Loading...
Geotechnical Exploration Report 02-11-2015 . TABLE OF CONTENTS Page No. PROJECT INFORMATION ............................................................................................. 1 Project Authorization ............................................................................................ 1 Project Description ............................................................................................... 1 Purpose and Scope of Services ........................................................................... 3 SITE AND SUBSURFACE CONDITIONS ........................................................................ 3 Site Location and Description ............................................................................... 3 Subsurface Conditions ......................................................................................... 4 Groundwater Information ...................................................................................... 6 EVALUATION AND RECOMMENDATIONS ................................................................... 6 Geotechnical Discussion ...................................................................................... 6 Site Preparation .................................................................................................... 8 Seismic Site Class .............................................................................................. 12 Infiltration Characteristics of Subsurface Soils and Pond Recommendations ...... 15 CONSTRUCTION CONSIDERATIONS ......................................................................... 16 Moisture Sensitive Soils/Weather Related Concerns ......................................... 16 Drainage and Groundwater Concerns ................................................................ 17 Excavations ........................................................................................................ 17 Utilities Trenching ............................................................................................... 18 GEOTECHNICAL RISK ................................................................................................ 18 REPORT LIMITATIONS ................................................................................................ 19 APPENDIX SITE VICINITY PLAN BORING LOCATION PLAN BORING LOGS WINPASS PAVEMENT DESIGN NRCS SOILS MAP USGS SEISMIC ANALYSIS GENERAL NOTES . Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 1 PROJECT INFORMATION Project Authorization The following Table summarizes, in chronological order, the Project Authorization History for the services performed and represented in this report by Professional Service Industries, Inc. (PSI). DOCUMENT AND REFERENCE NUMBER DATE AUTHOR OR AGENT & COMPANY Phone/Email Request for Proposal 1/12/2015 Mr. Mark Schaefer LASCO Development PSI Proposal #0675-142249 1/13/2015 Mr. Joseph Rozmiarek Mr. David Barndt, PSI, Inc. Request for Revised Proposal 1/14/2015 Mr. Mark Schaefer LASCO Development Revised PSI Proposal #0675-142249-R1 1/15/2015 Mr. Joseph Rozmiarek Mr. David Barndt, PSI, Inc. Notice to Proceed: 1/15/2015 Mr. Mark Schaefer LASCO Development Project Description PSI understands that the project includes the design and construction of a new Children’s Learning Adventure childcare center. The project site is located on the northwest quadrant of Galpin Boulevard and Arboretum Boulevard in Chanhassen, Minnesota. The site is currently undeveloped, but has had previous buildings and pavements were on the site, according to the provided Site Feasibility Report from LASCO Development. The following Table lists the material and information provided for this project: DESCRIPTION OF MATERIAL PROVIDER/SOURCE DATE Conceptual Site Plan Mr. Mark Schaefer LASCO Development 1/12/2015 Site Feasibility Report Mr. Mark Schaefer LASCO Development 1/9/2015 The proposed childcare center will be a single-story, slab-on-grade structure, approximately 33,000 square feet in plan. The building will not have a basement or below grade levels. Specific building construction details are unavailable at this time; however, PSI understands that building construction will consist of either cast-in-place concrete or masonry foundation walls supporting either precast wall panels or light gauge steel framing. The roof is anticipated to consist of steel joists and decking. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 2 Based upon this, PSI’s analysis is based on maximum wall and column loads being on the order of 3 kips per lineal foot and 100 kips, respectively. Additional site work will include the construction of parking lots and drive lanes around the perimeter of the structure; a stormwater pond on the east side of the site; playgrounds and ball fields to the west, north, and east of the structure; site utilities and miscellaneous landscaping. Site access is planned off West 78th Street to the north and west, and off Galpin Boulevard to the east. Finished floor elevation for the new building has not been finalized at this time, but it is expected to be at or within 2± feet of existing site grades on the east side of the site. The elevation difference between the borings completed within the proposed building is 6± feet. Based upon this, cuts on the order of 2± feet and fills of 4± feet will be required to reach final grades. Similarly, the current grades within the proposed pavement areas will be within 2± feet of existing site grades. PSI’s recommendations for the pavements are based on cut and fills being on the order of 2± feet. The following Table lists the structural loads and site features that are required for or are the design basis for the conclusions contained in this report: STRUCTURAL LOAD/PROPERTY REQUIREMENT/DESIGN BASIS BUILDING Maximum Wall Loads 3 kips per lineal foot (klf) B Maximum Column Loads 100 Kips B Finished First Floor Elevation Within 2 feet of existing site grades on the east side of the site (elevations 100± to 102± based off the temporary benchmark) B Maximum Floor Loads and Size 125 pounds per square foot (psf)/ Concentrated loads under 2 square feet B Settlement Tolerances 1-inch total; ¾-inch differential between adjacent columns B PAVEMENTS Pavement 18-kip ESAL (cycle & duration) Light Duty – 45,000 ESALs Heavy Duty– 100,00 ESALs Design life expectancy of 20 years R GRADING Planned Grade Variations at Surface of Site in Building Pad Area 2± feet of cut 6± feet of fill B Planned Grade Variations at Surface of Pavements 2± feet of cut/fill B B = Report has been prepared based on this parameter or loading in the absence of client supplied information at the time of this report. R = Reported to PSI by LASCO Development. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 3 The geotechnical recommendations presented in this report are based on the available project information, building location, and the subsurface materials described in this report. If the noted information is incorrect, please inform PSI in writing so that we may amend the recommendations presented in this report as appropriate and if desired by the client. PSI will not be responsible for the implementation of its recommendations when it is not notified of changes in the project. Purpose and Scope of Services The purpose of this study was to explore the subsurface conditions at the site and develop geotechnical design criteria regarding foundations, floor slabs, pavements, and stormwater management features for the proposed project. Subgrade preparation recommendations and construction considerations are also provided. PSI’s scope of services included drilling a total of seven (7) soil test borings, select laboratory testing, and preparation of this Geotechnical Report. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands, or hazardous or toxic materials in the soil, bedrock, surface water, groundwater, or air on or below, or around this site. Any statements in this report or on the boring logs regarding odors, colors, and unusual or suspicious items or conditions are strictly for informational purposes. SITE AND SUBSURFACE CONDITIONS Site Location and Description The site is located on the northwest quadrant of Galpin Boulevard and Arboretum Boulevard in Chanhassen, Minnesota. The site is bounded to the north and west by West 78th Street; to the south by Arboretum Boulevard (Minnesota State Highway 5), and to the east by Galpin Boulevard. Residential construction exists to the west and south, with undeveloped land to the north and retail construction to the east. The site is currently undeveloped, but had previous buildings and pavements that have since been demolished. The site Latitude and Longitude is approximately 44.86398N and 93.58060W, respectively. The site topography slopes gently downward from east to west and south to north, with differences in elevation between the borings on the order of 6± feet. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 4 Subsurface Conditions The subsurface conditions were explored with seven (7) soil test borings. The following Table depicts the general location and depth of each boring completed for this project: BORING GENERAL LOCATION SURFACE ELEVATION (FT) DEPTH OF BORING (FT) B-01 Proposed Stormwater Pond, West Side of Site 100 21 B-02 Proposed Building, Northwest Corner 96 21 B-03 Proposed Building, Southwest Corner 99 21 B-04 Proposed Building, Southeast Corner 102 21 B-05 Proposed Building, Northeast Corner 102 21 B-06 Proposed Building, West-Center 99 21 B-07 Proposed Building, East-Center 100 21 The surface elevation at each boring location was determined by the PSI drilling crew using conventional leveling techniques. The bonnet bolt of the fire hydrant located on the northwest corner of West 78th Street and Vasserman Trail was used as a temporary benchmark and assigned an arbitrary reference elevation of 100 feet. Elevations should be considered accurate to the nearest 1± foot. The borings were advanced utilizing hollow stem auger drilling methods and soil samples were routinely obtained during the drilling process. Drilling and sampling techniques were accomplished generally in accordance with ASTM procedures. Representative soil samples were obtained from the soil borings and were returned to PSI’s laboratory where they were visually classified using the Unified Soil Classification System (USCS) as a guideline. Further, PSI conducted limited laboratory testing on select soil samples to aid in identifying and describing the physical characteristics of the soils and to aid in defining the site soil stratigraphy. The results of the field exploration and laboratory tests were used in PSI’s engineering analysis and in the formulation of our engineering recommendations. The subsurface conditions at the site included surficial topsoil (5 to 12 inches thick). The topsoil was typically underlain by a layer of fill in Borings B-02 through B-07. The fill consisted of either silty sand or sandy silt, some of which contained organics. A loss of ignition test performed on one of the fill samples indicated the material contained 4.5% organics. The fill ranged from depths of 2± to 7± feet below existing site grades. The moisture contents on the fill materials ranged from 16% to 32%. The SPT N- values of the undocumented fill materials ranged from 5 to 15 blows per foot (bpf), indicating loose to medium relative densities. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 5 Underlying the fill materials in Borings B-02 through B-07 and underlying the topsoil in Boring B-01 were native sandy silts, silty lean clays, and silty sands to depths of 5± feet to 7± feet below existing site grades. The soils ranged in color from gray to brown. The native soils had moisture contents ranging from 5% to 17% in the sandy materials, 20% in the silty clay materials, and 16% in the sandy silt. The SPT N-values ranged from 7 to 13 bpf, indicating loose to medium relative densities. A possible cobble was encountered in Boring B-05 at a depth of 6 feet, and had an SPT N-value of 35 bpf. A hand penetrometer in the silty clay had a value of 1½ tsf, indicating a stiff consistency. Below the silty lean clays, silty sands, and sandy silts was a layer of sandy silt soils, some of which contained trace amounts of gravel, to depths of 10± to 20± feet below existing site grades. The soils ranged from moist to wet, with moisture contents ranging from 11% to 35%. The SPT N-values ranged from 5 to 17 bpf, indicating loose to medium relative densities. An exception to this general profile was encountered in Borings B-06 and B-07. Boring B-06 had layers of silt with sand to a depth of 10± feet underlain by sand with silt to a depth of 15± feet. Moisture contents ranged from 18% to 20% and were moist to waterbearing. SPT N-values ranged from 8 to 10 bpf, indicating loose to medium relative densities. Boring B-07 had a layer of silty lean clay from 7± feet to 15± feet below site grades. Moisture contents ranged from 18% to 28% and were very moist. Hand penetrometer values ranged from ¼ tsf to 1 tsf, indicating soft to stiff consistencies. Below the sandy silts and silty lean clays was a deposit of sandy lean clay to the termination depth of the borings. The sandy lean clay was gray in color, indicating that the strata had previously been saturated. Moisture contents in the clay layer ranged from 11% to 18%. Hand penetrometer values in the sandy lean clay ranged from 1½ to 3½ tsf, indicating stiff to very stiff consistencies. The above subsurface description is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The boring logs included in the appendix should be reviewed for specific information at individual boring locations. These records include soil descriptions, stratifications, penetration resistances, locations of the samples, and laboratory test data. The stratifications shown on the boring logs represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the actual transition may be gradual. Water level information obtained during field operations is also shown on these boring logs. The samples that were not discarded during classification or altered by laboratory testing will be retained for 60 days from the date of this report and then will be discarded. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 6 Groundwater Information Groundwater was observed within Borings B-01, B-03, B-04 and B-06 during drilling operations at depths ranging from 7 to 10 feet below existing site grades. Groundwater was observed at the completion of drilling operations in Borings B-02, B-03, B-04 and B-06 at depths ranging from 10 to 17 feet. Groundwater was not observed to collect in Boring B-05 or Boring B-07 at the time of drilling operations. Due to the fine-grained nature of the encountered soils, the observed water levels may not be indicative of the static groundwater level. Based on the observed water contents of the recovered soil samples and a review of the elevations of nearby surface water features, the static groundwater level on site is estimated to be at 94± feet relative to the temporary benchmark, or an elevation of 966± feet above mean sean level (MSL). The groundwater observations noted on the boring logs represent the groundwater conditions at the test boring locations. It should be expected that the groundwater levels will fluctuate at least several feet seasonally and depending on climatic conditions and precipitation. The possibility of groundwater level fluctuation should be considered when developing the design and construction plans for the project. Short- term dewatering may be required to facilitate foundation construction. EVALUATION AND RECOMMENDATIONS Geotechnical Discussion Based upon PSI’s interpretation and evaluation of the encountered subsurface conditions and understanding of the planned project, there are four geotechnical related concerns at this site, which will affect the design, construction and possible performance of the proposed project. The following summarizes these concerns: 1. Existing undocumented fill, some of which contained organics, was encountered extending to approximately 2± to 7± feet below existing ground surface in the proposed building pad. It should be anticipated that the depth and consistency of the existing fill materials may change from within the proposed building. A deposit of fill was observed within all borings to depths of approximately 2± to 7± feet below existing grade. The fill materials were underlain by very loose silts at Borings B- 02 and B-03, and by soft to stiff silty clays in Borings B-6 and B-07. PSI does not recommend that the new foundations or foundation supporting fill bear upon the existing undocumented fill material in its current condition. Therefore, full removal of the undocumented fill material is recommended for the preparation of the foundation system if conventional continuous wall and column footings are being considered for the project. Construction of floor slabs and pavements within undocumented non-organic fill and possible fill material poses a construction risk of experiencing greater total and/or differential settlements. If previous testing data is available relative to the placement of Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 7 the fill, it should be forwarded to PSI’s office for review. To greatly reduce the risk of experiencing future settlement associated with bearing upon the existing fill would require overexcavation of the fill soils and replacement with a compacted engineered fill. However, to assist the owner in evaluating the potential risk associated with the existing non-organic fill, we offer the following comments. Based upon the results of the test borings, the existing undocumented fills and possible fills were observed in a relatively loose to medium dense condition. Therefore, considering the relatively light loads of a floor slab and if the owner is willing to accept the potential to experience some minor settlements, it may be possible to support the floor slabs on newly placed engineered fill upon the existing non-organic undocumented fills provided the recommendations within the site preparation section are adhered to. If these recommendations are not followed, PSI cannot be responsible for the performance of the project. If the owner is unwilling to accept the elevated risk of floor slab settlement, the existing undocumented fill should be removed in its entirety from within, and 10 feet beyond, the proposed building pad. Depending on the size and spacing of the foundations and associated laterally oversized excavations, a large portion of the existing fill may be removed as part of foundation construction. 2. Groundwater was observed in Borings B-03, B-04, and B-06 at depths of 7± to 10± feet. The estimated static groundwater level is 2± to 7± feet below existing site grades. The second concern at this site may have an impact on the construction of foundations and utilities planned to be at or below 5 feet from existing ground surface. Groundwater was observed at depths of 7± to 10± feet below existing site grades. The estimated static groundwater level is 2± to 7± feet below existing site grades. Typically, in order to maintain a stable bearing surface, water levels should be maintained at least 2 feet below the bottom of the excavation. Depending on final site grades, the observed water levels would be 2 to 5 feet below planned excavation depths assuming that the finished floor elevation is at 100± to 102± feet. The existing silty soils at foundation bearing elevations would have reduced strength characteristics if allowed to become saturated. 3. Silty soils encountered at the foundation bearing elevations will become disturbed during construction activities. The third concern with this site is that loose to medium dense sandy silt soils were encountered at estimated foundation bearing elevations for the proposed building. Due to the granular nature of the foundation bearing soils, the base of the foundation excavations will be easily disturbed. Surface compaction of the foundation subgrades should be performed with a ho-pac, sheepsfoot, or vibratory plate compactor upon completion of excavation activities to re-densify the soils prior to construction of the footings. Care should be taken, however, if these soils are saturated. Excessive vibration can cause saturated non-cohesive soils to become unstable due to phenomenon called excess pore water pressure. Therefore, this process should be monitored by a representative of a geotechnical engineer during construction. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 8 4. Potential structural elements and utilities from previous construction may exist within the proposed building and pavement areas. The fourth concern with this site is that previous buildings and pavements had existed on the site. PSI has not been informed of the location of these site features. If encountered during construction, PSI recommends that any discovered foundations, walls, and floor slabs, etc. be removed in their entirety from beneath, and a minimum of 10 feet beyond the new building footprint. The resulting excavations should then be backfilled with compacted engineered fill as outlined in the Site Preparation section of this report. PSI recommends that after removal of any discovered foundation elements, the existing soils be observed by a representative of a qualified geotechnical engineer, prior to backfilling to the proposed subgrade elevations. Complete removal of any discovered foundations and foundation walls from within the pavement areas should not be required; however, within these areas PSI recommends that foundations and foundation walls be removed to a minimum depth of 2 feet below subgrade elevation to eliminate the potential for non-uniform settlement. The following geotechnical related recommendations have been developed on the basis of the subsurface conditions encountered and PSI’s understanding of the proposed development. PSI has presented these recommendations with the understanding that the owner is willing to accept an elevated risk of floor slab and pavement settlement by utilizing the existing fill for support of the structure’s floor slab. Should changes in the project criteria occur, a review must be made by PSI to determine if modifications to our recommendations will be required. Site Preparation Prior to the placement of new fill or preparation of the construction area subgrade, PSI recommends that the existing surficial organic matter, trees including root bulbs, frozen soils (if present during construction), and topsoil be removed from within and a minimum of 10 feet beyond the building and pavement areas. The existing non-organic undocumented fill should be removed at foundation locations, but may remain in place under the floor slabs and pavements if the soil passes proofroll operations as noted below. Unsuitable soils encountered should be selectively undercut and/or stabilized in place. A representative of a qualified geotechnical engineer should determine the need for and depth of removal or stabilization at the time of construction. After stripping and excavating to the proposed subgrade level, as required, the slab on grade and pavement areas should be thoroughly proofrolled. Proofrolling should be performed with a steel drummed vibratory roller where granular soils are present at subgrade elevations, or a fully loaded tandem axle dump truck or rubber tired vehicle of similar size and weight (typically 9-ton per axle) where cohesive soils are encountered. Soils that are observed to rut or deflect excessively under the moving load should be remediated prior to placement of engineered fill. Cut material generated by these operations may be moisture-conditioned and reused as engineered fill, used in landscape areas, or disposed of offsite. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 9 The proofrolling and undercutting activities should be witnessed by a representative of the geotechnical engineer. Proofrolling should be performed following a warm and dry period; which may limit the need for surface repairs to localized areas. However, if subgrade preparation must proceed during unfavorable wet and/or cool weather periods, such as early spring or late fall, more extensive surface repairs will likely be required, as discussed in the Construction Considerations section of this report. Based on the existing site grades, newly placed fill will be required to achieve design site grades. PSI has not been provided with design site elevations, including those of the planned finished floor elevation. Assuming a new finished floor elevation of 102± feet with reference to the temporary benchmark (the current elevation of Borings B-04 and B-05), and that undocumented fill is removed below foundations as recommended in this report, newly placed fills on the order of up to 6± feet will be required on the west side of the site. The following table details the estimated cut depths for fill removal and the estimated fill depths to achieve design site grades: BORING LOCATION EXISTING SURFACE ELEVATION (FT) ESTIMATED CUT DEPTH ELEVATION (FT) ESTIMATED FILL REQUIRED (FT) B-02 Proposed Building, Northwest Corner 96 91 (fill) 6 B-03 Proposed Building, Southwest Corner 99 97 (fill) 0 B-04 Proposed Building, Southeast Corner 102 100 (fill) 0 B-05 Proposed Building, Northeast Corner 102 100 (fill) 0 B-06 Proposed Building, West-Center 99 94 (fill) 3 B-07 Proposed Building, East-Center 100 93 (fill) 89 (fill and soft) 4 8 ***All elevations are based off the temporary benchmark of 100 feet for the bonnet bolt of the fire hydrant on the northwest quadrant of West 78th Street and Vasserman Trail. Bottom of footing elevation is estimated to be 97± feet relative to this temporary benchmark. Newly placed engineered fill required to establish site grades should be free of organic, frozen, or other deleterious materials, have a maximum particle less than 3 inches. The existing, non-organic fill may be reused for engineered fill, but will likely require moisture- conditioning prior to use. In lieu of using the existing onsite materials, imported fill should consist of sands with less than 12% of the particles passing the #200 sieve by weight. Newly placed engineered fill should be compacted to at least 98 percent of the maximum dry density and to within 3 percent of the optimum moisture content as determined by the standard Proctor (ASTM D698). Also, PSI recommends that a qualified geotechnical engineer test and document the engineered fill materials prior to placement. Engineered fill should be placed in maximum lifts of eight inches of loose material and should be compacted to within 3 percent of the optimum moisture content value as determined by the standard Proctor test (ASTM D698). If very moist or wet soils are to be Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 10 reused as engineered fill, they should be spread thinly on the ground and allowed to dry prior to placement. If water is to be added, it should be uniformly applied and thoroughly mixed into the soil by disking or scarifying. Each lift of compacted engineered fill should be observed, tested, and documented by a representative of PSI prior to placement of subsequent lifts. Compaction tests should be performed for every 2,500 square feet in the building pad and every 5,000 square feet in pavement areas. A minimum of three tests per layer is recommended. The lateral extent of the overexcavation of poor soil and subsequent placement and compaction of engineered fill should be equal to or greater than the depth of overexcavation below finished floor elevation. As for the pavement areas, the newly placed compacted engineered fill should extend at least 5 feet beyond the edges of the pavement. Foundation Recommendations The proposed building can be supported by conventional continuous wall and column footings designed to bear upon suitable bearing native soils or newly placed engineered fill that have been tested and observed by the geotechnical engineer or geotechnical engineering technician. PSI recommends that footings be designed for a maximum net allowable soil bearing pressure of 2,500 pounds per square foot (psf) for continuous footings and 1,900 psf for square footings based on dead load plus design live load. Minimum dimensions of 18 inches for continuous footings and 30 inches for any column footings should be used in foundation design to minimize the possibility of a local bearing capacity failure, even if the allowable bearing pressure recommended herein is not fully utilized. Where existing undocumented fill or unsuitable bearing soils are encountered in a footing excavation, the excavation should be deepened to competent bearing soil and the footing could be lowered or an overexcavation and backfill procedure could be performed. An overexcavation and backfill treatment would require widening the deepened excavation in all directions at least 6 inches beyond the edge of the footing for each 12 inches of overexcavation depth. The overexcavation should then be backfilled up to footing base elevation in maximum 8 inches thick loose lifts with suitable granular fill material compacted to at least 98 percent of maximum dry density and within 3% of the optimum moisture content as determined by standard Proctor (ASTM D698). Due to the potential variations in the strengths of the natural soils, it is recommended that soils at bearing elevation in the footing excavations be observed and tested by a Professional Service Industries, Inc., representative prior to concrete placement to evaluate the suitability and uniformity of the natural soils for support of the design foundation loads. A method for evaluating the acceptability of the soils under footings would involve hand auger and dynamic cone penetrometer testing below the footing bearing level for a minimum of one footing width or 3 feet, whichever is shallower. Each isolated footing should include at least 1 test probe. Test probes should be performed every 20-lineal feet in continuous footings. Based on the recommended net allowable bearing pressure of 2,500 and 1,900 psf, respectively, suitable bearing native soils should be unfrozen, non-organic and have a dynamic cone penetrometer value commensurate with a SPT value of at least 8 and 6 blows per foot, respectively. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 11 It should be noted that Borings B-07 had soft and loose soils to depths of 11± feet below existing site grades (elevations 89± relative to the temporary benchmark of 100 feet). In this area, a soil correction may not be economical for the depths of unsuitable soils observed in the borings. As an alternative to supporting the footings at deeper elevations or on a new observed and tested compacted engineered fill, the footings may also be designed to bear upon a stabilized subgrade at shallower elevations as detailed below. PSI recommends that the unsuitable soils that do not exhibit the recommended penetrometer values of 6 or 8 blows per foot, respectively, at foundation bearing elevations be subcut and stabilized. The soils should be subcut to a depth of 18 inches below planned bottom of footing elevation and extended 10 lineal feet beyond the observed soft soils in continuous footings and six inches beyond each face of the footing. The soil subcuts should extend a minimum of two feet beyond each face of isolated footings. A 12 inch thick layer of four to eight inch clear stone should be placed and statically rolled in place. Vibratory compaction of this material is not recommended. This static compaction should be observed by a geotechnical engineer or engineering technician to document the observed deflection under the compaction equipment. A second 12 inch thick layer should then be placed and statically rolled in place. If the stabilized subgrade does not deflect under the compaction equipment, the footing may then be placed on top of the clear stone strata. Exterior footings should be located at a depth of at least 42 inches below the final exterior grade to provide adequate frost protection. Isolated footings, such as those for canopies and planned site signage, should be located at a depth of at least 60 inches below the final exterior grade. If the building is to be constructed during the winter months or if footings will likely be subjected to freezing temperatures after foundation construction, then the footings and concrete should be adequately protected from freezing. Otherwise, interior footings can be located on the native soils or newly placed engineered fill at shallower depths below the floor slab, compatible with architectural and structural considerations. After opening, footing excavations should be observed, the support soils tested and concrete placed as quickly as possible to avoid exposure of the footing bottoms to wetting and drying. The silty soils at estimated foundation elevations are moisture-susceptible and will have reduced shear strengths if allowed to become saturated. Surface run-off water should be drained away from the excavations and not be allowed to pond. The foundation concrete should be placed during the same day the excavation is made. If it is required that footing excavations be left open for more than one day, they should be protected to reduce evaporation or entry of moisture. Based on the engineering properties of the soils that were encountered at the test borings and the recommendations provided herein, PSI estimates that the total foundation settlement for the foundation system discussed above will be about one inch. Differential settlement will probably be about 75% of the total settlement. While settlement of this amount is generally tolerable, the structure must be designed based upon the estimated settlement and must include properly spaced vertical control joints to minimize the effects of differential movement (such as cosmetic "cracking" of sensitive masonry materials). Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 12 Floor Slab Recommendations The building floor slab could be supported by the existing non-organic fill materials that pass proofrolling operations, or upon newly placed engineered fill, provided the subgrade is prepared as outlined in the Site Preparation Section of this report. PSI recommends that a subgrade modulus (k) of 100 pounds per cubic inch (pci) be used for design considerations based on a 12 inch square plate load test. However, depending on how the slab loads are applied, the value will have to be geometrically modified. The value should be adjusted for larger areas using the following expression for cohesive and cohesionless soil: Modulus of Subgrade Reaction, ks = (B k ) for cohesive soil and ks = k (B B 2 1)2 for cohesionless soil where: ks= coefficient of vertical subgrade reaction for loaded area, k= coefficient of vertical subgrade reaction for 144 square inches area B= width of area loaded, in feet PSI recommends that a minimum four-inch thick free draining granular mat be placed beneath the floor slab to enhance drainage. The granular fill should have less than 50% of the material passing the #40 sieve by weight and less than 5% passing the #200 sieve. Polyethylene sheeting should be placed to act as a vapor retarder where the floor will be in contact with moisture sensitive equipment or products such as tile, wood, carpet, etc., as directed by the design engineer. The decision to locate the vapor retarder in direct contact with the slab or beneath the layer of granular fill should be made by the design engineer after considering the moisture sensitivity of subsequent floor finishes, anticipated project conditions and the potential effects of slab curling and cracking. The floor slabs should have an adequate number of joints to reduce cracking resulting from differential movement and shrinkage. Seismic Site Class The site is in a municipality that employs the 2006 International Building Code with the 2007 Minnesota amendments. The Code requires a site class for the calculation of earthquake design forces. This class is a function of soils type (ie. depth of soil and strata types). Based on the estimated density of the soils observed within the boring locations, Site Class “D” is recommended. The USGS-NEHRP probabilistic ground motion values near latitude 44.86398N and longitude 93.58060W are as follows: PERIOD (SECONDS) 2% PROBABILITY OF EVENT IN 50 YEARS (% G) SITE COEFFICIENT FA SITE COEFFICIENT FV PGA 6.7 NA NA 0.2 (Ss) 6.3 1.6 NA 1.0 (S1) 2.7 NA 2.4 Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 13 The Site Coefficients, Fa and Fv were interpolated from IBC 2006 Tables 1613.5.3(1) and 1613.5.3(2) as a function of the site classification and the mapped spectral Response acceleration at the short (Ss) and 1 second (S1) periods. Pavement Recommendations Based on the proposed scope of services, no borings were completed within the proposed pavement areas. The following analysis is based off the soils encountered at the borings for the building. It should be noted that the soils encountered in the pavement areas at the time of construction may be different than those used in this analysis. If different soils are encountered, PSI should be contacted in writing to review our recommendations, and provide supplemental recommendations if necessary. Based on the borings completed within the proposed building (Borings B-02 to B-07), PSI anticipates the pavement subgrade soils will consist of either existing sandy silt undocumented fill or sandy clay undocumented fill after stripping the surficial topsoil and organic matter. After removal of the surficial soils, the exposed subgrade soils should be proofrolled and prepared as recommended in the Site Preparation section of this report. Any observed soft or loose locations should be selectively subcut or stabilized in place using aggregate base or clear stone. If the exposed fill soils contain organic or deleterious materials, they should be selectively subcut and removed in their entirety. A detailed traffic analysis was performed by LASCO Development, with the results provided to PSI as part of this exploration. Based upon the proposed construction, the pavement sections shown below are based on a 20 year design life and the daily Equivalent Single Axle Loads (ESALs) provided by LASCO Development. The provided traffic study recommended design values of 45,000 lifetime ESALs in light duty areas and 100,000 lifetime ESALS in heavy duty areas. The existing non-organic undocumented fill materials that pass proofrolling operations are considered relatively fair to poor materials, having a minimum CBR value of 3. Engineered fill material used to raise existing grades within parking and drive areas should meet or exceed this CBR value. The following design factors were used in developing the recommended asphalt pavement sections:  Design Life: - 20 years  Terminal Serviceability: - 2.0  Reliability: - 85%  Initial Serviceability: - 4.2  Standard Deviation: - 0.45 If during the final design phase these values are determined to be incorrect, PSI must be contacted to provide revised pavement recommendations. Based upon the soil borings, laboratory data and provided the subgrade soils are prepared as outlined in this report, the following flexible pavement section thicknesses are recommended for parking lot and drive areas. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 14 Light Duty Asphalt Pavement Section Granular Base Course Thickness 10 inches HMA Base Course Thickness 2 inches HMA Wear Course Thickness 1 ½ inches* *Based on using a standard pick-up truck for snow removal; if a front end loader is used for snow removal, this value should be increased to 2 inches Heavy Duty Asphalt Pavement Section Granular Base Course Thickness 10 inches HMA Base Course Thickness 2¼ inches HMA Wear Course Thickness 2 inches The granular base course should consist of well-graded crushed stone meeting the requirements from Section 2112 of the State of Minnesota Standard Specifications for Construction. The granular base course material should be placed and compacted to a minimum of 100 percent of the maximum standard Proctor dry density (ASTM D698) and within 2 percent of the optimum moisture content. Also, a representative of a qualified geotechnical engineer must test the base course material prior to, and during, placement. Asphaltic binder and surface courses should meet the requirements from Section 2360 of the State of Minnesota Standard Specifications for Construction. Asphaltic courses should be placed and compacted to the minimum required density contained within Section 2360 of the Standard Specifications. An adequate number of in-place density tests should be performed during construction to document the placement compaction. The pavements should be sloped to provide positive surface drainage. Water should not be allowed to pond on or adjacent to the pavement as this could saturate the subgrade and cause premature pavement deterioration. The granular base course should be protected from water inflow along drainage paths. Additionally, the granular base course should extend beyond the edges of the pavement in low areas to allow any water that enters the base course stone a path for exit. The parking and drive areas are recommended to be constructed with attention to final grades to facilitate drainage. Otherwise, a storm sewer system may be appropriate to carry away storm run-off water. Construction of the subgrade and pavements should be in accordance with the project specifications. A flexible pavement system is not recommended in dumpster pad areas and areas where heavy trucks will turn frequently or will be parked. Within these areas, consideration should be given for use of a rigid pavement. Based upon the anticipated traffic volumes, PSI recommends a concrete pavement section consisting of 6 inches of crushed aggregate base course and 6 inches of Portland cement concrete. The concrete must be properly reinforced and must have appropriately spaced control joints. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 15 Infiltration Characteristics of Subsurface Soils and Pond Recommendations Generally, the subsurface soil conditions below the upper layer of topsoil and fill consisted of sandy silt (Silty loam) to the depths of 15± feet in Boring B-01 at the proposed stormwater management feature. Field infiltration testing was not requested at the time of field exploration. However, for preliminary design purposes the following table provides estimates of design infiltration rates for different soil textures and is based on the infiltration rates published by the Natural Resources Conservation Service (NRCS). SOIL TEXTURE NRCS INFILTRATION RATES (IN/HOUR) Coarse sand or coarser (COS) >20 Loamy coarse sand (LCOS) >20 Sand (S) >20 Loamy sand (LS) 6.3-20.0 Sandy loam (SL) 2.0-6.3 Loam (L) 0.63-2.0 Silt loam (SIL) 0.63-2.0 Sandy clay loam (SCL) 0.63-2.0 Clay loam (CL) 0.63-2.0 Silty Clay loam (SICL) 0.63-2.0 Sandy clay (SC) 0.63-2.0 Silty clay (SIC) 0.06-0.20 Clay (C) 0.06-0.20 In general, the results of borings completed within the area of the proposed stormwater management feature (Boring B-01) and a review of the NRCS soil maps of the site indicate that the predominate soil types that will be located at the bottom of the proposed stormwater management feature will be either loam or silty loam soils. These soils have a relatively moderate to low permeability and would not be suitable to infiltrate water. The high water contents of the recovered samples indicate static groundwater is approximately 6± feet below existing site grades. Based on this, a surface detention pond is recommended for stormwater management. In order for the pond to hold water, PSI recommends that a clay liner be installed in the bottom and sides of the pond. The liner should be a minimum of 24 inches thick. PSI has not been provided with planned surface water elevations or planned bottom of pond elevations. The following recommendations are based on the bottom of the pond being 5± feet below existing site elevations (95± feet based on the temporary benchmark). This will require cuts on the order of 7± feet to account for the thickness of the installed clay liner. Based on the shallow groundwater observed at 10± feet below existing grades and the estimated static groundwater level of 6± feet below existing grades at Boring B-01, the construction of a compacted clay liner will present some constructability issues. In this case, the excavation for the pond will likely require extensive dewatering to construct the liner. Typically, in order to maintain a stable excavation, the water table will need to be lowered to an elevation at least 2 feet lower than the lowest anticipated excavation elevation. After the liner is installed, the pond should be filled while the dewatering is still underway. This will prohibit the liner from lifting under hydrostatic pressures. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 16 PSI recommends that fill placed for liners, if needed, have a minimum liquid limit of 25 and plasticity index above 12. The on-site materials would not be suitable for this purpose and will likely have to be imported. The fill should be placed in loose lifts not to exceed 8 inches in thickness and compacted to a minimum of 95% of the material’s maximum laboratory dry density as determined in accordance with the Standard Proctor (ASTM D698). The materials should be placed and compacted at moisture contents varying from 0 to 3% above the material’s optimum moisture content as determined in accordance with the above ASTM procedure. The performance of the pond can be affected by factors such as the introduction of sediment and organic materials to the pond bottom over time. Therefore, a pond maintenance program should be developed in order to remove sediment and organic materials. Concerning embankment slopes, it is PSI’s opinion that properly constructed slopes as steep as 2 horizontal to 1 vertical would generally be stable, but would be susceptible to erosion and difficult to maintain or construct with rubber tired mowing or grading equipment. Therefore, embankment slopes of 3 horizontal to 1 vertical or flatter are recommended. If final construction plans will include below grade stormwater detention or alternate stormwater management features, PSI should be contacted to review the new plan and provide a supplemental report regarding the design and construction of the new structures. Depending upon the proposed design and/or location of the new structures, additional borings and/or test pits may be needed at that time in order to provide supplemental recommendations. CONSTRUCTION CONSIDERATIONS PSI should be retained to provide observation and testing of construction activities involved in the foundation, earthwork, and related activities of this project. PSI will not accept responsibility for conditions that deviated from those described in this report, nor for the performance of the foundation or pavement if we are not engaged to also provide construction observation and testing for this project. Moisture Sensitive Soils/Weather Related Concerns Increases in the moisture content of the soil can cause significant reduction in the soil strength and support capabilities. In addition, soils that become wet may be slow to dry and thus significantly retard the progress of grading and compaction activities. It will, therefore, be advantageous to perform earthwork and foundation construction activities during dry weather. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 17 Water should not be allowed to collect in the foundation excavation, on floor slab areas, or on prepared subgrades during or after construction. Areas should be sloped to facilitate removal of collected rainwater, groundwater, or surface runoff. Positive site drainage should be provided to reduce infiltration of surface water around the perimeter of buildings, beneath floor slabs, and within pavement areas. The grades should be sloped away from buildings and surface drainage should be collected and discharged such that water is not permitted to infiltrate the backfill and floor slab areas of the building. Drainage and Groundwater Concerns Perched groundwater was observed at a depth of 7± to 10± feet below existing site grades during drilling operations, which is within two feet of the anticipated zone of construction. Typically, in order to maintain a stable excavation, the water table will need to be lowered to an elevation at least 2 feet lower than the lowest anticipated excavation elevation. If groundwater is within two feet at the time of construction, the foundations will present some constructability issues. In this case, the excavation for the foundations will likely require extensive dewatering. After the foundations are constructed, the anticipated building dead loads should be applied while the dewatering of the area is still underway. This will inhibit the foundations from lifting under hydrostatic pressures. If other minor groundwater seepage is encountered, a typical sump and pump technique should be sufficient for groundwater control. Should excessive and uncontrolled amounts of seepage occur, the geotechnical engineer should be consulted for recommendations. PSI recommends that the contractor determine the actual groundwater levels at the site at the time of the construction activities. Excavations It is mandated that excavations, whether they be for utility trenches, basement excavations or footing excavations, be constructed in accordance with current Occupational Safety and Health Administration (OSHA) guidelines to protect workers and others during construction. PSI recommends that these regulations be strictly enforced; otherwise, workers could be in danger and the owner(s) and the contractor(s) could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's "responsible person", as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. PSI is providing this information solely as a service to our client. PSI does not assume responsibility for construction site safety or the contractor's or other parties’ compliance with local, state, and federal safety or other regulations. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 18 Utilities Trenching Excavation for utility trenches shall be performed in accordance with OSHA regulations as stated in 29 CFR Part 1926. It should be noted that utility trench excavations have the potential to degrade the properties of the adjacent fill materials. Utility trench walls that are allowed to move laterally can lead to reduced bearing capacity and increased settlement of adjacent structural elements and overlying slabs and pavements. Backfill for utility trenches is as important as the original subgrade preparation or engineered fill placed to support either a foundation or slab. Therefore, it is imperative that the backfill for utility trenches be placed to meet the project specifications for the engineered fill of this project. Unless otherwise specified, the backfill for the utility trenches should be placed in 4 to 6 inch loose lifts and compacted to a minimum of 95 percent of the maximum dry density and within 2 percent of the optimum moisture content achieved by the standard Proctor test (ASTM D698). The backfill soil should be moisture conditioned to be within 2± percent of the optimum moisture content as determined by the standard Proctor test. Up to 4 inches of bedding material placed directly under the pipes or conduits placed in the utility trench can be compacted to the 90 percent compaction criteria with respect to the standard Proctor. Compaction testing should be performed for every 200 cubic yards of backfill placed or each lift within 200 linear feet of trench, which ever is less. Backfill of utility trenches should not be performed with water standing in the trench. Granular backfill material shall be compacted to meet the above compaction criteria. The geotechnical engineer can also specify a relative density specification for clean granular materials. GEOTECHNICAL RISK The concept of risk is an important aspect of the geotechnical evaluation. The primary reason for this is that the analytical methods used to develop geotechnical recommendations do not comprise an exact science. The analytical tools which geotechnical engineers use are generally empirical and must be used in conjunction with engineering judgment and experience. Therefore, the solutions and recommendations presented in the geotechnical evaluation should not be considered risk-free and, more importantly, are not a guarantee that the interaction between the soils and the proposed structure will perform as planned. The engineering recommendations presented in the preceding section constitutes PSI’s professional estimate of those measures that are necessary for the proposed structure to perform according to the proposed design based on the information generated and referenced during this evaluation, and PSI’s experience in working with these conditions. Proposed Children’s Learning Adventure, Chanhassen, MN PSI Project No. 0675598 19 REPORT LIMITATIONS The recommendations submitted are based on the available subsurface information obtained by PSI and design details furnished by LASCO Development. If there are revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, PSI should be notified immediately to determine if changes in the provided recommendations are required. If PSI is not retained to perform these functions, PSI will not be responsible for the impact of those conditions on the project. The geotechnical engineer warrants that the findings, recommendations, specifications, or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete, the geotechnical engineer should be retained and provided the opportunity to review the final design plans and specifications to check that our engineering recommendations have been properly incorporated into the design documents. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use by LASCO Development, for the specific application to the proposed Children’s Learning Adventure childcare center to be located on the northwest quadrant of Galpin Boulevard and Arboretum Boulevard in Chanhassen, Minnesota. APPENDIX SITE VICINITY PLAN BORING LOCATION PLAN BORING LOGS WINPASS PAVEMENT DESIGN NRCS SOILS MAP USGS SEISMIC ANALYSIS GENERAL NOTES Project Name:Children's Learning Adventure Project Location: NW Quad Galpin Blvd and Arboretum Blvd Site Chanhassen, Minnesota Vicinity Map 2915 Waters Road, Suite 112 PSI Project # : 0675598 Eagan, Minnesota 55121 B-9 B-8 B-7 B-6 B-5 B-4 B-3 B-2 B-1 B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 N Project Name:Children's Learning Adventure Project Location: NW Quad Galpin Blvd and Arboretum Blvd Chanhassen, Minnesota Boring Location 2915 Waters Road, Suite 112 PSI Project # : 0675598 Plan Eagan, Minnesota 55121 N B-9 B-8 B-7 B-6 B-5 B-4 B-3 B-2 B-1 B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-1 TBM B-2 B-7B-6 B-5 B-4B-3 Project Name:Children's Learning Adventure Project Location: NW Quad Galpin Blvd and Arboretum Blvd Chanhassen, Minnesota Boring Location 2915 Waters Road, Suite 112 PSI Project # : 0675598 Plan Eagan, Minnesota 55121 N B-9 B-8 B-7 B-6 B-5 B-4 B-3 B-2 B-1 B-1 B-2 B-3 B-4 B-5 B-6 B-8 B-9 B-1 TBM B-2 B-7B-6 B-5 B-4B-3 B-7B-6 B-5 B-4B-3 B-2B-1TBM 15 10 18 18 18 18 18 3-3-3 N=6 5-6-7N=13 3-4-9N=13 4-7-9 N=16 4-7-10 N=17 2-3-5N=8 4-5-5 N=10 TOPSOIL (5" Thick) Sandy SILT, Light Brown, Moist, Medium Sandy SILT, Trace Gravel, Brown, Moist,Medium Sandy Lean CLAY, Dark Gray, Moist, Very Stiff to Stiff End of Boring at 21 feet Cave in at 21 feet T-SOIL ML ML CL 16 16 16 16 16 16 18 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 6 feet While Drilling Upon Completion Estimated Static Level 95 90 85 80 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd Not Observed 10 feet Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:100 ft REVIEWED BY:JR West Side of Site EFFICIENCY N/A Proposed Stormwater Feature HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-1 17 15 6 18 18 18 18 2-2-3 N=5 6-6-6N=12 1-1-1N=2 1-2-3 N=5 2-3-3 N=6 2-5-5N=10 3-4-6 N=10 TOPSOIL (10" Thick) Fill, Sandy SILT, Trace Organics and Rootlets, Dark Brown to Black, Moist Sandy SILT, Trace Gravel, Light Gray toBrown, Very Moist, Very Loose to Loose Sandy Lean CLAY, Dark Gray, Moist, Stiff End of Boring at 21 feet Cave in at 19 feet T-SOIL FILL ML CL 19 28 27 20 21 18 18 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 2 feet While Drilling Upon Completion Estimated Static Level 95 90 85 80 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd 16 feet Not Observed Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:96 ft REVIEWED BY:JR Northwest Corner EFFICIENCY N/A Proposed Building HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-2 16 15 13 18 18 18 18 5-5-4 N=9 9-8-7N=15 3-3-4N=7 5-5-6 N=11 5-6-5 N=11 2-2-5N=7 3-4-5 N=9 TOPSOIL (9" Thick) FILL, Silty Sand, Trace Roots and Organics,Dark Brown to Black, Moist Silty Lean CLAY with Sand, Brown, Moist,Stiff Sandy SILT, Light Brown to Gray, Moist toWet, Loose to Medium Sandy Lean CLAY, Trace Gravel, Gray,Wet, Stiff to Very Stiff End of Boring at 21 feet Cave in at 14 feet T-SOIL FILL CL-ML ML CL 16 20 26 27 28 18 17 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 5 feet While Drilling Upon Completion Estimated Static Level 95 90 85 80 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd 10 feet 7 feet Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:99 ft REVIEWED BY:JR Southwest Corner EFFICIENCY N/A Proposed Building HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-3 17 18 18 18 18 18 18 4-4-5 N=9 4-4-4N=8 5-5-5N=10 5-3-4 N=7 3-3-5 N=8 2-3-5N=8 4-6-7 N=13 TOPSOIL (6" Thick) FILL, Sandy Silt, Trace Clay, Gravel andRootlets, Brown, Moist Silty SAND, Dark Brown, Moist, Loose SAND with Silt, Trace Gravel, Light Brown,Moist, Medium SILT with Sand, Light Gray, Very Moist toWet, Loose Sandy Lean CLAY, Dark Gray, Wet, VeryStiff End of Boring at 21 feet Cave in at 18 feet T-SOIL FILL SM SP-SM ML CL 16 16 8 28 24 35 18 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 7 feet While Drilling Upon Completion Estimated Static Level 100 95 90 85 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd 17 feet 10 feet Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:102 ft REVIEWED BY:JR Southeast Corner EFFICIENCY N/A Proposed Building HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-4 15 18 13 17 18 18 18 4-4-6 N=10 5-5-4N=9 5-7-28N=35 3-6-7 N=13 3-5-8 N=13 8-9-14N=23 4-6-6 N=12 TOPSOIL (8" Thick) FILL, Sandy Silt, Trace Organics andGravel, Mottled Brown and Black, Moist Sandy SILT, Trace Gravel, Mottled Gray andBrown, Moist, Loose to Dense (Possible Cobble at 6') Sandy SILT, Light Brown, Moist to VeryMoist, Medium Sandy Lean CLAY, Dark Gray, Moist, VeryStiff End of Boring at 21 feet Cave in at 18 feet T-SOIL FILL ML ML CL 32 17 5 23 11 11 16 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 7 feet While Drilling Upon Completion Estimated Static Level 100 95 90 85 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd Not Observed Not Observed Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:102 ft REVIEWED BY:JR Northeast Corner EFFICIENCY N/A Proposed Building HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-5 14 15 18 18 15 18 18 3-4-3 N=7 6-6-6N=12 2-2-3N=5 2-4-6 N=10 3-3-5 N=8 2-3-4N=7 4-5-6 N=11 TOPSOIL (12" Thick) FILL, Sandy Clay, Trace Rootlets, DarkBrown, Moist Silty Lean CLAY, Mottled Gray and LightBrown, Moist, Stiff SILT with Sand, Gray, Moist, Medium SAND with Silt, Dark Brown, Wet, Loose Lean CLAY, Trace Silt and Gravel, DarkGray, Moist, Very Stiff End of Boring at 21 feet Cave in at 18 feet T-SOIL FILL CL-ML ML SP-SM CL 20 18 20 20 18 17 17 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 4 feet While Drilling Upon Completion Estimated Static Level 95 90 85 80 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd 17 feet 10 feet Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:99 ft REVIEWED BY:JR West- Center EFFICIENCY N/A Proposed Building HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-6 15 17 10 18 18 18 18 5-3-4 N=7 5-5-6N=11 3-3-4N=7 2-1-2 N=3 3-3-3 N=4 3-5-5N=10 5-5-7 N=12 TOPSOIL (10" Thick) FILL, Sandy SILT, Trace Gravel and Organics, Brown to Black, Moist LOI = 4.2% Organics Silty Lean CLAY, Trace Sand, Mottled LightGray and Light Brown, Very Moist, Soft to Stiff Sandy Lean CLAY, Dark Gray, Moist, Stiff End of Boring at 21 feet Cave in at 17 feet T-SOIL FILL CL-ML CL 19 20 21 28 21 18 17 PROJECT NO.:0675598 PROJECT:Proposed Children's Learning Academy De p t h , ( f e e t ) STRENGTH, tsf Additional Remarks US C S C l a s s i f i c a t i o n 0 Qp Sa m p l e T y p e 2.0 0 Mo i s t u r e , % MoistureMATERIAL DESCRIPTION STANDARD PENETRATION TEST DATA N in blows/ft Qu Sa m p l e N o . Gr a p h i c L o g 50 PL El e v a t i o n ( f e e t ) LL 4.0 25 Re c o v e r y ( i n c h e s ) 7 feet While Drilling Upon Completion Estimated Static Level 95 90 85 80 LATITUDE:44.86398° LONGITUDE:-93.5806° LOCATION:Arboretum Blvd and Galpin Blvd Not Observed Not Observed Wa t e r REMARKS:Temporary Benchmark: Bonnet Bolt of Fire Hydrant, Northwest Corner of West 78th Street and Vasserman Trail DRILLER:JB Professional Service Industries, Inc. 2915 Waters Road, Suite 112 Eagan, MN 55121Telephone: (651) 646-8148 Chanhassen, Minnesota SP T B l o w s p e r 6 - i n c h ( S S ) SAMPLING METHOD: SS DATE STARTED:1/29/15 BENCHMARK:See Remarks The stratification lines represent approximate boundaries. The transition may be gradual.Sheet 1 of 1 DRILL COMPANY:PSI, Inc. STATION:N/A OFFSET:N/A LOGGED BY:JR COMPLETION DEPTH 21.0 ft DRILL RIG:Dietrich D-120 DRILLING METHOD:Hollow Stem Auger ELEVATION:100 ft REVIEWED BY:JR East Center EFFICIENCY N/A Proposed Building HAMMER TYPE:Automatic BORING LOCATION: 0 5 10 15 20 DATE COMPLETED:1/29/15 BORING B-7 Soil Map—Carver County, Minnesota Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/5/2015 Page 1 of 3 49 6 7 7 6 0 49 6 7 8 5 0 49 6 7 9 4 0 49 6 8 0 3 0 49 6 8 1 2 0 49 6 8 2 1 0 49 6 8 3 0 0 49 6 7 7 6 0 49 6 7 8 5 0 49 6 7 9 4 0 49 6 8 0 3 0 49 6 8 1 2 0 49 6 8 2 1 0 49 6 8 3 0 0 453740 453830 453920 454010 454100 454190 454280 454370 454460 454550 453740 453830 453920 454010 454100 454190 454280 454370 454460 454550 44° 52' 0'' N 93 ° 3 5 ' 9 ' ' W 44° 52' 0'' N 93 ° 3 4 ' 2 8 ' ' W 44° 51' 41'' N 93 ° 3 5 ' 9 ' ' W 44° 51' 41'' N 93 ° 3 4 ' 2 8 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 15N WGS84 0 150 300 600 900 Feet 0 50 100 200 300 Meters Map Scale: 1:4,080 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Carver County, Minnesota Survey Area Data: Version 11, Sep 16, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 16, 2012—Apr 6, 2012 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Carver County, Minnesota Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/5/2015 Page 2 of 3 Map Unit Legend Carver County, Minnesota (MN019) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CW Cordova-Webster complex 2.0 2.4% GL Glencoe clay loam 0.4 0.5% HM Hamel loam 13.5 15.8% KB Kilkenny-Lester loams, 2 to 6 percent slopes 7.3 8.5% KB2 Lester-Kilkenny loams, 2 to 6 percent slopes, eroded 10.8 12.7% KC2 Lester-Kilkenny loams, 6 to 12 percent slopes, eroded 22.1 25.9% KD2 Lester-Kilkenny loams, 12 to 18 percent slopes, eroded 10.1 11.8% LD2 Lester loam, 10 to 16 percent slopes, moderately eroded 0.7 0.9% MK Houghton and Muskego soils 10.0 11.7% ND3 Lester-Kilkenny clay loams, 12 to 18 percent slopes, severely eroded 4.3 5.0% NE3 Lester-Kilkenny clay loams, 18 to 25 percent slopes, severely eroded 1.2 1.4% PM Klossner muck, 0 to 1 percent slopes 1.1 1.3% TB Terril loam, 0 to 6 percent slopes 2.0 2.3% Totals for Area of Interest 85.4 100.0% Soil Map—Carver County, Minnesota Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/5/2015 Page 3 of 3 Design Maps Summary Report file:///P|/675 Projects/GEO/2015/0675598 Children's Learning Adventure Chanhassen GEO/Design Maps Summary Report.html[2/10/2015 8:44:27 AM] Report Title Building Code Reference Document Site Coordinates Site Soil Classification Occupancy Category Design Maps Summary Report PrintView Detailed ReportUser–Specified Input Children's Learning Adventure - Chanhassen, MN Thu February 5, 2015 21:38:48 UTC 2006/2009 International Building Code (which utilizes USGS hazard data available in 2002) 44.86398°N, 93.5806°W Site Class D – “Stiff Soil” I/II/III USGS–Provided Output SS =0.063 g SMS =0.101 g SDS =0.067 g S1 =0.027 g SM1 =0.065 g SD1 =0.044 g Although this information is a product of the U.S. Geological Survey, we provide no warranty, expressed or implied, as to the accuracy of the data contained therein. This tool is not a substitute for technical subject-matter knowledge.