 'Nana'DWARF BLUE ARCTIC WILLOW Spiraea nipponica 'Snowmound'SNOWMOUND SPIREA Viburnum trilobum 'Bailey Compact'COMPACT AMERICAN CRANBERRYBUSH #5 CONT.BCA 35 LANDSCAPE LEGEND Syringa x "Bailsugar'SUGAR PLUM LILAC #5 CONT.SPF 13 #5 CONT.24GOLD FLAME SPIREASpiraea x bumalda 'Gold Flame' 1.5'4'x4' INSTALL HEIGHT MATURE HEIGHT 1'3'x4' 1'3'x4' 1'2.5'x5' 1.5'4'x4' 1.5'3'x4' 1.5'3'x4' 1'3'x4' 1.5'3'x4' 1.5'5'x5' 1.5'4'x4' MYS Spiraea thunbergii 'Ogon'MELLOW YELLOW SPIREA GFS Lonicera x xylosteoides 'Miniglobe'MINIGLOBE HONEYSUCKLE #5 CONT.MGH 16 1.5'4'x4' SHRUB DETAIL5 L1.02 QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN. #5 CONT.ALPINE CURRANTRibes alpinum 1.5'3'x4'ALP #5 CONT.SVJ -Juniperious Horizoantalis 'Savin'SAVIN JUNIPER 1'3'x4' 17 #5 CONT.6BLACK CHOKEBERRYAronica melonocarpa elata 1.5'4'X4'BCB #5 CONT.5RED TWIG DOGWOODCornus Sericea 'Bailey'1.5'5'x5'RTD SCALE IN FEET 0 2010 SHRUB DETAIL2 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL3 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL4 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL6 L1.02 SCALE IN FEET 0 2010 SHRUB DETAIL1 L1.02 Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 MCA EPF / CKJ E CEN19486 Registration No. I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed LANDSCAPE ARCHITECT under the laws of the State of Minnesota. This certification is not valid unless wet signed in blue ink. If applicable, contact us for a wet signed copy of this survey which is available upon request at MFRA, Inc., Plymouth, MN office. Date:40252 William Delaney 10/09/14 A 07/17/14 CKJ City comments B 07/28/14 EPF Site/Grading/Utility Revisions C 08/08/14 EPF Phase I Grading D 08/25/14 CKJ For Permit E 10/09/14 CKJ Starbucks Comments Oct 10, 2014 - 3:02pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-L1.01-LAND .dwg L2.01 IRRIGATION DESIGN BUILD PARAMETERS MAXIMUM LATERAL LENGTH (FEET) MAXIMUM FLOW PER ZONEGRID PRECIPITATION RATES (IN/HR) END FEED EXAMPLE LATERAL FLOW PER 100 FT (GPM) CENTER FEED EXAMPLE 54 940.78 R/W 55 938.94 FND IP 9285 56 953.02 FND IP 1/2IP 57 954.88 FND IP 9808 58 946.62 R/W 59 934.29 CIM 60 935.43 FND IP RLS? 61 936.69 FND IP 1/2IP LOT 1 BLOCK 1 OUTLOT 1 PROPOSED R-O-W Client Project Location Certification Sheet Title Summary Revision History Sheet No.Revision Project No. Date Submittal / RevisionNo.By Designed:Drawn: Approved:Book / Page: Phase:Initial Issued: THE DRIESSEN GROUP, LLC 4999 FRANCE AVE. S., SUITE 216 EDINA, MN 55410 DAKOTA RETAIL CHANHASSEN, MN DAKOTA AVENUE AND HWY. 5 BCW EPF CEN19486 FOUND MONUMENT SET MONUMENT MARKED LS 47481 ELECTRIC METER LIGHT SANITARY SEWER STORM SEWER WATERMAIN FLARED END SECTION ELECTRIC TRANSFORMER AIR CONDITIONER GUY ANCHOR HANDICAP STALL UTILITY POLE POST SIGN TELEPHONE PEDESTAL GAS METER EASEMENT LINE SETBACK LINE RESTRICTED ACCESS BUILDING LINE BUILDING CANOPY CONCRETE CURB BITUMINOUS SURFACE CONCRETE SURFACE LANDSCAPE SURFACE DECIDUOUS TREE CONIFEROUS TREE OVERHEAD WIRE CHAIN LINK FENCE IRON FENCE WIRE FENCE WOOD FENCE TOTAL SITE AREA: LESS OUTLOT 1: LESS RIGHT-OF-WAY: 74,343 S.F. (GROSS 7,480 S.F. 944 S.F. 65,919 S.F. (NET) 0 SCALE IN FEET 20 40 LEGEND PROPERTY SUMMARY Oct 10, 2014 - 3:03pm - User:576 L:\PROJECTS\CEN19486\dwg\Civil\Preliminary\19486-S1.01-PPLAT.dwg S1.01 PRELIMINARY PLAT VICINITY MAP SITE1. Subject property's address is 7910 Dakota Avenue, its property identification number is 251800560, and 251800550. 2. Field work was completed on XX/XX/20XX. 3.Surveyed property is located in Section 13, Township 116, Range 23. 4.Zoning: BH Highway And Business Services District 5.Gross plat area = 1.707 Acres or 73,343 Square Feet Lot 1 area = 1.513 Acres or 65,919 Square Feet Outlot 1 area= 0.172 Acres or 7,480 Square Feet ROW area= 0.022 Acres or 944 Square Feet 6.Names and Addresses: A. Developer/Owner: Central Companies, LLC 2025 Coulter Blvd., Suite 215 Chanhassen, MN 55317 952-474-4828 B. Engineer & Land Surveyor: MFRA 14800 28th Ave. N. Suite 140 Plymouth, MN 55447 763-476-6010 PROPERTY SUMMARY The vertical datum is based on record plans provided by the City of Savage. BENCHMARK #1 Top Nut of Hydrant located on Dakota Avenue, as shown. Elev.=941.2 BENCHMARKS