Loading...
Site Plan 08-17-2015 with SBS notesPROPOSED GARAGE (E)- 441 S.F. FOOTPRINT, ATTACHED TO EXISTING HOUSE II I, HARDCOVER CALCULATION FOR 2 OPTIONS: OPTION E: BASELINE HARDCOVER 7191 + NEW WIDENING 489 = 7680 (23.9 % OF LOT) OPTION F: BASELINE HARDCOVER 7191 + GARAGE 621 + DRIVE 117 + NEW TURNOUT 298 - PAD 245 = 7982 (24.9 % OF LOT) )C& )v'g':norovy%8 S iC �'pr oprI e LBUILDABLE VSA 't� j�Q-��Y�TY► AEA OF SITE I ALL SETBACKSF TIO IS Foi, AREENF FORCED I -- --- b l!J elow,qv PROPOSED GARAGE (F)- 621 S.F. FOOTPRINT, HEIGHT: 16'-3" AT MID -SLOPE OF MAIN GABLE 19'-3" AT MID -SLOPE OF DORMER 21'-8" AT PEAK SITE OF PREVIOQS FUEL OIL TANK - PENDING MPCA DOCUMENTATION ON STATUS - ASSUMED TO BE REMEDIATED OHW 6VE INTERPO LAKE FROM SURVEY M/NNEWASHTA 0 5 10 20 40 � aoks-14 __ 3�� cedes WeI vOd ��tQ C41t�ck EXISTING IMPERVIOUS SURFACE (PER SURVEY): 7191 S.F. TOTAL LOT AREA = 32025 S.F. 2 OPTIONS SHOWN, IN ORDER OF PREFERENCE: OPTION E: PREFERRED - REMOVES NO MATURE TREES, HARDCOVER 23.9% OF LOT OPTION F: REMOVES 4 MATURE TREES, HARDCOVER 24.9% OF LOT, VOLUNTARY STORMWATER RETENTION IF REQUIRED OSITE PLAN 6 1"=30'-0" �Ilol Lh r. :E In - 1-7 10". ARCHITECTS 612.220.6190 MACKEYMALIN.COM IMP., PHASE Schematic Design ISSUE DAIS: DRAWN BY: PM SITE SITE PLAN LAKE M/NNEWASHTA -- II EXI TING 30' ^ BIT MINO S HY NT (SALVfZGED IP��\- _ BU POU TO BE PO SIBLE AND RELOCATED � R OV D WI HIN EASEME19T PE(ZCITY (D G E R 'S) -OPTION F ONLY-,, I r v S BY PTION I _ EXIS N X 1 XIUS CHOSEN) EW TURNOUT- I DRITUM IVE 1 298 S.F., II SEMI -PERVIOUS V -104' 11 II I / __ DRIVE -100 Ill 30' SETBACK I 3603 RED o°�� �- C05CSFRTE D CEDAR POINT Pel° DRIVE EXISTING 4 EXIST! - IRITI Ilull u j HOUSE - 1992 _ DRIVE I _ j t S.F. FOOTPRINT a I I — 1 I, F for r p I ..a.. ;j m op n 1 i -- _— D j -.---- � '---- x I I AW _ - -----_-� - SITE OF PREVIOQS FUEL OIL TANK - PENDING MPCA DOCUMENTATION ON STATUS - ASSUMED TO BE REMEDIATED OHW 6VE INTERPO LAKE FROM SURVEY M/NNEWASHTA 0 5 10 20 40 � aoks-14 __ 3�� cedes WeI vOd ��tQ C41t�ck EXISTING IMPERVIOUS SURFACE (PER SURVEY): 7191 S.F. TOTAL LOT AREA = 32025 S.F. 2 OPTIONS SHOWN, IN ORDER OF PREFERENCE: OPTION E: PREFERRED - REMOVES NO MATURE TREES, HARDCOVER 23.9% OF LOT OPTION F: REMOVES 4 MATURE TREES, HARDCOVER 24.9% OF LOT, VOLUNTARY STORMWATER RETENTION IF REQUIRED OSITE PLAN 6 1"=30'-0" �Ilol Lh r. :E In - 1-7 10". ARCHITECTS 612.220.6190 MACKEYMALIN.COM IMP., PHASE Schematic Design ISSUE DAIS: DRAWN BY: PM SITE SITE PLAN