Loading...
Approval Letter 7-12-05 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax: 952.2271110 Building Inspections Phone: 952.2271180 Fax: 952.2271190 Engineering Phone 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.2271110 Park & Recreation Phone: 952.227.1120 Fax: 952.2271110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.2271404 Planning & Natural Resources Phone: 952.227.1130 Fax 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.2271110 Web Site www.ci.chanhassen.mn.us July 12, 2005 Mr. Daniel J. Herbst The Pemtom Land Company 7597 Anagram Drive Eden Prairie, MN 55344 Re: Final Plat Approval - Lake Harrison Planning Case #05-14 Dear Dan: On July 12,2005, the Chanhassen City Council approved the following: The Final Plat for Lake Harrison creating 39 lots, 6 outlots and associated right-of- way for public streets (plans prepared by Westwood Professional Services, Inc., dated June 20, 2005) with a variance for a private street and street grade, subject to the following conditions: 1. If Lot 12, Block 3 is further subdivided to create an additional lot, the swimming pool must be removed, prior to the replatting. 2. E. Jerome and Linda Carlson will donate Outlots A, C and D to the City of Chanhassen. The developer shall pay full park fees for 37 new residential lots. The total park and trail fees due payable at the time of final plat recording are $148,000.00. 3. Building Official Conditions: a. A final grading plan and soils report must be submitted to the Inspections Division before building permits will be issued. b. Demolition permits must be obtained prior to demolishing any structures on the site. c. The developer must name and install a street sign for the private street. d. Retaining walls more than four feet high must be designed by a professional engineer and a building permit must be obtained prior to construction. e. Separate sewer and water services must be provided each lot. f. Existing wells and on-site sewage treatment systems on the site but be abandoned in accordance with State Law and City Code and the existing home must be connected to city sewer service when available. g. The swimming pool adjacent to the existing residence must be protected by a fence in accordance with City Code. The City 01 Chanhassen . A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks A great place to live, work, and play. Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 2 4. The developer must coordinate the address change of the existing home with the construction of the development and provide access for emergency vehicles at all times. 5. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420). The plans shall show fixed photo monitoring points for the replacement wetlands. The applicant shall provide proof of recording a Declaration of Restrictions and Covenants for Replacement Wetland. The applicant shall secure City approval of a wetland replacement plan prior to any wetland impacts occurring. Wetland replacement monitoring plans shall be submitted annually beginning one growing season after the wetland is created until the wetland replacement is accepted in writing by the City. The vegetation management plan shall be enhanced to provide a detailed outline for the treatment of reed canary grass and purple loosestrife. The vegetation management plan and wetland mitigation plan sheets shall specify that newly created wetland mitigation areas shall be seeded in a swath that extends at least l' above and l' below the normal water level of the mitigation areas. 6. A wetland buffer with a minimum width of 20 feet shall be maintained around Wetlands A, B, C, E, F, G and H. A wetland buffer with a minimum width of 16.5 feet shall be maintained around Wetland D and any wetland mitigation areas. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of City staff before construction begins and shall pay the City $20 per sign. 7. Building setbacks of 40 feet from the wetland buffer strips shall be maintained for all proposed building pads. Lot 3, Block 3 shall be revised to meet building setback requirements. 8. All plans shall illustrate Lake Harrison's OHW and a 150-foot structure setback from the OHW. 9. The bluff area on the property shall be preserved. All structures must maintain a 30-foot setback from the bluff and no grading may occur within the bluff impact zone (i.e., the bluff and land located within 20 feet from the top of the bluff). 10. Drainage and utility easements shall be provided over all existing wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds. 11. MN DOT category 3 erosion blanket and seed shall be applied to exposed creek slopes near/around road crossing within 24 hours of temporary/final grade. Riprap, appropriately sized, shall be installed at flared end outlets for energy dissipation with underlying gravel base or geotextile fabric. All emergency over flow structures shall be stabilized with riprap and geotextile or permanent turf re-enforcement blankets. Erosion and sediment controls shall be installed for the planned sanitary sewer crossing for Wetland A area. Silt fence, mulch and wetland seed shall be used for restoration. All 3:1 slopes shall be covered with category 3 erosion blanket. An outlet meeting NPDES water quality discharge requirements is needed on Pond 1. Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 3 12. Following storm water inlet installation, Wimco-type (or equal) inlet sediment controls shall be installed and regularly maintained. A detail for the inlet sediment controls shall be provided. 13. Following street and utility installation, Chanhassen specification Type 1 silt fence or other approved perimeter sediment control shall be installed for all positive slopes curbside. 14. Geotextile fabric shall be installed under the rock to promote effectiveness and lifespan of the rock construction entrance. 15. Chanhassen Type 2 heavy duty silt fence with straw/hay bale re-enforcement shall be provided for all silt fences adjacent to wetland and creek areas. Chanhassen Type 1 silt fence shall be installed at the OHW elevation of storm water basins following permanent outlet installation. 16. The "Inlet Sediment Filter" detail shall be altered to show a rock berm (1 Vz -inch rock, 2 feet wide and 1 foot high along the outside of the silt fence. Only metal T -posts shall be used, not wood stakes. 17. Silt fence shall be installed between wetland impact areas and the remaining wetland. 18. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Steeper than 3: 1 10:1 t03:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. 19. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. 20. All development phases shall be represented in the SWPPP (clear and grubbing, mass grading, large utilities, small utilities, home building, along with any special requirement such as wetland or creek crossing areas). 21. Construction phasing of the road shall be provided for the wetland/creek crossing. Due to potential concentrated flows, a creek crossing plan shall be developed and outlined in the SWPPP. A detail shall also be provided. Stabilization of the crossing area shall be provided within 24 hours following temporary or final grade. The silt fence shall be wrapped up and Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 4 around the culvert leaving the wetted perimeter free of silt fence. Soil shall be prevented from entering the waters of the State. 22. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $120,585.00. 23. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory- Bluff Creek Watershed District, Department of Health, Minnesota Pollution Control Agency (NPDES Phase II Construction Permit), Minnesota Department of Natural Resources (for dewatering), Carver County, Met Council) and comply with their conditions of approval. 24. Tree preservation fence shall be installed at the edge of the grading limits prior to any construction. Fencing shall be in place and maintained until all construction is completed. In no areas shall the fencing be placed within the bluff impact zone. 25. Any trees removed in excess of proposed tree preservation plans, dated 3/18/05, will be replaced at a ratio of 2: 1 diameter inches. 26. A total of 322 trees are to be planted. The number of overstory, deciduous trees, as shown on landscape plans dated 6120/05, required in the front yard of each lot are as follows: Lot, Block Number of trees required Lot 1, blk 1 5 Lot 2, blk 1 2 Lot 3, blk 1 1 Lot 4, blk 1 1 Lot 5, blk 1 1 Lot 6, blk 1 2 Lot 7, blk 1 2 Lot 8, blk 1 2 Lot 9, blk 1 1 Lot 10, blk 1 2 Lot 11, blk1 None - existing front yard trees to be preserved Lot 12, blk 1 None - existing front yard trees to be preserved Lot 1, blk 2 4 Lot 2, blk 2 3 Lot 3, blk 2 2 Lot 4, blk 2 2 Lot 5, blk 2 3 Lot 6, blk 2 1 Lot 7, blk 2 3 Lot 8, blk 2 2 Lot 9, blk 2 2 Lot 10, blk 2 7 Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 5 Lot, Block Number of trees required Lot 1, blk 3 5 Lot 2, blk 3 3 Lot 3, blk 3 2 Lot 4, blk 3 2 Lot 5, blk 3 1 Lot 6, blk 3 1 Lot 7, blk 3 1 Lot 8, blk 3 2 Lot 9, blk 3 2 Lot 10, blk 3 2 Lot 11, blk 3 3 Lot 12, blk 3 6 Lot 13, blk 3 3 Lot 14, blk 3 2 Lot 15, blk 3 2 Lot 16, blk 3 None - existing front yard trees to be preserved 27. The developer shall be responsible for planting any trees in side or rear yards as shown on the landscape plan dated 3/18/05. 28. Any private street is required to have 20-foot wide paved streets from back-of-curb to back-of- curb, be built to a 7-ton design, have a maximum slope of 10%, and contained within a 30-foot wide private easement. At the completion of the project, the developer will be required to submit inspection/soil reports certifying that the private street was built to a 7-ton design. 29. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes and traffic control plans. The applicant should be aware that any off-site grading will require an easement from the appropriate property owner. 30. All of the ponds are required to be designed to National Urban Runoff Program (NURP) standards with maximum 3:1 slopes and a 10:1 bench at the NWL. Pond number 3 must be adequately sized to accommodate the drainage from Lot 1, Block 4, and the proposed park area. 31. Any retaining wall over 4 feet in height must be designed by a Structural Engineer registered in the State of Minnesota with an approved fence. Also, it will require a building permit from the Building Department. 32. Prior to final platting, storm sewer design data and full size map will need to be submitted for staff review. Depending on the size of the drainage area, additional catch basins may be required at that time. The storm sewer will have to be designed for a lO-year, 24-hour storm event. Drainage and utility easements will need to be dedicated on the final plat over the public storm drainage system including ponds, drainage swales, emergency overflows, access routes for maintenance, and wetlands up to the 100-year flood level. The minimum easement width Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 6 shall be 20 feet wide. Emergency overflows from all stormwater ponds will also be required on the construction plans. 33. Erosion control measures and site restoration must be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type II erosion control fence, which is a heavy-duty silt fence, be used for the area adjacent to the existing wetlands. Type I silt fence shall be used in all other areas. In addition, tree preservation fencing must be installed at the limits of tree removal. Erosion control blankets are recommended for all of the steep 3: 1 slopes with an elevation change of eight feet or more. All disturbed areas, as a result of construction, must be seeded and mulched or sodded immediately after grading to minimize erosion. 34. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. The applicant is also required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. The applicant must be aware that all public utility improvements will require a preconstruction meeting before building permit issuance. 35. The sanitary sewer and water hookup charges will be applicable for each of the new lots. The 2005 trunk hookup charge is $1,458 for sanitary sewer and $2,955 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 36. The applicant shall include a drain tile system behind the curbs to convey sump pump discharge from homes not adjacent to ponds. Remove the proposed curb along the north side of the right turn land on Galpin Boulevard. 37. Maximum 3: 1 side slopes are allowed without the use of a retaining wall, revise the plan accordingly. 38. Minimum 40-foot wide public drainage and utility easements will be required between Lots 4 and 5, Block 1, and along the west side of Lots 10 and 11, Block 1. 39. On the grading plan: a. Show 12 foot spacing between any two parallel retaining walls over 4-foot in height. b. Add a note to remove all existing approaches. c. Show the EOF for the easterly cul-de-sac and the garage elevations of all Lots adjacent to it need to be at least 1.5 feet higher than the emergency overflow for the street. 40. On the utility plan: a. Relocate the proposed 12 inch pvc raw water main away from the retaining wall by at least 10 feet along the private street. Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 7 b. Show all existing utilities, pipe type and manhole rim/inverts within Lake Lucy Road, Galpin Boulevard, Highover Trail and Manchester Drive. c. Show the existing sanitary sewer in the center of the existing easement. d. Add note: any connection to existing structure must be core drilled. e. Water service must be I-inch copper type K. f. The watermain must be looped through to Manchester Drive versus Galpin Boulevard. 41. Staff is recommending that a raw water transmission main be extended through the site for future connection to the City's second water treatment plant. The construction cost for the raw watermain will be paid by the City from the water portion of the Utility Fund. The developer will be required to provide public drainage and utility easements over the transmission main and to install the pipe as a part of the utility construction. 42. Since the applicant is now proposing more units (38) than what the property has been assessed for, the additional 37 units (38-1=37) will be charged a sanitary sewer and watermain lateral connection charge. These charges are due at the time of final plat recording. 43. As with past developments that access off of Galpin Boulevard, a right-turn lane into the site will be required to be constructed. The turn lane must meet Carver County design requirements. 44. A lO-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, Xcel Energy, Qwest, Cable TV and transformer boxes. This is to ensure that hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. 45. Two additional fire hydrants are required. 46. Fire apparatus access roads and water supply for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternate methods of protection are provided. 47. Temporary street signs shall be installed on each street intersection when construction of the new roadway allows passage by vehicles. Pursuant to 2002 Minnesota Fire Code Section 501.4. 48. No burning permits will be issued for trees to be removed. Trees and shrubs must either be removed from site or chipped. 49. The private street driveway shall be as shown on the Lot 11 & 12 detail plan dated 7/11/05. 50. On the storm sewer and street plans show all the roads turning radius. 51. Show the sanitary sewer minimum 20-foot easement on Lot 1, Block 2. Mr. Daniel J. Herbst Lake Harrison July 12, 2005 Page 8 52. Show minimum 20-foot easement for the water-main of Lake Harrison Road looping to the north with the existing Manchester Drive water-main. 53. Show the right existing sanitary easement on Lot 3, Block 3, and revise the standard easement accordingl y. 54. All outlot boundaries shall be revised to incorporate wetland buffers where applicable. 55. The applicant shall submit a letter of credit in the amount of $136,400 to guarantee the design goal for the wetland replacement site, as approved in the replacement plan, is fully achieved. The letter of credit shall be written to remain in effect for 5 years." Two signed mylar copies of the final plat shall be submitted to our office for signatures along with the signed development contract, the required easements (trail and private street) and all required financial security and fees. Deeds conveying Outlots A, B C and D to the City must be submitted for recording. Two 1 "=200' scale mylar reductions of the final plat and one 1 "=200' scale mylar reductions of the final plat with just street names and lot and block numbers shall be submitted. In addition, a digital copy in .dxf format and a digital copy in .tif format (pdf compatible) of the final plat shall be submitted. The City will submit all the necessary documents to Carver County for recording of the subdivision. If you have any questions or need additional information, please contact me at (952) 227-1131. Sincerely, ; ~/<':l!J )\-)-<A'"~J'~ Robert Generous, AICP Senior Planner c: Paul Oehme, City Engineer/Public Works Director Steve Torell, Building Official g:\plan\2004 planning cases\05-14 Lake Harrison\approvalletter fp.doc