H-2d - Pickle Ball Courts Update CITY OF MEMORANDUM
CHANHASSEN TO: Todd Hoffman, Park and Recreation Director
7700 Market Boulevard
PO Box 147 FROM: Adam Beers, Park Supenntendent
Chanhassen,MN 55317
DATE: April 28, 2015
Administration
Phone 952 2271100 SUBJ: Recreation Center Pickle Ball Courts Update
Fax 952 2271110
Building Inspections Construction of the pickle ball courts started late last fall, with Plehal Blacktopping
Phone 952 2271180 being selected to perform the work at this site The existing court surface was
Fax 952 2271190 reclaimed, re-graded and compacted
Engineering
Phone 952 2271160 - Two lifts of asphalt were applied
Fax 952 2271170 - Two inches of base course.
- One inch of wear course
Finance
Phone 952 2271140 This spring Town and Country Fence installed the divider posts and fence that will
Fax 952 2271110
separate the six courts.
Park&Recreation
Phone 952 2271120 - The terminal posts are three inches in diameter with the line posts being
Fax 952 2271110 two and one-half inches—all posts were driven to a depth of four feet
City staff will be responsible for reinstalling fabnc on the surrounding 10-
Recreation Center foot penmeter fence
2310 Coulter Boulevard
Phone 952 2271400
Fax 952 2271404 Dermco-LaVine is scheduled to complete court construction starting in mid-May
once the overnight temperatures are above 50 degrees Final construction will
Planning& include
Natural Resources
Phone 952 2271130
Fax 952 2271110 - Final clean and pressure wash of surface.
- Patch any low areas.
Public Works - Apply a four-coat color system. Two coats of black acrylic/asphalt blend
7901 Park Place with filler and two coats of acrylic color with fill (kitchen will be alternate
Phone 952 2271300 color)
Fax 952 2271310 - Layout and stripe six pickle ball courts.
Senior Center
Phone 952 2271125
Fax 952 2271110
Website
www ci chanhassen mn us
g\pw\adam\pickle ball courts update.doc
Chanhassen is a Community for Life-Providing for Today and Planning for Tomorrow
N
6 •
r1
.+s
r
•
ice
\ -,____
g\pw\adarn\pickle ball courts update.doc