Loading...
Project NarrativePROPOSED DEVELOPMENT-OUTLOT B VILLAGES ON THE PONDS 4TH ADDN PROJECT SUMMARY NARRATIVE Introduction Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE PONDS 4TH ADDITION. We are proposing to subdivide and plat this parcel into Lot 1 retail development consisting of a 23,520 sf specialty retail store, as well as Outlot A which will contain the Pond Promenade Road improvements. Sidewalk construction and improvements are proposed along the full perimeter extents of Pond Promenade Road and Main Street as part of the improvements, enhancing the pedestrian friendly character of the project. Benches and bike racks are also being incorporated to further promote the pedestrian character. Architecture and Design The 23,520 sf single story building will be detailed with a varied pallet of warm toned materials for the building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices, standing seam metal roofing, aluminum windows, and fabric awnings. Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of a feature corner tower with a hip roof and wrap around sloped metal roofing at portions of all four elevations. Additional use of projecting fabric awnings and sculpted EIFS cornices provide increased relief within the building facade. The 50% building fenestration requirement is accomplished with an interplay of massing, color, and material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS cornices, brick piers, and fabric awnings provide a pedestrian scale and architectural detailing to each elevation. Windows at some locations, as governed by the Tenant’s store layout, may be spandrel or translucent glass highlighted with awnings. The exterior of the building is further enhanced with an emphasis to natural plant materials using a green screen climbing landscape element at the east elevation (Main Street) and extensive use of plantings varied in height along the north, east, and south elevations. The outdoor trash storage and loading area is also screened by use of plant materials. Articulation of the south wall elevation is also accomplished with the natural building steps resulting from the receiving appendage and with the added layering and screening provided by the freestanding trash enclosure with an architectural trellis detail. Tenant signage will be integrally lit channel letters and will occur on all four building elevations as allowed by city ordinance, and will be compliant with all allowable area requirements. Stormwater Design One of the unique challenges of this project is meeting the stringent requirements of Riley-Purgatory Bluff-Creek Watershed District (RPBCWD), and specifically the standards which just became effective January 1, 2015. This is further complicated by the existence of primarily group type D soils that are pervasive across this site. Stormwater rate, water quality and abstraction requirements are being satisfied via the construction of an underground stormwater infiltration system. Extensive areas of the parking lot are to be surfaced with pervious pavers over a draintile and rock infiltration basin system.