Site Plan 08-17-2015 with SBS notesPROPOSED GARAGE (E)-
441 S.F. FOOTPRINT,
ATTACHED TO EXISTING
HOUSE
II
I,
HARDCOVER CALCULATION FOR 2 OPTIONS:
OPTION E: BASELINE HARDCOVER 7191 + NEW WIDENING 489 = 7680 (23.9 % OF LOT)
OPTION F: BASELINE HARDCOVER 7191 + GARAGE 621 + DRIVE 117 + NEW TURNOUT 298 - PAD 245 = 7982 (24.9 % OF
LOT)
)C& )v'g':norovy%8
S iC �'pr
oprI e LBUILDABLE
VSA 't� j�Q-��Y�TY► AEA OF SITE I
ALL SETBACKSF
TIO IS Foi, AREENF
FORCED
I -- --- b
l!J
elow,qv
PROPOSED GARAGE (F)-
621 S.F. FOOTPRINT,
HEIGHT: 16'-3" AT
MID -SLOPE OF MAIN
GABLE
19'-3" AT MID -SLOPE OF
DORMER
21'-8" AT PEAK
SITE OF PREVIOQS FUEL
OIL TANK - PENDING MPCA
DOCUMENTATION ON
STATUS - ASSUMED TO BE
REMEDIATED
OHW 6VE
INTERPO
LAKE FROM SURVEY
M/NNEWASHTA
0 5 10 20 40
� aoks-14 __ 3�� cedes
WeI vOd ��tQ C41t�ck
EXISTING IMPERVIOUS SURFACE
(PER SURVEY): 7191 S.F.
TOTAL LOT AREA = 32025 S.F.
2 OPTIONS SHOWN, IN ORDER OF PREFERENCE:
OPTION E: PREFERRED - REMOVES NO MATURE
TREES, HARDCOVER 23.9% OF LOT
OPTION F: REMOVES 4 MATURE TREES,
HARDCOVER 24.9% OF LOT, VOLUNTARY
STORMWATER RETENTION IF REQUIRED
OSITE PLAN 6
1"=30'-0" �Ilol Lh
r.
:E
In - 1-7 10".
ARCHITECTS
612.220.6190
MACKEYMALIN.COM
IMP.,
PHASE
Schematic
Design
ISSUE DAIS:
DRAWN BY:
PM
SITE
SITE PLAN
LAKE
M/NNEWASHTA
--
II
EXI TING
30'
^ BIT MINO S
HY NT (SALVfZGED IP��\- _
BU POU TO BE
PO SIBLE AND RELOCATED
� R OV D
WI HIN EASEME19T PE(ZCITY
(D G E
R 'S) -OPTION F ONLY-,, I
r
v S BY
PTION
I
_
EXIS N
X 1 XIUS CHOSEN)
EW TURNOUT- I
DRITUM
IVE
1
298 S.F.,
II
SEMI -PERVIOUS V
-104'
11 II
I /
__
DRIVE -100 Ill
30'
SETBACK
I
3603 RED o°��
�-
C05CSFRTE D
CEDAR POINT Pel°
DRIVE EXISTING
4 EXIST!
-
IRITI Ilull u
j
HOUSE - 1992
_
DRIVE I
_ j t
S.F. FOOTPRINT
a I I
— 1
I,
F
for r
p I
..a..
;j
m op n
1
i
-- _—
D j
-.----
�
'----
x I
I
AW
_
- -----_-�
-
SITE OF PREVIOQS FUEL
OIL TANK - PENDING MPCA
DOCUMENTATION ON
STATUS - ASSUMED TO BE
REMEDIATED
OHW 6VE
INTERPO
LAKE FROM SURVEY
M/NNEWASHTA
0 5 10 20 40
� aoks-14 __ 3�� cedes
WeI vOd ��tQ C41t�ck
EXISTING IMPERVIOUS SURFACE
(PER SURVEY): 7191 S.F.
TOTAL LOT AREA = 32025 S.F.
2 OPTIONS SHOWN, IN ORDER OF PREFERENCE:
OPTION E: PREFERRED - REMOVES NO MATURE
TREES, HARDCOVER 23.9% OF LOT
OPTION F: REMOVES 4 MATURE TREES,
HARDCOVER 24.9% OF LOT, VOLUNTARY
STORMWATER RETENTION IF REQUIRED
OSITE PLAN 6
1"=30'-0" �Ilol Lh
r.
:E
In - 1-7 10".
ARCHITECTS
612.220.6190
MACKEYMALIN.COM
IMP.,
PHASE
Schematic
Design
ISSUE DAIS:
DRAWN BY:
PM
SITE
SITE PLAN