Loading...
MMW Proposed Underground Storm ChambersProject Information Calculator Version: Version 2: June 2014 Project Name: MMW Proposed Underground Storm Chambers for 2016 User Name/ Company Name: Cliff Buhman/Inspec Date: 9-5-15 Project Description: Proposed Underground Storm Chambers to replace Existing North Detention Pond Site Information Retention Requirement (inches): 1.1 CIN OFCHANHASSE!PI Site's Zip Code: 55331 RECEIVED Annual Rainfall (inches): 29.6 SEP 0 8 2015 Phosphorus EMC (mg/p: 0.3 TSS EMC (mg/1): 54.5 CHANHASSENPLANNING DEPi Total Site Area Land Cover A Soils B Soils C Soils D Soils Total (acres) (acres) (acres) (acres) (acres) Forest/Open Space - Undisturbed, protected forest/open space or reforested land 0 Managed Turf - disturbed, graded for yards or other turf to be mowed/managed 10.38 10.38 Impervious Area (acres) 4.01 Total Area (acres) 14.39 Site Areas Routed to BMPs Land Cover A Soils B Soils C Soils D Soils Total (acres) (acres) (acres) (acres) (acres) Forest/Open Space - Undisturbed, protected 0 forest/open space or reforested land Managed Turf - disturbed, graded for yards or 10.38 10.38 other turf to be mowed/managed Impervious Area (acres) 4.01 Total Area (acres) 14.39 Summary Information Performance Goal Requirement Performance goal volume retention requirement: 16012 ft3 Volume removed by BMPs towards performance goal: 7603 ft3 Percent volume removed towards performance goal 47 % Annual Volume and Pollutant Load Reductions Post development annual runoff volume 14.218 acre -ft Annual runoff volume removed by BMPs: 4.5948 acre -ft Percent annual runoff volume removed: 32 % Post development annual particulate P load: 6.38 lbs Annual particulate P removed by BMPs: 2.06 lbs Post development annual dissolved P load: 5.22 lbs Annual dissolved P removed by BMPs: 1.69 lbs Percent annual total phosphorus removed: 32 % Post development annual TSS load: 2108 lbs Annual TSS removed by BMPs: 681 lbs Percent annual T55 removed: 32 % BMP Summary De F.... ..1. rnA S��mmary Da A:�ula4e Dhnenhnnic Summary BMP Volume Volume Volume Volume Percent BMP Name Capacity Recieved Retained Outflow Retained From Direct BMP Name (ft3) (ft3) (113) (ft3) (%) 1 - Infiltration basin/Underground Infiltrati 7603 16012 7603 8409 47 Da A:�ula4e Dhnenhnnic Summary Volume Load From Load Outflow Volume From Volume Volume Percent From Direct BMP Name Upstream Retained outflow Retained Watershed BMPs (acre -ft) (acre -ft) (%) (acre -ft) (acre -ft) 1 - Infiltration basin/Underground Infiltrati 1 - Infiltration basin/Underground Infiltrati 14.218 0 4.5948 9.6232 32 Da A:�ula4e Dhnenhnnic Summary Load From Load From Load Outflow Percent BMP Name Direct Upstream Retained Load Retained Watershed BMPs (Ibs) (lbs) (%) (lbs) (lbs) 1 - Infiltration basin/Underground Infiltrati 6.38 0 2.06 4.32 32 Dissolved Phosphorus Summary TSS Summary Load From Load From Direct Direct Upstream Load Outflow Percent BMP Name Watershed BMPs Retained Load Retained (lbs) (lbs) (lbs) (lbs) M 1 - Infiltration basin/Underground Infiltrati 5.22 0 1.69 3.53 32 TSS Summary BMP Schematic 1 -nfilt basin/ underground Infiltration Load From Load From Direct Load Upstream Outflow Percent BMP Name Retained Load Retained Watershed BMPs (lbs) (lbs) (lbs) (lbs) M 1 - Infiltration basin/Underground Infiltrati 2108 0 681 1427 32 BMP Schematic 1 -nfilt basin/ underground Infiltration