HTPO Inspection Report 04-28-2015p Engineering ®Surveying
Landscape Architecture
A
INSPECTION REPORT
Project Name: Bluff Creek
Senior Cottages
Project No: 14-010 HTPO
City Project #13-08
Date: 2015-04-28
Day:
❑S ❑M ®T ❑W ❑Th ❑F ❑Sa
Weather:
❑Snow
❑ Clear
®Overcast
❑ Rain
❑ Sun
Temp:
❑ to 32
[:132-50
®50-70
[170-85
❑ 85+
Wind:
❑ Still
® Mod.
❑ Hi
Humidi
❑ Dry
®Mod.
❑ Hi
Client: City of Chanhassen - Engineering Department
Contractor: DDK Construction
Sub -Contractor: Ernie Meyers
Work Force:
Visitors:
Const. Equip:
Materials:
NOTES: Stephanie, City, called and told me she thought the contractor had paved the
trail and installed the ped ramps. I said I would stop by the site, which I did and Bob
and 2 more men were finishing the site grading. The trail and ped ramps still hadn't
been completed so I told Bob to make sure they call me when this work will be
completed.
I called Stephanie regarding as-builts on the pond and she said yes, the City requires
that the contractor has the surveyors shoot final pond grades to confirm the pond was
built correctly. I passed this information on to Bob and it will have to be done prior to
the City accepting this project. I told him it may be wise to do it now while they still
have equipment on site.
Inspector: Tedd Anderson/7e7 G�ir`4z
Hansen Thorp Pellinen Olson, Inc.
7510 Market Place Dr. Eden Prairie, MN 55344 • Phone: 952-829-0700 • Fax: 952-829-7806