PC SUM 2015 09 15
CHANHASSEN PLANNING COMMISSION
REGULAR MEETING
SUMMARY MINUTES
SEPTEMBER 15, 2015
Chairman Aller called the meeting to order at 7:00 p.m.
MEMBERS PRESENT:
Andrew Aller, John Tietz, Nancy Madsen, Lisa Hokkanen, and
Maryam Yusuf
MEMBERS ABSENT:
Mark Undestad, and Steve Weick
STAFF PRESENT:
Kate Aanenson, Community Development Director; Bob Generous, Senior
Planner; Drew Ingvalson, Planner I; and Alyson Fauske, Assistant City Engineer
PUBLIC PRESENT:
M.P. Knight 3605 Red Cedar Point Road
Frances Paap 3601 Red Cedar Point Road
3603 RED CEDAR POINT ROAD, PLANNING CASE 2015-14: REQUEST FOR
VARIANCES TO THE SHORELAND PROTECTION SETBACK AND THE 30 FOOT
FRONT YARD SETBACK TO CONSTRUCT A DETACHED GARAGE ON PROPERTY
ZONED SINGLE FAMILY RESIDENTIAL (RSF) AND LOCATED AT 3603 RED
CEDAR POINT ROAD (LOT 1, BLOCK 4, RED CEDAR POINT LAKE
MINNEWASHTA). APPLICANT/OWNER: MACKEY MALIN ARCHITECTS/GREGG
& KELLIE GEIGER.
Drew Ingvalson presented the staff report on this item. The applicant Gregg Geiger and his
architect Pat Mackey addressed issues associated with Options E and F. Since a public hearing
was held on this item previously it could not be held again. Chairman Aller opened up the
meeting for additional public comments. Frances Paap, 3601 Red Cedar Point voiced concern
with delivery and emergency vehicles being able to access her house. Dave Bishop, speaking on
behalf of Maria Knight, discussed the Affidavit of Maria Knight in which she believes this
property does not meet the criteria of a legal non-conformity because the house was unoccupied
for over a year. He explained their belief that the variance is improper because the property
already had a garage and as a result of that it is a request that is being made because of a
situation that was caused by the property owners themselves and it is their position that they
inherit the actions of the prior property owners because zoning runs with the land. He continued
to discuss view sheds, impervious surface coverage calculations, issues associated with Option F,
asked that a condition be included that there be no parking in the turn around. Susan Proshek,
3613 Red Cedar Point Road asked why the applicants have not considered opening up the old
garage that was closed off because of her belief that this proposal compromises the integrity of
Planning Commission Summary – September 15, 2015
the point. After discussion and comments from commission members the following motion was
made.
Hokkanen moved, Tietz seconded that the Chanhassen Board of Appeals and Adjustments
approves a 17 foot shoreland setback variance and a 20.2 foot front yard setback variance
to construct a two story attached garage subject to the following conditions and adopts the
attached Findings of Fact and Decision:
1.The applicant shall expand the private drive to maintain at least a 10 foot wide drive, not
to exceed 24 feet wide.
2.The driveway grade must not be less than 0.5% and must not exceed 10%.
3.The proposed structure shall maintain the existing drainage patterns.
4.The applicant must apply for and receive a building permit from the City.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
PUBLIC HEARING: ARBOR GLEN, PLANNING CASE 2015-16: REQUEST FOR
REZONING OF PROPERTY FROM AGRICULTURAL ESTATE DISTRICT (A2) TO
PLANNED UNIT DEVELOPMENT-RESIDENTIAL (PUD-R), CONDITIONAL USE
PERMIT FOR DEVELOPMENT WITHIN THE BLUFF CREEK CORRIDOR, AND
SUBDIVISION WITH VARIANCES OF 8.49 ACRES INTO 21 LOTS AND 4 OUTLOTS
ON PROPERTY LOCATED AT 9170 GREAT PLAINS BOULEVARD.
APPLICANT/OWNER: ARBOR GLEN CHANHASSEN, LLC/GIANETTI
PROPERTIES, LLC.
Bob Generous presented the staff report on this item. Speaking on behalf of the applicant, Mark
Eklo, 3360 Bavaria Road, Chaska discussed the design and floor plans being proposed.
Chairman Aller opened the public hearing. Steve Friedrichs, 8955 Southwest Village Loop,
speaking as President of the Southwest Village Homeowners Association, explained that they
were interested in knowing conceptually what was being proposed with this project and asked
the developer to follow through on what they say they’re going to do noting his belief that
Ryland Builders have done a D minus job on following through on issues associated with
Southwest Village. Jim Wilson, co-owner of the nursery located at 9150 Great Plains Boulevard
expressed concern with the type of materials being used to construct the retaining walls and
suggested using boulders. Chairman Aller closed the public hearing.
Tietz moved, Madsen seconded that the Chanhassen Planning Commission recommends
that the City Council approvethe PUD rezoning, Conditional Use Permit and Subdivision
with a Variance from the western perimeter setback subject to the following conditions of
approval, and adopts the Findings of Fact and Recommendation:
REZONING
2
Planning Commission Summary – September 15, 2015
1. Contingent on Final Plat approval for the Arbor Glen Development.
SUBDIVISION WITH VARIANCE
Building:
1.Final grading plans and soil reports must be submitted to the Inspections Division before
building permits will be issued.
2.Engineered design and building permits are required for retaining walls exceeding four feet
in height.
3.Each lot must be provided with a separate sewer and water service.
4.Demolition permits must be obtained before demolishing any structures.
5.Proper removal, abandonment or sealing of storage tanks, on-site septic systems, wells, etc. is
required. Permits are required, as applicable.
Engineering:
1. There is an existing field entrance (curb cut) on 101. The curb cut shall be removed since
access will be from CSAH 18.
2. The drainage along the corridor right-of-way should remain in a similar flow direction. It
appears from the contours that with the building of the berm there may be an area that does
not drain.
3. Any grading or other work within the road right-of-way will require a permit from Carver
County.
4.The City shall require a drainage and utility easement to be granted over Outlot A.
5.A 10-foot easement is required on the rear lot lines of Lots 1 through 9, Block 3.
6.The topography must show 100 feet beyond the property boundary to the west, including the
first floor elevation of the building on the adjacent lot.
7.The grading plan must be revised to include the house pads and driveway locations
8.The low floor elevations of these proposed homes must be revised to comply with a three-
foot separation from groundwater encountered during construction.
9.The lowest building openings of Lots 5 and 6, Block 3 must be adjusted to a minimum of one
foot above the emergency overflow (EOF) elevation or the EOF must be relocated.
10.A standard lot benching detail shall be included in the plan set.
3
Planning Commission Summary – September 15, 2015
11.The grading plan must be revised at the back of Lot 5, Block 2, between Lots 2 and 3,
Block 3 and between the retaining walls to be no greater than 3:1.
12.The Surface Water Pollution Prevention Plan with all elements required by the NPDES
Construction Permit shall be prepared and supplied to the city for approval with the final plat
and prior to any earth-disturbing activities.
13.Proof of the NPDES Construction Permit having been procured by the applicant shall be
supplied to the city prior to any earth-disturbing activities.
14.The entire buffer area shall be placed into Outlot C and the outlot shall be dedicated to the
city.
15.The trident underground storage and filtration system shall be located in a separate outlot
from Outlot C.
16.A detailed planting schedule, including types and size of plants if plugs are to be used or the
seed composition, source and application rate and method if the area is to be seeded, must be
provided to the city for review and approval before final plat. Yellow tags for the plant
source must be provided to the city. The plants shall be native and free of neonicotinoids.
17.A detailed maintenance schedule for establishment of vegetation within the primary zone and
buffer shall be provided to the city before final plat.
18.The soils within the buffer area shall be prepared by ripping to a depth of 12 inches to loosen
them and shall meet MnDOT Specification 3877-3 for Sandy Clay Loam Topsoil Borrow.
19.All residential lots shall have a minimum of six inches of topsoil meeting the specifications
for MnDOT Specification 3877-1 for Common Topsoil Borrow placed on all areas to be
seeded or sodded.
20.Monuments indicating the Bluff Creek Overlay District shall be placed at every other
property corner and at an angle of deflection greater than seven percent, but in no case shall
they be greater than 150 feet apart. The signs shall be installed immediately subsequent to
completion of final grade below the wall and before any building permits are issued for
Lots 2 through 11, Block 3. The plans shall be changed to reflect this requirement before
final plat.
21.Retaining walls shall be owned and maintained by a Homeowners Association (HOA). The
plan set shall call out the material for these retaining walls.
22.Walls over six feet tall (Wall B) shall not be boulder walls. Tiered boulder walls with a
combined total height greater than six feet tall must have adequate spacing between such that
they do not structurally impact one another.
23.The vegetation between tiered walls shall be low or no maintenance.
4
Planning Commission Summary – September 15, 2015
24.The emergency overflow (EOF) between Lots 5 and 6, Block 3 flows towards Wall A and
Wall B. Staff will work with the engineer designing the stormwater system and the structural
engineer designing the walls regarding conveyance of the water or relocation of this EOF.
25.A vertical curve is required for the transition between +3.14% and -1.57% grade on the South
Private Drive.
26.The curve and line table for the horizontal alignments of all streets must be revised to be
consistent with the plan sheets.
27.The specifications for this project must be revised to match the current City of Chanhassen
Standard Specifications and Detail Plates and the proposed plan set, including but not limited
to the pavement design.
28.The applicant’s engineer shall submit documentation for the design speed selection and show
turning movements in the plan set to demonstrate that larger vehicles will be able to navigate
the roadway curvature.
29.The applicant must obtain permits from Carver County for construction of an access and all
other work in their right-of-way. They must also comply with the comments received from
the Carver County Engineering Office.
30.An ADA-compliant pedestrian ramp shall be constructed where the trail intersects Lyman
Boulevard.
31.The City of Chanhassen Standard Detail Plates for pedestrian ramps shall be added to the
plan set.
32.The applicant must obtain a permit for any work in the MnDOT right-of-way.
33.Profile grades shall be shown for the sidewalk and bituminous trail.
34.The plan must have a design grade that developer and engineer are confident that the
construction process will achieve the minimum of 0.40%. If the grade is flatter than 0.40%
at the time of acceptance, the city will require the sanitary sewer be excavated and
reconstructed to meet the grade requirement. Staff recommends use of 0.50% minimum
design grade.
35.The 8-inch watermain pipe plans shall be revised to call out C900 as the pipe material and
shall be installed per the City of Chanhassen Standard Specifications and Detail Plates.
36.The watermain connection to Highway 101 shall be relocated away from the stormwater
infiltration system.
37.The proposed sanitary sewer and water main shall become city-owned after construction and
acceptance by the city council.
5
Planning Commission Summary – September 15, 2015
38.The applicant must meet the storm water management standards prescribed in Section 19-144
of city code which incorporates the NPDES construction permit by reference. This requires a
volume reduction of 1.0 inches of water quality volume from all new impervious surfaces or
provide evidence that the site, in its entirety, meets the criteria by which infiltration is
infeasible as discussed in the NPDES permits. If adequate evidence is provided that
infiltration is found to be infeasible, then the applicant must evaluate other methods of
abstraction.
39.The proposed storm water management system must meet the required reduction in total
phosphorus and total suspended solids.
40.The stormwater catch basins inside the cul-de-sac bubble shall be relocated to the curb line
and comply with the Chanhassen Standard Detail for cul-de-sacs.
41.A Homeowners Association (HOA) must be established that is responsible for the
maintenance and operation of the trident system if it is approved.
42.The city-authored maintenance agreement for stormwater management facilities shall be
revised accordingly, executed and recorded against the property.
43.The applicant shall develop an operations and maintenance manual which shall specify
anticipated inspection and maintenance, as well as schedule, necessary to ensure there is not
significant decreases in the practices’ efficacies. This operations and maintenance manual
shall be referenced in the maintenance agreement.
44.SWMP fees estimated to be $33,346.50 are due at the time of final plat.
45.The applicant is responsible for applying for, procuring approvals from and meeting the
requirements of all other agencies with jurisdiction over the project including, but not limited
to, the Minnesota Pollution Control Agency and the Riley-Purgatory-Bluff Creek Watershed
District.
46.Water and sewer partial hookups are due at the time of final plat. The partial hookup fees
will be assessed at the rate in effect at that time.
Environmental Resources:
1.A total of 18 additional overstory trees shall be planted throughout the development. The
applicant will submit a revised landscape plan.
2.A wetland buffer restoration plan shall be included in the revised landscape plan.
3.The applicant shall submit a tree inventory and tree preservation calculations as required by
ordinance prior to final plat review and approval.
Fire:
1.Provide/maintain three-foot clear space around fire hydrants.
6
Planning Commission Summary – September 15, 2015
2.The two private driveways will be required to have address signage which shall be submitted
to the Chanhassen Building Official and Fire Marshal for review and approval.
3.Relocate the proposed fire hydrant located by Lot 1, Block 2 to the property line between
Lots 3 and 4, Block 2.
4.Prior to combustible home construction, fire apparatus access roads capable of supporting the
weight of fire apparatus shall be made serviceable.
5.Street signs (temporary allowed) shall be installed prior to building permits being
issued. The Fire Marshal must approve street signage.
6.Prior to combustible construction fire hydrants shall be made serviceable.
Parks:
1.Full park dedication fees shall be collected per city ordinance in lieu of requiring parkland
dedication.
2.Construction of Great Plains Boulevard trail from the southwest intersection of Lyman
Boulevard and Great Plains Boulevard traveling south for approximately 675 feet to the
southern terminus of the property. The developer shall provide design, engineering,
construction and testing services required of the Great Plains Boulevard trail. All
construction documents, including material costs, shall be delivered to the Park and
Recreation Director and City Engineer for approval prior to the initiation of construction.
The trail shall be 10 feet in width, surfaced with asphalt and constructed to meet all city
specifications. The applicant shall be reimbursed by the City for the cost of the aggregate
base, trail surfacing, and storm water systems utilized to construct the trail as well as for
redesign of the plans if necessary. This reimbursement payment shall be made upon
completion and acceptance of the trail and receipt of an invoice documenting the actual costs
for the construction materials noted. Labor and installation, design, engineering and testing
services are not reimbursable expenses.
CONDITIONAL USE PERMIT
1.The developer may dedicate Outlot C to the City.
2.The developer shall prepare a restoration plan for the Bluff Creek Corridor.
3.The buffer will be required to have a vegetation management plan and soil amendments.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
7
Planning Commission Summary – September 15, 2015
APPROVAL OF MINUTES: Commissioner Hokkanen noted the verbatim and summary
Minutes of the Planning Commission meeting dated August 18, 2015 as presented.
COMMISSIONER PRESENTATIONS.
Chairman Aller reminded people that the Highway
101 river crossing will be closing on Fridays from 6:00 p.m. until Saturday mornings at 9:00 a.m.
until the bridge is completed.
ADMINISTRATIVE PRESENTATIONS.
Kate Aanenson discussed items on upcoming
Planning Commission agendas.
Hokkanen moved, Yusuf seconded to adjourn the meeting. All voted in favor and the
motion carried unanimously with a vote of 5 to 0. The Planning Commission meeting was
adjourned at 9:00 p.m.
Submitted by Kate Aanenson
Community Development Director
Prepared by Nann Opheim
8