Loading...
CC Staff Report 07-27-2015CITY OF CHANHhSSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.2271100 Fax: 952.227.1110 MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Sharmeen Al-Jaff, Senior Planner DATE: July 27, 2015 0 -O - t SUBJECT: Approve Resolution Amending Conditions of Approval to Moline's Addition Metes and Bounds Subdivision — Lot 3, Block 2, Moline's Addition — Planning Case #2014-30 On June 8, 2015, the City Council approved a resolution amending the Building Inspections conditions of approval for the Moline's Addition Metes and Bounds Subdivision. Phone: 952.2271180 Fax: 952.227.1190 The incorrect resolution was attached to the report. The only change to this report is a corrected resolution. Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Website www.ci.chanhassen mn.us PROPOSED MOTION "The Chanhassen City Council approves a resolution amending the conditions of an approval to Moline's Addition Metes and Bounds Subdivision — Lot 3, Block 2, Moline's Addition as shown in the amended staff report dated June 8, 2015, and adopts the attached Findings of Fact and Decision." City Council approval requires a majority vote of City Council present. On November 24, 2014 the Chanhassen City Council approved a metes and bounds subdivision dividing Lot 3, Block 1, Moline's Addition into Parcels 1 and 2, Block 1, subject to conditions. One of the conditions of approval was that the applicant was required to install the sewer and water service to the vacant property (Parcel 2) and submit a $10,000 escrow to ensure that the work was complete and the street properly restored. Subsequent to the November 24, 2014 meeting, the applicant requested that this condition be removed so that the person(s) purchasing and building on the property would be responsible for the installation of the sewer and water service, including the necessary road repair to West 65d' Street. The staff report has been edited and conditions of approval amended to reflect this change. All new information will appear in bold. ATTACHMENT 1. Resolution. 2. Staff Report dated June 8, 2015 (bold/strikethrough format). g:\plan\2014 planning cases\2014-30 2061 west 65th street metes & bounds\july 27, executive summary.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: July 27, 2015 RESOLUTION NO: 2015 - MOTION BY: SECONDED BY: A RESOLUTION APPROVING AMENDMENTS TO CONDITIONS OF APPROVAL OF A METES AND BOUNDS SUBDIVISION CREATING TWO PARCELS LOCATED AT 2061 WEST 65TH STREET WHEREAS, John J. and Kimberly E. Corey have requested a subdivision of the property into two lots of 15,165 square feet and 15,159 square feet; and WHEREAS, the Chanhassen City Council held a public hearing on November 24, 2014, and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance and approved Resolution No. 2014-78; and WHEREAS, the Chanhassen City Council met on June 8, 2015, and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance and approved Resolution No. 2015-35; and WHEREAS, one of the conditions of approval was that the applicant was required to install the sewer and water service to the vacant property (Parcel 2) and submit a $10,000 escrow to ensure that the work was complete and the street properly restored; and WHEREAS, subsequent to the approval, the applicant requested this condition be removed so that the person(s) purchasing and building on the property would be responsible for the installation of the sewer and water service, including the necessary road repair to West 65t' Street. NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby: 1. Rescinds resolutions 2014-78 and 2015-35. 2. Approves the following metes and bounds subdivision of 2061 West 65rd Street (Planning Case #2014-30) for property legally described as Lot 3, Block 2, Moline's Addition, Carver County, Minnesota: PROPOSED PROPERTY DESCRD'TIONM parcel i rue %wt 97.50 feet of Lot 3. Block 2, MOLr;FS ADDITION, according to the mcaded plat thereof Cann County Minnesotut. togetba aith euemmts for dramage and utility purposes ora under and aams the notthesiy 1000 feet, the sowhexly 10.00 Leet: the easterly. 500 fee[ ad the weS'Aly 5 00 fee thereof Parcell That part of La 3. Bion 2, MOUNTS ADDITION, wordw w the recorded plat thereof, Canxr CounMu o Iota 0.Tuch lies erase of the rest 97.50 feet. tordm with easements for drauuge and utility purposes over under and Gross the uord*dy 10.00 fat: dc southerly 10.00 feet the mterly 5.00 feet, and the wtsterly 500 fen thereof 3. Amends the conditions of approval to the metes and bounds subdivision for property located at 2061 West 651h Street (legally described as Lot 3, Block 2, Moline's Addition, Carver County, Minnesota) as follows: a. Metes and bounds subdivision Parcel 1 and Parcel l with the following conditions: Building The existing structure on proposed Parcel 2 must be provided with sanitary sewer connection — permit required. 2. Proposed Parcel 1 must be provided with separate sewer and water services (permit required) before a building permit is issued. Engineering The City Attorney shall draft and the developer shall execute a "Grant of Permanent Easement for Public Drainage and Utility Purposes" document. This document shall be recorded with the metes and bounds subdivision. 2. A roadway, drainage and utility easement must be dedicated over the portion of the existing cul-de-sac within the property and 15 feet beyond the edge of the road. This easement shall be recorded with the metes and bounds subdivision. 3. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision) plus $10/parcel. 4. Sewer and water hookup charges are due for *met Parcel 1, a portion of which shall be collected before the metes and bounds subdivision is recorded: Water: 1 unit x $1,957/unit = $1,957 Sewer: 1 unit x $677/unit = $677 The remainder of the sewer and water hookup charges for Parcel 1 shall be collected with the building permit. 5. If the final subdivision submittals are received after 2015, all fees shall be recalculated based on the rates in effect at that time. 6. A plumbing permit is required for the private storm sewer; the plumbing inspector will inspect the connection to the city storm sewer manhole. On Parcel 1, the proposed home style as required by City Code Section 18-40 (4) 2 (iii) is a slab -on -grade home. Based on Interstate Geotechnical Engineering's observations, the groundwater elevation is 1.8 feet below the ground elevation of the soil boring. The developer must verify the surface elevation of the boring location to determine the elevation of the groundwater; the lowest floor must be minimum three feet above that elevation per City Code Section 18-40 (4) 2 (i). 8. Before a building permit is issued for Parcel 1, the water service and sanitary sewer service must be installed. The sanitary sewer is within West 65s' Street, therefore installation of a sanitary sewer service will require cutting into and patching the City street. A Work in Right of Way permit must be obtained before installing the water and sanitary sewer service; an escrow for street repair to ensure that the street is restored shall be part of the permit requirements. The estimated cost of the street repair was $10,000 in 2014. The escrow amount shall be adjusted according to the construction costs at the time the Work in Right of Way permit is issued 9. Approval of the subdivision is contingent upon the applicant or property owner entering into a development contract with the City. 10. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce this Contract or for allowing deviations from it. 11. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. 12. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. 13. Release. This Contract shall run with the land and may be recorded against the title to the property. After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. 14. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. 15. Assignability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or both lots. 16. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. 17. Soil Correction. The property owner or his/her contractor shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi -lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. 18. As -Built Lot Survevs. An as -built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before the as - built survey is completed. If the weather conditions at the time of the as -built are not conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may be issued and the as -built escrow withheld until all work is complete. Environmental Resource Specialist 1. Tree protection fencing will be required around any preserved trees. It shall be installed prior to grading and located at the drip lines of the trees. 2. Landscaping shall be installed in accordance with City Code Section 18-61. Unless otherwise approved by the City, trees not listed in the City's approved tree list are prohibited. The minimum tree size shall be two and one-half (2%2) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). The lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October I through May 1 these conditions must be complied with by the following July 1 st. Upon expiration of the time period, inspections will be conducted by City staff to verify satisfactory completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the security to satisfy the requirements. The 0 City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. Parks 1. Park fees of $5,800.00 shall be paid for each new single-family lot prior to the recording of the property deed. Planning 1. Deeds shall be submitted to the city for review and recorded at Carver County for the two parcels. 2. A building permit shall not be issued unless all soil corrections have been completed as indicated in the attached exhibits titled "Subsurface Soil Investigation" dated October 25, 2014 and November 13, 2014. 3. Changes in Official Controls. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City s Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 4. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 5. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. 6. Compliance with Laws, Ordinances, and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: a) City of Chanhassen; b) State of Minnesota, its agencies, departments and commissions; c) United States Army Corps of Engineers; d) Watershed District(s); e) Metropolitan Government, its agencies, departments and commissions. Proof of Title. Upon request, the Developer shall famish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. Water Resource Coordinator 1. Total surface water management fees due prior to recording the property deed are $1,914.55. 2. Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with City Code § 7-22. Passed and adopted by the Chanhassen City Council this 27h day of July, 2015. ATTEST: Todd Gerhardt, City Clerk/Manager Denny Laufenburger, Mayor YES NO ABSENT 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.2271140 Fax 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax. 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.2271400 Fax 952.2271404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.2271310 Senior Center Phone: 952 2271125 Fax: 952 2271110 Website www ci.chan hasse n. unn, us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Sharmeen Al-Jaff, Senior Planner DATE: Ne,,,ember 24, 2014 June 8, 2015 SUBJ: Moline's Addition Metes and Bounds Subdivision Lot 3, Block 2, Moline's Addition -Planning Case #2014-30 PROPOSED MOTION "The Chanhassen City Council approves a metes and bounds subdivision creating two lots subject to the conditions of the staff report and adopts the attached Findings of Fact and Decision." City Council approval requires a majority vote of City Council present. EXECUTIVE SUMMARY The applicant is requesting metes and bounds subdivision approval to divide 30,324 square feet into two lots. City council may approve a metes and bounds subdivision of a lot into two lots inside the urban services area if both resulting lots meet the minimum requirements of the zoning ordinance and abut an existing public street, pursuant to Section 18-37 (b) of the Chanhassen City Code. PROPOSAL SUMMARY Request for a metes and bounds subdivision of 30,324 square feet (0.69 acres) into two (2) lots on property zoned Single -Family Residential (RSF) and legally described as Lot 3, Block 2, Moline's Addition (2061 West 65"' Street). Applicant: JMBC — James Brudos 14846 Timber Hills Road Minnetonka, MN 55345 (612)855-4949 Jmbrudoscompany@grnail.com Chanhassen is a Community for Life - Providing forTodayand Planning torTomorrow Todd Gerhardt 2061 West 65a` Street Metes & Bounds Subdivision NIa 4.3Juue 8, 2015 Page 2 of 12 Owner: John Corey 6409 Oxbow Bend Chanhassen, MN 55317 (612)221-8923 Coreyone1994@gmail.com The site contains a single-family home which is proposed to remain. Access to the site is gained via West 65s Street. The site contains a low area along the southwest corner of the property. There is a septic mound west of the existing single-family home that is proposed to be removed. There are some mature trees on the site. The majority of the trees are proposed to remain undisturbed. West 65th Street L In L - � BLOCK �2 P •. , sar�a9'ar ass c4 -- . — __ _ Todd Gerhardt 2061 West 651i Street Metes & Bounds Subdivision June 8, 2015 Page 3 of 12 The applicant is proposing to subdivide the property and locate a single-family home on the westerly portion of the site. The proposed subdivision meets city ordinance requirements and staff is recommending approval subject to the conditions of this staff report. The Moline's Addition plat was filed with Carver County on December 29, 1969. The existing home was built in 1981. No other records exist. APPLICABLE REGULATIONS Chapter 18, Subdivisions Chapter 20, Article XII, "RSF" Single -Family Residential District LAND USE: Residential Low Density (1.2 — 4.0 units per net acre) SUBDIVISION REVIEW The applicant is requesting a metes and bounds subdivision creating two lots. The net density of the development is 2.8 units per acre. Both parcels meet all the lot area, width and depth requirements. Parcel 2, which contains a single-family home, will have a total hard surface coverage of 24%. The city code allows up to 25%. The existing structure meets all required setback requirements. EASEMENTS MOLINE'S ADDITION .i N ' — : ._ �,< �mcs m t 7 �r it .,• c�owm SII is �100@� :I u riaun-tea n f , I a � I *rycw� The developer proposes 10 -foot front and rear yard and 5 -foot side yard drainage and utility easements on each lot, as shown on the plans. The City Attorney shall draft and the developer shall execute a "Grant of Permanent Easement for Public Drainage and Utility Purposes" document. This document shall be recorded with the metes and bounds subdivision. Todd Gerhardt 2061 West 65"' Street Metes & Bounds Subdivision r"_ 6—, 241-55June 8, 2015 Page 4 of 12 A roadway, drainage and utility easement must be dedicated over the portion of the existing cul- de-sac within the property and 15 feet beyond the edge of the road. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision) plus $10/parcel. STREETS The proposed subdivision is adjacent to West 65a` Street, a 25 -foot wide public street within a 60 -foot wide right of way without curb and gutter. This street was constructed in 1979 and was overlaid in 2013. The current standard for new streets within Chanhassen is 31 feet wide with curb and gutter. Staff does not recommend that the developer install curb and gutter along the property frontage since the remainder of the roadway would remain a rural section. UTILITIES There is one sewer and one water service within West 65a' Street that provides service to the existing home. The developer- ..,.,.poses t, install a e sewer sevviee to two e.>isting home Prior tor-e o o „ se .,,....t bordi g tw,.....wa:yisie 1n 000 security e ..reN4ded t„ o .. e. that Ohe weet is 1 condition after eiie freeze thaw eyele, Currently there is no water service or sanitary sewer service to Parcel 1. The proposed locations of the services are shown on the utility plan as a reference; the developer will not be installing the water service or the sanitary sewer service. Before a building permit is issued for Parcel 1, the water service and sanitary sewer service must be installed. The sanitary sewer is within West 65' Street, therefore, installation of a sanitary sewer service will require cutting into and patching the city street. A Work in Right of Way permit must be obtained before installing the water and sanitary sewer service; an escrow for street repair to ensure that the street is restored shall be part of the permit requirements. The estimated cost of the street repair was $10,000 in 2014. The escrow amount shall be adjusted according to the construction costs at the time the Work in Right of Way permit is issued. Sewer and water hookup charges are due for the new lot, a portion of which shall be collected before the metes and bounds subdivision is recorded: Water: 1 unit x $1,886 $1,957/unit = $1,896 $1,957 Sewer: 1 unit x $664 $677/unit = $664$677 Todd Gerhardt 2061 West 65"' Street Metes & Bounds Subdivision Nla ''.may 5June 8, 2015 Page 5of12 If the metes and bound subdivision is recorded after December 31, 2015, the partial sewer and water hook-up rates in effect at that time shall be collected. The remainder of the water and sewer hookup fees shall be paid with the building permit at the rate in effect at that time. GRADING & EROSION CONTROL Surface water currently drains from the back to the front of the property. The developer proposes grading on Parcel 1; Parcel l with the existing home will not be altered. The developer will install a private storm sewer system on the Parcel 1 and grade the property so that surface runoff will not leave the site. The proposed private storm sewer system will connect to the city storm sewer in front of Parcel 1. A plumbing permit is required for the private storm sewer; the plumbing inspector will inspect the connection to the city storm sewer manhole. There is evidence of high groundwater conditions in the area: Infiltration into a sanitary sewer manhole in the area. The infiltration was abated with the 2013 street project. 2. Site investigation performed in 1980 by Hakanson Anderson Associates, Inc. (attached) indicated mottled soils on the property 18 inches below the surface. Mottled soils are indicative of periodic soil saturation. 3. Site investigation performed in 1981 by Subterranean Engineering, Inc. (attached) indicating presence of water during borehole drilling, rising to 2.6 feet below the ground surface. 4. Site investigation performed by Interstate Geotechnical Engineering, Inc on October 25, 2014. On Parcel 1 the proposed home style as required by City Code Section 18-40 (4) 2 (iii) is a slab - on -grade home. Based on Interstate Geotechnical Engineering's observations, the groundwater elevation is 1.8 feet below the ground elevation of the soil boring. The developer must verify the surface elevation of the boring location to determine the elevation of the groundwater; the lowest floor must be minimum three feet above that elevation per City Code Section 18-40 (4) 2 (i). Interstate Geotechnical Engineering recommendations include removal of some of the material found on the site and placement of controlled fill. On November 13, 2014 Interstate Geotechnical Engineering provided a follow-up letter with a professional opinion that the groundwater elevation will return to its original level after the soil corrections are completed on the lot. Todd Gerhardt 2061 West 65th Street Metes & Bounds Subdivision "l^^26,24' SJune 8, 2015 Page 6 of 12 PARKS AND RECREATION The proposed subdivision is located within an area that is in the municipal park service boundaries of Pheasant Hill Park and the Minnetonka Middle School West Campus. The property has access to the city's comprehensive trail system located on Galpin Boulevard. In lieu of parkland dedication or trail construction, the development shall pay full park fees in force for the one new lot at the time of subdivision approval. Parks fees for 2014 are $5,800.00 per single-family lot. LANDSCAPING AND TREE PRESERVATION The applicant did not submit tree canopy coverage and preservation calculations. Estimated calculations are as follows: Total upland area (excluding wetlands).....................30,324 SF Baseline canopy coverage..........................................26% or 8,160 SF Minimum canopy coverage allowed ..........................30% or 9,097 SF Proposed tree preservation.........................................25% or 7,720 SF The applicant does not meet minimum canopy coverage allowed; therefore, the difference between the baseline and proposed tree preservation is multiplied by 1.2 to calculate the required replacement plantings: Difference in canopy coverage ..................................1,377 SF Multiplier...................................................................1.2 Total replacement .......................................................1,652 SF Total number of trees to be planted ...........................1 tree The total number of trees required for the development is one. There are no bufferyard requirements for this subdivision. MISCELLANEOUS A final grading plan and soils report must be submitted to the Inspections Division before building permits can be issued. Retaining walls over four feet high require a permit and must be designed by a professional engineer. Each lot must be provided with separate sewer and water services. COMPLIANCE TABLE Area (sq. ft.) Width (ft.) Depth (ft.) Setbacks Code 15,000 90 125 Front /Rear 30' Sides 10' Parcell 15,165 97.50 155.5 30/30/10/10 Parcel 15,159 97.50 155.5 30/30/10/10 Total 30,324 Todd Gerhardt 2061 West 651' Street Metes & Bounds Subdivision ^4^=.==y-46—,2413June 8, 2015 Page 7 of 12 RECOMMENDATION Staff recommends City Council approve the subdivision creating two lots subject to the following conditions and adoption of the attached Findings of Fact and Decision. Building The existing structure on proposed Parcel 2 must be provided with sanitary sewer connection — permit required. 2. Properties Proposed Parcel 1 must be provided with separate sewer and water services (permit required) before a building permit is issued. Engineering 1. The City Attorney shall draft and the developer shall execute a "Grant of Permanent Easement for Public Drainage and Utility Purposes" document. This document shall be recorded with the metes and bounds subdivision. 2. A roadway, drainage and utility easement must be dedicated over the portion of the existing cul-de-sac within the property and 15 feet beyond the edge of the road. This easement shall be recorded with the metes and bounds subdivision. 3. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision) plus $10/parcel. 4. Prior to reeerding the subdivision a $ 10,000 seourity mast be provided to enstife tha4 good .. ndifie« after one flee e thaw r ...lo 5. Sewer and water hookup charges are due for' Parcel 1, a portion of which shall be collected before the metes and bounds subdivision is recorded: Water: 1 unit x $1;886 $1,957/unit = X886 $1,957 Sewer: 1 unit x $664 $677/unit = $664$677 The remainder of the sewer and water hookup charges for Parcel 1 shall be collected with the building permit. 6. If the final subdivision submittals are received after 2414 2015, all fees shall be recalculated based on the rates in effect at that time. Todd Gerhardt 2061 West 65`s Street Metes & Bounds Subdivision N'''nJune 8, 2015 Page 8 of 12 8. A plumbing permit is required for the private storm sewer; the plumbing inspector will inspect the connection to the city storm sewer manhole. 9. On Parcel 1, the proposed home style as required by City Code Section 18-40 (4) 2 (iii) is a slab -on -grade home. Based on Interstate Geotechnical Engineering's observations, the groundwater elevation is 1.8 feet below the ground elevation of the soil boring. The developer must verify the surface elevation of the boring location to determine the elevation of the groundwater; the lowest floor must be minimum three feet above that elevation per City Code Section 18-40 (4) 2 (i). 10. Before a building permit is issued for Parcel 1, the water service and sanitary sewer service must be installed. The sanitary sewer is within West 65' Street, therefore installation of a sanitary sewer service will require cutting into and patching the City street. A Work in Right of Way permit must be obtained before installing the water and sanitary sewer service; an escrow for street repair to ensure that the street is restored shall be part of the permit requirements. The estimated cost of the street repair was $10,000 in 2014. The escrow amount shall be adjusted according to the construction costs at the time the Work in Right of Way permit is issued 11. Approval of the subdivision is contingent upon the applicant or property owner entering into a development contract with the City. 12. Third Parties. Third parties shall have no recourse against the City under this Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce this Contract or for allowing deviations from it. 13. Severability. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. 14. Waivers/Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. 15. Release. This Contract shall run with the land and may be recorded against the title to the property. After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. Todd Gerhardt 2061 West 65h Street Metes & Bounds Subdivision "'`^.:ay-24,-2414SJune 8, 2015 Page 9 of 12 16. Remedies. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. 17. Assignability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or both lots. 18. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. 19. Soil Correction. The property owner or his/her contractor shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill material that have been mass graded as part of a multi -lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. 20. As -Built Lot Surveys. An as -built lot survey will be required on all lots prior to the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before the as -built survey is completed. If the weather conditions at the time of the as -built are not conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may be issued and the as -built escrow withheld until all work is complete. Environmental Resource Specialist 1. Tree protection fencing will be required around any preserved trees. It shall be installed prior to grading and located at the drip lines of the trees. Todd Gerhardt 2061 West 65h Street Metes & Bounds Subdivision Nla 'y,June 8, 2015 Page 10 of 12 3. Landscaping shall be installed in accordance with City Code Section 18-61. Unless otherwise approved by the City, trees not listed in the City's approved tree list are prohibited. The minimum tree size shall be two and one-half (2%) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). The lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall be provided to the City. These conditions must then be complied with within two (2) months after the certificate of occupancy issued, except that if the certificate of occupancy is issued between October 1 through May 1 these conditions must be complied with by the following July 1st. Upon expiration of the time period, inspections will be conducted by City staff to verify satisfactory completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not satisfied, the City may use the security to satisfy the requirements. The City may also use the escrowed funds for maintenance of erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this Contract or of City ordinances. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. Parks 1. Park fees of $5,800.00 shall be paid for each new single-family lot prior to the recording of the property deed. Plannin¢ Deeds shall submitted to the city for review and recorded at Carver County for the two parcels. 2. A building permit shall not be issued unless all soil corrections have been completed as indicated in the attached exhibits titled "Subsurface Soil Investigation" dated October 25, 2014 and November 13, 2014. 3. Changes in Official Controls. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the Todd Gerhardt 2061 West 6511' Street Metes & Bounds Subdivision "'`^.may-26,-2413June 8, 2015 Page 11 of 12 City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 4. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. 5. Variances. By approving the plat, the Developer represents that all lots in the plat are buildable without the need for variances from the City's ordinances. 6. Compliance with Laws, Ordinances, and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: a) City of Chanhassen; b) State of Minnesota, its agencies, departments and commissions; c) United States Army Corps of Engineers; d) Watershed District(s); e) Metropolitan Government, its agencies, departments and commissions. 7. Proof of Title. Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to enter into this Development Contract. Water Resource Coordinator 1. Total surface water management fees due prior to recording the property deed are $1,914.55. 2. Erosion Control During Construction of a Dwelling or Other Building. Before a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with City Code § 7-22. ATTACHMENTS 1. Findings of Fact and Decision. 2. Resolution with attachments. 3. Development Review Application. 4. Reduced Copy Existing Conditions Survey. 5. Reduced Copy Lot Split Exhibit. 6. Reduced Copy Grading & Erosion Control Plan. 7. Reduced Copy Utility Plan. 8. Public Hearing Notice and Mailing List. Todd Gerhardt 2061 West 65h Street Metes & Bounds Subdivision Mal "'�i-SJune 8, 2015 Page 12 of 12 9. Soil Percolation report from Hakanson Anderson Associates, Inc. dated September 2, 1980. 10. Soil Investigation report from Subterranean Engineering, Inc. dated June 29, 1981. 11. Subsurface Soil Investigation Letters from Patrick J. Hines, PE, President of Interstate Geotechnical Engineering Inc. dated October 25, 2014 and November 13, 2014. 12. Correspondence from: a. Chris Jerdee dated September 26, 2014. b. Terry Atherton dated October 27, 2014 c. Bill and Judy Ashenbach dated October 29, 2014 g:\plan\2014 planning cases\2014-30 2061 west 65th street metes & bomds\staff reportIdoc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND DECISION IN RE: Application of John J. and Kimberly E. Corey for Subdivision approval. On November 24, 2014 the Chanhassen City Council met at it's regularly scheduled meeting to consider the application of John J. and Kimberly E. Corey for a metes and bounds subdivision approval to create two lots. The City Council conducted a public hearing on the proposed subdivision preceded by published and mailed notice. The City Council heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Single -Family Residential District, RSF. 2. The property is guided in the Land Use Plan for Residential Low Density uses. 3. The legal description of the property is: Lot 3, Block 2, Moline's Addition. 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this subdivision ordinance; e. The proposed subdivision will not cause environmental damage; f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: 1) Lack of adequate storm water drainage. 2) Lack of adequate roads. 3) Lack of adequate sanitary sewer systems. 4) Lack of adequate off-site public improvements or support systems. 5. The planning report #2014-30 dated November 24, 2014, prepared by Sharmeen Al-Jaff, et al, is incorporated herein. DECISION The City Council approves the metes and bounds subdivision creating two lots. ADOPTED by the Chanhassen City Council this 24a` day of November, 2014. CHANHASSEN CITY COUNCIL M Mayor RI CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: November 24, 2014 MOTION BY: RESOLUTION NO: 2014 - SECONDED BY: A RESOLUTION APPROVING A METES AND BOUNDS SUBDIVISION CREATING TWO PARCELS AT 2061 WEST 65th STREET WHEREAS, John J. and Kimberly E. Corey have requested a subdivision of the property into two lots of 15,165 square feet and 15,159 square feet; and WHEREAS, the Chanhassen City Council held a public hearing on November 24, 2014, and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance. NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby approves the metes and bounds subdivision of 2061 West 65`d Street (Planning Case #2014-30) for John J. and Kimberly E. Corey for property legally described as Lot 3, Block 2, Moline's Addition, Carver County, Minnesota, subject to the following conditions: Building The existing structure on proposed Parcel 2 must be provided with sanitary sewer connection — permit required. 2. Properties must be provided with separate sewer and water services. 3. Existing Subsurface Sewage Treatment Site on proposed Parcel 1 must be properly discontinued and abandoned — permit required. Engineering The City Attorney shall draft and the developer shall execute a "Grant of Permanent Easement for Public Drainage and Utility Purposes" document. This document shall be recorded with the metes and bounds subdivision. 2. A roadway, drainage and utility easement must be dedicated over the portion of the existing cul-de-sac within the property and 15 feet beyond the edge of the road. Prior to recording the subdivision the developer shall pay the $45 GIS fee: $25 (subdivision) plus $10/parcel. 4. Prior to recording the subdivision a $10,000 security must be provided to ensure that the street is restored. The security can be released when the city determines that the patch is in good condition after one freeze -thaw cycle. 5. Sewer and water hookup charges are due for the new lot, a portion of which shall be collected before the metes and bounds subdivision is recorded: Water: 1 unit x $1,886/unit = $1,886 Sewer: 1 unit x $664/unit = $664 6. If the final subdivision submittals are received after 2014, all fees shall be recalculated based on the rates in effect at that time. 7. The remaining 70% of the sanitary sewer and water hookup fees must be paid with the building permit at the rate in effect at that time. 8. A plumbing permit is required for the private storm sewer; the plumbing inspector will inspect the connection to the city storm sewer manhole. 9. On Parcel 1, the proposed home style as required by City Code Section 18-40 (4) 2 (iii) is a slab -on -grade home. Based on Interstate Geotechnical Engineering's observations, the groundwater elevation is 1.8 feet below the ground elevation of the soil boring. The developer must verify the surface elevation of the boring location to determine the elevation of the groundwater; the lowest floor must be minimum three feet above that elevation per City Code Section 18-40 (4) 2 (i). Environmental Resource S ecn ialist 1. Tree protection fencing will be required around any preserved trees. It shall be installed prior to grading and located at the drip lines of the trees. 2. Parcel 1 is required to have one tree planted in the front yard. Parks Park fees of $5,800.00 shall be paid for each new single-family lot prior to the recording of the property deed. Planning Deeds shall submitted to the city for review and recorded at Carver County for the two parcels. A building permit shall not be issued unless all soil corrections have been completed as indicated in the attached exhibits titled "Subsurface Soil Investigation" dated October 25, 2014 and November 13, 2014. Water Resource Coordinator 1. Total surface water management fees due prior to recording the property deed are $1,914.55. Passed and adopted by the Chanhassen City Council this 24th day November of 2014. ATTEST: Todd Gerhardt, City Clerk/Manager Thomas A. Furlong, Mayor YES NO ABSENT In :, _ state Geotechnical Engineering, inc Patrick J Hines, PE 8167 1W St S Cottage Grove MN 55016 (612) 414-5770 25 October 2014 Mr James Rudos 14846 Timber Hill Road Minnetonka MN 55345 Re: Subsurface Soil Investigation Proposed Single Family Residence W of 2061 W 65`" St, Chanhassen, Minn CITYOFCHANHASSUP RECEIVED NOV 0 4 P014 'HANN "EN PLANNINGL7Fpr In accordance with your authorization, I have completed the above referenced investigation to determine site suitability for the proposed construction. A summary of my findings together with boring logs and my conclusions and recommendations are presented in the enclosed report. I found, as you already have been briefed, more than usual problems with the site. There is a total of 5'/4'& 61/4 at the locations of Boring 1 & Probe 1A, respectively, of unsuitable soil in the form of topsoil fill, general and varying fill, and buried original humus. Below at first is a low sand content lean clay, generally dark in color, saturated, very soft to soft (w/ depth). It is "normally consolidated" (consolidated enough to only support its own weight, not additional weight of fill soils or structures above). The overburdening fill has not been inplace long enough to force further consolidation. The moisture content test in this material indicated nearly 42%, high for a lean clay. This material extends only from 53/4 to 7' in Boring 1, but from 61/4 to 83/2'in Probe 1A. The first 9" of this material in Probe lA is very soft and is a borderline marl material. All of the aforementioned materials are unsuitable for structure support should be removed. I do acknowledge that excavators are often reluctant to excavate further once the buried organic soil is cleared, so understandings should be inplace at the time of gathering bids. Base soil below at first is a lean clay, a little sandy, dark gray, saturated, rather soft to medium. It has inclusions of a poorly graded (biased finer grained) sand with a few fines, also dark gray, saturated, loose to firm. Deepest soil, commencing at 1 Pin Boring 1, is a lean clay, rather sandy, dark gray, low gravel content, medium. Theses materials are glacial till. The sand inclusions in the upper portion are glacial outwash. All of these base mineral soils are suitable for residential construction, with conditions. Refusal to auger advancement was not encountered by boring termination depth of 23', indicating lack of bedrock to this level. Very importantly, groundwater was found in the main Boring at 1.8' (elev 961/4±). It is aquifer groundwater, but marginally so. It appears to be contained primarily in the sand inclusions at 7'+. But it also is coming from the upper soft and very soft clay, possibly from SCANNED Mr James Rudos 25 October 2014 Page 2 the lower organic soil. Proper construction on the site (removing the softer lean clay, promoting good site drainage) will mitigate some of this. Thus, water found presently can be regarded as a maximum level. Slab grade of the proposed residence should be set in accordance with City requirements utilizing this level. I recommend complete removal of all unsuitable soil which is likely to be the fill and buried organic soil as encountered plus the overly soft clay found in both the boring and probe. While this amounts only to another V/4 in the vicinity of Boring 1, it is another 2'+ in the vicinity of Probe IA. As indicated, excavators may be reluctant to excavate below organic soil level, but it is necessary (see longer discussion in the report). It is so important that full time inspection of the excavation by a soils engineer may be necessary. Of course, other zones of unsuitable soil not represented by the boring and probe could still be encountered due to the nature of small volume random sampling. Any other depths or zones of unsuitable soil should be removed as well. You could lower footings somewhat so that you have to provide less oversizing and not stray onto the neighbor's property. But footings here should not be lowered so much as to rest directly upon the suitable base soil as it is only marginally suitable. You need a little fill (2' is recommended) to spread footing loads out with depth. Footings maybe generally designed allowing the usual 2000 psf foundation bearing capacity, which will likely result in normal strip or pad footings. Special attention is again drawn to the advisory that excavations be examined by the Soils Engineer to verify soil boring results and to document adequacy of site preparation. Again this is very important as how much soft/very soft clay must be removed will require a high degree of field judgment. Fill, as used, should be tested for compaction adequacy. Soil correction should not be abated below slabs in any manner (ie, do not let the excavator try to "trench around" slab areas). Thank you for the opportunity to have been of service. If you have any questions on this, or if I can be of assistance in any additional capacity, do not hesitate to contact me at your convenience. Sincerely, RSTATE GEOTECHNICAL ENGINEERING, Inc atrick J mes, P>✓ President enclosures pH/SC SOIL BORING LOG Patrick 7 Hines,, PE 8167 100th St S Cottage Grove MN 55016 PRO..IEProposed Single Family Residence CT: West of 2061 W .64h St Chanhassen Minn LOG OF BORING NO: _ I DEPT SURFACE ELEVATION: Iy 98.1 SAMPLEM13THER TEoTS/—GEOLOGY N WB _FEET DESCRIPTIONANDCLASSIFICATION{ TYPE RL. UCPLEAN CLAY; variabl sand Or anic OL L• set _ ue y y' g ( Topsoil N 1 HA •1 Black, w/ tr's mineral Soil, Fill very moist, loose to firm LEAN CLAY, somewhat sandy, Pred Dark Gray (CL) Fill (eia r +j2 HA 2 w/ a: Little 0%tc Soil, w/ tr grave moist to ve moist, loose to firm 3 LEAN CLAY, rather silty, Organic (OL) Buried Black, w/ small roots, tr's undecom- Humus 4 posed vegetation, saturated, rather borderline Sapric Peat in soft 5 er ortion sl lighter, less organic, w/ depth 5.75 6LEAN CLAY, a itt a sandy, Very Darkto Lacustrine 1Dark Gray (CL), very soft to soft (w/ Deposit 77poor depth) 'grae ge gr, wl Glacial med, tr cs), w/ a few fines, Dark Gray Till, w/ (SP)i saturated, loose to firm Outwsh banded w/ LEAN CLAY, a little sandy, inclusion 9, Dark Gray (CL), saturated, rather soft soft to medium @ 8}'+ 10 more bands of clay, less of sand, w/ depth! 11 LEAN CLAY, rather sandy, Dark Gray Glacial 12• (CL), w/ a little gravel Till 1 saturated, medium 16 17 18 20 21 WATER LEVEL MEASUREMENTS DATE I TIME 23 Oct 16:29 SAMPLED DEPTH 7P CASiHG DEPTH CAVE-IN DEPTH None DRILLING IMUC LEVEL WATEA LEVEL 3.8' 24 Oct 13:515' 1.8' " 14:351 to 23' 6}' 3j0 15:201 5§' I I 2.1' 3 I HA ©©x`n Y 1 5 HA Y 6 FA N 1 7 1 FA ©OEM SW a DRILLING DATA 7J' 8%13 5 mpht Breezil rtlyaCllear,j Crew Chief-.__. pH Method: 3" Hand & 4" Power F1iRht* Augers *Mobile B-31 Drill Rig on Dodge Power Wagon commenced: 23 October Boring Completed: 24 October 2014 -SOIL BORING LOU (continued) VarvteA J ff1WOWL, pR 8167 100th St S Cottog('rnvp heft.`5016°. Proposed Single Family Residence t Chanhassen Minn PROJECT: West of 2061 65th St. LOG OF BORING NO: 1 DEPTH SURFACE ELEVATION: 98.1 SAMPLE LAB A OTHER TESTS IN GEOLOGY N WB L L FEET DESCRIPTIONANDCLASSIFICATION }� TYPE R W DE P.L. LEAN CLAY, rather sandy, Dark Gray (CL Glacial w/ tr to a little gravel Till N 9 FA 22 saturated, medium 23 End of Boring - No Refusal 24 Bore hole void backfilled w/ native 25 cuttings mixed w/ Bentonite on 24 October 2014 26 27 Probe lA - Elev = 97.8 28 0-6j' Topsoil Fill, Fill. (Sl .cess 29 than Boring 1), Buried Humus Lean Clay, possibly Marl, 30 Gray, saturated, very soft 7'-8}Lean Clay, rather silty, Dark 31 Gray, saturated, very soft_to F soft 8}'-10}' Lean Clay. w/ band inclusions, 32 Dark Gray, saturated, soft to medium 33 Probe put down by power flight auger � Jmethod on 24 October 2014 6 ummed«- :1 34 ately backfilled w/ native cuttings mixed w/ Bentonite I 351 I 361 I 38 39 4 41 I ( 42 II j 43� 4411 I 45� 46� � � I O '-4' N x v1 W Cou1 O IA rA u1 Obr•l O q.�C:y�' d A an �Cy > .w a�ayp7 yam° o ° F�mq�G N 00. . to udh7ly �. k' �Nrlq'y: 0) CO pyN (� 'O w 41 N !tl V: 0 d V tin N ,CD' q v u W r i b `O q � -H m v U) O N N O ro w0 9WW u C N U C r 3 'H EaZ 0 O LL u U• ~ N KO 1 CI 0 1 In H Z p: O y O O . 4 H pa H N y v, a aq U H < H W a'o •° O O J Uy m o U r � f co n vII z°a D approximate Property line k T I FROM : INTERSTRTE GEOTECHNICRL ENG PHONE NO. : 651 769 2467 Nov, 13 2014 11:05RM P2 Interstate Geotechnical Engineering, Inc Patrick J Hines, PE 8167 100* St S Cottage Grove MN 55016 (612)414.5770 13 November 2014 Mr James Rudos 14846 Timberhill Road Minnetonka MIST 55945 Re: Subsurface Soil Investigation Proposed Single Family Residence W of 2061 W 65' St, Chanhassen, Minn This is in response to your contact of recent regarding groundwater on this project. As you know, I investigated the lot last month and issued a report dated 25 October 2014,1 found a total of T& 8'/2'of unsuitable soil at the locations of Boring I & Probe IA, respectively, in the form of topsoil fall, general and varying fill, buried original humus and overly soft clay or marl. First suitable base soil is a loose to firm sand or a soft to medium lean clay. I recommended removing these materials and placing controlled fill, noting that you will have to seriously control groundwater in the process. Regarding groundwater, I found it very high on this site - at a stabilized level of 1.8'. As I understand it, The City of Chanhassen has asked if this water level will change as a result of site correction. I used as a stabilized water level the 1.8' found a day after the hand auger phase was completed. I had encountered water while drilling and did achieve the base granular soil that first day. When I did the power auger phase, water was creeping up to nearly the same level a few hours later, so I felt that the 1.8' is valid. I believe that, when you correct this lot, controlling groundwater, and compacting fill, most likely granular, the groundwater will soon rebound to its original level - 1.8' as found in my boring. If you construct ordinary and good site drainage on your finished project, groundwater will not be affected by any artificial rrcharge the result of your activities. If you have any additional questions on this, or if I can be of assistance in any additional capacity, do not hesitate to contact me at your convenience. Sincerely, INTERSTATE GEOTECIiNI rT$] 1NEERING, Inc �, _ - Att", �I P ESLSv CFI(t Y i.;tT P� S �I.^: ! Gaa '�r'CAi'Ir^; 3R'G�.'NS G r, r. C➢�/ I�'��iT Patrick J Hines, P1E b r ' :/ ' ?r1. I /1 9 A., Y c!r 8U s�0=1 S6;ONA1 President „? g�A;E �c i�EE=1 Ji' hr, LAWS OFTFiESTATEOrwiN!N'ESOTA it — e nt.2.. oF . fi :; Esu `C+ w' DATE: 13 Nr7c' 't5 Nil it N0._i 2iifS6 pH/SC 6�s�3rn ai'n i. itV0'� 1 Y COMMUNITY DEVELOPMENT DEPARTMENT RECEIVED Planning Division — 7700 Market Boulevard e CITY OF CHANHASSEN Mailing Address — P.O. Box 147, Chanhassen, MN 553.1¢P 2 6 2014 Phone: (952) 227-1300 / Fax: (952) 227-1110 C1mA!lBENPfARNMf wT APPLICATION FOR DEVELOPMENT REVIEW Date Filed: C1-19-,-14 60 -Day Review Deadline: Planner:; Case#�*0 ❑ Comprehensive Plan Amendment .........................$600 ❑ Create 3 lots or less.........................................$300 ❑ Minor MUSA line for failing on-site sewers ...... $100 ❑ Conditional Use Permit Metes & Bounds ........................ $300 + $50 per lot ❑ Single -Family Residence.................................$325 ❑ Single -Family Residence...............................$150 ❑ ❑ All Others .........................................................$425 ❑ ❑ Interim Use Permit 'Requires additional $450 escrow for attorney costs. ❑ In conjunction with Single -Family Residence..$325 applications through the the ❑ All Others .........................................................$425 (Refer to the appropriate Application Checklist for required submittal ❑ Rezoning ❑ Planned Unit Development (PUD)...................$750 ❑ Minor Amendment to existing PUD.................$100 ❑ All Others .........................................................$500 ❑ Sign Plan Review...................................................$150 ❑ Site Plan Review ❑ Administrative ..................................................$100 ❑ Commercial/Industrial Districts" ......................$500 Plus $10 per 1,000 square feet of building area 'Include number of existing employees: and number of new employees: ❑ Residential Districts.........................................$500 Plus $5 per dwelling unit Subdivision Vacation of Easements/Right-of-way...................$300 ❑ Create 3 lots or less.........................................$300 (Additional recording fees may apply) ❑ Create over 3 lots ...................... $600 + $15 per lot Metes & Bounds ........................ $300 + $50 per lot Consolidate Lots..............................................$150 ❑ Single -Family Residence...............................$150 ❑ Lot Line Adjustment.........................................$150 ❑ All Others ....................................................... ❑ Final Plat' ........................................................$250 Zoning Appeal ......................................................$100 'Requires additional $450 escrow for attorney costs. Zoning Ordinance Amendment............................$500 Escrow will be required for other applications through the the development contract. ❑ Vacation of Easements/Right-of-way...................$300 (Additional recording fees may apply) ❑ Variance...............................................................$200 ❑ Wetland Alteration Permit ❑ Single -Family Residence...............................$150 ❑ All Others ....................................................... $275 ❑ Zoning Appeal ......................................................$100 ❑ Zoning Ordinance Amendment............................$500 NOTE: When multiple applications are processed concurrently, the appropriate fee shall be charged for each application. (Refer to the appropriate Application Checklist for required submittal information that must accompany this application) ADDITIONAL REQUIRED FEES:(„ Notification Sign .................................................. $200 e -] TOTAL FEES: $` (City to install and remove) } 1 ® Property Owners' List within 500'......... $3 per address)( Received fromd h�, r ice, n�J (City to generate - fee determined at pre -application meeting) Escrow for Recording Documents .. $50 per document )l3 Date Received: 9�-14 Check Number: G� 10 $ (CUP/SPRNACNARNVAP/Metes & Bounds Subdivision) Project Name: 206 6S L\ Sfr eet Property Address or Location: 2-061yyesf 65+x. S- f Parcel #: 25-15360070 Legal Description: Lo{ 3 131ock Z Total Acreage: 303 Z 9 Wetlands Present? Present Zoning: ASIF Present Larl Use Designation: Existing Use of Property: )ZS ❑ Yes PNo ;+;on Requested Zoning: 4S F requested Land Use Designation:Ras -lam Description of Proposal•7hP l r C 4/t t Woo ld like +c,Sp /;� /of 1,40 ❑ Check box if separate narrative is attached APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: _ Address: City/State/Zip: S53YS` Email: 1en/J/'l�oloSGorn�a„�/0 grnail.co�n Contact: 'Tgr✓le's 6n,d9S Phone: Cele 612 8s5—�f9Y� Fax: p /� Date: PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Corey Contact: Soyer Co( Address: 6g0ak (>?doO� 8en Phone: X612)ZZf -892-3 City/State/Zip: C6'ZIn%12tSSf2 InAl SS,317 Cell: Email L Fax: Signature: 6 /ell (wrU'7 Date: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGIN(if applicable) SC�-i'" re''E//ER Name: - L3�� 1 VEST Thr, Contact: gory Address: /S -O SL(Ak Broad wo y Phone: (` 52- 9 6 20 2 City/State/Zip: Wq Zqi'� ,/j S 3 Cell: (61Z) r 9oZ- 3Z 2 Z Email: 1-01-14 Fax: Section 4: Notification Information Who should receive copies of staff reports? *Other Contact Information: ❑ Property Owner Via: ❑ Email ❑ Mailed Paper Copy Name: ❑ Applicant Via: ❑ Email ❑ Mailed Paper Copy Address: ❑ Engineer Via: ❑ Email ❑ Mailed Paper Copy City/State/Zip: ❑ Other* Via: ❑ Email ❑ Mailed Paper Copy Email: SCANNED Uvia ia`� 'IPIIIe ff al a9 1ies a`gs5s s P Pg $€t 9 w i _ 3 €S€ 3 t 6I ss `s$aa.= figaP AI '2 01Fg :P .. t $ EE S g IA �$ �;d e w @3�Ypp s 5 � g a g P •z j � �3 fad 9 �a f �" eme .I and a�mm® m xIt a �gg{If �5^'CPS �8 & ggpd � � a 3a 3 �• E s4§ t p65E—eM—zo ��235�P�°z Y�.�.�me��g tlLY NF i pp qq s4 Eg R@@pp P c w s` 'Bt BSe ��S � `m i 2� W i \ 1 1 I \ 1 I ^tai sit = _I II III 11 I !cryl 1 r1 / \ •Pa ;��. — // /� � i' e d II 1 _ 111\ 11 11 II 'I I — II bu--------m'----- iemu ip Iii Il —I j 1 /,v \✓' % l I I l I l �g4@mE I •`'\ I ���\\\I I � r\`/ II ^\90551 M.91.BiaZBS //% ///� J/ / // /�// � //// I a sp zg L 5 g 1 C- e E8 z i ?'8e g k aF e$' �^gyp} € x fi g p•; 5 S3Q5 e'� a � a 3 E• 398 Minn S6Sgglp3sO56.4 n SE:d e� ee g xop{p{ ;; °e.affi w4 Z a+�R gy" a K W Z n J w �ekS' G o ai w J ��P y $ oWe v3 9ded`&ds � < M I¢qE �" GLLi SE:d e� .w g xop{p{ °e.affi w4 g�a�sw�e@ SE:d a+�R gy" a K W Z n J �ekS' G o ai w z $ Z C zs € a U j$! j 4� w H � wgtl qpm& a e s Mq � iiI� k 6! t�! W (7 I ^ i■®� W I i � r {$R W i C J F u Eisi'#4t;e r-1 II� LU , 38888 N y 4 s C zs € a U j$! S9g 4� w H � wgtl qpm& N e s Mq §t a EE ¢® g f S k 6! t�! ^ W I i 2 y Aqk € a U j$! S9g ti°s "s� Ee «F qpm& N gs @ yp dd"A_ p N ^ W I i � N � {$R Et i C J F u Eisi'#4t;e r-1 II� LU , rr N E) S B�lcE �g�[ d I i iEEl iF oil HU f Et i Eisi'#4t;e r-1 II� E' 11 CITY OF CHANHASSEN AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on November 13, 2014, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Postponement of Public Hearing for 2061 West 65' Street Metes & Bounds Subdivision — Planning Case 2014-30 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Karn J. Eng lha dt, Depu Jerk Subscribed and sworn to before me this J-hday of 60*-Mh r 12014. Notary Pi blic Al O N ° C O'C O U N - c N c R .+ L C6 Cn 3 4> w `6 �-, .3 O .L, M tG N •j O O O 0 cT U 'V N R O N N U C E V OL 0 L C6 a L c O E CU T R c� O T c d C]. 3 CL N 00a 7 Na0 O) �R-N (U Q ,YU. D.tOO) O O) a)C) OO O N 3a C N 0.0) O U ... ao a 3 U Y y N N N 00 y .N w N ..% T c (U- N M ,,. N co a y LL i •N a s j 0 y E 'O �O 7 N L E ° L p N E U L L d C 0 0 � j d C w N � O' C N O N L V p 7 N j O O. Q p L .-. m N.L. N N E N y 0.a N N L U C E O N M -ffiO 0 rL. C— .O -p N c O N- C O E L T D U L .O C Y T M N YO 3 O> y ""r- Cn a C Y E �; N" U N O L0 N L > R o N O N N N. L N O 0 °) N U a) N .. 00 T a)) O' c N Z E y -NON O N N •�, E N C a CD N co L N Q N L C O T d tN/1 O Q C L CO O U .N E y 0 D U +L. V% N .O. E g' .c O E E N N N U o U N>" L a O` rn E .r .0 0 'O Z N _T L L R N U N •-� O) E c R c N N y N f6 N L p c CO y L N N C m > d p +. U (U C6 L >+ y N L LO R E t N O +' O 7 N y C R L +' N O L L C p o Co T y C y N m N CO O 3° Y L f6 : R O a E U E CO "' = L ... U TON y V ..+ C N y N ..+ +•+ C .., O N Q L .� U +-' a L _ Z T 0- CU (U t0 O Y y ) 0 .0- Y +C+ a C _ 3 Q N L E U N N C N L C6 ' j U E C O CU .0 �; D C O U V Q V M y U LL N 'C > V N CL •OC N CD R '`G E.0 U N .0 N N M 'O c 0. CO R y coC V . N N CU TOY Y L E m p �m c m oo ) or aLL inlL—Uaach 'L a � MISE ao N a m •aL,•,L co�w� G vU l�d'0 -5 C4 CH 0=r -r+ �NC7 V 0. (!� NN N N O U 'O L CLw - �, C s o N O R L Lw N O NCI NwC U U N •• R CNA O C C O O C U C Q V` A O .+ N N N E Z M cu p C.� V p L Qw d 7 Cog0 3 E at a` a¢�o` �r R E 06u w N O C 0) O'c YO U N - C N N c R .+ L 0) Mn(A R U N 3 G T w f6 3� �-, .3 O .L, M tG N .'�fU O 0 'OD U O �U.0 N :: O N R U N N O@ w E 'a 0 0 0 i6 a L c O E CU T O cw•U c (U T c d O O 3 CL N 0 0 °- N 0. O L N �-` (U Q fl. O O) N O ON y C N L a(U ...�.L.. NU .� ao T3 '.C_. NN y 0 N 00 y .N y C� fU N O �LCh N,T ..% 4= c (U- N M R` -O .y-' �=• L a s "L" E .p O ?' N .O L E p-0 O E V N C p 3 Cn j 41 c a) N L N 6 C N N 0 C N .0.n O L .«+ N>> N N j a L N N p —of C) m " N"' w L wC6 E yUN aR7y NLO U C.0 E N a0+ N .N... M _0om4 41 O- D. N -0 -O C N y 3 y- C6 C O E L� T N °a O E c M �Y3�o>�u C N U .N afc. a (D Noo--> c N N U y O L> R o N O N N N. L N c O > O O N >` O N 0 'C T U U a) O L y E .. 00 T a)) O' c N t Z L N O U .N. C co O U .L. N •�, 0)E R C R C6 y Z� N .0-0 Co 0 U N>" O O Ew •V O N N Z U C O a) 0 E O) N 0 U lyq (gyp L O L a O N '6 C m `2 a) N R U C6 R L y N Co c �_ >. N y 0) o m 0 CD m.� Co.0co aEU N CI) E N ,L., p L �� D= p y c aRi y L c 0Q Co �=-= c )co Z BU o E w= 0y c Ns ai c 55 L E 0>o 'yRV T 0 y LL Y CD 0 N N M U C "O CSV V L MNU N 'O fl. CO CO CL coC O . N N TOY Y L E m p F 0) ) HO.L= NC64 'L a U) M N N N U 'O a CyN �20.(A O Co L s o N L U N N y O .N O R CNA O C N Z C Q R Q a N aM a CL QQJa E 7 Cog0 BERNARD C JR & SANDRA BENZ BRUCE A & JEAN A MATTSON CAROL ASLESEN CHILD 2061 65TH ST W 2020 CRESTVIEW DR 6482 MURRAY HILL RD EXCELSIOR, MN 55331-9006 EXCELSIOR, MN 55331-8007 EXCELSIOR, MN 55331-8994 CASEY C MCDANIEL 2020 65TH ST W EXCELSIOR, MN 55331-9005 CRAIG R & CATHERINE JOHNSON 2071 MELODY HILL RD EXCELSIOR, MN 55331-8888 DORIS L NIKOLAI TRUST PO BOX 1461 SHERWOOD, OR 97140-1461 JOHN J & JUNE A HAMSHER 2081 MELODY HILL EXCELSIOR, MN 55331-8888 KATHERINE MARIE ANTOINETTE FOR 6486 MURRAY HILL RD EXCELSIOR, MN 55331-8994 PAUL S TUNGSETH 2051 CRESTVIEW DR EXCELSIOR, MN 55331-8008 ROBERT M & LINDA M PETERSON 2040 65TH ST W EXCELSIOR, MN 55331-9005 WILLIAM C & JUDITH J ASHENBACH 2041 65TH ST W EXCELSIOR, MN 55331-9006 CHARLES R & BEVERLY J JACKSON 2110 CRESTVIEW DR EXCELSIOR, MN 55331-8009 CYNTHIA A BODIN 2061 MELODY HILL RD EXCELSIOR, MN 55331-8888 DOUGLAS E & MARY K JOHNSON REV 6474 MURRAY HILL RD EXCELSIOR, MN 55331-8994 JOHN J & LYNNETTE J DELUCA 6484 MURRAY HILL RD EXCELSIOR, MN 55331-8994 MICHAEL J STACHOWSKI 2050 CRESTVIEW DR EXCELSIOR, MN 55331-8007 PEGGY LOU TRAGER 2080 CRESTVIEW DR EXCELSIOR, MN 55331-8007 STEVEN S & LORI A ABBLETT 2081 CRESTVIEW DR EXCELSIOR, MN 55331-8008 CHRISTOPHER M JERDEE 2081 65TH ST W EXCELSIOR, MN 55331-9006 DANA F NICHOLSON 6500 GALPIN BLVD EXCELSIOR, MN 55331-9013 GARY A NYBERG 6410 GALPIN BLVD EXCELSIOR, MN 55331-8018 JOHN THOMAS FAVORITE II 2080 65TH ST W EXCELSIOR, MN 55331-9005 NANCY H LIBERG REV TRUST 3543 LILAC LN MINNETONKA, MN 55345-1024 RICHARD & BARBARA D ATHERTON 2082 65TH ST W EXCELSIOR, MN 55331-9005 TIMOTHY P & HEIDI S LARKIN 2150 CRESTVIEW DR EXCELSIOR, MN 55331-8009 ��' HAKANSON NDERSON 1 ASSOCIATES, Inc* P.O. Box 665 222 Monroe Street Mr. Bernard Benz 311 3rd Street Excelsior, Minnesota 55331 Re: Benz Percolation Dear Bernie: professional engineers and surveyors Anoka, Minnesota 55303 September 2, to -r 3 8 ZO(,f W 612/417-5860 � . �lrrlLaS' ZS 1 F At your request percolation testing was performed at your lot located at part of the Southwest 1/4 of the Northwest 1/4 of Section 3 Township 116 North Range 23 West in Carver County, Minnesota. Standard methods of percolation testing were employed. Elevations are relative to an assumed elevation of 100.0' based at the top of the hydrant at the northeast property corner (see enclosed sketch). This report includes: _ 1. _ Joil boring logs 2. Percolation test results 3. Testhole location sketch and system configuration diagram 4. Septic system design specifications 5. Discussion and recommendations. The soil boring logs show sandy loam to sandy clay loam surface materials overlie heavier and firmer clay loam materials at depth. Significant soil mottling begins at about 1.5 feet depth at both boreholes. Soil mottles (spots of contrasting color) are accepted indicators of periodic saturation in soils. Soil gleying begins at about 4.0 feet depth at both boreholes. Gleying (dull gray soil color) forms in soils which are saturated and in a chemically reduced condition for long periods of time. Because the Chanhassen sewage ordinance requires three (3.0) feet elevation difference between the bottom of standard sewage absorption trenches and the water table or soil mottling, the site is unsuited for installa- tion of a conventional trench type septic system. An alternative means of sewage disposal, such as the mound (also known as the berm) system, is recommended. The percolation test results (below) show that measured percolation rates are faster than the 120 minute per inch minimum rate for mound systems. Soil texture at Hole Elevation Depth(inches) bottom of hole Percolation rate (min/in) $1 98.1 24 Silty clay loam 3.0 #2 97.9 28 Sandy loam to sandy 2.1 �6gt�a'� clay loam OCT 1 4.1981 CITY 0; CHANHASSEi civil municipal planning soils land surveying Mr. Bernard Benz - 2 - September 2, 1980 Measured percolation rates are somewhat rapid for the soil material in which the percolation tests were run. The design of the mound is based on a per- colation rate of 30-60 minutes per inch which is a typical rate for permeable clay loam soils. The minimum rockbed area for the mound is based on estimated sewage flow from a three bedroom house, 450 gallons per day,,and the design infiltration rate of the medium sand fill material, 1.2 gallons per square foot per day. 450 gallon/day . 1.2 gallon/ft2/day - 375 ft2 Two rock beds, each 10 feet wide by 20 feet long, provi& the needed area. The required basal area of the mound is based on the design infiltration rate for a soil with a percolation rate of 30 to 60 minutes per inch, or 0.74 gallons per square foot per day. 450 gallon/day = 0.74 gallon/ft2/day = 608 ft2 With 3 to 1 sideslopes and 1.5 feet of medium sand fill beneath the rock beds, the basal area of the mound is 1,845 square feet; so sufficient infiltration area is provided by the design. The pressure distribution system consists of Schedule 40 PVC pipe. The supply pipe is 2I�R',inch inside diameter pipe. The supply pipe should slope back towards the pumpii+4g chamber so that it drains after the mound is;dosed. The laterals are 1.5 inch inside diameter pipe. The laterals should have 1/4 inch diameter holes drilled at a spacing of 3.0 feet. The laterals should be connected to the manifold so the holes point downwards into the rock. The distal ends of the laterals should be capped. Also, the last hole in each lateral should be drilled horizontally in the end cap near the crown of the pipe to facilitate air venting. A submersible effluent pump capable of delivering at least 34 gallons per minute at a total dynamic head of at least 13.7 feet should be selected. Headlosses are calculated as follow: 1. Elevation headloss of 7.5 feet between top of mound (elevation 100.5) and pump discharge (approximate elevation 93.0) 2. Friction headloss of 1.2 feet in 50 feet of supply pipe (2.4 feet loss per 100 feet of 2 inch I.D. plastic pipe) and 3. Five (5.0) feet to account for losses in distribution network. If elevations or distances are changed, headloss should be recalculated. The sole purpose of soils data contained herein is evaluitionof soil suitability for on-site absorption of septic tank effluent at the test site. Although soil Mr. Bernard Benz - 3 - September 2, 1980 texture and horizonation and ground water elevation data may be helpful for the setting of basement elevations at this site, we cannot warrant any such interpretations or the use of this data for other purposes. If you have any questions regarding information containe in this report, please feel free to call me. Sincerely, HAKANSON ANDERSON ASSOCIATES, INC. t, ,_7 ` /z Ud / -1.% 7�U,7-/!.L"`-2""ice Gary J.( thbun, Soil Scientist f 1 GJR/jkw Enclosures File: 740.01 LOGS OF SOIL BORINGS PROJECT: Benz Percolation FILE No. 740.01 BORING ('METHOD: Borehole #1 - 3" Hollow tube 0-4'DATE' 8/28/80 4" Flight auger 4-6.5' Borehole #2 - 4" Flight auger 0-7.5' Borehole #1 Borehole #2 DEPTH 0.0 EL.EVATIO - 98.0- DEPTH 0.0 Y F-1 MWry nhi - 07 0 (feet) 1.. 1.1 3.: 4.2 6.5 Black sandy clay loam Grayish brown sandy loam to ` sandy clay loam with many Gray silty clay loam with many yellowish brown mottles �I Gray clay loam with many red and yellowish brown mottles, moist Grayish brown sandy clay loam to clay loam with many red and yellowish brown mottles, many bluish gray gleyed areas END OF.BORING GROUND WATER AT 93.6' ON 8/28/80 NAMISON ANDERSON ASSOCIATES, INC, (feet) 10 5.5 6.5 FDarkn sandy clayloam Light grayish brown sandy loam to sandy clay loam with few brownish yellow mottles Grayish brown sandy clay loam with many yellowish brown mottles- ii .Grayish brown.sandy.clay. with many red and yellowish brown mottles, soft and mois Grayish brown clay loam with many red and yellowish brown mottles, many bluish gray gleyed areas, firm Bluish gray sandy clay with many red mottles, firm END OF BORING GROUND WATER AT 93.2 ON 8/28/80. BY: �c L/ CONSULTING SOIL LNGINEERS 612/546-6938 SUBTERRANEAN ENGINEERING INC. 7415 WAYZATA BOULEVARD, SUITE III MINNEAPOLIS, MINNESOTA 55426 Mr. Bernard Benz 311 - 3rd Street Excelsior, Minnesota Job No. S-81139 June 29, 1981 55331 re: Soil Investigation Single Family Dwelling Lot 3, Block,2, Moline's Addition 2601 West 65th Street Chanhassen, Minnesota We were retained by Mr. Dwight Cravens, acting in behalf of Mr, Bernard Benz, to conduct a soils investigation for this project. The purposes of our work were to determine the general soil and ground water conditions within the proposed building area, and to prepare a report of our findings, including comments on recommended foundation types, footing design and installation procedures, etc. PROCEDURE A total of two (2) soil test holes were drilled at locations designated by Mr. Cravens in the field. The field work was performed on June 22, 1981 using a truck -mounted CME -55 drill unit SOIL AND FOUNDATION ENGINEERING, FIELD LOADING TESTS, ROAD SUBGRADE INVESTIGATIONS, EARTHWORK CONTROL 8 PAVEMENT DESIGN, MATERIALS TESTING, OBSERVATION AND CONSULTATIONS The test holes were advanced with 3'4"i.d. x 7"o.d. continuous flight, hollow stem augers which act as a temporary casing to prevent collapse of the sides of the holes. Standard penetration tests were performed in advance of the auger tip at 2 to 5 foot intervals of depth, in accordance with procedures designated in A.S.T.M. D-1586. Periodic observations for group water levels in the boreholes were made while drilling and aft completion. All soil samples obtained were brought to our laborator for examination and classification. They will be retained for a period of at least 90 days from date of issue of this report, after which they will be discarded unless we are otherwise notified. Drawing No. 1 is a site plan showing the soil test hole locations in relation to the outline of the proposed house. Detailed soil descriptions along with a plot of the standard penetration test blows per foot are given on the Borehole Log sheet, Drawing No. 2. Following the regular written soil descriptions are capital letters in parentheses, which represent the appropriate group symbols of the Unified Soil Classificatior System. A chart explaining this system is appended. All elevations in this report are to geodetic datum, and were obtained using the bench mark noted on the site plan. SITE AND GEOLOGY The property under present study is located on the upper portion of a large hill south of Lake Minnetonka. Natural inorganic soil at the site consists mainly of clayey glacial tjI SUBTERRANEAN ENGINEERING INC. x xx MINNEAPOLIS, MINN. related to the Des Moines ice lobe of the Wisconsin glaciation. During post -glacial times, a surface layer of topsoil has formed. According to information published by the State of Minnesota Geological Survey, the uppermost bedrock stratum under this site is believed to be dolomitic limestone of the Prairie du Chien formation. There is an area of dumped fill just south of Borehole SOIL CONDITIONS Only two basic soil types were encountered in our inves tigation. These are: topsoil; and Des Moines clayey glacial till. Topsoil A surface layer of topsoil,ranging in thickness from 1.5' to 2', occurs at our test hole locations. The topsoil consists of black organic silty and sandy clay. It is in a soft condition, with standard penetration test values of 2 a 4 blows per foot. It is overlain by a thin layer of brown silty clay fill at Borehole 2. The topsoil is unsuitable for foundation or floor slab support, or as a subgrade below a pavement. Water Modified Clayey Glacial Till The topsoil is underlain by a.major stratum of clayey glacial till. The uppermost 3 to 6 feet of the soil stratum has been modified by alluvial action, and consists of a mixture of grey and brown silty clay, clayey silt and clayey sand with random lenses of sand. :. SUBTERRANEAN ENGINEERING INC. x x MINNEAPOLIS, MINN. The upper mixed glacial till has a soft to stiff consistency, with standard penetration test values ranging from 2 to 8 blows per foot. This soil layer has low load bearing capacity and moderate compressibility. Des Moines Clayey Glacial Till Commencing at a depth of 4.6' to 8' below present ground surface, and extending beyond the terminal depths of our borings, is a dark grey sandy clay with traces of gravel, and random thin lenses of fine sand. Standard penetration test resistances within the dark grey clay vary from 5 to 13 blows per foot, representative of a stiff to tough consistency. This soil has moderate load-bearing capacity and low compressibility, and is a good foundation subsoil. GROUND WATER CONDITIONS Free ground water was observed in both boreholes, at a depth of 13' below present ground surface shortly after compl n drilling. The water then slowly rose to a deptf of 2.6' below present ground surface, corresponding to There are a number of lakes in the vicinity of the site. Lake Minnetonka and Galpin Lake to the north have average water elevations of 930' and 942' respectively. Lake Minnewashta to the west has an average water elevation of 944' Christmas Lake to the northeast has an average water elevatio of 932', and Lake Lucy to the southeast has an average water elevation of 956'.. �y SUBTERRANEAN ENGINEERING INC. x MINNEAPOLIS, MINN. A smaller lake known as Harrison Lake, to the south, has an average water elevation of less than 1000'. An analysis of this information indicated that the observed water levels in the soil borings represents perched ground water conditions, wherein the water is retarded from further downward percolation by relatively impervious clay soils below. Thus, even though some seepage could potentially occur in excavations extending deeper than 3 feet, the volume of such seepage water would be small, and could be handled by conventional pumping. DEVELOPMENT PLANS It is proposed to build a single family dwelling along with an attached garage at this lot. The proposed house is a 4 -level, split-level home. The major portion of the house is a slab -on -grade structure with only a relatively shallow sub - grade crawl space level below the family room. The buildi will have masonry foundation walls to outside grade level, wii wood frame construction above. Structural loads on the foot- ings of such a building are relatively light. Lowest design floor level is approximately at existing ground level. ANALYSIS AND RECOMMENDATIONS The stiff to tough clayey glacial till soils underlyinc this site are competent foundation subsoils for the proposed residential structure. SUBTERRANEAN ENGINEERING INC. MINNEAPOLIS, MINN. All obviously organic topsoil and any overlying existing fill should be stripped and removed from the buildin and pavement areas. In addition, it is recommended that the upper soft clay zone should be subcut in the proposed buildin area, and should be replaced with approved compacted sand fi7 Removal of topsoil and subcut of soft clay soils to a depth of 3' below grade at our test hole locations is recommended. Fill necessary to reach design grades should be on approved inorganic sand soil, free of any foreign material or debris. It should be spread in 6 to 8 -inch maximum loose lifts and should be compacted to achieve at least 93% Maximum Modified Proctor Dry Density, A.S.T.M..D-1557 in general fill areas and 95% Modified Proctor Dry Density in the uppermost 2' feet below pavement areas. It appears that it would be necessary to place the lowest design floor level approximately 14 feet above present ground surface at our test hole locations, in order to provid a minimum 4' separation between the floor slab and ground water levels observed in our borings as required by F.H.A. The building may then be supported upon conventional, relatively shallow apread footing foundation based on approve compacted sand fill. A net allowable soil bearing pressure of 1500 pounds per square foot may be used for the footing design. �, Mat' SUBTERRANEAN ENGINEERING INC. INNEAPOLIS, MINN. All perimeter footings in heated portions of the buil ing areas must be a minimum of 34 feet below outside finished grade for frost protection purposes. Perimeter footings in unheated portions such as the outside garage walls should be at least 4 feet below outside grade. Continuous strip foot- ings under bearing walls should be at least 18 inches wide for practical reasons. It is also recommended that a perime tile drain system should be installed around the footings to provide drainage from the sand fill. A conventional flexible pavement design, consisting of a 5" compacted granular base course overlain by a 2" hot -mi bituminous wearing surface, may be used above the sand fill surface in the driveway area. GENERAL The soil conditions have been established at our test hole locations only. There are likely to be variations in conditions between and around the borings, and interpolation or extrapolation of the results is not warranted. During construction, all excavations, earthwork, fill placement and compaction should be monitored and tested by a qualified soil engineer. We would be pleased to provide the necessary field engineering observation and testing services. SUBTERRANEAN ENGINEERING INC. x n �% MINNEAPOLIS, MINN. o - The recommendations contained in this report are intended solely for a project of the type described herein. I the event that any changes in the nature, design or location of the, building are planned, the recommendations and conclus contained in this report shall not be considered valid unless the changes are reviewed and the recommendations and conclusi of this report are modified or verified in writing. This report has been prepared for the exclusive use of Mr. Bernard Benz and Mr. Dwight Cravens for specific applicat'4 to a Single Family Dwelling at 2601 West 65th Street, Chanhas Minnesota in accordance with generally accepted soil and foun tion engineering practices. No other warranty, expressed or implied, is made. SUBTERRANEAN ENGINEERING INC. QccbCx..c.�c�, � - �� PatiicioJ. Bach '' Geological' tn'gineer Mervyn indess Registered Professional Engineer PJB:MM/pg Distribution: 4 cc Mr. Bernard Benz 1 cc File SUBTERRANEAN ENGINEERING INC. :Y% MINNEAPOLIS, MI NN. 0 0 O Q O QNth Z CQ` cs O S W U > w J W O J J m m m w w 0 O z W � J N n oLj a ~ J N a > W W a a ~ O o o'o w m u � 0 0 w z Zo � J W O Q O QNth Z CQ` cs O S W U > w J W O J J m m m w w 0 O z 4117 Fhb« C .p U N v N •p -IN '1 O1 C ^Y y W z.'460Y p. p „{{{--- T��� S� N y n U •'1 i 01 OI � �,O S O N G I I o OI y�-p IN 0 .Crl Y O N -F O b m • O' 4n M �OJIO [ S O9 ywSl N4 .4 MF WL2iil Y bF a = wM;1• Z m 1 O _ 2R a2N W W m'. Te W Y W , 6O _ J uz Z Y A a m ; _ z o, O a- � m o g °z o z s. Z' D. .6 i. ou; J'a G- 0 I 1 tl 0 O Z . µal m, C W u�i 6 J N O l- N OCONWO I W. A „ MM 9. O N NI M O pU n O• O J 9�, OI 6 N 6' 4 4117 Fhb« C .p U N v N •p -IN '1 O1 C ^Y y W z.'460Y p. p „{{{--- T��� S� N y n U •'1 i 01 OI � �,O S O N G I I o OI y�-p IN 0 .Crl Y O N -F O b m • O' 4n M �OJIO [ S O9 ywSl p u•6h2 u Y �m a = a 1 O _ 2R i m'. W Y W , 6O _ J uz Z Y A a m ; _ z o, O a- � m o g °z o z s. Z' .6 i. N. G- 0 I 1 tl 0 O Z . µal m, C W u�i 6 J N O I p u•6h2 u Y �m GENERAL NOTES DESCRIPTIVE TERMINOLOGY DENSITY CONSISTENCY TERM N VALUE TERM N VALUE APPROX UNCONFINEDCOMPRESSION STRENGTH Very Loose 0-4 Soft 0-4 0 — 1200 psf Loose 5-10 Stiff 5-8 1200 — 2000 psf Medium Dense 11-30 Tough 9-15 2000 — 4000 psf Dense 31-50 Very Tough 16.30 4000 — 8000 psf Very Dense Over 50 Hard Over 30 Over — 8000 psf RELATIVE PROPORTIONS MATERIAL CLASSIFICATION TERM RANGE TERM SIZE Trace 0 — 50/0 . Boulder Over 8 inches A Little 6 - 150/o Cobble 8 — 4 inches Some 16- 300/o Med Course Gravel 4-3/8 inches With 31 - 500/o Fine Gravel 3/8 in -NO 10 sieve Sand N010 sieve -N0 200 sieve Silt and Clay Finer than 200 sieve MOISTURE DESCRIPTION DEGREE .OF SATURATION % Dry. 0 Humid 1-25 Domp 25-50 Moist 50-75 Wet 75-99 Saturated 100 WATER LEVEL SYMBOL - 7: water levels shown on the boring logs are the levels measured in the borings at the time and under the conditions indicated. In sand, the indicated levels can be considered reliable ground water levels. In clay soil, it is not possible to determine the ground water level within the normal scope of a test boring investigation, except where lenses or layers of more pervious waterbearing soil are present and then a long period of time may be necessary to reach equilibrium. Therefore, the position of the water level symbol for cohesive or mixed texture soils may not indicate the true level of the ground water table. The available water level information is given at the bottom of the log sheet. SUBTERRANEAN ENGINEERING INC: CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES ASTM Designation: D 2487 — 66 T AND D 2488 — 66 T Unified Soil Classification System Major divisions Group symbols Typical names Laboratory classification criteria 0 e c GW Well -graded gravels, gravel -sand C i� D60 ID3o12 Cu=greater than 4; Cc= between 1 and 5 )(D60 y) mixtures, little or no fines Ri Oto Oto 0 A ° N CV GP Poorly graded gravels, gravel- $ Not meeting all gradation requirementsforGW m send mixtures, little or no fines e Y8pQ N N O 0 to N i �- ca t c GM d Silty gravels, gravelsandsilt mixtures a ; i `� Out a Atterberg limits below"A" line or P.I. less than 4 Above "A" line with F Q Y c p y t� between 4 and 7 are b xxk Z m "A" der/ine cases requiring i Z ° b GC Clayey gravels, gravel-sand•clay '-p t - Atterberg limits above of dual symbols c S mixtures c " line with P.I. greater than 7 �R 2 ° x e :_^ $ c SW Well -graded sands, gravelly little fines o ^' •- D60 lD 301 C =—greater than 6; C = between 1 and 3 u c co_ sands, or no m Dlo Ot o)(D6o Y `o A Z SP Poorly graded sands,9ravellY � '- a- • • ' `6 Not meeting all gradation requirements for SW Zi sands, little or no fines 111 x F t ti c 5 ° . CCy • L q N'� C b b u c d o m c SM Silty sands, sandsilt mixtures cE `c a .8-' N u Atterberg limits below "A" line or P.I. less than 4 Limits plotting in hatch Y £ ^ u c • c n c g n zone with P.I. between and 7 are borderUna d Clayey -clay mix- Atterberg limits "A" = o u«« m u �, o S requiring use of dual sy sands, sand above boll. SC turas c g = 1° line with P.I. greeter than 7 Q 00� Inorganic silts and very fine sands, rock flour, silty or clay -ML ey fine sands or clayey silts 60 c with slight plasticity eFor classification of fine-grained Inorganic clays of low to me- soils and fine fraction of coarse. o CL y, gravel) dium plasticity, Y days. 50 grained wilt. •4 4§ j.E sandy clays, silty clays, lean Atterberg Limits plotting in 8 _ clays hatched area am borderline Nasi- CH ti ih o fictions requiring use of dual d > Organic silts and organic silty symbols. Equation of A-line: £ OL clays of low plasticity x x PI-0.73ILL -20) At 30 , Inorganic silts, micaceous or •e tys �` ,4c MH diatomaceous fine sandy or OHa MH kr 2 silty wits, elastic silts d 20 Inorganic clays of high plea- CL *9d ticity, fat claysCH 10 E 4 ___ OH Organic clays of medium to , high plasticity, organic silts 0 10 20, 30 40 50 60 70 80 90 1 Liquid Limit Peet and other highly organic Masrerty Chan Pt wits I U.S. Department of Housing and Urban Development Certification By REGISTERED ARCHITECTS)/ENGINEERS(S) OR OTHER PROFESSIONALS) S/D Number '27 —220 75 S/D Name MP1M: Tract or, Unit Number o L Number of lots City & State Developer C ,get BENZ I Registered ii> urt/Engineer, or (designation), to the best of my personal knowledge, belief aand professional judgment, do hereby state that: (1) The attached Working Drawings and Specifications�nr� sub'i�isnn identified above, meet HUD s1od191— n procedures and j Gives described in books 4900.1. Chapters 3 dud n, 4i40.1 and HG. J The drawings and specifica- tions M, n approved by local authorities and are in ranee with applicable iocal standards; (2) The Working Drawings and Specificati ntiTte3 as 21 inciud royal signature and seal as the Hr-t:ftpr — neer or responsible t :r preparation; (3) The proposed development in accordance with these Wo Drew,*- and .Specifications (a) is-permissi er the applicable. zoning, building, housi other codes, ordinances or regulation o ified by any waivers oc4alned from a ate officials, and (b) complies with Minima erty Standards and other applicable standards clines and criteria. v soy_ R:"�T..'S 81139 Fen. Z1(s P(�aJE�ir /N Waivers of codes, etc., were obtained as listed in at'achment: I am aware of ap,rlicable sanctions provided in Title 18 U.S.C. 1010 and hereby declare that the foregoing statements are not false, fictitious, or fraudulent. I a. also aware that HUD will not accept future statements from me if any of the foregoing statements are false or incomplete. REGISTEREDI+G II ER(S) AEi+E{9 $a Signed Signed / Professional's lame _ ss Title Business ddress t, Name o Company S y�g S 5 Business Address Telephone License Number 43 — Telephone S-zi�zo Date {4116 9 19 R1 Date ,ig8i J If a reference is not applicable to your certification, strike it out and initial. J Identify Drawings and Specifications including information normally found in the Title Block of drawings. Identify attachment. HUD Form 92255-A April, 1980 Interstate Geotechnical Engineering, Inc Patrick J Hines, PE 8167 100'" St S Cottage Grove MN 55016 (612)414-5770 25 October 2014 Mr James Rudos 14846 Timber Hill Road Minnetonka MN 55345 Re: Subsurface Soil Investigation Proposed Single Family Residence W of 2061 W 65t'' St, Chanhassen, Minn CITYOFCHANHASSEN RECEIVED NOV 0 4 2014 CHANHA$3ENPLANNINGOPT In accordance with your authorization, I have completed the above referenced investigation to determine site suitability for the proposed construction. A summary of my findings together with boring logs and my conclusions and recommendations are presented in the enclosed report. I found, as you already have been briefed, more than usual problems with the site. There is a total of 5'/4'& 61/4 at the locations of Boring 1 & Probe 1A, respectively, of unsuitable soil in the form of topsoil fill, general and varying fill, and buried original humus. Below at first is a low sand content lean clay, generally dark in color, saturated, very soft to soft (w/ depth). It is "normally consolidated" (consolidated enough to only support its own weight, not additional weight of fill soils or structures above). The overburdening fill has not been inplace long enough to force further consolidation. The moisture content test in this material indicated nearly 42%, high for a lean clay. This material extends only from 5'/4 to 7' in Boring 1, but from 6'/4 to 83/z in Probe IA. The first 9" of this material in Probe lA is very soft and is a borderline marl material. All of the aforementioned materials are unsuitable for structure support should be removed. I do acknowledge that excavators are often reluctant to excavate further once the buried organic soil is cleared, so understandings should be inplace at the time of gathering bids. Base soil below at first is a lean clay, a little sandy, dark gray, saturated, rather soft to medium. It has inclusions of a poorly graded (biased finer grained) sand with a few fines, also dark gray, saturated, loose to firm. Deepest soil, commencing at 1 Pin Boring 1, is a lean clay, rather sandy, dark gray, low gravel content, medium. Theses materials are glacial till. The sand inclusions in the upper portion are glacial outwash. All of these base mineral soils are suitable for residential construction, with conditions. Refusal to auger advancement was not encountered by boring termination depth of 23', indicating lack of bedrock to this level. Very importantly, groundwater was found in the main Boring at 1.8' (elev 96'/4±). It is aquifer groundwater, but marginally so. It appears to be contained primarily in the sand inclusions at 7'+. But it also is coming from the upper soft and very soft clay, possibly from SCANNED Mr James Rudos 25 October 2014 Page 2 the lower organic soil. Proper construction on the site (removing the softer lean clay, promoting good site drainage) will mitigate some of this. Thus, water found presently can be regarded as a maximum level. Slab grade of the proposed residence should be set in accordance with City requirements utilizing this level. I recommend complete removal of all unsuitable soil which is likely to be the fill and buried organic soil as encountered plus the overly soft clay found in both the boring and probe. While this amounts only to another V/4 in the vicinity of Boring 1, it is another 2'+ in the vicinity of Probe IA. As indicated, excavators may be reluctant to excavate below organic soil level, but it is necessary (see longer discussion in the report). It is so important that full time inspection of the excavation by a soils engineer may be necessary. Of course, other zones of unsuitable soil not represented by the boring and probe could still be encountered due to the nature of small volume random sampling. Any other depths or zones of unsuitable soil should be removed as well. You could lower footings somewhat so that you have to provide less oversizing and not stray onto the neighbor's property. But footings here should not be lowered so much as to rest directly upon the suitable base soil as it is only marginally suitable. You need a little fill (2' is recommended) to spread footing loads out with depth. Footings maybe generally designed allowing the usual 2000 psf foundation bearing capacity, which will likely result in normal strip or pad footings. Special attention is again drawn to the advisory that excavations be examined by the Soils Engineer to verify soil boring results and to document adequacy of site preparation. Again this is very important as how much soft/very soft clay must be removed will require a high degree of field judgment. Fill, as used, should be tested for compaction adequacy. Soil correction should not be abated below slabs in any manner (ie, do not let the excavator try to "trench around" slab areas). Thank you for the opportunity to have been of service. If you have any questions on this, or if I can be of assistance in any additional capacity, do not hesitate to contact me at your convenience. Sincerely, I RSTATE GEOTECHNICAL ENGINEERING, Inc atrick J Hines, PE President enclosures pH/SC Patrick J Hines, PE DEPTH IN FEET 5 f[[ 14 15 16 17 18 19 20 21 SOIL BORING LOG — 8167 100th St S Cottage Grove MN 55016 rrupusea Jingle Family Residence ---- –_ PROJECT: West of 2061 W .65th St Chanhassen, Minn LOG OF BORING NO: _ I SURFACE ELEVATION: 98.1 GEOLOGY N yyg SAMPLE LAB 3 OTHER TESTS DESCRIFTIONANDCLASSIFICATION} TYRE A I W DE. LL. DZ'g- ILEAN CLAY, variably sandy, Organic (OL P L• set _ ue Topsoil N 1 HA Black, w/ tr s mineral Soil, Fill very moist, loose to firm LEAN GLAY, somewhat sandy, Pred Dark Gray (CL) Fill Y w/ a, little 0%tc Soil w/ tr graves - (elev 46 '±)2 HA Lwist to. very moist, loose to fine/ 'LEAN CLAY, rather silty, Organic (OL) Buried SAMPLED CASiMG 3 HA Black, w/ small roots, tr's undecom- Humus DEPTH DEPTH posed vegetation, saturated, rather iMUD LEVE LEVEL Crew Chiet pH _ borderline Sapric Peat in soft 16:29 7 ' None per ortion $Aetnod: 3" Hand Augers Rigon & 4" Power F1iRht* *Mobile B-31 Drill Dodge Power Wagon 24 Oct( 13:51 5' sl lighter, less organic, w/ depth I „ „ CLAY, a itt a san y, VeryDar to Lacustrine Y 4 HA 1LEAN. Dark Gray (CL), very soft to soft (w/ Deposit 15:20 5 } de th 1SAN , poorly -gra a a kpredzine gr, w med, tr cs), w/ a few fines, bark Gray Glacial Y 5 HA (SP); saturated, loose to firm Till w/ banded w/ LEAN CLAY, a little sandy, Outwash Y 6 FA Dark Gray (CL), saturated, rather soft inclusion soft to medium @ 8}'+ more bands of clay, less of sand, w/ depth LEAN CLAY, rather sandy, Dark Gray Glacial N 7 FA (CL), w/ a little gravel Till saturated, medium 155 7j' 8%13 t BreeJ Clear, WATER LEVEL MEASUREMENTS + DRILLING DATA Clear, Calm DATE 7'IM I SAMPLED CASiMG G— EVE-1 I LL;HG WA'EA DEPTH DEPTH I DEPTH iMUD LEVE LEVEL Crew Chiet pH _ F23 Oct 16:29 7 ' None 3.8' 1.8' $Aetnod: 3" Hand Augers Rigon & 4" Power F1iRht* *Mobile B-31 Drill Dodge Power Wagon 24 Oct( 13:51 5' I „ „ 14:35 to 23 6} 3} 2,1 , Canrenced: 23 9ori r• 4Ccapl>Ied: 24 October October 2014 15:20 5 } U 1L LVL\ll\V L]VV -I _ (continued) 816; 100" St S Pam. k J Hi+.r..� PR Cott. gr3 min MN `5016° Proposed Single Family Residence PROJECT: West of 2061 65th St. Chanhassen, Minn LOG OF BORING NO: 1 DEPTH SURFACE ELEVATION: 98.1 SAMPLE LAB & OTHER TESTS IN GEOLOGY N WB L L FEET DE SCRIPTIONAND CLASSIFICATION M TYPE R W DE p.L. LEAN CLAY, rather sandy, Dark Gray (CL Glacial N 9 FA w/ tr to a little gravel Till 22 saturated, medium 23 End of Boring - No Refusal 24 Bore hole void backfilled w/ native 25 cuttings mixed w/ Bentonite on 24 October 2014 j 26 27 Probe 1A -. Elev = 97.8 2 0-6}' Topsoil Fill, Fill. (S•1.iess than Boring 1), Buried Humus 29 W-7Lean Clay, possibly Mari, - 30 Gray, saturated, very soft 7'-81' Lean Clay, rather silty, Dark 31 Gray, saturated, very soffit to I soft 8}'-10}' Lean Clayc,} w/ hand inclusio-is', 32 Dark Gray, saturated, soft to medium 33 Probe put down by power flight auger. j J method on 24 October 2014 & ummed« I 34 ately backfilled w/ native cuttings mixed w/ Bentonite 35J 36 i 371 38 39 i 4 41 i j 42 43 441 i j 457 i I 461 — i --- i— O 'x LM wc 0) rALn 44 w 0� m a+ .. o z 3 .a ... . o Fw�tl@yAi O a"o," C @Hv to ejbo �1�+�p �'• -' �: m H y 0bwwro W(i mm 0%o a`di:' q w mca W N 0 O N '-i O N N Cd P4 O q r-4 co U � 3 � x d •d 0 Q CL � O c7 ~ N C4 PO4 a+ N G! FC37 N H II V y 2 K O O, O H HpqC ti u u w a a G O O 51 II o ar m zas o ten: 0w apprmdmlte Property line T FROM : INTERSTATE GEOTECHJICRL ENG PHONE NO. : 651 769 2467 Nov. 13 2014 11:05RM P2 Interstate Geotechnical Engineering, Inc Patrick J Hines, PI; 8167 100'^ St S Cottage Grove MN 55016 (612)414-5770 13 November 2014 Mr James Rudos 14846 Timberhill Road Minnetonka MN 55345 Re: Subsurface Soil Investigation Proposed Single Family Residence W of 2061 W 651 St, Chanhassen, Minn This is in response to your contact of recent regarding groundwater on this project, As you know, I investigated the lot last month and issued a report dated 25 October 2014. I found a total of 7 & 8'/,'of unsuitable soil at the locations of Boring 1 & Probe IA, respectively, in the form of topsoil fill, general and varying fill, buried original humus and overly soft clay or marl. First suitable base soil is a loose to Stan sand or a soft to medium lean clay. I recommended removing these materials and placing controlled fill, noting that you will have to seriously control groundwater in the process. Regarding groundwater, I found it very high on this site - at a stabilized level of 1.8'. As I understand it, The City ofChanhassen has asked if this water level will change as a result of site correction. I used as a stabilized water level the 1.8' found a day after the hand auger phase was completed. I had encountered water while drilling and did achieve the base granular soil that first day. When I did the power auger phase, water was creeping up to nearly the same level a few hours later, so I felt that the 1.8' is valid. I believe that, when you correct this lot, controlling groundwater, and compacting fill, most likely granular, the groundwaterwill soon rebound to its original level - 1.8' as found in my boring. If you construct ordinary and good site drainage on your finished project, groundwater will not be affected by any artificial recharge the result of your activities. If you have any additional questions an this, or if I can be of assistance in any additional capacity, do not hesitate to contact me at your convenience. Sincerely, INTERSTATE v.\GEOTECHNI�GINEERING, Inc eV J. hy, 1 F'EI;EBY C�:F:I fhY "'"AT Tl?f5 EL"'1 ce•��"'` y,^+' (/ tl ,,.. t'v.PiCAT!Vi9 UQ Q4'\ •'' ,ryg"ti FBS r_. 1 Iz;^r nr::-;,:^P.•,^'%y i,?= O aFv .RE fY\G BQ (J'i4�l�,t loll (7:1 :C(iT a R`il� .:;?; i 5 T E,1i I i?';9 A .,U Y L!C !0 :,: L ER0zESSAL Patrick J Hines, PE e'*• STATE t WEE'; Uf' c i Ttic LAWS OF T lie STATE OFNN WI�OTA President � ro�. STATE m p7% 4. 0'r pH/SC �'° �si`nue ?�°�� DATE: 13 RIDcr `(Y MINNESOTA REG, N0. i Z -6e-4 �I AI-Jaff, Sharmeen From: Chris Jerdee [cjerdee7@gmail.com] Sent: Friday, September 26, 2014 11:26 AM To: AI-Jaff, Sharmeen Cc: Chris Jerdee Subject: proposed lot split and site development on W. 65th Street in Chanhassen Hello Sharmeen, My name is Chris Jerdee and I live at 2081 W. 65th Street in Chanhassen. I think I spoke to you a couple of weeks ago on the phone about the lot next to mine and a proposed splitting of the lot. The property was recently sold to gentlemen who is "flipping" the property and it's come to my understanding that he plans to split the lot into two parcels. The purpose of my letter is twofold. First, I want to inform you and/or whoever else might be working on this particular project that the lot in question has a pretty significant water problem. I'm surprised it was ever built on in the first place because the lot literally becomes a duck pond every spring when the snow melts and then again every time we get any significant rainfall. It will get standing water more than ankle deep on both the western edge of the lot bordering mine and also on the south side of the lot. As I understand it there are springs underneath the ground and the water table is very high. This is coupled with the fact that the street is higher than the lot so the water has nowhere to drain. I tried to remedy this on my property by having a landscaping contractor install drain tile that ties into the catch basin in the culdesac. Unfortunately the lot in question next to me has an even larger drainage problem so it still impacts my property. Second, and more importantly, I want to be sure that if the lot is indeed approved to split and a new home is built that the proper steps are taken to ensure that any watershed does not impact my lot further. If any grading is done to build a new structure I want to be sure that it is not done in such a way that simply moves the water problem from that lot on to mine. Hopefully whoever buys the property does their due diligence and has a percolation test done because if not I think they might end up being surprised. Thanks in advance for your consideration regarding this matter. If you or anyone has any questions I can be reached at 612-385-1329. Chris Jerdee C11,'01FC1qANHASSEN RECEIVED SEP 2 R ?014 CHANHA_WN p� NNtNG DEpl. SCANNED STS Sr7 (, ht.��.7'L somice" A MW*ly o,E AfUA Ay1—A4A— 9qolvrdas -.✓t? L- 0 ...Q -P 7W4J3 Lar LNSv. C +W40 -W-0 e.407 CrrYJn Tt/ fi2 f iz,l ,4 A�4-� -W22 P T-Arar &� 7#- L, 44-1 AT sT,e-AsO ,T�-,54sw1:` /S 7-40E ons YA.D7- 4A4W 2z-., tnlZ rArS7- OA-/7;z/,C 1'19'7. WOV-tea.! 77f 14P`sd W -f* 6diL;ry ,� DaTs�T _I��asv T�e"�t�s✓ta- � as=' T�"� ��� _ 004.sA.4(. 4N c5sr5s, ZT ffi43 aQn,I 577, Li�7" !� CCLkST,e/4—,,W Cn -�4D ;?c.19v4-470 SA%p7i-r. s shySs aoy / is Lr4 e&- A771)64 7`tt 6s+,00VAP" �T �sq-� sHary a cc,J "--I* 7+9-!.S- LA',97- j jjojir# X'sts /ddro w e- /IW 7'6 p Tr a,s77706c u 7 710 On evc s AIAOXIA� tpaM Dura -AMew-,,r5, Pkv ssapnc s-ys7-kx t o Lam-- OMoASA44z och4oi eAy Ta oar - 1h" A307- 7'f}�- % QU1',ct S J( 6�Arroe S (?Ar UI .T tom_ Tfi�uauc � 14pe /49�sJ �'c�u o v�M� OF J( oaJ4A.,/ LLQ A- X- D acr -I- hlaa La 1=0-A, M 11l-eL D � t �"i�t®��� �D' ors `�r� ccstt ` MAM��� 17 .A� 4-,Kj Oo ara t_ ,fir r T 7.+i�tf /U�'lG t3a�th�v a1� bj &_L L--r�,� c�T M�9 S s� o T/�c—/LS d ��h ✓ :Ts u tF}�+ N 0.S7- t trS 5d 0mp s f�R��-Tri��-rt� _hum tN�i�S' lE�i-f ce+�.�Tt�✓ �rs-tL l ry r9-tr $+'u7 ,f} ✓�ts�'J�,;-Dy',rt� 1s]N��i . i �C? f+s� /Tt� i1�'IR - f�Qb Y� GlI-DaJ ✓J (vJtoL� Tt7` h�ii'✓�E Tn eCS�"' 1uJ1L.7` aJt7�tiDNT !� i3t9z5� 1�y/Efi+�i y ff� Aa 7b ',WC 0✓�+3-Trr� p �4�LC�'sus�r. )V" %',b a/t.7ti � p.a+.1 GJ� 5 T b. V-7 ifa9 YET rM e` LST' t/.r!-t uv . 8-6 *-,Lo AI-Jaff, Sharmeen From: judy ashenbach Uashenbach@hotmail.com] Sent: Wednesday, October 29, 2014 11:16 AM To: AI-Jaff, Sharmeen Subject: To The Honorable Mayer & City Council Members This letter is to let you know of our concerns regarding the development of another lot at the property next door to us; 2061 West 65th Street. When we purchased out home in 1975, we were told that lot was not a buildable lot and would not be developed because of stream and wet land. When Mr. & Mrs. Benz built there home this forced the water our way and we had to add additional drainage to our home. When they built, I watch the slab of their home being laid in water. The side of their lot that they built on is the driest part of that property. To add another home on that lot would mean more water problems for this street and home owners. I remember when city sewer was installed and the city had to pump water from under the street for several weeks before installing sewer. Please take our concerns to all concerned. Thank you for your service and thank you for taking the time to serve us and the City of Chanhassen. Sincerely, Bill and Judy Ashenbach 2041 West 75th Street Chanhassen, MN Phone 952-474-6821 jashenbach @Hotmail.com /Q,C