Loading...
H-3. Well 15 Site Plan, Pheasant HillsCITY OF 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952 227.1160 Fax 952.227.1170 Finance Phone: 952.227.1140 Fax: 952 227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.2271400 Fax 952.227.1404 Planning & Natural Resources Phone: 952.2271130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Website www.ci.chanhassen.mn.us 1113 1 D1 VE11L:►i u TO: Park and Recreation Commission FROM: Todd Hoffman, Park and Recreation Director DATE: November 25, 2014 SUBJ: Approve Well #15 Site Plan, Pheasant Hill Park PROPOSED MOTION The Park and Recreation Commission approves the Well #15 Site Plan for Pheasant Hill Park including the well, an underground electrical service vault, a temporary chemical feed building, the addition of three parking stalls for the park and landscaping. Approval requires a simple majority vote of the commission. BACKGROUND Pheasant Hill Park was acquired in 1990 for development as a neighborhood park after this area of the City was identified as park deficient. OVERVIEW The city is considering drilling a new well on Pheasant Hill Park land. The well is proposed due to growth in the city and drawdown in the regional aquifer. The city studied several sites for a new well and it was determined the Pheasant Hill Park site is the best overall option. The well is anticipated to have good water yield based upon the geology in the area. The well and equipment can be screened and landscaped easily from the surrounding properties. The well, if drilled, would be approximately 500 feet deep and draw from the Jordan aquifer. The water would not be treated for iron and manganese at this time, however, the well will be planned for connecting to a future treatment plant. Most of the equipment is proposed to be constructed underground except for a shed that will store the chemicals necessary to treat the water, Chlorine and Fluoride. The shed is planned to be temporary; once the west treatment plant is constructed the water from this well will be piped for treatment and the shed will be removed. As part of the well improvement project three parking stalls are planned to be constructed on Lake Lucy Lane for park access parking. The trail to the park from Lake Lucy Lane will be realigned and landscaped. The well equipment will be set back into the tree line area on the hillside to screen the equipment. Some trees will need to be removed to construct the well. Review of the trees in the area has been completed and it was determined most of this area is buckthorn and scrub brush. A landscape plan will be part of the well contract. Chanhassen is a Community for Lite - Providing for Today and Planning forTomorrow Park & Recreation Commission Well #15 Site Plan November 25, 2014 Page 2 RECOMMENDATION It is recommended that the Park and Recreation Commission approve the Well #15 Site Plan for Pheasant Hill Park. ATTACHMENTS 1. Pheasant Hill Park Inventory. 2. Neighborhood Meeting Announcement. 3. Well # 15 Site Plan dated 11/03/14. 4. Original Park Master Plan dated 5/15/91. g: \park \th\pheasant \well # 15 memo.docz Pheasant Hills Park Legend so y/\ ''�LJ Feet Lake Edge / Creek ` r �Building N v �, —Trail `c, Park Boundary •r� 1� j+ ,,� g , JV N� � 11 f nTI T • �t / { ;A* {: f Lake`L-uc yY'a , • �' ° - ,�__�, �`� -� /� Lake Locy.'Rd cr • 'd 122 I 4F City of Chanhassen Pheasant Hills Park Address: 1720 Lake Lucy Lane Classification: Neighborhood Parcel ID #: 25- 0033300 Acreage: 10.87 ac Description: SE 1/4 of NE 1/4 sec. 4 Acquisition Date: 1990 Misting Fa " " _ Ballfield(s) x Basketball Court(s) Bike Rack _ Bleacher(s) _ Boat Access Canoe Rack _ Dock(s) _ Fishing Pier _ Hockey Rink(s) • Open Field • Park Benches • Picnic Area(s) x On -Street Off - Street _ Picnic Shelter x Play Area(s) Reservation Picnic Site(s) x Sand Volleyball Court(s) _ Shore Fishing x Skating Rink _ Skate Park _ Sliding Hill _ Soccer Field(s) _ Swimming Beach _ Swing Tennis Court(s) - i x Trails, _x Bituminous; _Turf _ Warming House x Wetlands x Wooded Area # of Spaces # HDCP Spaces Not Present 0 PARK INVENTORYAI 123 CITY OF CHANHASSEN Meeting to Discuss Proposed Municipal Well WHAT: Open House Regarding New City Well ...... . ..... ...... ..... ...... ._....,..,,.....,,,....._..... WHEN: Thursday, November 13, 2014, 4 -612M WHERE: Council Chambers, Chanhassen City Hall 7700 Market Boulevard, Chanhassen DETAILS: Open house for residents to learn & ask questions about the proposed new well and its construction. ( No formal presentation will be made.) bLake> a sant ark EProposed Well QUESTIONS? Contact Paul Oehme, City Engineer at 952.227.1169 or poehme @ci.chanhassen.mn.us For more information visit the City's website www.ci.chanhassen.mn.us /well15 LANNOUNCING L- %0 CITY OF CHANHASSEN Meeting to Discuss Proposed Municipal Well WHAT: Open House Regarding New City Well WHEN: Thursday, November 13, 2014, 4 -6PM ...... _ ............ .... . WHERE: Council Chambers, Chanhassen City Hall 7700 Market Boulevard, Chanhassen ................ DETAILS: Open house for residents to learn & ask questions about the proposed new well and its construction. ( No formal presentation will be made.) d m r � > Pheasant a0� Hill Park o m (u Y take ane Proposed °lb Well Lake Lucy QUESTIONS? Contact Paul Oehme, City Engineer at 952.227.1169 or poehme @ci.chanhassen.mn.us For more information visit the City's website www.ci.chanhassen.mn.us/well15 9 ETma EXISTING BITUMINOUS PATH 24p24" �TO BE REMOVED AND RELOCATED A �� it EXISTING GROUND 1:1a1TJN' Ia:IM9 1015 1010 PROPOSED WELL REALICNMENT. 1005 •uui RID c°x51R11L•IMNI Pn°M OM=•: MR ENGINEERING CO. BARB 47M WEST 77TH MINNFAPOUS, MN. � 53135 -IBO] urn -,I;, A�"..ibe � 1 -t�euj .2 2.1 P8: 1- 800- e3z -2M ....A°vum __ - __- 1005 %15 LOCI"ON. WELL 15 CHANHASSEN, MINNESOTA BARR PROJECT No. 231010.00 p°M GWB CLIENT PROJECT No SEE C -02 RELF/SEG A B C 0 1 2 3 m /FOR DATE RFLFA9ED n.euw °niE"°^ � SITE PLAN AND PIPE PROFILE PROPOSED ELECTRICAL VAULT No. BY CHK APP DATE REVISION DESCRIPTION DAN pWG No. (,` -01 REV. No. A vi,- eKL PROPOSED 12 "0 DIP BEE C -04 PROPOSED SHRUB (TYR) 1000 1000 EDGE OF VEGITATION i 2 i 995 995 c I / I� I / PROPERTY LANE PROPOSED 12'0 WATERMAIN ' I ! 990 990 a o °o 0 0 I I I I EXISTING PRIVATE DRIVEWAY -0 +00 0 +20 0 +40 D +60 O +BD 1 +00 1 +20 1 +40 PROPOSED WELL FLUSHING HYDRAM I PROPOSED CHEMICAL FEED BUILDING I 2 PROFILE: WELL 15 PIPE SEE C -OB I PROPOSED TREE (TYP) - tH:4v O 20 40 _ I nOR2 SCALE IN FEET PROPOSED CHEMICAL FEED O MANHOLE. SEE C -03 ¢ ¢ EXISTING PARK SIGN. NI BUILDING DRIVEWAY R N —° - -Q1 I T- °1'-z —. SALVAGE. AND REINSTALL IN KIND COORDINATE LOCATION WITH OWNER 1. THE SUBSURFACE UPLDY INFORMATION ON THIS PLAN IS SHOWN TO UTILITY QUALM LEVEL D. THIS OUALNY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES I 1 OF CI /ASCE 38 -02, ENTITLED - STANDARD GUIDELINES I 1 FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA ". 2. FIELD VERIFY DIMENSIONS AND EXISTING UTILITIES. FIELD _ \ OHydr/ 1 VERIFY TIE -IN LOCATION AND ELEVATION AT 18'0 DIP. • PROPOSED PARKING AREA \ O ^ 3. INSTALL SILT FENCE AROUND PERIMETER OF (THREE STALLS) TR CONSTRUCTION LIMBS AND AS SHOWN. INSTALL SILT ? FENCE OR ORANGE SAFETY FENCE AROUND DRIP UNE •/ OF TREES AS SHOWN. -- CONNECT TO EXISTING 18 "0 WATERMAIN " -- 4. STRIP AND STOCKPILE ALL TOP SOIL FOR REUSE IN FINAL GRADING. • / 5. ROUTE TEST PUMPING AND DEVELOPMENT WATER TO • \ / DRAINAGE AREA TO WEST. CONTRACTOR TO OBTAIN AND NEEDED PERMITS PRIOR TO DISCHARGE. 0 0 43 4 1 j / \ / B. ROUTE ALL SITE DRAINAGE THROUGH AN APPROVED / / SEDIMENT TRAP PRIOR TO RELEASE TO DRAINAGE AREA. EXISTING 18 "0 WATERMNN �/ T. THE FINAL LOCATION OF THE ELECTRICAL VAULT AND WELL WILL BE STAKED IN THE FIELD BY THE ENGINEER. / B. SAW CUT AND REMOVE PAVEMENT APPROXIMATELY 20 / OCoble TV Line FT. ON EITHER SIDE OF PIPE ALIGNMENT. RESTORE IN -� • / II KIND. / 9. ENCASE IN POLYETHYLENE AND RESTR/JN ALL D.I.P. 10. COORDINATE SUMP PUMP DISCHARGE LOCATION WITH '�• OWNER AND ELECTRICAL. 2 "0 DR17 HDPE MAY BE USED • IN PLACE OF PVC. 11. GRADE BEHIND RETAINING WALL TO DIRECT RUN OFF AWAY FROM WELL. 12. COORDINATE WITH OWNER FOR HYDRANT DISCHARGE ORIENTATION. 1 PLAN: WELL #15 SITE 13. PROTECT AND SUPPORT BURIED UTILITIES. DURING PIPE - 0 20 40 INSTALLATION COORDINATE ALL WORK NEAR BURIED L .� UFRLFRES WITH UTILM OWNER. SCALE IN FEET 10. PIPE CONNECTONS TO VAULT ARE PWN END STEEL. VERIFY CONNECRON REQUIREMENTS WITH VAULT SUPPLIER. NOT FOR COASTROCR0.4 11 -13 -10 On 1iEVOxi`wisPnwi�RLO'ar uE OR �xou w MXER SUFERAMpI Wm %T- i AM A our 1KENSm Prmf@LgyA Fx.} �EtA ux°FA tx[ UY5 di TE STATE OF FS°fA PRNRO xP» •uui RID c°x51R11L•IMNI Pn°M OM=•: MR ENGINEERING CO. BARB 47M WEST 77TH MINNFAPOUS, MN. � 53135 -IBO] urn -,I;, A�"..ibe � 1 -t�euj .2 2.1 P8: 1- 800- e3z -2M ....A°vum o.t. AS SHOWN 11/03/14 CITY OE CHANHASSEN .CHANHASSEN, MINNESOTA WELL 15 CHANHASSEN, MINNESOTA BARR PROJECT No. 231010.00 p°M GWB CLIENT PROJECT No RELF/SEG A B C 0 1 2 3 m /FOR DATE RFLFA9ED n.euw °niE"°^ � SITE PLAN AND PIPE PROFILE ypgryp[ p/NIEL A xFSLEx WEE Loaf A No. BY CHK APP DATE REVISION DESCRIPTION DAN pWG No. (,` -01 REV. No. A vi,- eKL Park Eiildlifies 6 car parking lot off of lake Lucy Lane Open playing field r], L f I tennis mutt (with 2nd court expansion area) % ' 2 half court basketball courts 4 (overlaying tennis mutt) * Sand volleyball court Forest "Tot lot If Play structure Possible fut ` Elementary age play structure nifild 7Pc- playin * Paved trail between Wood Duck Ln. & Lake Lucy Ln. ' Mown great loop trail oTaunisl 0 5 park benches - 5 picnic tables e PIRY 14 Prairiev % Fomt N S -0 so, i,ail Forest Prairie t —06 x qsq 3 Weiland an y, vors TT: LAKE LANE.' LUCY oROAD JG 7— < cc I- 0 (L 0 W _j Z Z l— z QN ¢Z W= X [L Q Chanhassen Pheasant Hill Park Proposed Well 15Proposed Well 15 Chanhassen Pheasant Hill Park Example of well drilling equipment Example of wellhead with cover removed The park green space will be restored after construction with most equipment installed underground A small building will house the water treatment equipment Example of electrical transformer located near well by Xcel P: \ M p l s \ 2 3 M N \ 1 0 \ 2 3 1 0 1 0 1 0 \ W or k f i l e s \ P o s t e r \ P r p o s e d W el l 1 5 P o s t e r V 2 . C D R R L G 1 1- 1 3 - 1 4