Loading...
Site Plan 08-17-2015L J u 1 3603 RED CEDAR POINT DRIVE EXISTING HOUSE - 1992 S.F. FOOTPRINT HARDCOVER CALCULATION FOR 2 OPTIONS: OPTION E: BASELINE HARDCOVER 7191 + NEW WIDENING 489 = 7680 (23.9 % OF LOT) OPTION F: BASELINE HARDCOVER 7191 + GARAGE 621 + DRIVE 117 + NEW TURNOUT 298 - PAD 245 = 79(2(:24.9 LOT) BUILDABLE AREA OF SITE IF ALL SETBACKS ARE ENFORCED - 387 S.F.I PROPOSED GARAGE (F)- 621 S.F. FOOTPRINT, HEIGHT: 16La' AT MID -SLOPE OF MAIN GABLE 19'-3" AT MID -SLOPE OF DORMER 21'-8" AT PEAK LAKE I I I° < I I nG PROPOSED GARAGE (E)- ----- 441 S.F. FOOTPRINT, I 30' Q ATTACHED O EXISTING - BIT MING S HY (SALVl�GED IF HOUSE BU POU TO BE P IBLE AND RELQCATED � - R OV D ` (D G E R S) -OPTION F ONLY-,, j V S BY PTION CHOSEN) I EW TURNOUT- 1 BITUM US DRIVE \ ��\ DRIVE -100 1 1 30 1 ' i 1 e SETBACK I CONCRETE 1 3603 RED CEDAR POINT DRIVE EXISTING HOUSE - 1992 S.F. FOOTPRINT HARDCOVER CALCULATION FOR 2 OPTIONS: OPTION E: BASELINE HARDCOVER 7191 + NEW WIDENING 489 = 7680 (23.9 % OF LOT) OPTION F: BASELINE HARDCOVER 7191 + GARAGE 621 + DRIVE 117 + NEW TURNOUT 298 - PAD 245 = 79(2(:24.9 LOT) BUILDABLE AREA OF SITE IF ALL SETBACKS ARE ENFORCED - 387 S.F.I PROPOSED GARAGE (F)- 621 S.F. FOOTPRINT, HEIGHT: 16La' AT MID -SLOPE OF MAIN GABLE 19'-3" AT MID -SLOPE OF DORMER 21'-8" AT PEAK SITE OF PREVIOUS FUEL OIL TANK - PENDING MPCA DOCUMENTATION ON STATUS -ASSUMED TO BE REMEDIATED 0 -4 UT OHW UN.E INTERPOtATEE LAKE FROM SURVEY MINNEWASHTA 0 5 10 20 40 EXISTING IMPERVIOUS SURFACE (PER SURVEY): 7191 S.F. TOTAL LOT AREA = 32025 S.F. 2 OPTIONS SHOWN, IN ORDER OF PREFERENCE: OPTION E: PREFERRED - REMOVES NO MATURE TREES, HARDCOVER 23.9% OF LOT OPTION F: REMOVES 4 MATURE TREES, HARDCOVER 25.06°/y)OF LOT, VOLUNTARY STORM WATER- RETENTION OSITE PLAN ," = 30B-0" north ARCHITECTS 672.220.6190 MACKEYMALIN.COM W LL' u D W Z Z o f N O W W ENi> Q Q p� v z Lu a< (' wU W o V V) M PROJECT PHASE Schem°tic Design PROJECT NUMBER: ISSUE DATE, ISSUE DATE SITE SITE PLAN LAKE MINNEWASHTA O--------- ----- - '-�'--- Q EXI TING-"�- 1] BIT MING S HY (SALVl�GED IF BU POU TO BE P IBLE AND RELQCATED � - R OV D WI HIN EASEMEg1T PMCITY (D G E R S) -OPTION F ONLY-,, j V S BY PTION CHOSEN) I EW TURNOUT- 1 1 298 S.F., SEMI -PERVIOUS i V \ ��\ DRIVE -100 1 1 30 1 ' i \`I SETBACK I CONCRETE 45 S.F. / SITE OF PREVIOUS FUEL OIL TANK - PENDING MPCA DOCUMENTATION ON STATUS -ASSUMED TO BE REMEDIATED 0 -4 UT OHW UN.E INTERPOtATEE LAKE FROM SURVEY MINNEWASHTA 0 5 10 20 40 EXISTING IMPERVIOUS SURFACE (PER SURVEY): 7191 S.F. TOTAL LOT AREA = 32025 S.F. 2 OPTIONS SHOWN, IN ORDER OF PREFERENCE: OPTION E: PREFERRED - REMOVES NO MATURE TREES, HARDCOVER 23.9% OF LOT OPTION F: REMOVES 4 MATURE TREES, HARDCOVER 25.06°/y)OF LOT, VOLUNTARY STORM WATER- RETENTION OSITE PLAN ," = 30B-0" north ARCHITECTS 672.220.6190 MACKEYMALIN.COM W LL' u D W Z Z o f N O W W ENi> Q Q p� v z Lu a< (' wU W o V V) M PROJECT PHASE Schem°tic Design PROJECT NUMBER: ISSUE DATE, ISSUE DATE SITE SITE PLAN -15" OSIDE ELEVATION Scale: 3/16"= 1'-0" DETACHED GARAGE I , OPTION 1711 Ell Ell I , Ell I I I I I L ---------------- OSIDE ELEVATION Scale: 3/16"= P-0" 27' OFRONT ELEVATION Scale: 3/16"= 1'-0" 23' ioI —rt----------- —� II II ,I II ,I II ,I --- J OREAR ELEVATION Scale: 3/16"c 1'-0" 23' z Q NIT ECTS 612.220.6190 MACKEYMALIN.COM W w V Z� W Z Z D0Z NCLw W w QQ p�vz W 0 2 It Wo Z510 M PROJECT PHASE: S& ... m DesiOn PROJECT NUMBER: ISSUE DAIS: ISSUE DATE DRAWN BY: PM Al GARAGE n 0 ae d M d r a F F C Co 4A Vf W v z Q NIT ECTS 612.220.6190 MACKEYMALIN.COM W w V Z� W Z Z D0Z NCLw W w QQ p�vz W 0 2 It Wo Z510 M PROJECT PHASE: S& ... m DesiOn PROJECT NUMBER: ISSUE DAIS: ISSUE DATE DRAWN BY: PM Al GARAGE 3603 RED CEDAR 0 z a 8 118 3605 RED CEDAR POINT DRIVE POINT DRIVE OEXISTING NORTH ELEVATION Scale: 1/8"= T-0" OEXISTING WEST ELEVATION Scale: 1/8"= V-0" Q ARCHITECTS 612.220.6190 MACKEYMAEIN.COM W V Z� W Z Z f JA W N QQ oe W jwvz W 0_ ow W p 10 M PROJECT PHASE: Sch..I'c Design PROJECT NUMBER: ISSUE DATE: ISSUE DATE DRAWN BY: PM X20 GARAGE 3603 RED CEDAR o z a 8 16 POINT DRIVE OPROPOSED NORTH ELEVATION - OPTION E Scale: 1/8"= 1'-0" OPROPOSED WEST ELEVATION - OPTION E Scale: 1/8"= 1'-0" 3605 RED CEDAR POINT DRIVE ARCHITECTS 611.440.6190 MACKEYMALIN.COM W w U2, 0 W Z Z f o %A w W N Q Q C9 adVz Wog W o 10 M PROJECT PHASE: 5chemari< Design PROJECT NUMBER: ISSUE DATE: ISSUE DATE DRAWN BY: PM A20 GARAGE 3603 RED CEDAR 0 z a a 16 POINT DRIVE OPROPOSED NORTH ELEVATION - OPTION F Scale: 1/0"= V-0" E ARCINITRCTS 611.440.6190 MACKEYMALIN.COM W W U2, Z0 W Z Z yy Z W in Q Q W = V Z W o= it V W p V 10 M PHASE: Schematic Design NUMBER: ISSUE DACE: ISSUE DATE DRAWN BY: PM A21 GARAGE