D-4a. Approval of Resolution Amending the Metes and Bounds Subdivision �� ��. t�
F _._��_.._
MEMORANDUM
''` TO: Todd Gerhardt City Manager
Orl� ' �
���IIiI�,���.���„�;
�li��l! FROM: Sharmeen AI-Jaff, Senior Planner
7700 Markel Boulevard
Po Box 147 DATE: June 8, 2015
Chani�assen,MN 55317
SUBJECT: Approve Resolution Amendulg Conditions of Approval to Moline's
Administratiun Addition Metes and Bounds Subdivision—Lot 3, Block 2, Moline's
Phone:95222�.i��oo Addition—Plaiming Case#2014-30
Fax:952227.1110
Building Inspections pROPOSED MOTION
Phone:952.227.1180
Fax:952.227.11go "The Chanhassen City Council approves a resolution ainending the conditions of
an approval to Moline's Addition Metes and Bounds Subdivision— Lot 3, Block 2,
Engineering Moline's Addition as shown u1 the amended staff report dated J�une 8, 2015, and
Phone:952.2?_71160
Fax��52.2��t��o adopts the attached Findings of Fact and Decision."
E=inanc� City Council approval requires a majority vote of City Council present.
Phone�952 221.1140
1=ax:952 2271110
On November 24, 2014 the Chanhassen City Council approved a metes and bounds
€��r�pf�f�ecrea�i��� subdivision dividing Lot 3, Block l, Moline's Addition into Parcels 1 and 2, Block 1,
Phone��52.22���2o subject to conditions. One of the conditions of appi-oval was that the applicant was
Fax:952.227.1��o required to install the sewei-and water seivice to the vacant property�Parcel 2) and
Recreation Center submit a $10,000 escrow to ensure that the work was complete and the street properly
2310 Coulter Boulevard i•estored. Subsequent to the November 24, 2014 �neeting, the applicant requested that
Phon���52.22�.140o this condition be reinoved so that the person(s)purchasing and building on the
�ax����2.22��404 property would be responsible for the installation of the sewer and water seivice,
iucluding the necessaty road repair to West 65t" Street. The staff report has been
°���°°1°��` edited and conditions of a roval amended to reflect this chan e All new
Natural Resouree� pp g •
Phone:952.227.��3o infoi�nation will appear in bold.
Fax:952.227.1110
ATTACHMENT
Public Works
7901 Park Place 1. Resolution.
Phone:95222z13oo 2. Staff Repar-t dated June 8, 2015 (bold/strikethrough format).
Fax 952.22713�10
Senior Center
Ph01lB�952,227 I 125 g:Ap1an�2014 planning cases�2014-30 2061 west 65th street metes&bounds'a�evised ezecuti�-e summaiy.doc
Fax�95222711�10
Website
�vww.cl.chanhassen.mn.us
Chanhassen is a Community for Life- Pro�ii�iing for�loday and Nlanning for�lomorrow
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: June 8, 2015 RESOLUTION NO: 2015-
MOTION BY: SECONDED BY:
A RESOLUTION APPROVING AMENDMENTS TO CONDITIONS OF
APPROVAL OF A METES AND BOUNDS SUBDIVISION CREATING TWO PARCELS
LOCATED AT 2061 WEST 65T'' STREET
WHEREAS, John J. and Kimberly E. Corey have i•equested a subdivision of the property
into two lots of 15,165 square feet and 15,159 square feet; and
WHEREAS, the Chanhassen City Council held a public heai-ing on Noveinber 24, 2014,
and found the plan coilsistent with the Chanhassen Comprehensive Plan and Zoning ordinance
and approved Resolution No. 2014-78; and
WHEREAS, one of the conditions of approval was that the applicant was required to
install the sewer and water service to the vacant property(Parcel 2) and submit a$10,000 escrow
to ensure that the work was complete and the street properly restored; and
WHEREAS, subsequent to the appi-oval, the applicant requested this condition be
removed so that the person(s)purchasing and building on the property would be responsible for
the installation of the sewer and watei- service, including the necessary road repair•to West 65��'
Street.
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
amends the conditions of approval to the metes and bounds subdivision for property located at
2061 West 65th Street (legally described as Lot 3, Block 2, Moline's Addition, Caiver County,
Minnesota) as follows: �
Building I�i
1. The existing structure on pi�oposed Parcel 2 must be provided with sanitaiy sewer connection
—permit required.
2. Proposed Parcel 1 must be provided with separate sewer and water seivices (permit required)
before a building peimit is issued.
1
En�ineei7ng
1. The City Attar•ney shall draft and the developer shall execute a "Grant of Permanent
Easement for Public Drainage and Utiliry Puiposes" document. This document shall be
recorded with the inetes and bounds subdivision.
2. A roadway, drainage and utility easeinent must be dedicated over the portion of the existing �
cul-de-sac within the property and 15 feet beyond the edge of the i-oad. This easeinent shall
be recar•ded with the metes and bounds subdivision.
3. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision)
plus $10/parcel.
4. Sewer and water hookup charges are due for*z��� Parcel 1, a portion of which shall be
collected befoi-e the metes and bounds subdivision is recol•ded:
Watei-: 1 uiut x $1,957/unit = $1,957
Sewer: 1 unit x $677/unit= $677
The remainder of the sewer and water hookup charges for Parcel 1 shall be collected with the
building pet7nit.
5. If the final subdivision submittals are received after 2015, all fees shall be recalculated based
on the rates in effect at that time.
6. A plumbing pe1-mit is required for flle private stoi�n sewer; the plumbing inspector will
inspect the connection to the city storm sewei•manhole.
7. On Parcel l, the proposed hoine style as required by City Code Section 18-40 (4) 2 (iii) is a
slab-on-grade home. Based on Interstate Geotechnical Engineering's observations, the
groundwater elevation is 1.8 feet below the ground elevation of the soil boring. The
developer must ve1•ify the surface elevation of the boring location to detennine the elevation
of the ��oundwatel; the lowest floor must be ininimum three feet above that elevation per
City Code Section 18-40 (4) 2 (i).
8. Before a building permit is issued for Parcel 1, the water service and sanitary sewer service
must be installed. The sanitary sewer is within West 65t1i Street, therefore installation of a
sanitary sewer service will requve cutting into and patchulg the City street. A Work in Right
of Way pennit must be obtained befor•e installing the water and sanitaiy sewer service; an
escrow for street repair to ensure that the street is restored shall be pai�t of the pennit
requireinents. The estimated cost of the street repair was $10,000 in 2014. The escrow
amount shall be adjusted according to the construction costs at the time the Work in Right of
Way pennit is issued
9. Approval of the subdivision is contingent upon the applicant or property owner entering into
a development contract with the City.
2
10. Third Parties. Thud parties shall have no recourse against the City under this Contract. The
City is not a guarantor of the Developer's obligations under this Contract. The City shall have
no responsibility or liability to lot ptuchasers or otheis for the City's failure to enforce this
Contract or for allowing deviations fi�om it.
11. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this
Contract is for any reason held invalid, such decision shall not affect the validity of the
remaining poi�tion of this Contract.
12. Waivel•s/Ainendinents. The action oi•inaction of the City sha11 not constitute a waiver or
a�nendment to the provisions of this Conn�act. To be binding, amendments or waivers shall be
in writing, signed by the parties and approved by written resolution of the City Council. The
City's failure to promptly take legal action to enforce this Contract shall not be a waiver or
release.
13. Release. This Contract shall run with the land and may be recorded against the title to the
propei�ty. After the Developer has coinpleted the work required of it under this Contract, at the
Developer's request the City Manager will issue a Cei-tificate of Coinpliance. Prior to the
issuance of such a cei�tificate, individual lot owners may make as written t•equest for a certificate
applicable to an individuallot allowing a minimum of ten(10) days for processing.
14. Remedies. Each right,power or i-einedy herein conferred upon the City is cumulative a�ld in
addition to every other right, power or remedy, expressed or implied, now or hereafter arising,
available to City, at law or in equity, or under any other ag1•eement, and each and eveiy right, �',
power and remedy he1•ein set forth or otherwise so existing may be exercised fi•oin tilne to tiine �
as often and in such order as may be deemed expedient by the City and shall not be a waiver of �
the i•ight to exercise at any time thereafter any other right, power or reinedy.
15. Assi iig abili�. The Developer•may not assign this Contract without the written peimission of
the City Council. The Developer's obligation hereunder shall continue in full force and effect
even if the Developer sells one ar both lots.
16. Soil Conditions. The Developer acknowledges that the City makes no representations ar
wat�•anties as to the condition of the soils on the property or its fitness foi•construction of the
improveinents or any other purpose for which the Developer may make use of such pi•opei�ty.
The Developer further agrees that it will indeinnify, defend, and hold hai7nless the City, its
governing body membeis, officers, and employees from any claims or actions arising out of the
presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or
pollutants were caused to be there by the City.
17. Soil Coi��ection. The property owner or his/her contractor shall be responsible for soil
coi7�ection work on the propei�ty. The City makes no representation to the Developer concet7ling
the nature of suitability of soils nor the cost of con�ecting any unsuitable soil conditions which
inay exist. On lots which have no fill inaterial a soils report from a qualified soils engineer is
not required unless the City's building inspection department deterinines from obseivation that
there may be a soils problem. Oillots with fill inaterial that have been mass graded as part of a
inulti-lot grading project, a satisfactoiy soils repoi-� from a qualified soils engineer shall be
provided before the City issues a building pennit foi-the lot. On lots with fill material that have
3
been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided
before the City inspects the foundation for a building on the lot.
18. As-Built Lot Sutvevs. An as-built lot sui-vey will be required on a111ots prior to the Certificate
of Occupancy being issued. The as-built lot suivey inust be prepared, signed, and dated by a
Registered Land Surveyor. Sod and the bituminous driveways inust be installed before the as-
built suivey is completed. If the weather conditions at the time of the as-built ai-e not conducive
to paving the driveway and/or installing sod, a teinporaiy Certificate of Occupancy may be
issued and the as-built escrow withheld until all work is complete.
Environmental Resource Specialist
1. Tree protection fencing will be required around any preserved trees. It shall be iiistalled prior
to gY�ading and located at the di-ip lines of the trees.
2. Landscaping shall be installed in accordance with City Code Section 18-61. U�nless otherwise
appr•oved by the City, trees not listed in the City's approved tree list ar•e prohibited. The
ininilnum tree size shall be two and one-half(2�/z)inches calipel•, either bare root in season, or
balled and burlapped. The trees may not be planted in the boulevai•d (area between curb and
property line). The lot purchaser shall sod the bouleva�-d area and all drainage ways on each lot
utilizing a mulimum of four(4)inches of topsoil as a base. Seed or sod shall also be placed on
all disturbed areas of the lot. If these improvements are not in place at the tune a certificate of
occupancy is requested, a finaslcial guarantee of$750.00 in the foi7n of cash or letter of credit
shall be provided to the City. These coilditions inust then be complied with within two (2)
inonths after the certificate of occupancy issued, except that if the certificate of occupancy is
issued between October 1 through May 1 these conditions must be complied with by the
following July 1 st. Upon expiration of the tune period, inspections will be conducted by City
staff to verify satisfactoiy coznpletion of all conditions. City staff will conduct inspections of
incomplete items with a $50.00 inspection fee deducted fi•om the escrow fund for each
inspection. After satisfactory inspection, the fulancial guarantee shall be returned. If the
requuements are not satisfied, the City may use the security to satisfy the requirements. The
City may also use the escrowed funds foi•maintenance of erosion control pursuant to City Code
Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These
requireinents suppleinent,but do not replace, specific landscaping conditions that may have
been required by the City Council for pi-oject appi-oval.
Parks
1. Pai•k fees of$5,800.00 shall be paid for each new sin�le-family lot prior to the recording of
the property deed.
Plamling
1. Deeds shall submitted to the city for review and recorded at Carver County for the two
parcels.
4
n om leted as
2. A building pei7nit shall not be issued unless all soil corrections have bee c p
indicated in the attached exlubits titled "Subsurface Soil Investigation" dated October 25,
2014 and Noveinber 13, 2014.
3. Changes in Official Controls. For two (2) years fiom the date of this Contract, no amendments
to the City's Coinprehensive Plan, except an amendment placing the plat in the current urban
sei-vice area, or official controls shall apply to or affect the use, development density, lot size,
lot layout oi-dedications of the approved plat unless i-equired by state oi-federal law or ag�eed to
in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract
to the contrary, to the full extent pei7nitted by state law the City may require compliance wifll
any ainendments to the City's Comprehensive Plan, official cont��ols,plattulg or dedication
requirements enacted aftei•the date of tlus Contract.
4. Iron Monuments. Before the secui-ity for the completion of utilities is released, all monuments
must be con-ectly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The
Developer's suiveyor shall submit a written notice to the City certifying that the inonuments
have been installed.
5. Variances. By approving the plat, the Developer represeilts that all lots in the plat are buildable
without the need for variances from the City's ordinances.
6. Compliance with Laws, Ordinances, and Re�ulations. In the development of the plat the
Developer shall comply with all laws, ordinances, and regulations of the following authorities:
a) City of Chanhassen;
b) State of Minnesota,its agencies, depas-tinents and cormnissions;
c) United States Ai711y Coips of Engineers;
d) Watershed Disn-ict(s);
e) Metropolitan Governnlent, its agencies, departinents and commissions.
7. Proof of Title. Upon request, the Developei-sha11 fui7iish the City with evidence satisfactoiy to
the City that it has the authority of the fee owners and contract for deed pui-chasers to enter into
this Development Conti-act.
Water Resource Coordinator
1. Total surface water inanagelnent fees due prior to recording the property deed are $1,914.55.
2. Erosion Control During Construction of a Dwelling or Other Building. Before a building
pet7nit is issued for consn-uction of a dwelling or other building on a lot, a $500.00 cash escrow
or letter of ci-edit per lot shall also be furnished to the City to guasantee compliance with City
Code § 7-22.
5
-
Passed and adopted by the Chanhassen City Council this 811i day of June, 2015.
ATTEST:
Todd Gerhardt, City Clerk/Manager Denny Laufenburger, Mayor '
YES NO ABSENT '
6
MEMORANDUM '
C��V o�'� TO: Todd Gerhardt, City Manager
�
CHANHAS�����'� �
FROM: Shanneen Al-Jaff Senior Planner
7700 Markef Boulevard
�0 aox 14� DATE. T,fe�7L�en'z4�, �^ June 8, 2015
Cnanhassen.N1N 553�17
SUBJ: Moline's Addition Metes and Bounds Subdivision
Lot 3, Block 2, Moline's Addition-Planning Case#2014-30
Administration
Phone:952.221.1100
Fax 952.227.1110 PROPOSED MOTION
Building Inspections "The Chai�hassen City Council approves a metes and bounds subdivision creating
Phone 952227.118o two lots subject to the conditions of the staff report and adopts the attached
Fax 952.227.1190
Findings of Fact and Decision."
Engineering
Phone�952227��6o City Council approval requires a majority vote of City Council present.
Fax:952227.1170
Finance EXECUTIVE SUMMARY , w „�, � ,��� .>t� , , , ,
S �' ' , � �
�
Phone,952.227,1140 '`''�► � _-;�''°�` '��`:` � `�*y �' + �•^,��� �'' r
i y c �-,, �. .k��.� � �
The applicant is requesting metes ��w� �a' � ��j�;�r� *.�� ���� �� .�,� '�'`
Fax:952 2�I.ii10 – � `
>� '� � � �� �'� .,:�'+t��,i} '' ,��,hn�kr. s� ����.
and bounds subdivision approval = ;,�R -� �: R ,�. ,.; - a'�,�`� �►�� � "
Park&fiecr�e�tior� to divide 30 324 s uare feet into �� � � � ' � ��������� '� ��` � TM "� ��
Phone:95�?71�1120 � q ����� ����° '��',3� ,"� � -� '�� '�!� �a�� o��.
two lots. Cit council ma � � �� �E � �'��
ry '-�
���� : w, ' �,� _ �' '�
Y Y ��+� �� ���- .�._ �
�-aX 9�����,,�o � . - � � � _ — � �_� a �,
approve a metes and bounds �-�� .�,,��'' ;���w� ss,„sr„;� ���
� r �-� . n
' ��`'� '"�i ';:.� r, �._ F �.,� �';,,���.� �i��E
Ftecree�tion eenter subdivision of a lot into two lots � � �t�� � ,
��`�� � ,�'
inside the urban services area if � `� �� ��� ._- � ,. � _�-�
,
2310 Coulter Boulevarci �, �` '� ,€��`�� ��� � '�! ��� ���,"
.,� d + ,�,. r4�A.-i« WY�,� ;_,•�y ry a9'���� W�
Phone�952.227.140o both resulting lots meet the �,,Y p k���, .,.,,, � �`� � �+ � ... � � ���� .
1 ax:952.?2/.1��,04 . . . ��,.�+. > 1 , .�� f'�"—�/=*r j,� �.: ''s► �,..
min�nuin requireinents of the -�,�,, �, _�, � _���f + � .a _ , �_ � ;;
, "t'�'�► � � �
zoning oi•dinance and abut an f_ y �"�"*��.^,��� t � '°�' �"'� "" �:'
py 9 p i` ':. � LHLSTNIYlD! r
��I�11�1����0I �� � t9l� i t -. � N,l; 4.+�
existin ublic sh�eet ursuant to �
IVatural Resa�ie�,c� g p � p �'�' '�'�f� �� � . ,.... �',�,��^�►a' • , A�
Phone:952.2v i�3o Section 18-37 (b) of the .,�'���,�w' ' f';,��•"'ti; � ,� � �'� �,� t,„", ��"'�I��.'''
Fax:952227 i i i0 Chanhassen City Code. '�' !-���•-9-�- - �T�'����..��,`
� a:, , , , - ,,R,, 's.
�a ��;, '� .. �. —
Public worlcs PROPOSAL SUMMARY
7901 Park Place
Phone 952.227.i�oo Request for a metes and bounds subdivision of 30,324 square feet (0.69 acres) into
Fax:952.2z71310 two (2) lots on property zoned Single-Fainily Residential (RSF) and legally described
Senior Centef� as Lot 3, Block 2, Moline's Addition (2061 West 65t�' Street).
Phone:952 22/1l�ti
Fax:952.227�rio Applicant: JMBC—James Brudos
14846 Timber Hills Road
website Miimetonka, MN 55345
www.ci.chanhassen.rnn�is (612) 855-4949
.Ir�a�l�rudosco�1�a11� w �n1ail.co�i1
Chanhassen is a Community for Life-Provldin�forloday and Planning foi�lomorrow
Todd Gerhardt
2061 West 65t�' Street Metes & Bounds Subdivision
, June 8,2015
Page 2 of 12
Owner: Jolui Corey
6409 Oxbow Bend
Chanhassen, MN 55317
(612) 221-8923 '�
Coreyone1994@gmail.com ,
The site contains a si�lgle-family home which is proposed to reinain. Access to the site is gained I
via West 65t1i Street. The site contains a low area along the southwest corner of the property. '��
There is a septic mound west of the existing single-family home that is proposed to be removed.
There are some inature trees on the site. The majoi•ity of the trees are proposed to remain
undisturbed.
,
.. � — — , �
�
, ,
• � West 65ih Strect
� � � , .
�'.:
° �
�
�
� ��,
�
_ _ � 13 1. t) (� � (��
�� ; '=�
.. . , .
Todd Gerhardt
2061 West 65th Street Metes & Bounds Subdivision
�'�^�,�ti, �n��June 8, 2015
Page 3 of 12
The applicant is proposing to subdivide the property and locate a single-family home on the
westerly portion of the site. The proposed subdivision meets city ordinance requirements and staff
is recointnending approval subject to the conditions of this staff report.
BACKGROUND
MOLINE'S ADDITIdN
�""^"""""""" 4JuU5T,1940 C4A�,liCLGOF0lrfli
.................. r�AtC I)i•:IIC_.:`.:Lp:iC' ':_'�:�CVC�.:
The Moline's Addition plat was filed with
Caiver County on December 29, 1969. The ,
existing home was built in 1981. No other `-�- _ ';"`° - �
records exist. , �� F � =
e
', . . ',, ..- ,�•�
APPLICABLE REGULATIONS G5TI1 9TRCCT
_ � �� �
Chapter 18, Subdivisions � � `� '��i� ' }�•� ��
Chapter 20,Article XII, "RSF" Single-Family - � . ' - '`���� ��
Residential Dish-ict �� �
LAND USE: Residential Low Density _,,,,,,,, .
(1.2-4.0 units per net acre) ;_-_-;� � � ..- •
�. �
, �L.J'y,{�._....
SUBDIVISION REVIEW
The applicant is requesting a
metes and bounds subdivision �:��`
creating two lots. The net � ; �" �� � �� �� � � �_ �i
density of the development is �� _ � � � I
z�T = �-,-c— -�t� �.
2.8 uiuts per acre. Both parcels � �� _ � --`-' '
� � : r-
f:• 6 D LE ��
�. � ,-1 .J7.., `• ' ,�+� 1 I
meet all the lot ai-ea, width and � �� ,- -; � �� ; ���> ;'
, �i :: � i � � I
depth requirements. r_� ��,�, � '�, . , . �.� �
., . i �
:: �_s,: �;� , �� _.__ � i '�,rx�,.� , �
, � �� c�,oez.� � � ► i
Parcel 2 which contains a �y°;'TR 'i' �- TF��3o ' +. � �
� ;;� ; BF,�,� i, � . �
single-family home, will have a " '' '` t °•-- , K �
.i
total hard surface coverage of ' ' `�� �;f-���s;--- '-y+ ;: � ;
Parcel �. Parcel �
24%. The city code allows up , j� , � � '„_, '
to 25%. The existing sh-ucture ;t ; ;, . °.,� + � , � 2, ,. �
meets all required setback �r--`'-'-'-' `-------____
�
. :�. ___
requn•ements. °
EASEMENTS
The developer proposes 10-foot fi•ont and rear yard and 5-foot side yard drainage and utility
easements on each 1ot, as shown on the plans. The City Attorney shall draft and the developer
shall execute a "Grant of Permanent Easement for Public Drainage and Utility Puiposes"
document. This document shall be recorded with the metes and bounds subdivision.
Todd Gerhardt
2061 West 65t�' Street Metes & Bounds Subdivision
��;�''n-o-��June 8, 2015
Page4of12
A i•oadway, drainage and utility easement must be dedicated over the portion of the existing cul-
de-sac within the property and 15 feet beyond the edge of the road.
Pi-ior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision)plus
$10/parcel.
STREETS I
The proposed subdivision is adjacent to West 65�' Street, a 25-foot wide public street within a
60-foot wide right of way without curb and gutter. Tlus st1•eet was constructed in 1979 and was
overlaid in 2013. The cui��ent standard foi-new streets within Chanhassen is 31 feet wide with
curb and gutter. Staff does not recommend that the developer install curb and gutter along the
property frontage since the remainder of the roadway would remain a rural section.
UTILITIES
There is one sewer and one water service within West 65�' Street that provides service to the
existing hoine. T�, a_._'.,N_�N..,r.,.,_., *., ..�„+w" �.._.. .,_.._. ..�. .._o*� *�,o _.__�*;�n',^,ro.
.. . , . .. . .__ ____a�
> >
,,.�;�;�,,, �4'+or ., a f�oo�o �1,.,.,, .. ,..lo
> > '
��
Currently there is no water sel•vice or sanitary sewer service to Parcel 1. The proposed
locations of the services are shown on the utility plan as a reference; the developer will not
be installing the water service or the sanitary sewer service.
Before a building permit is issued for Parcel 1, the water service and sanitaiy sewer service
must be installed. The sanitary sewer is within West 65t�' Street, therefore, installation of a
sanitary sewer service will require cutting into and patching the city street. A Work in
Right of Way permit must be obtained before installing the water and sanitary sewer
service; an escrow for street repair to ensure that the street is restored shall be part of the
permit requii•ements. The estimated cost of the street repair was $10,000 in 2014. The
escrow amount shall be adjusted according to the construction costs at the time the Work
in Right of Way permit is issued.
Sewer and water hookup charges are due for the new lot, a portion of which shall be collected
befoi-e the metes and bounds subdivision is recorded:
Water: 1 unit x $-l�� $1,957/uiut=�C $1,957
Sewer: 1 unit x �4 $677/unit =�-FC4-$677
Todd Gerhardt
2061 West 65r�' Street Metes & Bounds Subdivision
"�r����� �ni SJune 8,2015
Page5of12
If the metes and bound subdivision is recorded after December 31, 2015, the partial sewer
and water hook-up rates in effect at that time shall be collected. ��,
The 1-emainder of the water and sewer hookup fees shall be paid with the building pei7nit at flle
rate in effect at that time.
GRADING & EROSION CONTROL
Sui-face water cui•rently drains from the back to the front of the property. The developer
proposes grading on Parcel 1; Parcel2 with the existing hoine will not be altered. The developer
will install a private storm sewer system on the Parcel 1 and grade the property so that surface
runoff will not leave the site. The proposed private stot-m sewer system will connect to the city
stoi�n sewer in front of Parcel 1. A pluinbing perinit is required for the private storm sewer; the
pluinbing inspector will inspect the connection to the city stonn sewer inanhole.
There is evidence of high groundwater conditions in the area:
1. Infiltration into a sanitary sewer manhole in the area. The infiltration was abated with the
2013 str•eet project.
2. Site investigation perfor7ned in 1980 by Hakanson Andei•son Associates, Inc. (attached)
indicated mottled soils on the property 18 inches below the surface. Mottled soils ai-e
indicative of periodic soil saturation.
3. Site investigation perfoimed in 1981 by Subter�•anean Engineel•ing, Inc. (attached)
u7dicating presence of water during borehole drilling, rising to 2.6 feet below the ground
surface.
4. Site investigation perfoi-�ned by Interstate Geotechnical Engineering, Inc on October 25,
2014.
On Parcel 1 the proposed home style as required by Gity Code Section 18-40 (4) 2 (iii) is a slab-
on-g7•ade home. Based on Interstate Geotechnical Engineering's observations, the groundwater
elevation is 1.8 feet below the ground elevation of the soil boring. The developer must verify the
surface elevation of the boring location to determine the elevation of the gi�oundwater; the lowest
flooi•must be miiumum three feet above that elevation per City Code Section 18-40 (4) 2 (i).
Interstate Geotechnical Engineerulg recommendations include removal of some of the material
found on the site and placement of controlled fi11. On Noveinber 13, 2014 Interstate
Geotechnical Engineering provided a follow-up letter with a professional opinion that the
gt•oundwater elevation will retur�l to its original level after the soil con•ections are completed on
the lot.
Todd Gerhardt
2061 West 65th Street Metes & Bounds Subdivision
'`���� �� �n�SJune 8,2015
Page6of12
PARKS AND RECREATION
The proposed subdivision is located within an area that is in the municipal park seivice
boundaries of Pheasant Hill Pai-k and the Minnetonka Middle School West Campus. The
propei�ty has access to the city's comprehensive ti•ail system located on Galpin Bouleval•d. In
lieu of parkland dedication or trail construction, the development shall pay full park fees in foi•ce
for the one new lot at the time of subdivision appi•oval. Pa��ks fees foi-2014 are $5,800.00 per
sulgle-family lot.
LANDSCAPING AND TREE PRESERVATION
The applicant did not submit tree canopy covei•age and preservation calculations. Estimated
calculations are as follows: ���
Total upland area(excluding wetlands).....................30,324 SF
Baseline canopy coverage..........................................26% or 8,160 SF
Minimum canopy coverage allowed..........................30% or 9,097 SF
Proposed tree preservation.........................................25% or 7,720 SF
The applicant does not meet minimum canopy coverage allowed; therefore, the difference
between the baseline and proposed tree preservation is multiplied by 1.2 to calculate the required
replacement plantings:
Difference in canopy coverage ..................................1,377 SF
Multiplier...................................................................1.2
Total replacement.......................................................1,652 SF
Total number of trees to be planted ...........................1 tree
The total number of trees requii•ed for the developinent is one. There are no bufferyard
requu•ements for this subdivision.
MISCELLANEOUS
A final gading plan and soils report must be submitted to the Inspections Division before building
pet7nits can be issued. Retaining walls over fom•feet high require a pet7nit and must be designed by
a professional engineer. Each lot must be provided with separate sewer and water seivices.
COMPLIANCE TABLE
Area (sq.ft.) Width (ft.) Depth (ft.) Setbacks
Code 15,000 90 125 Front/Rear 30' Sides 10'
Parcell 15,165 97.50 155.5 30/30/10/10
Parcel2 15,159 97.50 155.5 30/30/10/10
Total 30,324
Todd Gerhardt
2061 West 65�' Sh•eet Metes & Bounds Subdivision
��r,,;, ��, �ni cJune 8,2015
Page 7 of 12
RECOMMENDATION
Staffrecommends City Council approve the subdivision ci•eating two lots subject to the
following conditions and adoption of the attached Findings of Fact and Decision.
Buildin�
1. The existing structure on proposed Parcel2 must be provided with sanitaiy sewer connection
—permit required.
2. ��€�i€� Proposed Parcel 1 must be provided with separate sewer and water seivices
(permit required) before a building permit is issued.
�ce„��Aa �,,a „�.,,,,,a,,,,�e-������re�
En ing eering
L The City Attorney shall draft and the developer shall eaecute a"Grant of Permanent
Easement for Public Drainage and Utility Purposes" document. This document shall be
recorded with the metes and bounds subdivision.
2. A roadway, drainage and utility easement must be dedicated over the portion of the existing
cul-de-sac within the property and 15 feet beyond the edge of the road. This easement shall
be recorded with the metes and bounds subdivision.
3. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision)
plus $10/parcel.
. ,
,.,a „ „a;�;,,,, „�+o,.„ o �.00�o ��,,,.., ,. ,,.io
5. Sewer and watei-hookup charges are due for*�� Pareel 1, a portion of which shall be
collected before the metes and bounds subdivision is recorded:
Water: 1 unit x $��€� $1,957/unit=�C� $1,957
Sewer: 1 unit x $-�4 $677/unit=��4-$677
The remainder of the sewer and water hookup charges for Parcel 1 shall be collected
with the building permit.
6. If the final subdivision submittals are received after�9-1�2015, all fees shall be recalculated
based on the rates in effect at that time.
Todd Gerhardt
2061 West 65t�' Street Metes & Bounds Subdivision
�a���June S, 2015
Page8of12
0
1�,,;1,7; ;� .,���,o �+o o�'��f �� �1,�� r;,�,A
8. A plumbing pei�rnit is required for the private storm sewer; the plumbing inspectoi•will
inspect flle coimection to the city stoi�n sewer manhole.
9. On Parcel 1, the proposed home style as required by City Code Section 18-40 (4) 2 (iii) is a
slab-on-grade home. Based on Interstate Geotechnical Engineering's observations, the
groundwater elevation is 1.8 feet below the ground elevation of the soil bar•ing. The
developer inust verify the surface elevation of the boring location to deter�nine the elevation
of the groundwater; the lowest floor must be minimum three feet above that elevation pei•
City Code Section 18-40 (4) 2 (i).
10. Before a building permit is issued for Parcel l, the water service and sanitary sewer
service must be installed. The sanitary sewer is within West 65t�' Street, therefore
installation of a sanitary sewer service will require cutting into and patching the City
street. A Work in Right of Wa,y permit must be obtained before installing the water
and sanitar,y sewer service; an escrow for street repair to ensure that the street is
restored shall be part of the permit requirements. The estimated cost of the street
repair was $10,000 in 2014. The escrow amount shall be adjusted according to the
construction costs at the time the Work in Right of Way permit is issued
11. Approval of the subdivision is contingent upon the applicant or property owner
entering into a development contract with the City. I
12. Third Parties. Third parties shall have no recourse against the City under this Contract. �I
Tbe City is not a guarantor of the Developer's obligations under this Contract. The City I
shall have no responsibility or liability to lot purchasers or others for the City's failure to I
enforce this Contract or for allowing deviations from it. ''
13. Severability. If any portion, section, subsection, sentence, clause,paragraph, or phrase of
this Contract is for any reason held invalid, such decision shall not affect the validity of the
remaining portion of this Contract.
14. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or
amendment to the provisions of this Contract. To be binding, amendments or waivers
shall be in writing, signed by the parties and approved by written resolution of the City
Council. The City's failure to promptl,y take legal action to enforce this Contract shall not
be a waiver or release.
15. Release. This Contract shall run with the land and may be recorded against the title to the
property. After the Developer has completed the work required of it under this Contract,
at the Developer's request the City Manager will issue a Certificate of Compliance. Prior
to the issuance of such a certificate, individual lot owners may make as written request for
a certificate applicable to an individual lot allowing a nrinimum of ten (10) days for
processing.
Todd Gerhardt
2061 West 65t�' Street Metes & Bounds Subdivision
�^;�''��June 8,2015
Page9of12
16. Remedies. Each right,power or remedy herein conferred upon the City is cumulative and
in addition to every other right, power or remedy, expressed or implied,now or hereafter
arising, available to City, at law or in equity, or under an,y other agreement, and each and
every right,power and remedy herein set forth or otherwise so existing may be exercised
from time to time as often and in such order as may be deemed expedient by the City and
shall not be a waivei• of the right to exercise at any time thereafter any other right, power
or remedy.
17. Assignability. The Developer ma,y not assign this Contract without the written permission
of the City Council. The Developer's obligation hereunder shall continue in full force and
effect even if the Developer sells one or both lots.
18. Soil Conditions. The Developer acknowledges that the City makes no representations or
warranties as to the condition of the soils on the property or its fitness for construction of
the improvements or any other purpose for which the Developer may make use of such
property. The Developei•further agrees that it will indemnify,defend, and hold harmless '
the City, its governing body members, officers, and employees from any claims or actions ;
arising out of the presence,if any, of hazardous wastes or pollutants on the property, I
unless hazardous wastes or pollutants were caused to be there by the City.
19. Soil Correction. The property, owner or his/her contractor shall be responsible for soil
correction work on the property. The City makes no representation to the Developer
concerning the nature of suitabilit,y of soils nor the cost of correcting any unsuitable soil
conditions which may exist. On lots which have no fill material a soils report from a
qualified soils engineer is not required unless the City's building inspection department
determines from observation that there may be a soils problem. On lots with fill material
that have been mass graded as part of a multi-lot grading project, a satisfactory soils
report from a qualified soils engineer shall be provided before the City issues a building
permit for the lot. On lots with fill material that have been custom graded, a satisfactory
soils report from a qualified soils engineer shall be provided before the City inspects the
foundation for a building on the lot.
20. As-Built Lot Surveys. An as-built lot survey will be required on all lots prior to the
Certificate of Occupancy being issued. The as-built lot surve,y must be prepared, signed,
and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be
installed before the as-built survey is completed. If the weather conditions at the time of
the as-built are not conducive to paving the driveway andlor installing sod, a temporary
Certificate of Occupancy may be issued and the as-built escrow withheld until all work is
complete.
Environmental Resource Specialist
1. Tree protection fencing will be required around any preserved trees. It shall be installed prior
to grading and located at the drip lines of the trees.
Todd Gerhardt
2061 West 65t�' Street Metes & Bounds Subdivision
'`�z'�z'z9-13June 8,2015
Page 10 of 12
� n i , a � �, �,.00 ri.,,,+oa ;,, ��,o �„r. . ,,,.,a
3. Landscaping shall be installed in accordance with City Code Section 18-61. Unless �
otherwise approved by the City,trees not listed in the City's approved tree list are '
prohibited. The minimum tree size shall be two and one-half(2'h) inches caliper, either
bare root in season, or balled and burlapped. The trees may not be planted in the
boulevard (area beriveen curb and property line). The lot purchaser shall sod the
boulevard area and all drainage ways on each lot utilizing a minimum of four(4) inches of
topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these
improvements are not in place at the time a certificate of occupancy is requested, a
financial guarantee of$750.00 in the form of cash or letter of credit shall be provided to
the City. These condidons must then be complied with within two (2) months after the
certificate of occupancy issued, except that if the certi�cate of occupancy is issued between
October 1 through May 1 these conditions must be complied with by the following July
lst. Upon expiration of the time period, inspections will be conducted by City staff to
vei•ify satisfactory completion of all conditions. City staff will conduct inspections of
incomplete items with a$50.00 inspection fee deducted from the escrow fund for each
inspection. After satisfactory inspection, the financial guarantee shall be returned. If the
requirements are not satisfied,the City may use the security to satisfy the requirements.
The City may also use the escrowed funds for maintenance of erosion control pursuant to
City Code Section 7-22 or to satisf,y any other requirements of this Contract or of City
ordinances. These requirements supplement, but do not replace, speci�c landscaping
conditions that may have been required b,y the City Council for project approval.
Parks
1. Park fees of$5,800.00 shall be paid for each new single-family lot prior to the recording of
the propei�ty deed.
Plannin�
1. Deeds shall subinitted to the city for review and recorded at Caiver County for the two
parcels.
2. A building permit shall not be issued unless all soil corrections have been completed as
indicated in the attached exhibits titled "Subsurface Soil Investigation" dated October 25,
2014 and November 13, 2014.
3. Changes in Official Controls. For two (2) years from the date of this Contract,no
amendments to the City's Comprehensive Plan, except an amendment placing the plat in
the current urban service area, or official controls shall apply to or affect the use,
development density,lot size,lot layout or dedications of the approved plat unless
required b,y state or federal law or agreed to in writing by the City and the Developer.
Thereafter,notwithstanding anything in this Contract to the contrary, to the full extent
permitted by state law the City may require compliance with any amendments to the
Todd Gerhardt
2061 West 65t1i Street Metes & Bounds Subdivision
�a,,., �ti �ni cJune 8, 2015
Page 11 of 12
City's Comprehensive Plan, official conti•ols,platting or dedication requirements enacted
after the date of this Contract.
4. Iron Monuments. Before the security for the completion of utilities is released, all
monuments must be correctl,y placed in the ground in accordance with Minn. Stat. §
505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City
certifying that the monuments have been installed.
5. Variances. By approving the plat, the Developer represents that all lots in the plat are
buildable without the need for variances from the City's ordinances.
6. Compliance with Laws,Ordinances, and Re�ulations. In the development of the plat the
Developer shall comply with all laws, ordinances, and regulations of the following
authorities:
a) City of Chanhassen;
b) State of Minnesota,its agencies, departments and commissions;
c) United States Army Corps of Engineers;
d) Watershed District(s);
e) Metropolitan Government,its agencies,departments and commissions.
7. Proof of Title. Upon request, the Developer shall furnish the City with evidence
satisfactor,y to the City that it has the authority of the fee owners and contract for deed
purchasers to enter into this Development Contract.
Water Resource Coordinator
1. Total surface water manageinent fees due prior to recoi•ding the property deed are $1,914.55.
2. Erosion Control During Construction of a Dwelling or Other Building. Before a building
permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash
escrow or letter of credit per lot shall also be furnished to the City to guarantee
compliance with City Code § 7-22.
ATTACHMENTS
1. Findings of Fact and Decision.
2. Resolution with attachments.
3. Development Review Application.
4. Reduced Copy Existing Conditions Survey.
5. Reduced Copy Lot Split Exhibit.
6. Reduced Copy Gi•ading & Erosion Control Plan.
7. Reduced Copy Utility Plan.
8. Public Hearing Notice and Mailing List.
Todd Gerhardt
2061 West 65�' Street Metes & Bounds Subdivision
��r�.,�ti �n�cJune 8,2015
Page12of12
9. Soil Percolation report from Hakanson Anderson Associates, Inc. dated September 2, 1980.
10. Soil Investigation r•eport froin Subterranean Engineering, Inc. dated June 29, 1981.
11. Subsurface Soil Investigation Letters from Patrick J. Hines, PE, President of Interstate
Geotechnical Engineering Inc. dated October 25, 2014 and November 13, 2014.
12. Coi7•espondence from:
a. Chris Jerdee dated September 26, 2014.
b. Terry Atherton dated October 27, 2014
c. Bill and Judy Ashenbach dated October 29, 2014
g:\p1an�2014 planning cases�2014-30 2061 west 65th street metes&bowids\staff�report3.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND DECISION
IN RE:
Application of John J. and Kimberly E. Corey foi• Subdivision approval.
On Novernber 24, 2014 the Chanhassen City Council met at it's regularly scheduled meeting to
consider the application of John J. and Kiinberly E. Corey for a inetes and bounds subdivision
approval to create two lots. The City Council conducted a public hearing on the proposed
subdivision preceded by published and mailed notice. The City Council heard testimony from all
interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The pr•operty is cui7•ently zoned Single-Family Residential Disti7ct, RSF.
2. The property is guided in the Land Use Plan for Residential Low Density uses.
3. The legal description of the propei-ty is: Lot 3, Block 2, Moline's Addition.
4. The Subdivision Ordinasice directs the Planning Commission to consider seven possible
adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding
thein are:
a. The proposed subdivision is consistent with the zoning ordinance;
b. The proposed subdivision is consistent with all applicable city, county and regional plans
including but not limited to the city's coznprehensive plan;
c. The physical charactei7stics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion a�ld siltation, susceptibility to flooding, and stoim watei-
drainage are suitable for the proposed development;
d. The proposed subdivision makes adequate provision for water supply, stor7n drainage,
sewage disposal, streets, erosion control and all other improvements required by this
subdivision ordinance;
e. The proposed subdivision will not cause enviromnental damage;
f. Tl1e proposed subdivision will not conflict with easements of record; and
g. The proposed subdivision is not premature. A subdivision is premature if any of the
following exists:
1
1) Lack of adequate storm water drainage.
2) Lack of adequate roads.
3) Lack of adequate sanitaiy sewer systems.
4) Lack of adequate off-site public improveinents or suppoi-� systems.
5. The planning report #2014-30 dated November 24, 2014, prepat•ed by Shar7neen Al-Jaff, et
al, is incorporated herein.
DECISION
The City Council approves the metes and bounds subdivision creating two lots.
ADOPTED by the Chanhassen City Council this 24t�' day of November, 2014.
CHANHASSEN CITY COUNCIL
BY:
Mayor
2
�._�
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: November 24, 2014 RESOLUTION NO: 2014-
MOTION BY: SECONDED BY:
A RESOLUTION APPROVING A METES AND BOUNDS SUBDIVISION
CREATING TWO PARCELS
AT 2061 WEST 65th STREET
WHEREAS, John J. and Kimberly E. Corey have requested a subdivision of the propei�ty
into two lots of 15,165 square feet and 15,159 square feet; and
WHEREAS, the Chanhassen City Council held a public hearing on Noveinber 24, 2014,
and found the plan consistent with the Chanhassen Coinprehensive P1an and Zoning or•dinance.
NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby
approves the metes and bounds subdivision of 2061 West 65'�d Street(Planning Case#2014-30)
for John J. and Kimbei-ly E. Corey for property legally described as Lot 3, Block 2, Moline's
Addition, Carver County, Minnesota, subject to the following conditions:
Buildin�
1. The existing structure on proposed Pai•cel 2 must be provided with satutary sewer connection
—permit required.
2. Properties must be provided with separate sewei•and water services.
3. Existing Subsurface Sewage Ti-eatment Site on proposed Parcel 1 must be properly �
discontinued and abandoned—permit required. I
En ineering I
1. The City Attorney shall draft and the developer shall execute a "Grant of Per•manent
Easement for Public Drainage and Utility Purposes" document. This document shall be
recorded with the metes and bounds subdivision.
2. A roadway, drainage and utility easement must be dedicated over the por�tion of the existing
cul-de-sac within the property and 15 feet beyond the edge of the road.
3. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision)
plus $10/parcel.
1
4. Prior to recording the subdivision a $10,000 security inust be provided to ensure that the
street is restored. The security can be released when the city detennines that the patch is in
good condition after one freeze-thaw cycle.
5. Sewer and water hookup charges are due for the new lot, a portion of which shall be collected
before the metes and bounds subdivision is recorded:
Water: 1 unit x $1,886/unit= $1,886
Sewer: 1 unit x $664/unit= $664
6. If the final subdivision submittals are received after 2014, all fees shall be recalculated based
on the rates in effect at that time.
7. The remaining 70% of the saiutaiy sewei• and water hookup fees inust be paid with the
building peimit at the rate in effect at that time.
8. A plumbing permit is required for the private storm sewer; the plumbing inspector will
inspect the comlection to the city stonn sewer manhole.
9. On Parcel 1, the proposed home style as required by City Code Section 18-40 (4) 2 (iii) is a
slab-on-grade home. Based on Interstate Geotechnical Engineering's observations, the
groundwater elevation is L8 feet below the ground elevation of the soil boring. The
developer must verify the surface elevation of the boring location to determine the elevation
of the groundwater; the lowest floor must be ininiinum three feet above that elevation per
City Code Section 18-40 (4) 2 (i).
Environinental Resource S�ecialist
1. Tree protection fencing will be i•equii-ed around any preserved trees. It shall be installed prior
to grading and located at the drip lines of the trees.
2. Parcel 1 is required to have one tree planted in the fi•ont yard. ��,
Parks
1. Park fees of$5,800.00 shall be paid for each new single-family lot prior to the recording of
the property deed.
Planning
1. Deeds shall submitted to the city for review aild recorded at Carver County for the two
parcels.
2. A building permit shall not be issued unless all soil corrections have been completed as
indicated in the attached exlubits titled "Subsurface Soil Investigation" dated October 25,
2014 and November 13, 2014.
2
Water Resource Coordinator
1. Total surface water management fees due prior to recording the proper�ty deed are$1,914.55.
Passed and adopted by the Chanhassen City Council this 24th day November of 2014. �
ATTEST: I
Todd Gerhardt, City Clerk/Manager Thomas A. Furlong, Mayor
YES NO ABSENT
3
, ' In state Geotechnica� Engineerinb, inc
� Patr�ck J Hines, PE
a i�� 1 oo�h st s
Cottage Grove MN 55016
(612)414-5770
25 October 2014 `-��'�`rt���;��iuHa�s����
�3�CEIVE�
;��� � � ��1�
Mr James Rudos
14846 Timber Hill Road ' - "`�s�������������iPj����;��:;j�
1Vlinnetonka MN 55345
Re: Subsurface Soil Investigation
Proposed Single Family Residence
W of 2061 W 65t" St, Chanhassen, Minn
In accordance with your authorization, I have completed the above referenced investigation
to determine site suitability for the proposed construction. A summary of my findings
together with boring logs and my conclusions and recommendations are presented in the
enclosed report.
I found, as you already have been briefed, more than usual problems with the site. Thez-e is
a total of 53/4' & 6'/4'at the locations of Boring 1 &Probe lA,respectively, of unsuitable soil
in the form of topsoil fill, general and varying fill, and buried original humus. Below at first
is a low sand content lean clay,generally dark in color, saturated,very soft to soft(w/depth).
It is "normally consolidated99 (consolidated enough to only support its own weight, not
additional weight of fill soils or structures above). The overburdening fill has not been
inplace long enough to force further consolidation. The moisture content test in this material
indicated nearly 42%, high for a lean clay. This material extends only from 53/4° to 7' in "
Boring 1, but from 6'/4`to 83/2` in Probe lA. The first 9" of this material in Probe lA is ve�y
soft and is a borderline marl material. All of the aforementioned materials are unsuitable for
structure support should be removed. I do acknowledge that excavators are often reluctant
to excavate further once the buried organic soil is cleared, so understandings should be
inplace at the time of gathering bids.
Base soil below at first is a lean clay, a little sandy, dark gray, saturated, rather soft to
medium. It has inclusions of a poorly graded (biased finer grained) sand with a few fines,
also dark gray, saturated,loose to firm.Deepest soil,commencing at 11'in Boring l,is a lean
clay, rather sandy, dark gray, low gravel content, medium. Theses materials are glacial till.
The sand inclusions in the upper portion are glacial outwash. All of these base mineral soils
are suitable for residential construction,with conditions. Refusal to auger advancement was
not encountered by boring termination depth of 23', indicating lack of bedrock to this level.
Very importantly, groundwater was found in the main Boring at 1.8' (elev 96'/4±). It is
aquifer groundwater, but marginally so, It appears to be contained primarily in the sand
inclusions at 7'+. But it also is corriing from the upper soft and very soft clay,possibly from
N�-,i�_i:.;
�, . ��.
� Mr James Rudos
- 25 October 2014
Page 2
the lower organic soiL Proper construction on the site (removing the softer lean clay,
promoting good site drainage) will mitigate some of this. 'Thus, water found presently can
be regarded as a maximum levela Slab grade of the proposed residence should be set in
accordance vvith City requirements utilizing this leveL
I recommend complete removal of all unsuitable soil which is likely to be the fill and buried
organic soil as encountered plus the overly soft clay found in both the boring and probe.
While this amounts only to another 1'/4' in the vicinity of Boring l, it is another 2'+ in the
vicinity of Probe lA. As indicated, excavators may be reluctant to excavate below organic
soil level, but it is necessary(see longer discussion in the report). It is so important that full
time inspection of the excavation by a soils engineer may be necessary. Of course, other
zones of unsuitable soil not represented by the boring and probe could still be encountered
due to the nature of small volume random sampling. Any other depths or zones of unsuitable
soil should be removed as well. You could lo�ver footings somewhat so that you have to
provide less oversizing and not stray onto the neighbor's property. But footings here should
not be lowered so much as to rest directly upon the suitable base soil as it is only marginally
suitable. You need a little fill (2' is recommended) to spread footing loads out with depth.
Footings may be generally designed allowing the usual 2000 psf foundation bearing capacity,
which will likely result in normal strip or pad footings.
Special attention is again drawn to the advisory that excavations be examined by the Soils
Engineer to verify soil boring results and to document adequacy of site preparation. Again
this is very important as how much soft/very soft clay must be removed will require a high
degree of field judgment. Fill, as used, should be tested for compaction adequacy. Soil
correction should not be abated below slabs in any manner (ie, do not let the excavator try
ta "trench around" slab areas).
Thank you for the opportunity to have been of service. If you have any questions on this, or
if I can be of assistance in any additional capacity, do not hesitate to contact me at your
convenience.
Sincerely,
INT�RSTATE GEOTECHNICAL ENGINEERING, Inc
`� �� � -�,
P'atrick J Hines,
President
enclosures
pH/SC
� � �
� ` SOIL BORING LOG
` � 8167 100th St S
' � Patrick J �ines, PE
,
_ Cottage Grove MN 55016
Proposed �ingle Family Residence — -
���JFvT: West of 2061 W :b5th St Chanhassen, Minn
LOG OF BORING N�, _ �
C>�►'Ti-fT� SUFi�'ACE ELEVATION: 98.1 SAM�LE LAB +� OTHER TEal'�
�� �EOLbGY N W8
' ��ET �—�ESCRIFTIOF�ANDCLASSIFIC�TiO1V ` � TYr�E R � W DE: p.L. =�
LEd�N �LAY, variably sandy, Organic (OL set ue
� Topsoil ` N 1 HA
�'1 Black, w/ tr s mineral Soi19 Fill
a! very moist, loose to firm �
�' � c�, Soa,�wt�at �ay, Pred Dark Gray (Q,) :� -
� 2� w/ a.•little Organic Soil, w/ tr grave Fill (elev�G��j2 HA
3�moist to ve moist, loose to fiYm
� �LEAN CLAY, rather silty, Organic (OL) Buried 3 �
Black, w/ small roots, tr's undecom- Humus
I 4 posed vegetation, saturated, rather 1
borderline Sapric Peat in soft j
i '°, 5 �PPer portion � ,
i '' sl lighter, less organic, w/ depth
i ' S•�5( LEAN CLAY, a itt e san y, ery ar to Lacustrine y 4 HA 41.9
i �Dark Gray (CL), very soft to soft (w/ Deposit
I ', � � depth) ��
� ��1SAND, poorty graYed�pr����ne gr, w Glacial �
� med, tr es), w/ a few fines, Dark Gray � Till w/ Y 5 � 8/13
; (SP);'saturated, loose to firm Outwash � Y 6 FA 25.6
� � banded w/ LEAN CLAY, a little sandy, inclusiQn
i g-� Dark Gray (CL), saturated, rather soft
j soft to medium @ 8�'+
� 10 more bands of clay, less of sand, w/
I depth
! 11 �
; LEAN CLAY, rather sandy, Dark Gray , Glacial N 7 FA
; 12� (CL), w/ a little gravel Till i
� j saturated, mediu�
� 13� ► �
� I ( � ' �
14- � ` �
' i
I 15� f i
� � I N 8 FA
( 16� �
, � 1 � �
l 1�= � �
I ' �
18 �
19 �
�
I
20 I �
21 � I SW 5 mph±Breez�
f c24�) �o��+,r�stly clear, i
� aeat�er: �23rd) 70°F±, .�
WATER LFYE� MFASUREMEN7S DRILi.lNG �ATA Clear, Calm I
�—'--I — S,AiAPLc'D CJ.51±dG CAVE•IN aRIILlPdG WA'iE+� � i
' DaTE ? ��� pEPTN D£P7►i DEPTH JkauO LEYE LEVEL „ l
' Crew ,.hiet� pH _�Y r
23 Oct 16:29 7 ' None 3.8' �etnod: 3" Hand & 4" Power Flight* �
� 24 Oct � 13�51 5� 1.8o Augers *Mobile B-31 Drill �
! Rig on Dodge Power Wagon i
' IB oo i 14:35 to 23' 6�' 3�' C�enced: 23 October (
� 9e �° � 15 t 20 � 5�` 201' ga���9�ornplet�d: 24 October 2014
`._ I
, - f�OlL B�KINE� t�UV �-----�-
� (continued) 816s 100t° St S
��#T�a_k.� �$t�asr�. Pf� � c (�rn�1P N7t� �5(11h�
� Cott� g •
Proposed Single Family Residence
PROJECT: West of 2061 65th St. Chanhassen, Minn
LOG OF BORIN(� NO: 1
DEPTH SURFACE ELEV,4TION: 98.1 SAMPLE CJ68 6 OTH�Fi TEST5
�N GEOLOGY N W9 L �
FEET DESGRIPTtONANDCLASSIFICATION �¢ 'TYPE R IIV �E �;L;
• LEAN CLAY, rather sandy, Dark Gray (CL Glacial � 9 FA
22 w/ tr to a little gravel Till
Isaturated, medium
i 23- __ _ _ .
End of Boring - No Refusal
24
Bore hole void backfilled w/ native
25 cuttings mixed w/ Bentonite on 24
i October 2014
� 26
I 27
Probe lA � Elev = 97.8
� 28 0-6�' Topsoil Fill, Fill. (S=i 3ess
� 29 than Boring 1), Buried Humus ' i
� 6�'�7' Lean Clay, possibly Marl, �
� �" Gray, saturated, very soft I I
' 30
j 7'-8�' Lean Clay, rather silty, Dark
i 31 ` Gray, saturated, very soft to I �
i soft i
, . 8�'-10�' Lean Clayt. w/ �and inclusions,
j 32 � 1�3ar.k Gr�y, saturated, soft to ;
j medium '
� j
I 33 Probe put down by power flight auger � ;
� �method on 24 October 2014 & ummed�� ' :.I � �
; 34 ately backfilled w/ native cuttings i I
� mixed w/ Bentonite
35 � � i
I I ,
i36 !
� i
i 37 I
i . �
I38 I I
� 39 I �
� I
( 4 i
� �
� �l i �
� (
i 42 � � j
I �
i
! 43 . � � '
44I � � i I �
� I � � ,
; � I
� r�-� � � i i � �
� � ' ' j `
�
�
; �6 ; ; � �
� i � � I � I ,
� �. � �
• n-��
� � w� �� �� �
� o ,�� � �
a
� � �'��' x �
v ,�o ,�,� �n �
o� � °,�� �;+'� m �
P4 Ci'��� �-� � z N ..
a� �q� �` � � ''i
� a� W � � � � o �c
H � �� �' � 0�°,�
d O� N Gl
• O 4J C)�� � � +.i
� a ' �
� H�b p: �+ �
Fa �y +� N � y � c�nu�i
W,t��'p y�° F' v +-+ �
� �� � �
�
b v � w
� � '� v
o D' p tA
. O'� N cNd
a � o�
w �
�� �
�n c� �
3 ''�
�
o �s
� � o
� � a
� b c� � cv u� a�i
'u . �j z � II u ti�
O
� � O . :� �,
� F � N JJ
� ' a a ,1; �
U t..� .� w
� p J o vUi o U
�
�
� �! ,
�
�."'
. B
' �5
.5B � ;�
� �� ,
! . ��
�� �� � �
o�
� " x �
�o �� ,
H W 6-��� N C�!
� Pa W
�G
' approximate property line A'�
�".� �
� �
0
s
�
� e �..�- � _.�"—�
' ��b� � Ih�T�RST�T� �EOTECHNICAL E�G PHONE NOD � �S1 769 2467 Novo 23 2��� �1o�5A� P2
�:����zs���#�� �����f���i��E��� �r���:��e�����,�� �r�.�
�'�,�a�k�'�-������,P�
$1�S7 1 rJb�'SH�
CvtfAg�Grpve ivfN 55i}IC�
(6�2)4]4-5770
�s ���������a��
z��.����� �.����
����-� ��������������.�
i�'a��a����r��c�I�' ��3��
��o S�.b���#���� S�a�������i��,�;��a�
���sp�s�� �i�.�1����a�����s�d��c�
�d'�f�0G1 � �Sth ��,��a��������, It�iBz�.
T1��� ��������a�a�s�t��a����c����C�����ce�.t������iis��gsa��nc��r���e-�, �az��rs�,g�ct. �i,s}��s�
1c�.��v, Y i�a��ti��t����������.s���a�tt���d i���� ������t d�.���5 ������r�Ol�: � fa��a�c�
�,t��� ��`7°� �sl�" a�f�Y�s��t�.������1 �t���Ys��tie��.�a�f13���.� f �.I�ra��� lP�,resp�������r,
�s��a.�fc��c�f t�p���1�11����.�����d v��.��f���,���i�d�as�`t��.���xt��a��id���r�;y��ft�1�y
or Y�,�X. �`a��� saaz���b�� 1���� ��f� �s a, le���� t� �xzra ���� �� � sc�f� t� rx��o�i�� 1��� ���y. Z
����z�axx��g�e�ed r�rn�vir���lx���r.��tcr��lls�.������ix����nt�-���e��'a1�,a��t��g th������il�����
fcs s��s��e�y�a��t�����ux�drRr�t��z���ae�x����s.���g�r������az�x��aa�����fou�.��t���ai�h
crz���as����-���.st��ssli���I�v�I��`1 a�°o���c��na�t�n��t�'�'Iz��it��f�f���h,�.ss�r�h��s��d
i�°�.� �ra.t��I�rre� �1� �k��ra���s � r���l��af��t�c�����a��.
� t�s�d �s � st�.bi�iz�ci �a�z 1���� t�i� �,$° f����� � ��� ����` �h� 1���� ����;� ����� ur�s
�c�r��1�t��o I 17�d�r��aun���°�c�r�r����w1����°aTl��z��.�d�dfc�.�.��,i��v������s��raza�la�sc�il t�h�t
�it°st��yo't�I`���.T d.i�#�x��a�r�r�u��r���s�,w�t�x��s���epit�g�a�t�r���°�y t�ae�a��1�;���
� £�v� t���� �at��°, �� � f�It t��f�,� �,$° �� �r�,�4t�. 7 ��Ia��� t���; vv��� �r�� c��ct t.�is 1��,
�arxt��ITug�gt�u.naci��ter���c��a�r��sa.��i�s���g�����Xa��ly�u1a�°,t�i��oa�d��t�r�ilt�cx�xa
r�h��r�d��g�� ��i����i I���I� 1 e����f���g��xxy b���.�,�f y����n�tr��t�rd����y���oo�
�zt� t�ira��� ��a y�u� f�s��c� �x�s�j���� g�°ca�r���a�t�� wz�� a���l�e ���`����c� �Sy ar�y ar�if��i�l
x��k��B��t�����s�lt�of y��ar�.ct�vx#n��.
If`�e���h��� any a.�di����.� q�x��ti��ss a�n tls�s9 ��yf'� ��a b� �f�..�sb�k��a�� in �z�� a��.�t����l
��a���i'�y9 ��x�c���c�it�t�t�����fi����t'� �t ymur ct��av�rei���.
5ir����7��
�TI'��,�s�'��'I"� C�FC�TE��.I�T���_����?,x��E�T�9 ���
�' .� � `Cf'^ \� .tl'^FIJI+ 1�! `S r:?W p�A eds r+ a
,�(,�8rt��;E� e �99 ���, ��'i�:-i�`Y� �`_;I•G"i ���! '`� s �...,:,'w�, i"'v(!'°;�.'•��rU�•a s��
t Y� d6}[W�'��14Y{.� �' �j
��i�'�.c6��'H���,�`���'� t:`,-��.��=ifi� Y'��a:�J {'7�^;��..,~..:.��ti i.r- rn {a�'.'P"�.�'�(; •'•.F\I !�7•,. -�^
� � � . _ ' �"" ;.�a IdiSA� 1:i d Ui��_F�.�� ivl 7 �,;:1.�t
�. ' ��.�?.';,�: ". ,,,ao�� �a n+!� --n�r-
+5 ':� j '��� 1%;; I "1`9 h
������k.�I�i�,�� �� �,�.s �� � v. _ �� _ ,,.,��. j ;�„�� I�,_:,�,� ;�..:�Y ia.���.e:���3;.,� �3:�m±��;�;DE�,�
� � A ����� `g�� ",it�CL`# l�l i �i1L" Ll-i1d�w Q� C d�le��f�i� ' ' 4'�f
�re��c��t�st ��:� �T�`ar� „"�.-' m �d- tv�l�li�Fa�TA
��,��'�r� �� �����
p�J�� �������,���������_��'�" C��T�o�� y '4 s�11�vfl�������i�C.��.��.�?€"s'"�
����x����i�.����'° - --
_;
� �1 '
MM TY DEVEL PMENT DEPART ENT
RECEiVED
. CO UNI O M
Planning Division — 7700 Market Boulevard � � �r � � 9
Mailing Address— P.O. Box 147, Chanhassen, MN 55��P 2 � 2��� � � � � ��
Phone: (952) 227-1300/ Fax: (952) 227-1110
r �'?t��'?����;a�.k���`�P�1���3�c�:;
APPLICATION FOR DEVELOPMENT REVIEW
Date Filed: `�1�a �'�, "(� 60-Day Review Deadline: Planner:�.,,� Case#;�r_�i�-�-- ._�3C_�:
• ' • • • • - . • •
❑ Comprehensive Plan Amendment.........................$600 � Subdivision
❑ Minor MUSA line for failing on-site sewers......$100 ❑ Create 3 lots or less.................... ....................$300
❑ Create over 3 lots ......................$600 + $15 per lot
❑ Conditional Use Permit � Metes & Bounds ........................ $300 + $50 per lot
❑ Single-Family Residence.................................$325
Consolidate Lots..............................................$150
❑ All Others.........................................................$425 ❑ Lot Line Adjustment.........................................$150
❑ Final Plat* ........................................................$250
`Requires additional$45Q escrow for attorney costs.
❑ Interim Use Permit Escrow will be required fior other applications through the
❑ In conjunction with Single-Family Residence..$325 developmentcontract.
,, �,..
i�ii vu7ers.........................................................$425
❑ Vacation of Easements/Right-of-way...................$300
❑ ReZOning (Additional recording fees may apply)
❑ Planned Unit Development (PUD)...................$750 '
❑ Minor Amendment to existing PUD.................$100 ❑ Variance ...............................................................$200 I
❑ AllOthers.........................................................$500
❑ Wetland Alteration Permit
❑ Sign Plan Review...................................................$150 ❑ Single-Family Residence...............................$150
❑ All Others.......................................................$275
❑ Site Plan Review
❑ Administrative..................................................$100 ❑ Zoning Appeal ......................................................$100
Lj Commerciai/Industriai Districts� ......................$50i�
Plus $10 per 1,000 square feet of building area ❑ Zoning Ordinance Amendment............................$500
'Include number of existing employees: _ NOTE: When multiple applications are processed concurrently,
and number of new employees: the appropriate fee shall be charged for each application.
❑ Residential Districts.........................................$500
Plus $5 per dwelling unit (Refer to the appropriate Application Checklist for required submittal
information that must accompany this application)
ADDITIONAL REC�UIRED FEES: ��
. � ,
j� • � ................................. P.$200 ,�� TOTAL FEES: $ ��-�_�L`��'
� Notification Si, n ...............
(City to install and remove) ��- •�"� r 'D�
� Property Owners' List within 500'.........$3 per addressl�:�� Received from:J p�� �� ( �•,e c< .1
(City to generate—fee determined at pre-application meeting) '
� �sc���v fo� �z�cru�r� D�cu����r�ts ..$�C �r�:,cumert :�;^�� • � � r �. �
� I�" Ciaie r«t;�ivGu. �—��-: f� C�i�Cn ��lumb�r: ��� I C�J
(CUP/SPR/VAC/VAR/WAP/Metes&Bounds Subdivision) �-
��-�;' � 1�='�tw��
�
. - . - . . .
Project Name: ��� I �F'� �����° -�'�'��'�'t
Property Address or Location: �U h � L'�✓�'S T �� '�1"' �� ��a.���
Parcel #: �J�-°�J�r'JC��7D Legai Description: �-�t � Q'��� �;• �i��l=,�E"�` ����°`�e�` _"
Total Acreage: 3u3�`� Wetlands Present? ❑ Yes �No
Present Zoning: �S � Requested Zoning: �`��
Present Land I!;� ��� ,��;, �_�n: � >����_`���� ��pt,�1�C�'V�,S,��quested Land Use Designation;� � �_ ��
Existing Use of Property: �-� �
Description of Proposal: %l�� �/�/��c=��'� en/oc���d �,�� -¢ra ,��D�, � �'x o�S"�:%�c� ��� rr�-�'�
-}s>,a� /�3�""-s
❑ Check box if separate narrative is attached
--= G�„.��i��F=p:
e ' • • - • o ° e e � •
APPLICANT OTHER THAPJ PROPERTY OWNERo In signing this application, I, as applicant, represent to have obtained
authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to
the right to object at the hearings on the application or during the appeal period. If this application has not been signed by
the property owner, I have attached separate documentation of full legal capacity to file the application. This application
should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this
application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I
further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to
any authorization to proceed vvith the study. I certify that the information and exhibits submitted are true and correct.
Name: ���i�� Contact: ����� ��'����
Address: 0����� L���'��� ��a��� ���� Phone: ,
City/State/Zip: ���'�i������� �� .�,���d�� Cell: ��� �.��� ���� ���
Email: P� �����S�;��� e� �' c��o� � ��s� Fax: II
Signature� �� � Date:��`��� � �li
��z�P��TY(�i�i�iv�R: In signing this application, I, as property owner, have full legai capacity to, and hereby do, �
authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those
conditions, subject only to the right to object at the hearings or during the appeal periods. I wiil keep myself informed of
the deadlines for submission of material and the progress of this application. I further understand that additional fees may
be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the
study. I certify that the information and exhibits submitted are true and correct.
Name: �1��'�� ������ Contact: ����� ���
P,ddress: ���� ����"� �� Phone: ������� � �� ��
City/State/Zip: ���������'� �� �,��.��� Cell:
� �, .
Email: ��` _ �1�� � � ���' ���e� „ �� Fax: �
Signature: � Date:
Yhis application must be completed in full and be typewritten or clearly printed and must be accompanied by all
information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the
appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and
applicable procedural requirements.
A determination of completeness of the application shall be made within 15 business days of application submittal. P,
written notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
PI20JECT ENGIfVEER(if applicable)
Name: ��°��� ���b�,����E��� .�w � Contact: ���'� ���a°����� e �t`�
Address: ��� ���t�� ������ Phone: ��i-��� ��� ����
City/State/Zip: �� ��`�� a �'� �'��� ceii: �6? ��m �� ��
Email: ��f� ��"��'�: ��°`� Fax:
. . . . .
Vllho sho�ld recei�ve copies of staff reports? *Other Contact In�ormation:
❑ Property Owner Via: ❑ Email ❑ Mailed Paper Copy Name:
❑ Applicant Via: ❑ Email ❑ Mailed Paper Copy Address:
❑ Engineer Via: ❑ Email ❑ Mailed Paper Copy City/State/Zip:
❑ Other* Via: ❑ Email ❑ Mailed Paper Copy Email:
_.�,;���.�a!E'c�=.p_,�
gti 3
' - _ _ - S ��5`� �
. _ - 4 � Z 1� ��� $& � �
( I�:I I'I I I I I I I I
` � III � Ilil l l �11I � ''
- = o = °
_ � W y (n
C w
P - ` _ - � w o ,� L �
O�
� _ �� $ � w ' � �� O LL>�
� _ __` 5�,.�� � � �u�.,��uyi, .. � �'z U >
� �: � I m
- _ a � eBeBeer�B e�Be� C �p
� - � I I e 1' O
. N
I . - 8�
t tl X N
Y _ �€ < _ € - �j I �.�,' LL�
� iS S� � ' �.c�� � '�k 5if
�
€ F. �:: I F7���1 �A ,C� , m� �9 a� f 3
_ _ € _ - € � � ��� �y� ,�,�, g � c Q
0 U y N F
„ _ D.mva.po �o�+oop'=o� � �p
� { �� _� _ ..,� . . ��� 3E ..�, �Sx =Z
_ _ _ _ _ . _ ' : U-
r , . , � � > �
��Om
UI
G'I�
I I I ' F..:li
i \ �r€i - .. I �I�,�
; �, i i ���
i � , ���
1 ,� I\� `� r rI'/ I � � � � � I I // � mI3
� � � � �I /�I � ---
/ � ' � � a
i � �� � �� i i � �� / A� z�
, � �
il i i ��
� � � � �, � r----- � � � �-s
II \ A � '�J/ I�//I ,_—__J/ / I ' I � I \\ ��
� ` r
\ I \
I �—�J
� \ \ � � /
\\ \\�.: \ I �\ \1 I � I�/--// // / I ,..$ —
� I
` \ � � �� �, �� ; I ,� , ,; �.,1 ,
� � , ,, � � ,, �� �� i I
,
{+ ,-
, � � � �µ'I � �� �— �� � , o �
-. _ _�-, - �j ' I� �J �6 I / I i // �'��`-.� l o
\\\ 1 I IL � II �l g \ / �T� Na E� �i/ 25 Iz`
l 9S'SSI 3 i �
�
� � � � I � / a� �.
�__ \ ��� 1 °Ffll . ,/ � R �" I�
e
1 1 1 - � I _ �,, � l�� �`= I�
�� i i � � � � r�' , s � __ �
�� r i �� `� � >� -- � € i = I=
, �' � i , f� � i �' ' --
i � � � � i � � =�e O � ,'� _ ':
\ si � j I�I ' NII `1'� io � � � ' i � £��e � 'j 1G� �/ /�/ // i� /� _,°� '
, , ��
1 ; � I i� �; ,., --�--._.----- � � ' � `'�
� �
� i i i �� � � � � ; � � e��s i �� � ,� ,' / — _�.��
__ I _' a
� ,_� i �� i ,, sg ��o ' —_ _
I I �� i i /
� 1 ��1 � 1 II wll � r-i------- � a , � �� � i� / i� �, --
�rc e
II �1 1 �. I �Y j � -s.�__.-_ --- ., - I /� � /� � ��/ i� .r
II � � � I I I � ��^ �� � �,� i �" il /� / i � � i� / °� _
ii )�:: i i � i �i �i � �_,����-� ��o y�"�� i i / � i � �� _-
V � / / �� � I ��I IS 3 I�M� �, � �1 / / � // �� / o _ .
/ i / I � �
/ /I I - !° / � � , � �I I l � / �� �� � / oo<<�a° .�.
� / / I �� �� • m�� ^� � i i I I � �°'I I � � � � � �� - _- '.
i / � �I! `p. �I o j �� 1 i � ^� � � / // � __ ,.
/ / / I I �&§ A I � I � � I I / � �
/ / � � �'� �o g- a �� i � I � � � �i / / / / � � / � _.;'LL_- i,
/ � � s`�� l � z , � ,p I / pp�
� /� �� ��� � �� �3� ( z�� z�tl � I � l ���� �� l l� / � l % � � � ���'a��- '
� i .. \ � 9 i�- ,� �� °aa � �� t� I � � �✓ l � � l � � � -- :��o ��.
�/ ._ I �^__��__,F ���a 1 ��__I � � � � � � I � =
i y--o� � --ie l 1 / � I � � � � / �,
:� �\ Fr=�x q6� �I 1 I / / /� / � l � I / I _om_,Y,w II
i � 50-���x i���2 � � i--� F, �/ / / j � l � I �oap�t��.
� \��sl � \�'l/ / i � �P g / / / / / / aowoNm<`
%' �\ ,, ��
;; � �-, �o - � ��,. , ,- , , ,. , , ; , , ,, _ a�
n _, � , �.m=, : I
�� _,� � , � � � , , �, , —
I ; �' � / // / �I _
� � ia<
_P�_ I / / I ���LL
i \ � � / / �
I , t-'—i\cs._ �_ / \ � � / �/ / / _ _
' - � I/ i /�J � I � / / � i / I
joNo
� . ,�f:== , �
-� - � �------1--� � � , / ,
� \ ' / � ��--� / � \ J' / � // � � /// � � I
I III ���� � \9b'SSl M11.,9V.BZo bS� / / I / / / / � // �
� I i�\ I\ � � � / / � / / � / / � /
� h // �
�
r
� J, , �I �
' '`_ � �=` I I �" ' ' ' ' l � % i �/ ' l � i i
� �ti � � � � � � -
I -- I \ I _. �� / � � / � j � / / �
� �� � i / � / / / l / / / �
l ��',,` I -;�,�"\� , � i // / �I / � � I l I �
i
� - i / / � / I
� �-�—;---1. i ,,- ; , � � � � � , , � , �
�, �_ , , ,, , , , , �
�, i � � ,�--- ,� ,� ,�i,�,� ; � � �� �
��, � _ i ,-- ,� �,� ��,� ,, , ; �---,,,�
, , �
,�, � , ,,-- , � , , i, , , �
-� . , , , , , , , , � o
, , __, _
��--� i --�' �—_�� .-� , ; , ;i , � ' ,
I I--'— — __ -- / _--_� , , , , 3 m
� , � � I , /
i � � � �`�
_ € �, � _ �: "a � �� �£��s
� _ - - E 3 �`gna� ;� �
sV ; _ � _ � I�1i I�=��o�P� � � ;
ap
§V �t - 3 ' - �I ILJIg � �Il � i �lll � � II
�
- { � o .. �'
c _ - z a �
n " �_ - -- _ - w G��o ��. , a �j �n
� � - �€ y 9s< e� �:� " `o�
� - - - -_ > ��:eai>asga a a"m>
' - _ - j ��„���3i�, :G'F25 p >
- `II � �_ � - N eea9oe CvB~ eo�lI�s@ -� �p
�, q _- ' _ �� - 5 ' _ I tl O
C - � �_ - - - � ` - .o'
��` c ` � t � 3 �� �'�� � �d
' € € _ e �. € - zL 3"� ��.��- ,^�"�". � .�x NF
_ �� �€� - _ ouoa�po �:�.❑Eeo6ve� O
- - �� .;E - tt (0(/�
- ' f< L W
_ - - ., -t ���
, c
� ,:� € €= t _ _.' � _ �S x �Z
_ el��. €I�_: - � ... . ' - �c" c� �,. �e �I'�acl _3��_..3 �� U�
U
Q G.
� ' � i �_ - � ;
, � � i �3
� , � � � �'` �
i i � I 0 �_ ,
� j � i ,�=�zn�:yy �� i
i � e k ��.,
� � =.�. � ��x � �'� -
_. ' I , � ��1� s� i ��
i i I� \i � I `��TSk-.��`'3 y ^'
. +. �
_ _ -- � _---j I v
I I 9S'SSI 3„9h,BZoGON N `0` '"�`_� '
p
x9
I `" '
s :�
�____' �
�-. , . T______________________
� i ___ '
--�� �i ,
_"""__'cs_�'___'_'_'_"" � � ° g�
1 , � I
I � ' i O. _.�""- _ _
I �I � I I � N M� I -_`-�� _
F I` (I�E
. �� I ` � P U I ��� c�11'C�
�. I „�1 i �, " i _c���'
` � �I � a i i = Ip a
� �I i '' � � 3� -
I �i 3 �j f�-= _---___-i5"SSrx.9c.6?�ZCS=1--_______1,'yJ - �z u
m o
� �r
v
a e
� w a3oa�a
N
^ _ � �.
"' <�i6 -F______
- >o
' _____________� � -
I I I� \ I _ _
., I � i � 0. i .�a _
�_ I I --_.I � _
I i i i _ _ 'op�
I W =-
, x>
� � d$LL�5`z _
I I I
�ai<�n
�� � � i NzaNZN��n
wc,�
I i �_v,
I________�g•_________ � ' i
I �._____-'
r �________- i
___________,________�
I I I `. 96'sst h1..9o,eZoZGs I
\
I j I _ � _
I I ! _ I
�
I � I `\ �
i i I I
I � I � ��ap
, ! , � -
� � ��� � � - s� � �
�� : o i I r � I ij � _-
� z o , � � _ _ :-
w I � �I �
� _ �� �
� z z
- , - .. � . - .. Q
C7 , _
�
c� J ��I � , �I � � � E- - I _-'€ - a
.. .. .i , ,. J
. ,. _ - , � -c f
L" �I 3 . - e� _ -
. � _ . .,„ _. �y��.
� . �J � k _ t 8__-- p
.. �I. � � .. . _ w
0
I �l - h �
o a � _�
__ �
� � - � o�� ' ' ' °� .,! H W
� III e � ���I I� �I�I� . ,. - - . ' __ z0 v p
: p � m ; � ,
�
, } ,..I Q = c I .. 3 c w L F U Q
` i u o N ~ u '' o ol'�� ..._...__...... . ei '� �
� ¢�� . , 0 4 I �_ ' Z F- a'
_ � � �]
� N � N
°L . — �J ' II __ 4 a' N �
~I I' i w ¢
� J-
�
-�:�
:�;.-_� � N w «s �
rz �
i.;�
,,
�._..__.. .._�,....� —_��,..._._., _.��_�—_.�,..m.__ �
_ c� o
V N' Z ni
�o � �po L1a�� �
�w �u - - = C7
a��°=_ o - z � __� �IQ-
pQ�o�a � -- G $ a` �o� ZO
aoxaN ow�N � _ �' o� Qo U� .
°oQyso �40� "'03 - _ _ z�
_ Q3QQ oF$ °z`_ _ _ _
_ m o' w �o
�'o� o �oLL= - � _ � - ��
�o��a - 000� _ _ �j'�
w�9�°K� ams� °�� _ � > o0 3 �a _nad 2;
�w f w w �a ww �w�a r
_........._...,.._...�.,....,_.._—__re.�.....,.___ ... ..._._ �,,,._..e...,.,._U LL�3
m�
W a
�&
2:
Q�
�,�
' �� ; � , � � � --��{
. : . j � _ ._. . .__ .. : ^,.J ..
3�
. � � , �� _ ��.
� _ . � � . � • � ��� �
\ . , , � , - �. � �
�
' *'
,� � .. �3 �
Z _ €' � y� ; ,
, � ---- �.
' '
g - � , --_
., ,
, F � .
r� € :
� �; . ; � — ----
,
;
�
r .
^ -,.__. � .. _ :. .. s� ; .r-- ,� ; . e
L.L ' ' __ . k . . - _ . g&�
� x , �� - � w
� , ',� � ��
� �' �: L�; -�<� _
Z L � � --
� ^ , ., • .._ -
C� ' a�', g�
Z ,I � - . .. , � " _�3
O � � �. Er - .�F . � �o
O . 'I ' . � -- �-�� x ��.. ���X i� q.� oz`�_,�a oy- _ ` , . ; ��8
"7 i "�'1 _ i � o
� � �� � � � i � �
i i o� . � � � . -.8
W t � � �� � �;. , � Oa��o i _
3 � �1 � i
0
�x � i �
W � w
� � �� � � �ov�a i
�, >, , � �
.. - ./�, � a o o� � �. OG1a � - "�z�
Z . . . ., ' - � . LL LL LL K IB �1NP _�_, . � . °� .
p1`<� . �"�' V` H a1� .. ,,i , .
Qt� � <5:5% �!, ` � N ..i i . v.., �,��. .
Q w o � . DRIVE � s �__._, _ �6ti� ti�� -� , ,
i �0
�� . �y ,� �i �� I
/1/ O> , \. . � I . _ ,
rL.fn_ ` '
V z . , ��. � p605
�.
v � �. � .. . . . ; � � � `: , � '�.
_' �L��(___"" .�. 'F^ � > 4:
. __'R" 'i1-yC-���., :�..,_:�, i I '��i
.. .. 1w a _ _ �,�_�.�,���--...�.�1 " � . �u o 'i
I
c� M� r I o.�� i
C � I
f. . � � -�� . , rc, .
' - � _� ? ' � . .°
� � � - �� �m �- n F Z I � / . w�u
.. .. a Z o �� . � .
_ �c I
/
. ,. . �* / r��
��'�z
` N
� i � I}',z i -' - N
� _ i i �I _ . _. ... . _ _ . _ �. _ _._
0 I� I �
�/ � , } � i°I il i � . -
+Z k� i i
w I I I i `F _ � E�-r - _ ��.�
y C.. _ 4
.. £I � _.. . � . ,
G J ,
. z � ,.. � . �_ _ �'yy
- . ' H
w i - . . � - -_ .
J I m f , - -.-. .. LJw..
, _ w
� - - ��z ;�� � -
�I� _.
� m sIG ��� � 4 - - � _ �, � cn
a °I � � _ z
� s � o
� . N
_ ' Q
I - ` _ �, �
�
J
I}
�rc - _
pix
t �
�� _
a
�� :.� _ I ¢ ' � �
� � m
_ �
r �
� — H
_ �� _ = J � W
- , �
- -- �
,�; �
,_J
a
_ <I � �
f�jr �
��_... I^:I
�._u
�
�;�.;"? N
�
e
ei / � '
� e �3� o �h g ��
r_.-..- . .-_r_.�._ ..,. _., d e,. o� �E-� a� '� Q W
-_.._ _......... . ...... ....._,. � " _ 5._ `
�I�� 2
_ _ j § ��g y��._ �� p �� I�
w �o - � �6 ' `e,'�'� e U
X� „ w - ? � � i s I��e 5:s`a- e -
w a�= o o� �` �S w ° � � g��, � � §w':?`� � �
o"' _�
wwwa� 4 �, ��� " � .� 1� � b Z� .
a�tLL°`o �' o €b � �� �els' �E�a �� ��o �.
� u � �� E' II ,I:3 ��'o �� �"
��=o°j u �� d �/ .ae,
� F 51. .. p C�`
ao"aN ow ' � ¢� Yo; ��c _ E w3 .
ia �Ep �O�Q W� N � '� �a� � 6 gga .�r � �%'$ g �o 'i
NpaOJ y � wo3 �, = geF -, I ,83� �_ 'i
= auoa �vp`, o� p - o ;e= 6 � °����6 � � � �o li
_� �e�ei� � $ •�.; �3�
�o�zo �oLL o� � � � . E Ee. � � �f�
�o= � �- ° � - _ 4i� � E ga�?�8°s I�
?o a�a = o 0 o u - �. �� ; - $ p� $ s ; aaiy:o€,� -
w`3000K� ams3 0 � - W �� tI =i`�se:,P` � $
.._._.a U rc 3 n a �a o / e��6���e � :.
[SP[I� G ii
..... � ,,,. EP�F��49s d
��— � �-.�'.� ,x,_
o�W �
,�
_oQ� �
,: �
; : � a�wo
� , LL
. � ,w
, u�
� = p,
LLmp
-- �
, o,=
��o
, , „ .� _ mp�o
- .. �
_— , . < <
��- � ��� oa� _-
���''/�' t _u;�- _
���L, � �U �,; ,l ,� � =��z ��
Z ���"� 0. r z
d �' �
� Qs ��� � � o�=
� r
� � � "' > --- �
_ _� � ,
x >S jf-� -'�>X. . o�z..;�._.. , ,�06�`' � .
1— � �����' T0�'L� o�p _o��
� �� A. oj , � r� p�a I �� } . » „�
ji � -
N M y ( � II
' �u . (O t0 tD rv .
. 0 O o Q li . p615
Ir 1
�. ., I _ LL 11 ll K I p . �' �{Q
� YCYt\ � �F-mU
� ���5.5% I �`u_
�N .�DRIVE " o .�O
p � '�' 0 6
r-�. —' . �y �,�p '
w c � 1 �
tt� - \,.. � .. I ���,`�- �
E
O> �i, �
,c>z � 606 0� .
�
�' a p
- .. .. .m .. .. � � -�,�`��_„ u k
�.�,e � �- �u c.;i W
�. �� . -.�.-__~. �—x -�`2b9-�"'- -. . rcw .
. � ^ r J - � � o�e
5
e . -_ �o `_--_
��
uwjz
. � � � �J
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt,being first duly sworn, on oath deposes that she is and was on
November 13, 2014, the duly qualified and acting Deputy Clerk of the City of Chanhassen,
Minnesota; that on said date she caused to be lnailed a copy of the attached notice of
Postponement of Public Hearing for 2061 West 65t'' Street Metes & Bounds Subdivision—
Planning Case 2014-30 to the persons named on attached Exhibit "A", by enclosing a copy of
said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all
such owners in the United States mail with postage fully pi•epaid thereon; that the names and �
addresses of such owners were those appearing as such by the records of the County Treasurer, I'
Carver County, Minnesota, and by other appropriate records.
_ '°Z.,4.�t. '1�1�-�`�x''�.�
Karen J. Eng�l�dt, Depu�y lerk
Subscribed and sw�rn to before me
this P�°day of���a�,t-`f�'��'�=.r� , 2014.
, .
<_ 1
Notary P lic
� � � � O +� i
. � � � ,F, V N _
C —
. o o N ��L � � � �n �3
O N t � L N � � � p � � `,K �
�fA 'C y- "� � � � — N +.; � V � O � �
� '� � O O .V �'.V U � � p � � � �'-' (n C
� � -- Q- � � .n � � � N � � a� a � �'
++ °-� � ° � � � � � � o � a'� � � � o � � �
�
G� oN � � y �° Q � . � �U � Qo Q � � v .� c-�no
� � � N � N � p � � � � � N � M V � += � � _ •- c,�j
_ � ,,_, f� � � � L '� Q..� � O .� O � � � L � p � � � �
� � Q
.� 'V � � � oN� o L � .� °� � � � ° � � � N Q� � � � � U � �
= O � L m ... M y .� � . N 'D "� C .� � c� ' � �O L � N E
_ � N .«+ � � O � � S c� � � � � 0 � � .� ca O � � � � � O O � � >
C� � �r0 � � � � � o � -�- � > � o � � � �� ° � � n' E �' � � o � � U c`�a °
� U N c� c6 � � N N i N � '� � >+ � N >, U U � � t/� � �, N p "- C N � z
�- E -� > �, -� "g O � E Ca � �L (a � �, �� �>, � ,n ,� n � Q- ca � c
a' � � . c� � � � a� � a� > � o
°� oU � � .� � oU � .� � � � ' � v �, � � � � � �La�
a =' � "' 'c� ° � � � z �y Q' � ° ,� ° � c � �'� u, � ca � � c o cn c�
O U � � � m � CL6 .�' � � � � � � �� c�i� .V � � c� � � � � Q V � }' '� 'Q L �
� Z � U L o � � U � � c .� � c � = a � � c�n � '�n � E c . • uS � o .� �
G� � m — c� .� � � �Y N .o � � � '''' � � � v � � •> v o � � c� � a� � � �
C� t/� �s � � � � � otS � � ai � � � � � E � � � � �� � � � � � � a c�n
tA � � a� • a� � a� . oE
�
p ca c � =,o �d� � c � � p � � n. � o ci� � Ua � ° � � � � r� E ao � �
Z = p � += � � CO � cB � O O L Q� � . �� � � � c� N O N i � �
� .�Uf� � OCn � � NQ CH 0 +� +� �- Nc� d' — � .� (n cnN U � � � �
O �
� �
s � �- f,; °' �
V � .. .;.; , o .. N .�.� �
c c � �
'� c.> c Q � � � Q }, Q � � y E z '
°' � cc �� � `� n,� a� a� E
0
� as a aa � a � � � E C� �tst� ''
� � II��
� � o .� �
'� � � "'' V N =
O �'� � � Lf� �
� � y � •L C6 �% � (n � � N
O s cc5 � � �� O .� -c � �
�t/� � � � � � � — � � � V � � � �
� E � � a�i °o ' .n a�i �U � � � °, � � � �� �� �r
++ �-r � ° :� � c� � � -� o � �'`� � � � o � � �
�
� OON � � y � �- � � �U .� �� �" � � � :� � �
� � � � ° N � o ,� cn c � � � � c? +- � += c � � c�
C U
,L C � N � � � � •� Q-� � O � +� O � � � O � O E � Q i
� •V � � � �� � � ,� � a��i � ° � � � � Q�s � ai � � U � �
� � o p L m ��� � .� � = � � � � -a � .� � �n — c o -� ,� � �
_ � c� ..r � � o �a � s cn � � � � � � a� � � o � � � � � o o �� >
V � � �' c- >+ '" N �' i- � O > fn tn Q, C �+-� � cn N � O
� � NO � � � � � o � a� c ? � °, �' N �, � —°° � a� cQn" � � °� � o ,.� � U `� z
� V L � t > � � '� N O � � � � ct3 � �� ca � � � ,� >, c � � � � fl" � � � �
� �+ � � U � � .� � oU � .N � � � •� � � � . � � U � � � c� � .� � o .� o
a '''� � `� '� o � � � z �� � �c`a ° � ° E � � �'� c�n � � � -�, � o v, � }' � �
y.- C� � � � °o � L �, c°'na� � `� a� o � o � � cn � �-' o � -� o ' � �� .� aia� a�
0 � o o � Lc� . � � c� E � -�-� � cn . � � cn .� � c � Q � � �, �Q � �
Z � UY o Q- � U � � � .� � c � = n � .� � � � � E c . cn � o .� >
� � d — c� .� � ca �Y a� ,� � c �+_- -�-� � Q- � cn ca � � o a� � � +- a� � —
� N �� _ � � � � .� �ts � a ai Q� � � � � E � � 3 a�i �� o � � � � °� � �
y o � � � � � � � oE � � � o � cn � v� .,_, � � � � c� � Q- v�'i
p c� c � >,o �rn � c � � p �, � a o c/� � Ua � ° � � ,� � • r� E ao � c�
S p += ti � CO C c6 � O O � Q � i >+ � � � N O � � .� �
Z � � �UI� � O (n � � NQ = I- 0 � .� r- NMd' "-- Q. � (n cnN U "� �� �
�
O �
s � �- �; � �
s � o ,, cn ,,.,
V � � � N � � � c c o
•� � c Q c`�i � � Q Q � � � z
a�i � � Q� v � Q� a ayi E
� a� a aQ � a � t a � C� �tsc°�
BERNARD C JR & SANDRA BENZ BRUCE A&JEAN A MATTSON CAROL ASLESEN CHILD
2061 65TH ST W 2020 CRESTVIEW DR 6482 MURRAY HILL RD
EXCELSIOR, MN 55331-9006 EXCELSIOR, MN 55331-8007 EXCELSIOR, MN 55331-8994
CASEY C MCDANIEL CHARLES R & BEVERLY J JACKSON CHRISTOPHER M JERDEE
2020 65TH ST W 2110 CRESTVIEW DR 2081 65TH ST W
EXCELSIOR, MN 55331-9005 EXCELSIOR, MN 55331-8009 EXCELSIOR, MN 55331-9006
CRAIG R& CATHERINE JOHNSON CYNTHIA A BODIN DANA F NICHOLSON
2071 MELODY HILL RD 2061 MELODY HILL RD 6500 GALPIN BLVD
EXCELSIOR, MN 55331-8888 EXCELSIOR, MN 55331-8888 EXCELSIOR, MN 55331-9013
DORIS L NIKOLAI TRUST DOUGLAS E & MARY K JOHNSON GARY A NYBERG
PO BOX 1461 REV 6410 GALPIN BLVD
SHERWOOD, OR 97140-1461 6474 MURRAY HILL RD EXCELSIOR, MN 55331-8018
EXCELSIOR, MN 55331-8994
JOHN J &JUNE A HAMSHER JOHN J & LYNNETTE J DELUCA JOHN THOMAS FAVORITE II
2081 MELODY HILL 6484 MURRAY HILL RD 2080 65TH ST W
EXCELSIOR, MN 55331-8888 EXCELSIOR, MN 55331-8994 EXCELSIOR, MN 55331-9005
KATHERINE MARIE ANTOINETTE MICHAEL J STACHOWSKI NANCY H LIBERG REV TRUST
FOR 2050 CRESTVIEW DR 3543 LILAC LN
6486 MURRAY HILL RD EXCELSIOR, MN 55331-8007 MINNETONKA, MN 55345-1024
EXCELSIOR, MN 55331-8994
PAUL S TUNGSETH PEGGY LOU TRAGER RICHARD & BARBARA D ATHERTON
2051 CRESTVIEW DR 2080 CRESTVIEW DR 2082 65TH ST W
EXCELSIOR, MN 55331-8008 EXCELSIOR, MN 55331-8007 EXCELSIOR, MN 55331-9005
ROBERT M & LINDA M PETERSON STEVEN S & LORI A ABBLETT TIMOTHY P & HEIDI S LARKIN
2040 65TH ST W 2081 CRESTVIEW DR 2150 CRESTVIEW DR
EXCELSIOR, MN 55331-9005 EXCELSIOR, MN 55331-8008 EXCELSIOR, MN 55331-8009
WILLIAM C &JUDITH J ASHENBACH
2041 65TH ST W
EXCELSIOR, MN 55331-9006
. �
� ,
t
., . .._._] 5�
, � �� .:_.-�._ ___. �_ �� ....��
,_ ,�... J �'�
�— �( �\ / � �C��� i (`.��'� `._-
lr�l.�ls..IJ I ��.'���'�
� - _._—_. '— - --�
-� `-��� '-_`_'
= l`��AN,SrON professional enqineers and surveyors
.� �.,NDERSON
� �4,S'S"OC`I14TES, Inc.
P.O. Box 665 222 Monroe Street Anoka, Minnesota 55303 612/427-5860
September 2, 1980
�k
,;
i � � � ,
Mr. Bernard Benz ` � �� � ' �_ �y�`���'�� � ��t:'�,`'
311 3rd Street ` �" ��ti " ��
Excelsior, Minnesota �� � ,
�
55331 �`���1� �,�� ���� e
Re: Benz Percolation �j
!
Dear Bernie: �
At your request percolation testing was performed at your lot located at part
of the Southwest 1/4 of the Northwest 1/4 of Section 3 Township 116 North
Range 23 West in Carver County, Minnesota. Standard methods of percolation
testing were employed. Elevations are relative to an assumed elevation of
100.0' based at the top of the hydrant at the northeast property corner (see
enclosed sketch) .
This report includes:
,
�
_ 1. �oil boring logs
2. Percolation test results
3. Testhole location sketch and systein configuration diagram
4. Septic system design specifications
5. Discussion and recommendations.
The soil boring logs show sandy loam to sandy clay loam surface materials overlie
heavier and firmer clay loam materials at depth. Significant soil mottling
begins at about 1.5 feet depth at both boreholes. Soil mottles (spots of contrasting
colorj are accepted indicators of periodic saturation in soils. Soil gleying
begins at about 4.0 feet depth at both boreholes. Gleying (dull gray soil color)
forms in soils which are saturated and in a chemically reduced condition for long
periods of time. Because the Chanhassen sewage ordinance requires three (3.0)
feet elevation difference between the bottom of standard sewage absorption
trenches and the water table or soil mottling, the site is unsuited for installa-
tion of a conv�ntional trench type septic system. An alternative means of sewage
disposal, such as the mound (also known as the berm) system9 is recommended.
The percolation test results (below) show that measured percolation rates are
f_aster than the 120 minute per inch minimum rate for mound systems.
Soil te�:ture at
Hole Elevation Depth(inches) bottom of hole Percolation rate (min/in)
��l 98.1 24 Silty clay loam 3.0 f k �= � �,�F ;F �;
p��:�"�c._� . .. .
�l2 97.9 28 Sandy loam to sandy 2.1
clay loam �� f' , � 1�iSl
"l��' �Jr_: �,� �f:�,� _,� ..
ia a vi�fil"aljr'3,;+.3�:
civil • municipal • planning • soils � land surveying
G �
Mr. Bernard Benz - 2 - September 2, 1980
Measured percolation rates are somewhat rapid for the soil material in which ,
the percolation tests were run. The design of the mound is based on a per-
colation rate of 30-60 minutes per inch which is a typical rate for permeable
clay loam soils. �,
�(
The minimum rockbed area for the mound is based on estimated sewage flow from
a three bedroom house, 450 gallons per day9and the design infiltration rate of
the medium sand fill material, 1.2 gallons per square font per day. '
ti
450 gallon/day -: 1.2 gallon/ft2/day = 375 ft2 `
�ao rock beds, each 10 feet wide by 20 feet long, provid�: tl�e needed area.
The required basal area of the mound is based on the des��gn infiltration rate
for a soil with a percolation rate of 30 to 60 minutes per inch, or 0.74
gallons per square foot per day. '
450 gallon/day j 0.74 gallon/ft2/day = 608 ft2 ,
With 3 to 1 sideslopes and 1.5 feet of inedium sand fill beneath the rock beds,
the basal area of the mound is 1,845 square feet; so sufficient infiltration
area is provided by the design.
The pressure distribution system consists of Schedule 40 PVC pipe. The supply
pipe is 2i�inch inside diameter pipe. The supply pipe should slope back towards
the pumpir�g chamber so that it drains after the mound is'�dosed. The laterals
are 1.5 inch inside diameter pipe. The laterals should have 1/4 inch diameter
holes drilled at a spacing of 3.0 feet. The laterals should be connected to
the manifold so the holes point downwards into the rock. The distal ends of
the laterals should be capped. Also, the last hole in each lateral should be
drilled horizontally in the end cap near the crown of the pipe to facilitate
air venting.
A submersible effluent pump capable of delivering at least 34 gallons per minute
at a total dynamic head of at least 13.7 feet should be selected. Headlosses
are calculated as follow;
1. Elevation headloss of 7.5 feet between top of mound (elevation 100.5)
and pump discharge (approximate elevation 93.0)
2. Friction headloss of 1.2 feet in 50 feet of supply pipe (2.4 feet loss
per 100 feet of 2 inch I.D. plastic pipe) and
3. Five (5.0) feet to account for losses in distribution network.
If elevations or distances are changed, headloss should be recalculated.
The sole purpose of soils data contained herein is evaltation of soil suitability
for on-site absorption of septic tank effluent at the test site. Although soil
a
Mr. Bernard Benz - 3 - September 2, 1980
texture and horizonation and ground water elevation data may be helpful for
the setting of basement elevations at this site, we cannot warrant any such
interpretations or the use of this data for other purpos�s.
�
;;
If you have any questions regarding information contained in this report,
please feel free to call me.
Y
Sincerely,
IiAICAPISON ANDERSON ASSOCIATES, INC. �� ,
!���f���; ,�' , �li�T,��`-�',,i./ t
� ,'' � � 1 �
Gary J. �ti�thbun, Soil Scientist !�
GJR/jkw
Enclosures
`
File: 740. 01
�� �;
�
� ' �o�s or-�so I� r3o�z r,►�s
fROJECT� Benz Percolation Fi� No, 740.01
BoRlr��� P1ET1-IOD: Borehole ��l - 3" Hollow tube 0-4'�ATE; � g/28/80
4" Flight auger 4-6.5'
Borehole ��2 - 4" Flight auger 0-7.5` ;'
Borehole �1�1 �� "���Borehole �IZ
D�PTf�{ 0.o EIrEVATIO�I - 98.0 • �EPTH �•� ' �I.�VA� - 97.9
(feet) � (teet)
�t
Dark ��ro���n sandy clay loam
Black sandy clay loam
1.0 'F (
1.3 ��
Light grayish brown sandy
Grayish brown sandy loam to loam to sandy clay loam with
sandy clay loam with many 1:7 few brownish ellow mottles
1.8
- �
Grayish brown sandy clay
Gray silty clay loan with loam with many yellowish '
many yellowish brown mottles brown mottles '
3.0 ,I
� 3.3 -� - ��- � � ,' � �
Grayish brown. sandy clay �
with many red and yellowish
Gray c;lay loam with many red , brown mottles, soft and mols
and yellowish brown mottles,
moist . 4.0 _
4.2
Gr.ayish brown clay loam with
many red and yellowish brown
mottles, many bluish gray
Grayish brown sandy clay ' gleyed areas, firm
loam to clay loam with many
red and �ellowish brown 5.5
mottles, many bluish gray
gleyed areas -
Bluish gray sandy clay with
many red mottles, firm
6,5 6,5
�ND OF BORING END OF BORING
, e._._�.
GROUND ?aATER AT 93.6' ON 8/28/80 GROUND WATER AT 93.2 ON 8/28/80.
y� r, .
f�'�IJ�ftSO;d Af�D�RSOi�� ASS�IIal�ES, II��tC, ?�Y: �'-����.t.��,_,�• �<�:�.��-v�
� aT
4�
� ��
. ' CONSULTING SO►. �NGINEERS � ' �-=_--_�--.
; , � _
. , , < -
� � 612/546-6938 .:= ::; �_".�..5 U�T�R RH I V G H I�I�v .
f p�
��p�GCp��OcA
.aJ�V V .
�,�2.�x� �� ENGINEERING INC.
����
�, �y��.
��n } ,
..__'`��'
7415 WAYZATA BOULEVARD, SUITE II I
MINNEAPOLIS, MiNNlESOTA 55426 �
Job No . S-81139
June 29, 1981
Mr , Sernord Benz !,
311 - 3rd Stre�t '
Excelsiar, Minnesota 55331 '
re : Soil Investigation
� Single Family Uwelling ,
Lot 3, Block ,2, Moline ' s Addition
2.603. West 65th Street �,
_ � Chanhassen, Minnesota
�. We were retained by Mr. Dwight Cravens, acting in beholf
af Mr . 8ernard Benz, to conduct a s�oi�l� investigation for this
project . The purposes of our work were to determine the general
soil and ground water conditions within the proposed building area,
and to prepare a report of ovr findings, including comments on
recommended foundation types, footing design and installation
procedures, etc . .
PROCEDURE ,
/� total of two ( 2; soil test holes were drilled at
locations design�ted by Mro Cravens fn the ffeld. The field work
was performed on June 22, 1981 using a truck-mounted CME-55 drfll
unit �
,
SOiL ANO FOUNDATION ENGINEERING, f1EL0 LOADING TES7S, ROAD SUBGRADE INVESTIGATIONS,
EARTHWORK CONTROL tt PAVEMENT DESIGN, MATERIALS TESTING, OBSEHVATION AND CONSULTATIONS ' �
. . z
� � � The test holes were advanced with 34"i .d, x 7"o.d .
continuous flight, hollow stem augers which act as a temporary
casing to prevent collapse of �he sides af the holes. Standard
penetration tests were performed in advance of the auger tip at
2 to 5 foot intervals of depth, in accor°dance with procedures
designated in A. S.T .A�. D-1586 . Periodic abservations for groun
water levels in the boreholes were made while drilling and afte
eompletion . '
. All soil samples obtained were brought to our laborator
for examination and classification. They will be retained for '
a period of at least 90 days from date of issue of this report,
after which they will be discarded unle�s we are otherwise
• a
notiffed .
Drawing No. I is a site plan showing the soil test hole
• locations in relation to the outline of the proposed house .
Detailed soil descriptions alorig �with a plot of the standard
penetration test blows per foot are giver� on the Borehole Log
sheet , Drawing Noo 2 . Following the regular written soil
descriptions are capital letters in parentheses, which represen
the appropria�e group symbols of the Unified Soil Classificatio
Systeme A chart explaining this system is appended. ,
All elevations in this report are to geodetic datum, and
were obtained using the bench mark noted on the site plon .
� SITE AND GEOLOGY
�Th� property under present study is located on the upper
portion of a large hfll south of Lake �Ainnetonka, Natural
inorganic soil at the site consists maar�ly of clayey glacial t ' a
� ����"'��� SUBTERRATTEAN -
ENGINEERING INC.
MIN�NEAP�LIS, MINN.
�,�X ,
�� 3
� � related �o the Des �.�oines ice lobe of the Wisconsin
glaciation. During post-glacial times, a surface layer of
topsoil has formed.
According to i�formation published by the State of
Minnesota Geological Sua°vey , th� uppermost bedrock stratum
under this site is believed to be dolomitic limestone of the
Prairie du Chien formation.
There is an area of dumped fi11 just south of Borehole ;
. SOIL CONDITIONS
Only two basic soil types were encountered in our inves
tigation , T{�ese are : topsoil ; and Des Moines clayey glacial
till .
Topsoil
A surface layer of topsoil ,ranging in thickness from
' 1 .5 ° to 2 ' , occurs at our test hole locations . The topsoil
consists of black organic silty and sandy cloy . It is in a
soft condition, with standard penetration test values of 2 an
4 blows per foot . It is overlain by a thin layer of brown
silty clay fill at Borehole 2 , The topsoil is unsuitable for
foundation or floor slab support , or as a subgrade below a
povement . .
Water Modified Clayey Glacial Till
The topsoil is underlain by a .major stratum of clayey
gl�cial till . The uppermost 3 to 6 feet of the soil stratum
has been modffied by alluvial action, and consist� of a
mixture of grey anci brown silty clay , clayey silt and clayey
' .
sand with random lenses of sond ,
:,�;;,... SU�`.I'.�+'R.R,AI`T�' 1�N
";,,�, I t
- ENGINEERII�TG INC.
n x MINNEAPOLIS, MI NI�T.
` 4
F The upper mixed glacial till has a soft to stiff
consistency, with standard penetration test values ranging
from 2 to 8 blows per foot . This soil layer has low load
bearing capacity and moderate compressibility. .
Des Moines Clayey Glacial Till •
Commencing at o depth of 4. 6 ' to 8 ' below present
ground surface, and extending beyoncJ the terminal depths of
our borings, is a dark grey sandy clay with traces of gravel ,
� and random thin lenses of f� ne sand . Standard penetration
test resistances within the dark grey clay vary from 5 to 13
blows per faot , representative of a stiff to tough
consistency .
• . This soil has moderate load-bearing capacity and low
compressibility, and is a good foundation subsoil .
GROUND WATER CONDITIONS
Free ground water was observed in both boreholes, at
a depth of 13' below present ground �urface shortly after
compl ' � drilling . The water then slowly rose to a dept�
of 2 . 6 ' below present ground surface, corresponding to
�u.a t�_.o 3 ' .
There are a number of lakes in the vicinity of the
site . Lake rAinnetonko and Galpin Lake to the north have
average water elevations of 930 ' and 942 ' respectively. Lake
Minnew�shta to the west has an average water elevation of 944 .
Ghristmas Lake to the northeast has an average water elevatio
e of 932 ' , and Lake Lucy to the southeast has on average water
elevatfon of 956 ' .
���"r���� SUBT�RRANEAI�
�� ;�
ENGINEERING INC.
' n x MIIVIVEAPOI,IS, MIN11oTT.
x
. 5
A smaller lake known as Harrison Lake, to the south,
has an average water elevation of less than 1000 ' . "
An analysis of this information indicated that the
observed watex- levels in the soil borings represents perched
graund water conditions, wherein the water is retarded from
further downward percolation by relatively i.mpervious clay
soils below .
Thus, even though some seepage could potentially occur
� in excavations extending deeper than 3 f.eet, the volume of '�,
such seepage water would be small, and could be handled by �
conventional pumping .
DEVELOPAqENT PLANS
, , It is proposed to build a single family dwelling along
with an attached garage at this �.ot . The proposed hause is a
4-level , spYit-level home. The major portion of the house is
a slab-on-grade structure vrith only a relatively shallow sub-
grade crawl space level below the family room. The buildin
will have masonry foundation walls to outside grade level, wi I
wood frame construction above . Stsuctural loads on the foot-
ings of such a building are relatively light .
Lowest design floor level is approximately at existing
ground levela
APJALYSI S AND RECOMI�ENDATIONS
ihe stiff to tough clayey glacial till soils underlyin
this site are competent foundation svbsoils for the proposed
residential structure .
:���'''��� SUBTER�AI`TEAN
��.� -
ENGII�EERING INC.
�: � ,� IVIIN�NEAPOLIS, MINN.
. '. �
` All obviously organic topsoil and any overlying
existing fill should be stripped and removed from the buildin
and pavement areas . In addition, it is recommended that the
upper soft clay zone should be subcut in the proposed buildin
area, and should be replaced with approved compacted sand #'il
Removal of topsoil and subcut af soft clay soils to a depth
of 3 ' below grade at aur test hole locations is recommendedo
Fill necessary to reach design grades should be an
approved inorganic sand soil, free of any foreign material or ,
debris . It shou].d be spread in 6 to 8-inch maximum loose '',
lifts and should be compacted to acnieve at least 93% �.�aximum �I
Modified Proctor Dry Density, A. SoT ,p1. .D�1557 in general fill
, � areas and 95% �.�odified Proctor Dz°y Density in the uppermost
2i feet below pavement areas .
It appears that it would be necessary to place the
lowest design floor ievel approximately li feet above present
ground surface at our test hole locations� in order to provid
a minicnum 4 ° separation between the floor slab and ground
water levels observed in our borings as required by F.H.A.
The building may then be supported upon conventional,
relatively shallow apread footing foundation based on approve '
compacted sand fill . A net allowable soil bearing pressure
of I500 pounds per square foot may be vsed f.or the footing
design .
� '`��� SUBTER,�,ANEAN
S��';n�,
ENGrINEERIIITG INC.
n Yx MIIi�NEAPOLIS, MINN,
° . - -�
/
° All perimeter footings in heated portions of the build
ing areas must be a minimum of 3i feet below outside finished
grade for frost pratection purposes . Perimeter footings in
unheated portions such as the outside garage walls should be
at least 4 feet be�ow outside grade . Continuous strip foot�
ings under bearing walls should be at least 18 inches wide
for proctical reasons . It is also recommended that a perimet :
tile drain system should be installed around the footings to
provide drainage from the sand fi31 .
A convention�l flexible pavement design, consisting
of a 5" compacted granular base course overlafn by a 2" hot-m ',
bituminous wea.ring surface, may be �seci above the sand fill I
surface in the driveway area . 'I
GENERAL
' The soil conditions have been established at our test
hole locatfons only. There are likely to be variations in
conditions between and around the borings, and interpolation
or extrapolation of the results is not warranted.
During construction, all excavations, earthwork , fill
p�.acement and compaction should be monitored and tested by r
qualified soil �engineers We would be pleased to provide the
necessary field engineering observation and testing services .
' `,�`''��-. SUB�ERRAl�T�EA�T
: ���
�
ENGINEERING I1�TC,
x x �,� lYlINNEAPOLIS, MIN1�T.
� 8
� � The recommendations contained in this report are
intended solely for a project of the tyPe described herein . I
the event that any cfianges in the naturee design or location
of the, building are planned, the recomm�ndations and concl.us' �
contained in this report sha11 not be considered valid unle�s
the changes �re reviewed and the recommendatfons and conclusi �
of this report are modified or veriffed in writing .
This report has been prepared for the exclusive use of
Mr . Bernard Benz and Mr , Dwight Cravens for specific applicat ' �
to a Single Family Dwelling at 2601 West 65th Street, Chanhas t
Minnesota in accordance with genera?1y accepted soil and foun c
tion engineering practices . No other warranty, expressed or
, , implied, is made .
SUBTERRANEAN ENGINEERING INC.
° , pa�t�.,c,�r�, � '�.�
Patricia+, J : Bach ' i
Geologica�,� �ngi'neex
; ;,,,;,,'� `•
;y , ; �,,
, ',j,,,1 1 ' � � ,
, �`-� ,� ryl '`t, 1 ,
. �� � ,^���v�`
/��.� �
�Aervyn iindess
Registered Professional Engineer
PJ B :P�M/P9
Distribution : 4 cc A�r . 8ernard Benz
1 cc File
.�;:���• STTBT� �,RA1� EA�T
';�,�,A '".-
ENGINEEH,IIoTG I�C.
YYX IVIIN�NEAPQLIS, I1�SINN.
� Q �
W =
a �
3 J Q `
a a o
c�
U
z � � r
o w
w o
� } o
Y w U w
_ a Z J C�
--' �
. � J_� .. � � Y -O .
Y Q Kj
� W J � .
� � � �
2
U w � �
J
W O J J '
m a m w
�
w
F-
0
z
� �— ——
w `°
� ��
r
O � �
v�i W Q
� } w J
O a ~ J
� � m
' z �
� m � �
� r �O O
w Z O
v - �
. �
�
N I� �
+S� O
J
W
�
� • �
(
I
0
^
Q^
V A.
� `V �
I
I I (/' I
� � � _
I � J � �
� o
�� . m Z'W� "'1,.Z N . . � Z o m f � � � F�y-aii -V 'L" K �
fv �2harW-: Z:unWr � m. � ° � , �'^-� � � �µ N ,'J�- �` I�
O � � �� ��
R\ ,,n.,, � r � o
� �� � �� ` .!! �a{. O' � "�' m [� W �
' �-�`_ W .. � _. �. J .1�. y7^j� µ,l� ..Q. � . e.1 7 � (� _
� � .. �. .Q �Q' Q. .Z�.•.;.,(�. = rJ '^' ��Z �
� �% ' j(�, ' W�. � �OC.. Q W, � O ��7 F"'I. W '.
. O.' '~ ��. {/�- _� 'F ~�� Wy ZH Q Z `���{y`, �� ��j, � �I
Q . u U . � � �. � `� . .J � Z' �ajy. J ��.�. Z� _ .�� �l :Z ^ _� 'O
p N (9 v
o K �a a �� � � Q � W 3 �,.` c � I I J £I 1 I � �'/� W � � o °. t .
0 pu i� Ov� �n a `^ V' m �� j. ' d N V t .n XS .O 3 I--�I Vt .� V� �", I
'- O p z ����00 '�-�- � `,91 ' c a
_ °�+� I1
� "-
.a d
n � i, • rn.-� �v+• — ___ _ ._
�O N
�' y �.v - . .v .. . _. -__ - i
.�i,6 u
. � � „� o . .� -- . Q . �'� ,
_ M rl�� , .�1
vi N +' ' , _. _._-._.____ W � � �,� ? ;
� I o - � - -0�. �--.._U •.-, '— . ,. .
.N. .C_ ._-_v� •
__ '_ . .
, ._.._._'_' ' -�-p"-1 �Y .
. . ��'O,N+� 41
_._.___._ 4" O^"� N
___... p N 4- -� � ..i . � .�F^ rd V U O �
j�u x ,^o , c .•� "- a o . � w� `
� � ,� ..�v a� o �., .� '" � : Z `" .oi c �v v o i
... p ^ �I N � pv.,�+ "�� v �`" � +� . . �. .4�- •H O l+ �:'�""-� . I1
. r v o. . U o � �pI w .a �� . �.� m s•.��v�3 T I
y U �� y. .�n�n � 4. a ' . . w' �. 3�„o . O
T O
� u ' ..� I O �. O�J�U f.� '�O 01 � � �1 ++ ~� O T,r1 C H � 'I
•.� m L .�. � tu Z ti o.° v °
W ' T U T � � � u�1 U r�1 J.S S � J . ..� E .�.�.�r-I , �
F o� �I „� � � � � o U rn � � � 1.0•.. u�3*'t ,
Z o " o o, � �v v•� �° �I ,., ° N �° . . . � � y ..-�i o, �
� ,,T, ti� v olol '' c ? °��D v ti�
'� �I O� �V �� O . � 7�� > 7 " '
p ` E,� �'1 O m�.
t. �
� . Y O � ��s . p C CO N.� O
G.
.. C U i 3 .� . , � a �-
, �� � O J O 0� . � _ _ ..
.--1 C) ,+� �,'-� _ _' • � 1 O
�,_
_ � � m� m � E�, _ _.. -- __. -- - _ - .}. .o
I O ` � y ' � � _ _ - _ _- _ _ _� LL �
.{... _ . . _ __
F .. .. I . �. . .. .... __ �
a \ � "" "_ � I-�- .. . -' _.. _ -
1 � W
1 ,, � � _ �_ - 1" _� - _ _ - o a
, o -� � :__._ .. {� ._ . .._�_�- _
- .
' . ;
l i ' ��
, �m.. ro .- ---- _.. _ . -� • -�-1�. -� ��..L._ f _ _ - - _ _ - � N
�.a. m - � � _ .. ., '! -_�_.�.� �_ _- �i.- .�._ - - - _ - - - - O
ut _ ..._ -- -1
u N .W�. b _... .. . .
, N � o __� ,-- } , .�- 1 . -' � _ _ - - - o m
- � 1
� a r� �N - - ; � � ; F -
- _ .
r > 3 _- � 1- � �' { i ;" - i__^ o
z _ ' --
o' ° _ r � _ -- r--- z
� .O j ..� m� . r � i ._� ! r . '. � -_ - .1'; .�� - � . . { I o
-� -- � .: . _... ^
a . . _., - I I 1 . _� I,: i _
_I
�y v p. p O - �� I � f r'� �,t; � � .' i I��.--,`- . . ..
/� � S .. Z p'. :L.�� '_�__�"_ � ,T.i^\ . F �y- ,
. ' �'ix _ ,I+Y � . P N Y1 '
, � W K� ' _.....-..----�-..=--V�'_. . . �
��
p�un�-Y O o '�i S � ' p a� N
. +'' i-� ++++
°- °/' � oo
v +' .H
vu u " ��� 3a~i >3
. �� ..1. � . _ . O �a+ N • T
�
� � u� in ...I O � � . .. ��2� O� 61"D
O 4,y+
'-o"� 3 ui vi .-' . 3 � • . � .°`� C �S N O�"�
Z o ° o >.v a • .,, +�"- �.,-�.-� o o s�.«�.-i
p:; T w a��c I �, u�c�- . �� a o o •.�� a o s ...
�,I v�w�
a �.,I'».�' �j� �� � o� ,-� � � •-�+� � � �.i c v w v� � w '
oG. •-i L N L fD S 4- T •-� v�� '"O a vi <� N O ri-0 . O"O
� N., �I m u c o i•.� � � '1 o T o w� w O i E' i n v S_
W P .-1 01�O O^'A�V � � � . . .-i�' �.- .-i C O ul • 41 � .
V Vl C J r1 vi � yl ^ �+ p .,1. U .�O >.`.."'�D
�' ..� O o�scn � s' J SS W Z t,� �i h� O� •
Q � 0 .
p C '�'' � O v C -V U O�Ol J ..N.-1 C�'-1 E� N
. 0 J > 1 •++ O ..i J . NS
U v � � o ;`� v � o -� ��ti n.+++� +�.•�+'
. ' It, 1 N,-� O J a).v �I �, -O in F- �'D 7 O�����
p J t+ U U O O C � � _ .. p)L'O•-I C�O r 1
�O � v L•tn `i y�...,�-1 N i� 4) N•ll N
" W-V V � 4" N >
� y v . [ rl i,•ri Q � �
U +' .-�rl O +� � . , O N O Ul O M Q1 0 .
0 0 4- o•.� u o .-� at., v r
,-i� o n. v�+, v> --1� - O
� _ . - -_ - _
. . . ...� �� _ - _ -
O _._ _ ..... + i r _
' � _"__ .. � ' " __ '" _ _
\ p' __ _ ' .`_' " _ _ " _ � �
� _ � i , r. �
_ , ._ _ , . __ _: _ _
_ _ _ r LL
. t_ _ , ; . - _-
o. 1 Q ..t..'_ . I._... .. _. . ..._l. ... -� ' W
� Z � � ,+ � . _-� ' � - ___ -,__ _ _ _ 4
� ' ' � _ ��,.J . . .. .. i- '.. . .�-_. � _ -
oC " _
_.....
"_' O
w '_"_ _ _ _ ' �_ .._. ... .�.. .. ._.._- . _" ...._ � _ N N
Ww __- � - _.. � - . � _ - _
J Z O .__'. ..... _._.. ' _ __ ' _-_ - _ �
_.- I'
0 } �N ._... '_' -.. y� 7 ._ . _ _._- _" _ - "_ _ _ _ O eP
_ ; l0 y _." �.. `� y- l �� . . � _ ._ . _ __
Z > '__ ., i_ {_ � . I...� '_' __ - • �_r .
O � Q _ ___'_ . - . _ - -_
Q y�j f0 u _ _ _ - _ ___ _ _ _ - -'_ " - -�
� ? :'r �
r�+ .. . _ . _...... .. . ... -
._ "__ � ___ �
F„ __ --- - -
- _ , -
w a � .� -- -� - -
. ... ._ o
... _ ...- . . . . � �---- �: .
u . 0 _ ___.._. . � - _. . _..._ . . , .
__
F 0 =. � 2 - - - - - - . � . , .
o , .
- . � � . . r ' � . .
�' S � _9 . ' . ..
IJa � � � o
,p.wa,�-= u• �.
W -
�� � � GENER,�4L NOTES
.,�;;;.. ;
x I
DESCRIPTIVE TERMINOLOGY
DENSITY CONSISTENCY
APPROX UNCONFINED
TERM N VALUE TERM N VALUE COMPRESSION STRENGTH
Very Loose 0- 4 Soft 0-4 0 — 1200 psf
Loose 5 -10 Stiff 5-8 1200 — 2000 psf
Medium Dense 11-30 Tough 9-15 2000 — 4000 psf
D e n s e 31-50 Very Tough 16-30 4000 — 8000 p sf
Very Dense Over 50 Hard Over 30 Over — 8000 psf
- RELATIVE PROPORTIONS MATERIA�I CLASSIFICATION
� TERM RANGE TERM S IZE
Trace 0 — 5°/o . Boulder Over 8 inches
A little 6 - 15 °/o Cobble 8 — 4 inches
Some 16 - 30°/o Med Course Grpvel 4-3/8 inches
With 3T - 50°�o Fine Gravel 3/8 in-N� 10 sieve
Sand N� 10 :ieve-N� 200 sieve
Si{t end Clay Finer than Z00 sieve
MOISTURE DESCRIPTION DEGREE .OF SATURATION %
�ry 0
HumIC �_2�
Oomp 2,�-�
Motst 50-75
Wet �_99
Saturotad ��
WATER � LEVEL
SYMBOL -�
Water levels shown on the boring logs are the �evels measured in the borings at the time
and under the conditions indicated. In sand, the indicated levels can be considered
reliable ground water levels. In clay soil, it is not possible to determine the ground
weter level within the normel scope of a test boring investigation, except where tenses
a layers of more pervious waterbearing soil are present and then a long period of time
mey be necessary to reech equilibrium. Therefore, the position of the water level symbol
for cohesive or mixed texturo soils may not indicete the true Ieve1 of the ground water
table. TF►e evaileble wetar level informntion is given at the bottom of the log sheet.
SUBTER�ANEAN ENGINEERING INC.�
� �A�lFIGATION OF SOILS FOR ENGINEERING PURPOSES .
ASTM Designation: D 2487 — 66 T AND D 2488 —66 T
Unified Soil Clauification System
Major divisio�t �ymbol: Typieal names laboratory cisssification erit�ria l
�, Well�raded gravels,gravelsand �o �e0 ��30�2 • I
� � GW C�- greater than 4;C�= between 1 and:
,� miztures,little or no fines � p�o D�oX�bo
o � � � �
.� N c ` q' ,�
�
o �
� N � a � C
°' V � Poorly greded gravels, gravel- $ Not meeting all gradation requirements for GW
_ �•� J Gp sand mixtures,little or no fines • �
� d
N
> �� 'w a (� �n
N ��Z �+ > !n tA �'
� �t � c GM d Silty gravels, gravel-sandsilt •��-, N y � Atterberg limitsbelow"A"
d � � L �^ u mixtures � Q a V,` N line or P.I.less than 4
� � — Above "A" line with F
Q � � � � � � o � �a � between 4 and 7 are b�
K N.t_� „ derline cases requirinp �
m �w � Z � � o
�n 0 � O O N [ C��CI r�i
�Z � GC Clayey gravels,gravel-sand-clay '� � , , , Atterberg limits above"A" o f dua l sym b o ls
c � mixtures � � • • • line with P.I.greater than 7
�Y "� `° : : :
� � � � : : :
o �
�� �3 Weli�graded sands,gravelly ` o � � � �bo ��ao��
m N c SW d•- ; ; ; C�=—greater than 6;C�� between 1 and 3
C � � ;,. sands,little or no fines � �, , , , p�o D�o�bo
U m ° c o,�
d � g . . .
y � '� � o � � : : :
� � �� Pooriy graded sands, gravelly �•w . . .
o � � SP ' ' ' Not meetinp all gradation requiroments for SW
� _ �,p J san�,little or no fines �o � ' ' :
10 0
o ' �
" r �,.. v — c •
c c o2 « w c '
` � � ,�—�� � c d � � � � •. .
� � � � c Atterberg limits below"A"
o � � c � SM Silty sands, sand-silt mixtures � �� �t� � line or P.1. less than 4 Limits plotting in hatch
� t — � 10— � �- �^ � zone wiYh P.I. betvwtn
••-9 w � �' � � c �
� N •��� � g'� r � cr and 7 are bordertina q
�N y •- "' � � " d � requiring use of dual sy
� �o Clayey sands, sand-clay mix- � � � o ° Atterberg limits above "A" bols.
� $ SC tures Q Q•� J � `n line with P.I,greater than 7
Inorpanic silts and very fine
sands, rock flour,silty or clay-
� ML ey fine sandt or clayey silu �
c with slight plasticity
r t For classification of fineyrained
q N Inorgenic clays of low to me- soils and fine froction of coarse-
9� dium plssticity,prev�lly clays, 50 grained soil�.
•� �E �� sandy clays, :ilty clays, lean Atterberg Limits plotting in
g M clays hatched eree an borderline csa�ci- CH
«_
N �� fications requiring use of dual
symbols.
� '� OL Organic silu and organic silty x � Equation of A-line:
A " cleys of low plasticity � PI=0.73(LL-20)
�
r �
�� 'Y ,� 30
Inorpsnic siltt, micaceous or � �p
� � '� MH dietomrceous fine sandy or � ���
� � � silty�oils,elastic silts a ,P. OH e MH
�'� p � 20
LL � Y'y
� � Inorpanic clays of hiph plas- CL
° � .. CH ticity,fet clays
i r E 10
� y� 7 . �:M �� MLa dOL
« � 4 ---• - -
� Orpanic cleys of inedium to ,'
� � OH hiph platicity,orpanic silts 0
0 10 20 30 40 50 60 70 W 90 1
� Liquid limit
�"`'' » P�at and other highly orpanic Mwxieity ChwK
_�'� � wil:
�., o,...�..e..., �.,.�;..�..:,,.,. ....,
J.�. sJ��:artmpnt of Housing �and Urban Development
Certification By
� REGISTERED ARCtIITECT(S)/ENGINEERS(S) OR OTHER PROpESSIONAI(5)
� S/D Numbe}^ ' 27 "�2� 7�'j
S/D Name OL E
Tract or Unit Number o7 ,�
Number of lots
City & State —
!
De'vel oper C N
I C t � �?f, S�, Registered �/Engineer, or
(designation), to the best. of my personal
knowledge, bzlief and professiondl ,�udgment, do hereby state that;
(1 ) The acta�hec: Working Drawings and Specifica�t�ion�s�a�--ttT�
s��`:�'��•?•,�on idcntlfied above, meet HUD �ien procedures
. nrd a;;;:•:ti�es described in bocks 4900.1 � Chapters 3
� arid �, 4i40.1 and HG. J The drawings and specifica-
tic:�� h�� �e,n npproved by local authorities and are in
; �at1f,P. with applicable tocal standards;
(2) Tne 4io�i:ing Drawings and Specificati e as
• 2/ includ roval signature and seal as
the hith��� neer or , responsible
t � , ��:r preFaration;
(3} The pru�osed development in accordance with these Wo :#rtg'�
. �.,_>:����.gs and Specifications (a) is permissi , er the
a�pl �czble zoning, building, housi other codes,
ardir.ances or regulation o ified by any waivers
oc.tati�ed from a ate officials, and (b) complies with
Mir;iT?a erty Standards and other appticable standards
� elines and criteria.
`� P�.�-� So�� �.��,� �s-�<<3s r�. - �.� ���r iN
" �urv� ,tssr,_� '
Waivers of cod�s, etc. , were obtained as listed in a�achment:
_ _...-�-------- J
I am aware of a�:n?iceble sanctions provided in Title 18 U.S.C. 1010 and
hereby decl�v�e tt;at. tf�e foregoing statements are not false, fictitious, or
fraudulent. I am also aware that HUD will not accept future statements
from me if any of the foregoing statements are false or incomplete.
REGISTEREO ��GI ER(S) �a� • C��-�Q
Signed __ `/�' � Signed �
Professional 's ame ss Title
� Bus9ness ddress �' G ' IJ<, Name o Company ute - �
S t,S 5 q Business Address ,os;S�;wa�� ,
Telephone ���Q93$ � ,
License Number .___�d435- M�NM elephone -z5�zo
Date �j�,,�� 13Ri Date ,_ si9�i
� If a r�r�^rence is not applicable to your certification, strike it '
out and ir.itial . ',
� identi`y Drawings and Specifications including information normally ' '
found in the Title Block of drawings. ,
� Identify att�chment. � HUD Form 92255-A ',
April , 1480 il
_ ___.________�___..�___.._____.__ _ _.__ _..____._ _.__..__ _ _._ i
' I
I
. � In�,erstate Geotechnical Engineering, Inc � �
' Patrick J Hines, PE
� � 8167 ]00`h St S
Cottage Grove MN 55016
(612)414-5770
25 October 2014 �., :�.;+�'����dr�iurP,�E�-�
���a.
'��C�'IUE�
VO`V � 4 �(111L
Mr James Rudos
14846 Timber Hill Road `j�'"" ". �� ' ���������,�;�;;
Minnetonka MN 55345
Re: Subsurface Soil Investigation
Proposed Single Family Residence
W of 2061 W 65t'' St, Chanhassen, Minn
In accordance with your authorization, I have completed the above referenced investigation I
to determine site suitability for the proposed construction. A summary of my findings '
together with boring logs and my conclusions and recommendations are presented in the
enclosed report.
I found, as you already have been briefed, more than usual problems with the site. There is
a total of 53/4'&6'/4'at the locations of Boring 1 &Probe lA,respectively, of unsuitable soil
in the form of topsoil fill, general and varying fill, and buried original humus. Below at first
is a low sand content lean clay,generally dark in color,saturated,very soft to soft(w/depth).
It is "normally consolidated" (consolidated enough to only support its own weight, not
additional weight of fill soils or structures above). The overburdening fill has not been
inplace long enough to force further consolidation. The moisture content test in this material
indicated nearly 42%, high for a lean clay. This material extends only from 53/4' to 7' in
Boring 1, but from 6'/4'to 83/Z' in Probe lA. The first 9" of this material in Probe lA is very
soft and is a borderline marl material.All of the aforementioned materials are unsuitable for
structure support should be removed. I do acknowledge that excavators are often reluctant
to excavate further once the buried organic soil is cleared, so understandings should be
inplace at the time of gathering bids.
Base soil below at first is a lean clay, a little sandy, dark gray, saturated, rather soft to
medium. It has inclusions of a poorly graded (biased finer grained) sand with a few fines,
also dark gray, saturated,loose to firm.Deepest soil,commencing at 11'in Boring 1,is a lean
clay, rather sandy, dark gray, low gravel content, medium. Theses materials are glacial till.
The sand inclusions in the upper portion are glacial outwash. All of these base mineral soils
are suitable for residential construction,with conditions. Refusal to auger advancement was
not encountered by boring termination depth of 23', indicating lack of bedrock to this level.
Very importantly, groundwater was found in the main Boring at 1.8' (elev 96'/4±). It is
aquifer groundwater, but marginally so. It appears to be contained primarily in the sand
inclusions at 7'+. But it also is coming from the upper soft and very soft clay, possibly from
: , ��'�'s��� �;
.
� Mr James Rudos
25 October 2014
Page 2
the lower organic soil. Proper construction on the site (removing the softer lean clay,
promoting good site drainage) will mitigate some of this. Thus, water found presently can
be regarded as a maximum level. Slab grade of the proposed residence should be set in
accordance with City requirements utilizing this level.
I recommend complete removal of all unsuitable soil which is likely to be the fill and buried
organic soil as encountered plus the overly soft clay found in both the boring and probe.
While this amounts only to another 1'/4' in the vicinity of Boring 1, it is another 2'+ in the
vicinity of Probe lA. As indicated, excavators may be reluctant to excavate below organic
soil level, but it is necessary(see longer discussion in the report). It is so important that full
time inspection of the excavation by a soils engineer may be necessary. Of course, other
zones of unsuitable soil not represented by the boring and probe could still be encountered
due to the nature of small volume random sampling.Any other depths or zones of unsuitable
soil should be removed as well. You could lower footings somewhat so that you have to
provide less oversizing and not stray onto the neighbor's property. But footings here should
not be lowered so much as to rest directly upon the suitable base soil as it is only marginally
suitable. You need a little fill (2' is recommended) to spread footing loads out with depth.
Footings may be generally designed allowing the usua12000 psf foundation bearing capacity,
which will likely result in normal strip or pad footings.
Special attention is again drawn to the advisory that excavations be examined by the Soils
Engineer to verify soil boring results and to document adequacy of site preparation. Again
this is very important as how much soft/very soft clay must be removed will require a high
degree of field judgment. Fill, as used, should be tested for compaction adequacy. Soil
correction should not be abated below slabs in any manner (ie, do not let the excavator try
to "trench around" slab areas).
Thank you for the opportunity to have been of service. If you have any questions on this, or
if I can be of assistance in any additional capacity, do not hesitate to contact me at your
convenience.
Sincerely,
INTERSTATE GEOTECHNICAL ENGINEERING, Inc
"/ r- �� -
� ��
P�' ,:\:_ ._�_.
trick J Hmes, � �
President
enclosures
pH/SC
j � . " --- SOIL BORING LOG ----
! Patrick J Hines, PE 8167 100th St S
� Cottage Grove MN 55016
,
� Proposed Single Family Residence -
PROJE�T: West of 2061 W :65th St Chanhassen, Minn
LOG OF BORING NO: - 1
D�r�T'ri�� SURFACE fLEVATlON: 98�1 SAM�LE t.�1B d� OTFiER TEa1'S
�� /--� �EOIOGY N W9
' F�ET �7ES;�RiPTlONANbCL0;551F1C�TiON � � TYr'c R I W DE, �•�• D��
P•�• set v_ ue
ILEAN CLAY, variably sandy, Organic (OL Topsoil N 1 HA
•l Black, w/ tr s mineral Soil, Fill
� very moist, loose to firm
�CLAY, samewhat sandy, Pred Dark Gray (CL) Fill e `� + 2 HA
I 2 w/ a li t t l e O r g a n i c S o i l, w/ t r g r a v e �� v �' -j
� 3��moist to very moist, loose to fizm
� �LEAN CLAY, rather silty, Organic (OL) Buried 3 HA
Black, w/ small roots, tr's undecom- Humus
� 4 posed vegetation, saturated, rather 1
borderline Sapric Peat in soft � I
� 5 'upper gortion �
� �sl lighter, less organic, w/ depth
i 5•�56 LEAN CLAY, a itt e san Ver �ar c�to Lacustrine
y� y Y 4 HA 41.9
� �Dark Gray (CL), very soft to soft (w/ Deposit
( � de th �� �
� � �SAND, po�ri.� gra�ed��pre.�c.��ne gr, w Glacial y 5 HA � 8/13
� � med, tr es), w/ a few fines, Dark Gray ( Till, w/
; (SP),'saturated, loose to firm Outwash � Y 6 FA u•6 i
I � banded w/ LEAN CLAY, a little sandy, inclusiQn �
i g-� Dark Gray (CL), saturated, rather soft ,
i soft to medium @ 8�'+ �
� 10 more bands of clay, less of sand, w/ �
� depth I
� 11 _._�_. r___.__._ .._.___._.____....__.4_�______--_---- i I
i LEAN CLAY, rather sandy, Dark Gray Glacial N 7 FA � �
� (CL), w/ a little gravel Till ' '
; 12-j saturated, medium ;
I �
13� ( � � � i
I 14 I � I � � i
1 i � � � j
� 15� � I i I
� � N 8 FA ; ' ,
I16�' t I ,
17� � ( � � 1
f � ' ;
18 I �
19 �
i
�
20 I I
21-� ( I �SW 5 mph± Breez�
! � � (24th) 70�B+, �stly Clear, �
e �eat�er: �23�'d) 70°F±,
.�
w�rF� ��v�� ME.4S{lREMEN7S DRILLlIVG �ATA Clear, Calm I
_� f _ i
! DaT� I .��F SA]APLcD G45lHG GYE•IN I ORILLING W�'�R
� _ � _ � DEPTH pEr�'7ii DEPTH iMUD LEVE iEVEL Crew Chiet__�_ PH ! _,____ u �
r 23 Oc_�1 16:29 7 ' None 3.8' �etr,od: 3" Hand & 4" Power Flight* �
� 24 Oct � 13:51 5' 1.8' Augers *Mobile B-31 Drill �
���__� -
i Rig on Dodge Power Wagon
( "� " ( 14:35 to 23' ( 6'�' 3�' Co�n�enced: 23 October� �
) " " � 15•20 + ��� 2,l� $orin�Co-ripieted: 24 October 2014 �
-- - —�
`y��p�y��k�p;
.-- : - �O1L BUKINU L'(JG
. � (continued) gl�; 100�° St S
• �a#ri�-k J ffi+�� �C Cottt�g� r,-�•iP MN 55fllh`` -
Proposed Single Family Residence
PROJECT: West of 20�i1 65th St, Chanhassen Minn
LOG OF BORING NO: 1
DEPTN SUAFACE ELEVATION: 98.1 SAMPLE LAS b OTHER TEST5
�N — GEOLOGY N WB � �
FEET bESGRiPT10NANDCLASSIFICATION * TYPE R W �E p:�;
• LEAN CLAY, rather sandy, Dark Gray (CL Glacial N 9 FA
� w/ tr to a little gravel Till
� 22 saturated, medium
I 23 .
End of Boring - No Refusal
I 24
Bore hole void backfilled w/ native
I25 cuttings mixed w/ Bentonite on 24 j
� October 2014
� 26 �
27 (
I Probe lA � Elev = 97.8 ;
�
� 28 0-6�' Topsoil Fill, Fill. (S1 less I
� than Boring 1), Buried Humus �
� 29 �
, 6�'�7' Lean Clay, possibly Marl, �
� � Gray, saturated, very soft
' 30
� 7'-8�' Lean Clay, rather silty, Dark � �
' 31 Gray, saturated, very soft to � �
' soft i
� 8#'-10�' Lean Clay�- w/ band inclusions, �
� 32 ' i�ark (�ray, saturated, soft to �
; medium
i
� 33 probe put down by power flight auger i
� �method on 24 October 2014 & ummed� i j �
i 34 ately backfilled w/ native cuttings � i
� mixed w/ Bentonite I �
' 35 �
i
� I
i 36 '
i 37 �
i 38 '
! �
► f � ! I
39 I
, '
i �
� ,
� 40 � � j
� � I I
' �� I � � i
; � i i
I 42 I �
� i � � '
� +3 I ' � � I i
� I � I
i I j I I � I �
,+4� i � � � , , � ;
� '
� � � I � � � � , i �
i 4�� � � : �
I ' � �
� ; , i � �
�h-� i � i � � � ;
_ � - � __ .� _ ' ' ' � _` __—
!
T�.1�
� �� �
O W ��� t>
� o a � 'x �,
'''� o "'�� �
'+.+ o �, �n ..,+
�
o� Q °n �;Q � m
tA W'O Z
F1 � �a �^ � � � 3 �O
�
woa�W � `° ►�+ o
Hw � � o ^ �� °o �
' O i� y'-I� � . � �.+
� v
id ��q � ` +' � �
0
H y �► � � N � cn u�i
�d �� �
W ��� �� � b � �
i� � •� �o �
.ti ai 3
m � '� a�i
. a'� � cn
�{ N
a � o �
w ro
� U �
3 �
o �
� ��
U.. v� o � �.�i
� CJ C7 � N � �
� (f? H II U � �
Z R+ O
+� _
y O O , =a �,
G) H rya N 1.�
� �
� a a ,u �
� U H J w •r�i
� ,� O O �U o U
� ,� J cn
�
3 �`e �
�=
�
�
, r
"_�_�'��._____ s�t�"�
` - �.��
i �p '�
� � �-�` 1
� � o� �
y ° �, z°o�i
�� � II ,
a W ... `�� .1�-I C�l
� S� O e-�
�� � � � PQ W
� �
a raxiu�te ro r Line� �
'°� ,_---• _�--_._� �_�� _ __..e__._
�. ,,,a _��
�-; t
i
�
.,.�:iw.at X ""_�""'rr�
FROM : Ih�TERSTRTE G�OT�CHNICAL ENG PHONE �0. : 651 769 2�67 Nov. ].3 ��14 1�:��AM P2
lnt��-�tate +�eotec.hni��� �n�rnee�riug, �ue
Patrick J I�ines,P�
S���ioo�s�s
Cottug�Grove MN 55{}1 G
{'612)414-5770
13 T;ovem��r 20]4�
Mr 7�m�� Rudo�
14 84� Tiniberhi�I�.�ad
i�Izmr��t+�nka Ivliti 5534�
R�: �u.b��r#�a�� Sai1�nv�sti�atitar�
�°r���scd Sin.�1e Fanul��e�zdenc�
't� �f 20�1 W GSth �t, +��anhasser�, Minn
T�is is in respoz�se to y�tY�e can�aGt o�recent regardin�gr�und�3ter cm #�is prajeat. As you
�Cnow, T invcsti�ate�i the�o�k��s# r��onth�nd isstYed a re�ort d��k�d 2S (�ctQber 2014. r fot�nd
a tt�tal of 7' & SjJZ' �f ut�suz�abl�soil at the lc>cations of B���g t �Prob� lA,respecf�velY,
in the fQrm of to�soil��1,g���t'�I a�nd varying fi11,�uried a�-i����k►u,n�us and overly soft�1�y
or maxX. F�x�t suit�bfe base sail i� a loas� to £'�zxn �a�td c�r a soft to mec#iurr� 1�an �l�y. S
r.ea�rxzimended��emavin��hese rnatcri�is a��p�acia�g oc�nt�-c�lled�il,�iQt��ig tha.t you will k�aue
ta seriausly cantrai�rounciw�ter i�a tkz���x4����.Reg�rding�raundw�ter,�foun+�zt v�xy h?�1�
oz�t�,zs sit�-at�stabilized l�vel of I.$'.As I undez�tand it,Ttxe�City ofChan���.ssen has asked
i�`this vvater I�val wil� �han�� as a result 4f sit�conrection.
� used as a st.�biliz�d w�tex 1e��� tlie �.�' fo�and a d�y ��'ter the hand aug�r �hase was
c�mpl�ted.I�i�d�n.Gountered wate�w$ile dril�ix��and di�achie�v�t1�e�+ase gra�.ular sail th�t
first day.`�Jhen T did 1�a�po���r�uger phase,w�tez was�re�ping�ap to nearly tl�e sarn���v+�l
� �'ew ha�r� 1�ter, sa Y felt tl�t tk�e 1.8' �s v��id. 7 b�li�ve thak, w��n �c�u correct this lo�,
�orxtzcallu��gi�ou��,dw�ter,��nc�compa.ctin�fili,ino�t�zk��y,�rilrlar,thc groiar�d���terwi�I sdaza
r�bt��tnt1 tr��t$ axigi�ai I�v�I- 1.�'as�ot��d�n axxy b�r-i�.g.I£y�u construct�r�.i�����zzd�c�or�
��t� dz�ai��ge on yaur finish�d pxt�jec�� gro��ndwa.ter will nQt T�� a£'£�c�t�d by �ny artificial
x•��k�at-�e t]�e result�f your activxti��.
If you liav� any a.dditi4nal r�u��tion� an this, ar if Z c��z� be af assist4nce in �n� ac�d�t���7a1
c�p�c�ty, dr��at hesitate tc� �c��xtact ri�e at you�•conv�ni��c�.
�i�a�rely,
Ii�1T�RSTAT� .�`.x�QTECHN1�Qa�s�T��T�ERII�TG, I�c
�����Y+hR641�,�,� �1'��ia_�+� C�i;I�fi:..,�''�i�ii�!!'�'� ���"'?!,Cr�i v�":�'��t+.�i�i �i�
����� • � , ,: � y
������+�'I�y�^�,,�jn�`�y� ��r ��f�i� � �,.'r.3 i� ,�. � �✓e i�i`� r� 1 �i��^ ,i-, iel�� FJ;�����
�"atri�k.X Hines �'� � � � ��� U. _?±','�r ,.�,�-.��.�;;�,,�� I t�..�r��1.��`t �.,�:��;����"� ��'�;���;Ot�lA�
+ � '*�'� '��Q84 � �r �-. : r
,o : �� i�Cc'S IJIV���i�i1L" L1-i�d�,�. Q� �fIC .�i�F�i� (��' iY���,��L�.�,r�T�
pre�i c�er�t �ro= STs��E �"�Q �
��:e� Or t o�, � �,n.J
�'+ �
�'' �'� ' IJ�TE: i� /�t9cr (�F 1�91�iVESOT,�R�G. Nfit� � 2.c�S's''4�
� d;�N�S�.r`��Ss�r'`� '
p�:tlS� �����d�x°i s►p Q��� -- +
r
+
AI-Jaff, Sharmeen
From: Chris Jerdee [cjerdee7@gmail.com]
Sent: Friday, September 26, 2014 11:26 AM
To: AI-Jaff, Sharmeen
�c: Chris Jerdee
Subject: proposed lot split and site development on W. 65th Street in Chanhassen
Hello Sharineen,
My name is Chris Jerdee and I live at 2081 W. 65th Street in Chanhassen. I think I spoke to you a couple of
weeks ago on the phone about the lot next to mine and a proposed splitting of the lot. The property was
recently sold to gentlemen who is "flipping" the property and it's come to my understandulg that he plans to
split the lot into two parcels.
The puipose of my letter is twofold. First, I want to inform you and/or whoever else might be working on this
particulai-project that the lot in question has a pretty significant water problem. I'm surprised it was ever built
on in the first place because the 1ot literally becomes a duck pond every spring when the snow melts and then
again every tune we get any significant rainfall. It will get standing water more than ankle deep on both the
western edge of the lot bordering inine and also on the south side of the lot. As I understand it there are springs
underneath the ground and the water table is very high. This is coupled with the fact that the st�•eet is higher
than the lot so the water has nowhere to drain. I tried to i-emedy this on my property by having a landscaping
contractor install drain tile that ties into the catch basin in the culdesac. Unfortunately the lot in question next to
me has an even larger drainage problem so it still iinpacts my propel�ty.
Second, and more importantly, I want to be sure that if the lot is indeed approved to split and a new home is
built that the proper steps are taken to ensure that any watershed does not impact my lot further. If any grading
is done to build a new structure I wailt to be sure that it is not done in such a way that siinply moves the water
problem from that lot on to mine.
Hopefully whoever buys the property does their due diligence and has a percolation test done because if not I
think they might end up being suiprised.
Thanks in advance for your consideration regarding this inatter. If you or anyone has any questions I can be
reached at 612-385-1329.
Chris Jerdee
��s+'`t����-���F ���
RECEII��.,;� "�"; �
�S�p � � ,, ; { ��
CNANNA�SENP/.�MMI��a��=,;
.
,� .�^;�e,�9f����_`�,
�
-
�a �,
r
- � � �-������
����
/ �' � ��-����-�5� �� ?'�-<..> � � ,�:� �b.� �.
�;
�'�i3� I����,���-� ��;�/�... �� ,:.�.�-���-�j �d�..�
s 1 CY'.�E7�'7�"'rt'
., �
Cr��-s�' � S��-�- S�: ��'=i��`���- �,�-t`���
� � � ��6,S�"�� �S T
���� �1.�'�� o� /'yv�tltf�°�/�`�.�y,=�_ .
�j1��t,�Zi�S� d� T�,� /�iG h� ' . t r `�: ° = ' `
�:
���P � x : �� `.�. �y R:=.; , �.
1;� �� �`��._� 7h�-���2��i� �S r a�u �tsrt� s�.✓�y
� ��""d t,i+�1�.'. �,�� z�` c �+u L.� �L 1�t�t t� r f€.�' 7`}�-����1-c5�'"'
�-`�t� 0 ,� ,�`h�� .L-a T ��e%� GG��T��1�?"' /�` ,��1����,
/�v 5 v�� -�u DVL�r �a7' ��� T�/�Z ��'�'� ��J
�- t�/�-1,�.��."� ��"�.� '�`�T e� T�-�: �� '� `"x=� `"`� ��
�"��,.'t� ���r�a5.�b /J�:v,�.b��'1�"." ���� �
�`'��-"..,�`�#"�t�" /�5' �r'� �'�" ��'� .�� 1.a�°" B-�..� ����.�_�� �
,�°����'"�/� ��� o•� Ti�.r �"�T' ��.� ��-��l.r�?�
�,%'�1°r-� 1�J� �t� �'��'� �1�� 7'"�� ���s� cr/� �t�ft..%,
�
-� ��}7�/� /�C�UA� _���/��5+11,..T` �S p r� T�-}� ��E�L,/�
���,�" t�^� ��;� ��LS�� ��'11�r2.���'G�� ��L�'IJie"�
.�` �e�ls� /�` t� t�e,.r� ;�"�� 1'3��.f�G �$�� f�/�',�e��'�
����t� � t��-� t��..� ��,�-�.�-sr" ���-.�
�'� I�'�C��' � / � d� t��" l`:�` ���3 �iv �.�i�
. ��-�` f���G o2,�-�T,te�/E't.� ��2 f�Y913 �i�.�L��
�' �� � g Tt"�S F t��,'" T� �`a G,�' l� ,�3",�-t, T�1-nv LE
/ �L.1�J�,�/��"'�� , 7`/��' �Sr�-���' 5���"''��r�
a�.�t�.�� �"��.� �..�T����. �� f��� e�r�-~ ��
� p��-r�►�� ��` ��� �-� �'3a�f�-�� ��--���..
f� �a a �r'�. ��i.���'"� �, � ��� �s��'i� �s��`Tt�f�
� � ��������� �� �� �r� ��
�'� e��-�°�- ����� �'"1�-°�+1��,��� c� � �,��trz+�y�
�'���� �3 v�— 7—��- ��l,r'��c� �' � r����,�'
f i���5'�P�..,� i�. , a� o �v �►�i G �t-��/�-� .��`�'I.A&�G fi�� c171
,� `'. . �4=.�/, ���,� �����5_ � 5 T�r�-�r ��'�Jd�?�-�. /�t�t`J�T�L�,4���
����.,� �i�. ��s�i�`,� �v ,�"���, ;� �
, .
3�� l
/J�. 4�1 1+✓ y9�'' +}. -,; �1{ 'r.Pr • ,r 'i K�.,�� ) �t p ,�i. . y�� `�'/��y�.� �{ �E�+r—?--�
/V/�`d Y ��' 'y.`�'''..- � � F w✓i.ee' �s'�x �4��q Y isf l,+4=�%��'aii6 17'� � !, •'1 �''a1�s�-'�
����'� /�'T�� � ,� �' Ct��/�-�r} � �►�-��? #1� ,G ��� �=``'�
�� T,��' <'. �.,�L.����'�t-� �-�� ����-�'°� ! .�"'l..�`�' ��� :� �_ _: -
,�,l�c�z. '.3.�°'��-.�,�o�7+C..�/�..1�:` :�.
���.., .;r' ;� t1� �� � `� a`- -- � ,�; � ,,° �. ; r ;�
� a ��"'� ! �" ,�'/�L�g'� (,�',1� t� �'`�;�� ���.���':� � ������e}��".�.���...���r
.�:_, .:
�{'', ° r =� ,�`.�.-��. � ��`, ,_� ' �
_ /``"
. .� <„� n,�
�, :�� ��� �����.�������. t`a����' ��� �"���"/t��1��f������:;
fi�1L� L-=�j���,� /'9� �6��-' �" ��i��/LS _�i/��.1 -�����
.�? c��� ��=t�� /�-tl�' �'�� �J�,so�� , .S'�s�,�- 1��1�t,�-��.��;:
�'�/.��—,�����. u�v�'�-1 � /s���' L�.� G�T l it.d cJ�4—L�y�
/� %�'� $��./r,� J���q--�L1 ,f��-/h� �E'���,�-�:,. ,
� �
� ��� ���" ���-�,��� �s � �� ��-�---�-�>��. �-�-.�-�__
�tJ�� t� L�dv�.--`7t S �C3 t,�dTi-� Tt�a� /4-+E3 r� Y.� G/La t>�J�
-5'�7'�C ���+tit � �z�t>1v r,)� a�V T/�`I S ,�a�"' �
---- , . ��u 7"�- /�� �t�-�.-"�' TU �3� rv,�� � ��. , f:; F_ . __
_._ ___-_..
. - , a . r �•, . �
/4- l3�-�s�. 3�t��'T;
��JJ! t��5�.� '�'�-�` i�t�`�'�. �t�t�-��i t�� ! �.y :x�_i
�'�� !t/1L L �`��.. d� ,�-�G�t-T �,= 14�-�li �+�!�/�""���.-�: . P
> 1�-��� 7�� T� ��� t,v�3-,�tr�. �r�(�v L.C°'� �" s v 5��-,
j 7' !d 1L,L, U G �t'nI',`� �, �� � .�-.��A, r , � , ,:�. .��. �. II
Zt I����It.� ��,�/� 1 T'� ���
� �
,�'�/L,.�� ��,�� t�j � ��.<'� ;�'� �>...� ` ��,s ��� � �-;;
,� � ;�—� o,� �� �o� / t�,�....2�". ��`�y G�''�L.L,. T-� �-
J�"+�f�,���.+':1 t� F� Z fj�a"r�°� � � ' / �� �.�"�'/-L� � �1'
7"�� /'��'� ,��� 1,�I��.�� �� T�-}��''��-�
��! �J�L� /��'1 c �}/,}a�� ��� ?
/�.�..�,,�'" ,C�� �-;�= .� �- ���- ���� ,�.�,�, �t:t�4.�`�.
��-� �=���.
�� �
��
��Y
�
� ����:� . �-�
�..
AI-Jaff, Sharmeen '
From: judy ashenbach [jashenbach@hotmail.com] ',
Sent: Wednesday, October 29, 2014 11:16 AM
To: AI-Jaff, Sharmeen
Subject: To The Honorable Mayer& City Council Members
This letter is to let you know of our concerns regarding the development
of another lot at the property next door to us; 2061 West 65th Street.
When we purchased out home in 1975, we were told that lot was not a
buildable lot and would not be developed because of stream and wet land.
When Mr. & Mrs. Benz built there home this forced the water our way and
we had to add additional drainage to our home. When they built, I watch the slab of their
home being laid in water. The side of their lot that they built on is the driest
part of that property. To add another home on that lot would mean
more water problems for this street and home owners.
I remember when city sewer was installed and the city had to pump water
from under the street for several weeks before installing sewer.
Please take our concerns to all concerned.
Thank you for your service and thank you for taking the time to serve us and
the City of Chanhassen.
�incerely,
Bill and Judy Ashenbach
2041 West 75th Street
Chanhassen, MN Phone 952-474-6821 jashenbach @Hotmail.com
1
�