Loading...
CC Staff Report 01-12-2015CITY OF CHANHASSFN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952 2271100 Fax 952 2271110 Building Inspections Phone 952 2271180 Fax 952 2271190 Engineering Phone 952 2271160 Fax 952 2271170 Finance Phone 952 2271140 Fax 952 2271110 Park & Recreation Phone 952 2271120 Fax 952 2271110 Recreation Center 2310 Coulter Boulevard Phone 952 2271400 Fax 952 2271404 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Terry Jeffery, Water Resources Coordinator Kate Aanenson AICP, Community Development Director DATE: January 12, 2015 V& SUBJ: Approve Resolution Modifying Storm Water Fees for Chanhassen Retail Fourth Addition — Planning Case 2014 -28 PROPOSED MOTION "The Chanhassen City Council approves a resolution modifying the stormwater fees for Chanhassen Retail Fourth Addition " City Council approval requires a majority vote of city council. BACKGROUND On November 10, 2014 the City Council approved the final plat for Chanhassen Retail Fourth Addition. Because there were no public improvements, the approval of the plat included a resolution for the conditions of approval The applicant recalculated the storm water construction fees. Modifications to the fees resolution require council approval ANALYSIS Planning & All site plans and subdivisions are required to install stormwater best management Natural Resources practices consistent with Chapter 19 of City Code In the case of the Chanhassen Phone 952 2271130 Retail Fourth Addition site, it was agreed that it would be more beneficial to make Fax 952 2271110 improvements to the pond located between Target and Minnesota Trunk Highway 5. Public works Staff agreed to take cash in lieu of constructing a stormwater practice This cash will 7901 Park Place be applied to a scheduled collaborative project between the Riley- Purgatory -Bluff Phone 952 2271300 Creek Watershed District and the City of Chanhassen to improve the hydraulics and Fax 952 2271310 water quality function of pond LS -P3 31 Senior Center The cash amount was to be based upon the consulting engineer's opinion of cost to Phone 952 2271125 construct a facility that would accommodate the modeled runoff volume from the site. Fax 952 2271110 The original opinion of cost provided was $20,000. The engineer asked to revise the website cost based upon using a different pre - treatment technology The revised opinion of www ci chanhassen mn us cost was $12,000 Staff prepared an opinion of cost based upon bid prices received for the 2014 road project and arrived at a cost of $25,200 (see attached staff estimate) Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Chanhassen Retail Fourth Addition January 12, 2015 Page 2 To resolve the disparity in cost estimates, it was agreed to split the difference between the two. To this end, the recommended revised cash in lieu of constructing the stormwater practice should be $18,500 rather than the $25,000 shown in the original resolution RECOMMENDATION The Chanhassen City Council approve the attached resolution modifying the stormwater fees for Chanhassen Retail Fourth Addition ATTACHMENTS 1 Storm Water Fee Calculation 2 Proposed Resolution amending Resolution 2014 -74 regarding stormwater fees 3 Original Resolution 2014 -74 adopted by the City Council on November 10, 2014. g- \plan\2014 planning cases\2014 28 shops at chanhassen\storm water fee reduction.docx NOODLES STORMWATER ESTIMATE Costs Based Upon 2014 Road Project Bid Results ITEM UNITS QUA IT C91, SUBGRADE EXCAVATION ° YDS 162 $40 /YRD $ 6,48000 FINE FILTER AGGREGATE Y YDS 97 $90 /YRD $ 8,73000 4" PVC SCHED 40 PERFORATED PIPE LF 100 $10 50 /1-F $ 1,05000 CONNECT TO STORM EA 1 $300 $ 300.00 GEOTEXTILE or EPDM LINER SF 1500 $1 50 /SF $ 2,250.00 RAIN GUARDIAN EA 1 $2,000 $ 2,00000 PLANTINGS o EA 700 $3.00 /EA $ 2,100.00 $22,91000 10% CONTINGENCY $ 2,29100 TOTAL $25,20100 q Assumes 40% void space and a water quality treatment volume of 1,757 CF Assumes 1 foot bounce above filter medium as part of treatment volume capacity Assumes one plant per 2 25 square feet This ignores land acquisition, engineering costs, mobilization costs as well as erosion prevention and sediment control costs You created this PDF from an application that is not licensed to print to novaPDF printer (http / /www novapdf com) CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: January 12, 2015 MOTION BY: RESOLUTION NO: 2015- SECONDED BY: A RESOLUTION MODIFYING STORM WATER FEES FOR CHANHASSEN RETAIL FOURTH ADDITION WHEREAS, on November 10, 2014, the City Council approved Resolution #2014 -74 approving the final plat for Chanhassen Retail Fourth Addition creating one lot and one outlot; and WHEREAS, Condition #2 of Resolution #2014 -74 required the applicant to submit $25,000 in lieu of constructing a stormwater facility; and WHEREAS, the $25,000 amount was based upon the consulting engineer's opinion of cost to construct a stormwater facility, and WHEREAS, the estimate of the cost to construct the stonnwater facility has been modified based on using an different pre- treatment technology; and WHEREAS, the recommended revised cash requirement in lieu of constructing a stormwater facility is $18,500. NOW, THEREFORE, BE IT RESOLVED that the City Council approves the following modification to Condition #2 of Resolution 2014 -74 as follows- 2 The applicant shall submit $18,500 in lieu of constructing stormwater best management practices to be used exclusively for the improvement of the water quality downstream of the site. ATTEST: Todd Gerhardt, City Clerk/Manager YES NO g \plan \2014 planning cases \2014 28 shops at chanhassen \subdivision resolution1doc Denny Laufenberger, Mayor ABSENT CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: November 10, 2014 RESOLUTION NO: 2014 -74 MOTION BY: Laufenburger SECONDED BY: Ernst A RESOLUTION APPROVING A FINAL PLAT CREATING CHANHASSEN RETAIL FOURTH ADDITION WHEREAS, Willow -MN, LLC, has requested final plat approval for Chanhassen Retail Fourth Addition creating one lot and one outlot and WHEREAS, the proposed subdivision complies with all requirements of the Chanhassen City Code, and WHEREAS, the Chanhassen Planning Commission held a public hearing on September 16, 2014 and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance and recommended approval of the subdivision NOW, THEREFORE, BE IT RESOLVED that the City Council approve the plat of Chanhassen Retail Fourth Addition subject to the following conditions Engineering Before the final plat is recorded the Surface Water Management fees, Park Dedication fees, and GIS fees, $45 00, must be paid as well as any recording fees not collected with the final plat application 2 The applicant shall submit $25,000 in lieu of constructing stormwater best management practices This shall be due at time of final plat to be put into an account to be used exclusively for the improvement of water quality downstream of the site The Storm Water Utility fee for the 2014 rate is $18,525 10 and shall be due at final plat 4 The final plat must dedicate drainage and utility easements around the perimeter of the property in accordance with City Code Section 18 -76 Park and Trail Full park fees shall be collected as a condition of approval for Shops at Chanhassen. The park fees in full at the rate in force upon final plat submission (2014 rate $7,562 60) Passed and adopted by the Chanhassen City Council this l Och day of November, 2014 ATTEST: Todd Gerhardt, City Clerk/Manager YES Furlong Ernst Laufenburger McDonald Tj ornhom NO None 2 Thomas A. Furlong, Mayor ABSENT None