HTPO Inspection Report 05-19-2015Engineering -Surveying
Landscape Architecture
INSPECTION REPORT
Project Name: Bluff Creek
Senior Cottages
Project No: 14-010 HTPO
City Project #13-08
- /-, 30
Date: 2015-05-19
Day:
❑S ❑M ®T ❑W ❑Th OF ❑Sa
Weather:
❑Snow
1 ❑ Clear
®Overcast
❑ Rain
❑ Sun
Tem
❑ to 32
❑ 32-50
050-70
❑ 70-85
❑ 85+
Wind:
❑Still
®Mod.
❑ High
Humidity:
❑Dry
®Mod.
❑ Hi
Client: City of Chanhassen - Engineering Department
Contractor: DDK Construction
Sub -Contractor:
Work Force:
Visitors:
Const. Equip:
Materials:
NOTES: Stephanie, City, called and said they were going to pour the ped ramp and
asked me to stop out when I could. I had a meeting so Steve from the City stopped out
and helped them with the ped ramps. When I stopped out they were still working on
finishing the concrete ped ramps. They hadn't set the domes on the west side of the
road but were in the process of setting them up. I left the site because I didn't know
what Steve told them to do and the concrete was already on the ground.
Inspector:
Ted Anderson
Hansen Thorp Pellinen Olson, Inc.
7510 Market Place Dr. Eden Prairie, MN 55344 e Phone: 952-829-0700 • Fax: 952-829-7806