Loading...
Approval Letter 11-14-2014Building Inspections Dear Mr. Lamo: Phone: 952.227.1180 Fax 952.227.1190 This letter is to confirm that on November 10, 2014 the Chanhassen City Council Engineering approved the following: Phone 952.2271160 1952.227.1170 Conditional Use Permit subject to the following conditions: Finance November 14, 2014 CITY OF Building P4. CIIINSEN Park & Recreation Mr. Bruce Lando 7700 Market Boulevard PO Box 147 Twin Cities Self Storage Chanhassen, MN 55317 1900 Stoughton Avenue Phone: 952.227.1125 Chaska, MN 55318 Administration Phone: 952.227.1100 Re: Twin Cities Self Storage, Conditional Use Permit & Site Plan Fax: 952.227.1110 Planning Case #2014 -31 Building Inspections Dear Mr. Lamo: Phone: 952.227.1180 Fax 952.227.1190 This letter is to confirm that on November 10, 2014 the Chanhassen City Council Engineering approved the following: Phone 952.2271160 1952.227.1170 Conditional Use Permit subject to the following conditions: Finance 1. The 60 parking stalls for vehicle storage shall be confined to the area labeled Phone: 952.227.1140 Building P4. Fax 952.227.1110 Park & Recreation 2. The development shall comply with Site Plan 2014 -31, plans prepared by Phone: 952.2271120 Carlson McCain dated September 5, 2014. Fax: 952.227.1110 Phone: 952.227.1125 Site Plan for five additional 14,250 square -foot storage buildings subject to the Recreation Center following conditions: 2310 Coulter Boulevard 1. The applicant must provide adequate evidence that there is no area on the subject Phone: 952.227.1400 Buildine: Fax: 952227.1404 altering the site layout. Planning & 1. The buildings are required to have automatic fire extinguishing systems. Natural Resources Phone: 952.227.1130 2. Building plans must be prepared and signed by design professionals licensed in Fax: 952.227.1110 the State of Minnesota. Public Works 3. Retaining walls over four feet high must be designed by a professional engineer 7901 Park Place and a permit must be obtained prior to construction. Phone: 952.227.1300 Fax 952.227.1310 4. Detailed occupancy - related requirements will be addressed when complete building plans are submitted. Senior Center Phone: 952.227.1125 Engineering: Fax: 952.227.1110 Website 1. The applicant must provide adequate evidence that there is no area on the subject www.ci.chanhassen.mn.us property suitable for infiltration. The discussion must include the practicality of altering the site layout. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Bruce Lamo November 14, 2014 Page 2 2. The hydrologic modeling must be completed with accepted literature values for the soil type present or the applicant must provide evidence that the infiltration rates are equal to the 3.97 inches per hour assumed for the model. The applicant must provide water quality modeling, acceptable under Section 19- 144(a)(I)c. of Chanhassen City Code, showing that the water quality treatment conditions are met for the required water quality volume from all new impervious surfaces. 3. A comprehensive, standalone SWPPP document with all elements required by Part III of the NPDES construction permit, the provided checklist and Section 19 -145 of city code shall be prepared and submitted to the City for review and comment before any earth - disturbing activities, including but not limited to removal of any existing surfaces or structures, and removal of vegetation will be allowed or any grading permit will be issued. 4. The conveyance must be stabilized along the entire length and energy dissipation and erosion prevention practices must be designed and implemented to protect the infiltration basin from unnecessary sediment deposition. 5. The applicant shall include a materials list and engineers opinion of cost for all items necessary to meet the SWPPP requirements for erosion prevention and sediment control including the materials necessary for six (6) inches of topsoil and final stabilization. This amount shall be collected as escrow for erosion control. 6. The applicant shall prepare an operations and maintenance manual for the channel. 7. Assurances shall be provided for the conveyance channel consistent with the MS4 permit requirements for systems not owned and maintained by the MS4 permittee. Specifically: a. It must allow for the city to conduct inspections, perform maintenance and assess costs when the permittee determines that the owner and/or operator of the structural stormwater BMP has not conducted maintenance. b. It must include conditions that are designed to preserve the permittee's right to ensure maintenance responsibility ... when those responsibilities are legally transferred to another party. c. It must include conditions that are designed to protect/preserve structural stormwater BMPs and site features that are implemented to comply with Part IILD.5.a(2). If site configurations or structural stormwater BMPs change, causing decreased structural stormwater BMP effectiveness, new or improved structural stormwater BMPs must be implemented to ensure the conditions for post - construction stormwater management in Part III.D.5.a(2) continue to be met 8. The applicant must procure and comply with the requirements of all other jurisdictional agencies with authority over the project area. Mr. Bruce Lamo November 14, 2014 Page 3 9. The plan shall be redrawn to 50 -scale or larger, and must show the location of the benchmark used in the survey. 10. The first floor elevation and comer elevations of the nearby buildings must be labeled to confirm that the grading will allow water to flow away from all structures onsite. 11. The pond's Emergency Overflow Elevation and location must be shown on the plans. 12. Due to the location of the open channel drainage, the developer's engineer shall submit phased grading and erosion control plans. The plan phasing shall illustrate the erosion control that will be in place as the different buildings are constructed in Phase 1 through Phase 4. 13. The plan sheets must identify any proposed stockpile locations and the erosion control measures to contain them. 14. The aisles around the perimeter of the buildings must meet a minimum of width of 30 feet to allow 8 -foot parking on one side and a 22 -foot driving aisle. 15. The corners of the parking lot shall be modified to provide adequate aisle width. Environmental Resources Specialist: 1. The applicant shall provide landscape buffers to the north of buildings P2, P3 and P4 and the west of P3. The required number of trees for the vehicular use area shall be incorporated into the buffer landscaping. 2. The applicant shall submit a revised landscape plan showing the additional buffers as well as an alternate selection to blue spruce. Fire: 1. The new buildings will be required to have an approved fire sprinkler suppression system installed. Plans shall be drawn by a sprinkler design professional and submitted to Chanhassen Fire Marshal for review and approval. 2. Twelve -inch building address numbers must be installed on each end of the building. Numbers must be of contrasting color. Contact Fire Marshal for additional information. 3. "No Parking Fire Lane" signs will be required. Contact Fire Marshal for specific areas to be signed. Plannin¢: 1. The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. Mr. Bruce Lamo November 14, 2014 Page 4 2. The applicant shall create a zoning lot and recombine the two properties as one parcel. We have contacted your engineer to get estimates for the erosion control measures as part of the development. We have also estimated your landscaping requirements for the development. Once we have all these numbers, I will draft the site plan permit that must be executed by Twin Cities Self Storage, LLC. Note that if there is a different property owner and/or mortgage holder on the property, they will need to sign the consent(s) at the end of the permit. Once you have executed the permit, it must be returned to me for City execution and recording at Carver County within 120 days of the approval (by March 10, 2015) and prior to the issuance of a building permit. The required security specified in the site plan permit (for erosion control and landscaping) shall be submitted in conjunction with the site plan permit. Once this is recorded and erosion control installed and inspected, a building permit may be issued. A separate building permit application and review is required for the actual building construction. We recommend that you begin the building permit review as soon as possible. A copy of the executed permit will be returned for your files. Should you have any questions, please contact me at (952) 227 -1131 or by email at bgenerous (a,ci.chanhassen.mn.us. Sincerel Robert Generous, AICP Senior Planner Enclosures ec: Kate Aanenson, Community Development Director Todd Gerhardt, City Manager Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official Stephanie Smith, Project Engineer Dan Riggs, Carlson McCain gAplan\2014 planning cases\2014 -3l twin cities self storage cup spr\approval letter.doc