Loading...
PC Staff Report 7-19-05 ~ z -< u ~ ~ ~ ~ -< -< ~ -< ~ ~ ~ ~ 00 PC DATE: July 19,2005 w CC DATE: Aug. 8, 2005 CITY OF CHANHASSEN REVIEW DEADLINE: August 16, 2005 CASE #: 05-23 ~ BY: RG,LH,ML,AM,JS,ST STAFF REPORT PROPOSAL: Request for Rezoning of property from Agricultural Estate District (A-2) to Planned Unit Development (PUD), Preliminary Plat Approval, and Wetland Alteration Permit- Chanhassen West Business Park. LOCA TION: The northwest corner of the intersection of Lyman Boulevard and Galpin Boulevard APPLICANT: Eden Trace Corporation 8156 Mallory Court Chanhassen, MN 55317 (952) 361-0722 V olk Minger Partnership P. O. Box 236 Chanhassen, MN 55317 (952) 470-1753 PRESENT ZONING: Agricultural Estate District, A2 2020 LAND USE PLAN: Office/Industrial ACREAGE: 40.15 acres DENSITY: EA.R 0.18 - 0.33 SUMMARY OF REQUEST: The applicant in proposing an Office-Industrial Planned Unit development consisting of eight lots and three outlots with a wetland alteration permit to fill and alter wetlands within the development. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City has a relatively high level of discretion in approving rezonings, PUD's, and amendments to PUD's because the City is acting in its legislative or policy making capacity. A rezoning or PUD, and amendment thereto, must be consistent with the City's Comprehensive Plan. The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi judicial decision. Location Map Chanhassen West Business Park Planning Case No. 05-23 8470 Galpin Boulevard City of Chanhassen c C'Cl Q) ..lil:: f1I f1I f1I C'Cl C'Cl .s:: .s:: (.) lij _ .s:: o (.) >- - B ~ - C3 SCANNED Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 2 of 26 PROPOSAL/SUMMARY The applicant is proposing an office-industrial Planned Unit Development. The development consists of eight lots, three outlots and public right-of-way. The developer proposes creation of a common open space to preserve wooded areas within the development. Access is proposed at the existing driveway entrance off Galpin Boulevard. Ponding for the development is proposed in the southwest comer of the project. Water and sewer service are available to the site. The purpose of this development is to create a PUD light industrial/office park. The use of the PUD zone is to allow for more flexible development while creating a higher quality and more sensitive proposal. The standards are partially based on the uses within the Industrial Office Park District (lOP), but provide additional requirements not included in the lOP district. The PUD design standards will be incorporated in an ordinance which will regulate the development of the site. The property to the north is a residential single-family subdivision, Trotters Ridge, which is zoned Planned Unit Development-Residential. The property to the east, across Galpin Boulevard, is a residential single-family subdivision, Stone Creek, which is zoned Single-Family Residential. The property to the south, across Lyman Boulevard, contains the Holasek nursery, which is currently zoned Agricultural Estate District and is guided for OfficelIndustrial use. Both Galpin Boulevard and Lyman Boulevard are classified as minor arterial roadways in the City of Chanhassen Comprehensive Plan. Minor arterial roadways are intended and designed to carry higher traffic volumes. As the city continues to grow, Galpin Boulevard will provide mobility for north-south traffic flow to destinations within the city as well as the regional transportation system. The property has abandoned farming uses on the northern and eastern portions of the site; abandoned mining and excavating operation on the western and southwest portions of the property; and landscaping and contracting operations are located on the central portion of the property. A house is located in the southeast corner of the property. Three large wetland areas are located in the east central, northwest, and southwest of the property. The site is significantly wooded in the north central area. The property has a high point of approximately 980 feet in the north central area and a low point of 940 feet in the southwest corner of the property. The property is bounded by Galpin and Lyman Boulevards. Staff is recommending that the preliminary Planned Unit Development, preliminary plat and wetland alteration permit be approved. BACKGROUND On August 12,1996, City Council denied a Land Use Map Amendment #96-1b from Office/Industrial to Residential Medium Density for the northerly 22.6 acres, conceptual and preliminary approval of PUD #96-2, preliminary plat approval for 23 lots and associated right- of-way, Site Plan Review #96-5 approval for 140 townhouse units, and Wetland Alteration Permit #95-2b. In the summer of 1995, Scherber Partnership Properties requested a land use map amendment from Office/Industrial to Residential - Low Density, a rezoning to Single Family Residential, Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 3 of 26 RSF, and preliminary plat approval to permit 59 single-family lots. City staff recommended denial of the land use map amendment and consequently the rezoning and subdivision. The Planning Commission voted unanimously to recommend denial of the development, and the City Council tabled the item, with the consent of the applicant, to permit staff and the applicant to work out a compromise for the development of the parcel. However, in February, 1996, the applicant formally withdrew the development application. On February 13, 1987, City Council approved CUP #87-1 for a landscape contractor's yard and a wholesale nursery and a variance to permit a contractor's yard within one mile of an existing contractor's yard (on the same property). On November 19, 1984, the City Council approved a Conditional Use Permit (CUP), #84-13, to permit a contractor's yard for R & W Sanitation on the southeasterly 32 acres of the site. Such approval included the storage and repair of garbage trucks. The property was zoned R-IA, Agricultural Residence District. On November 19, 1984, the City Council also approved CUP #84-14 for a contractor's yard to include the storage and repair of construction equipment. In April, 1982, the property owner, Yolk, applied for a building permit to reconstruct a pole barn which had collapsed due to heavy snow. The building permit was denied because the storage and repair of excavating equipment in the pole barn was not a permitted use in the R-IA district at that time. Mr. V olk petitioned the Council on May 17, 1982 to issue the building permit. The City Council approved the issuance of the building permit subject to Mr. V olk applying for a rezoning request from R-IA to 1-1. Mr. Yolk made an application for the rezoning and a comprehensive land use plan amendment. On June 25, 1982, the Planning Commission recommended denial of the request. The City Council considered the request on October 4, 1982. The Council tabled the item until staff completed a survey of all contractors' yards as well as other non-conforming uses in the city. The City Council amended the Zoning Ordinance to allow contractor's yards as CUPs in the R-1A zone on August 20, 1984. On November 12, 1980, a rezoning request from R-IA to I-Ion the parcel was considered by the Planning Commission. At that meeting, the request was revised to an ordinance amendment to permit contractors' businesses and storage yards as conditional uses in the R-IA district. The Planning Commission recommended denial of the request. The City Council subsequently denied the request on January 5, 1981. REZONING Justification for Rezoning to PUD The applicant is requesting to rezone approximately 45 acres from A2, Agricultural Estate District, to PUD, Planned Unit Development for an Office/Industrial Park. The project consists of eight lots. This property was one of four areas designated for Office/Industrial use as part of the 1991 comprehensive plan update. The review criteria are taken from the intent section of the PUD Ordinance. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 4 of 26 Section 20-501. Intent Planned unit developments offer enhanced flexibility to develop a site through the relaxation of most normal zoning district standards. The use of the PUD in this instance is to permit impervious surface clustering within the development in order to preserve a significant area of trees. The use of the PUD zoning also allows for an internal transfer of site coverage. In exchange for this enhanced flexibility, the City has the expectation that the development plan will result in a significantly higher quality and more sensitive proposal than would have been the case with the other more standard zoning districts. The proposed development provides a compatible development with the surrounding development subject to the recommended modifications to the plan. The proposed and rezoning assist in the furtherance of the following land use goals of the City of Chanhassen Comprehensive Plan: Recognizing that some uses pay their own way in terms of the property taxes generated and some uses do not, Chanhassen will strive for a mixture of development which will assure it financial future. Development will be encouraged within the MUSA line. Planned industrial development will be encouraged as a means of encouraging tax base growth and creating new employment opportunities. Development should be phased in accordance with the ability of the city to provide services. Development shall be consistent with the Comprehensive Land Use Plan. DEVELOPMENT DESIGN STANDARDS Staff is proposing the following development standards govern the development of the property. Development Standards a. Intent The purpose of this zone is to create a PUD light industrial/office park. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed underground. Each lot proposed for development shall proceed through site plan review based on the development standards outlined below as well as the Design Standards for Commercial, Industrial and Office-Institutional Developments contained in Chapter 20, Article XXllI, Division 7, of the Chanhassen City Code. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. Ancillary uses may be permitted as listed below once a primary use has occupied the site. Shared parking may be used within the development. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 5 of 26 b. Permitted Uses The permitted uses in this zone shall be limited to light industrial, warehousing, and office as defined below. The uses shall be limited to those as defined herein. If there is a question as to whether or not a use meets the definition, the Community Development Director shall make that interpretation. Light Industrial - The manufacturing, compounding, processing, assembling, packaging, or testing of goods or equipment or research activities entirely within an enclosed structure. There shall be negligible impact upon the surrounding environment by noise, vibration, smoke, dust or pollutants. Conferences/Convention Center - establishments designed to accommodate people in assembly, providing conference and meeting services to individuals, groups, and organizations. Contractor yard - means any area or use of land where vehicles, equipment, and/or construction materials and supplies commonly used by building, excavation, roadway construction, landscaping and similar contractors are stored or serviced. A contractor's yard includes both areas of outdoor storage and areas confined within a completely enclosed buildings used in conjunction with a contractor's business. Must comply with the following standards: (1) Equipment and supply storage must be screened or enclosed. Screening shall comply with Buffer Yard D and F4 Fencing as specified in Chapter 20 of the Chanhassen City Code. (2) Vehicles/Equipment shall be stored within an enclosed or screened area. (3) No unlicensed or inoperable vehicle/equipment shall be stored on premises. (4) All chemicals shall be stored in proper storage facilities, specified by OSHA regulations. (5) The contractor shall be licensed, bonded and insured. Day Care - establishments providing for the care and supervision of infants and children on a daily basis. The following applies to Day care centers: (1) The site shall have loading and drop off points designed to avoid interfering with traffic and pedestrian movements. (2) Outdoor play areas shall be located and designed in a manner which mitigates visual and noise impacts on adjoining residential areas. (3) Each center shall obtain all applicable state, county, and city licenses. Health Services- establishments primarily engaged in furnishing medical, surgical and other health services to persons. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 6 of 26 Hotel/Motel - establishments engaged in furnishing lodging, or lodging and meals, to the general public. Must comply with the following standards: (1) The site shall have a covered entrance and a separated drop off area, which may not block the drive isle. (2) Parking: shall be located in the interiorlbehind building. Office - Professional and business office. Recreation/Health Club - establishments engaged in operating reducing and other health clubs, spas, and similar facilities featuring exercise and other physical fitness conditioning. Research Laboratory - establishments engaged in scientific research or study. Must comply with the following standards: (1) All chemicals and pollutants and waste must be stored, used and disposed of according to OSHA and Hazmat regulations and standards. (2) The building must be secure from persons other than laboratory personnel. (3) No outdoor experiments that cause hazards or excessive noise or odors shall be permitted on site. Utility services Warehousing - Means the commercial storage of merchandise and personal property. Ancillary Uses (in conjunction with and integral to a primary use) Antennas Screened outdoor storage - Outside storage is permitted, if approved by the City Council as part of the site plan review, subject to being completely screened with 100 percent opaque fence and/or landscape screening. Showroom - showroom type display area for products stored or manufactured on-site provided that no more than 20 percent of the floor space is used for such display and sales. Telecommunication Towers by conditional use permit only. Prohibited uses . Auto related including sales and repair . Churches . Garden Center Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 7 of 26 . Home furnishings and equipment stores . Home Improvement/Building Supply . Lumber Yard . Retail c. Setbacks The development is regulated by the PUD Standards. There are no minimum requirements for setbacks on interior lot lines in the PUD zone, except as specified below. The following setbacks shall apply: In the PUD standards, there is the requirement for landscape buffering in addition to building and parking setbacks. The following building and parking setbacks shall apply: Buffer yard, Setback building/parking (ft.) Error! Bookmark not defined.Galpin C, 50, 50 Blvd. Lyman Blvd. C, 50, 50 Street A NA, 30, 10 Interior Lot Lines B,O,O West Perimeter Lot Line (adjacent to C, 30, 10 industrial) North Perimeter Lot Line (adjacent to D, 100, 100 residential): Buffer yard & setback No fences shall be permitted between the required landscape buffer and arterial and collector roads. The PUD standard for hard surface coverage is 70 percent for office and industrial uses. Any one site/lot can exceed the 70 percent requirement, but in no case may the entire finished development exceed 70 percent hard surface coverage. d. Development Standards Tabulation Box 1. Minimum Lot Dimensions a. Lot Area = one acre b. Frontage = 150 feet; Minimum frontage on cul-de-sac = 60 feet c. Depth = 200 feet 2. Building Area Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 8 of 26 Building Square Footage Breakdown: I Use I Percent Total I Square Feet I Office 30% 105,000 Light Industrial rw arehouse 70% 245,000 Total (Maximum) 350,000 The actual use percentages and square footage totals may vary provided that the total building square footages are not exceeded. 3. More than one (1) principal structure may be placed on one (1) platted lot. 4. Building height shall be limited to 3 stories or 4 feet. e. Building Materials and Design 1. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. 2. All materials shall be of high quality and durable. Masonry or higher quality material shall be used. Color shall be introduced through colored block or panels and not painted cinder block. 3. Brick may be used and must be approved to assure uniformity. 4. Block shall have a weathered face or be polished, fluted, or broken face. 5. Concrete may be poured in place, tilt-up or pre-cast, and shall be finished in stone, textured, coated, or painted. 6. Metal siding will not be approved except as support material to one of the above materials or curtain wall on office components or, as trim or as HV AC screen. 7. All accessory structures shall be designed to be compatible with the primary structure. 8. All roof mounted equipment shall be screened from adjacent public right-of-ways and the project perimeter by walls of compatible appearing material or camouflaged to blend into the building or background. Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials or landscaping. 9. The use of large unadorned, concrete panels and concrete block, or a solid wall unrelieved by architectural detailing, such as change in materials, change in color, fenestrations, or other significant visual relief provided in a manner or at intervals in keeping with the size, mass, and scale of the wall and its views from public ways shall be prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 9 of 26 walls shall be given added architectural interest through building design or appropriate landscaping. The buildings shall have varied and interesting detailing. 10. Space for trash and recycling shall be provided in the interior of all principal structures or within an enclosure for each lot developed in the Business Park. 11 Each building shall contain one or more pitched roof elements depending on scale and type of building, or other architectural treatments such as towers, arches, vaults, entryway projections, canopies and detailing to add additional interest and articulation to structures. 12. There shall be no underdeveloped sides of buildings visible from public right-of-ways. All elevations visible from the street shall receive nearly equal treatment and visual qualities. f. Site Landscaping and Screening 1. Landscaping along Lyman and Galpin Boulevards shall comply with buffer yard standard C. Landscaping along the northern project perimeter shall comply with buffer yard D. Landscaping along the westerly project perimeter shall comply with buffer yard B. All buffer yard plantings shall be installed as part of the subdivision. Each lot must present a landscape plan for approval with the site plan review process. 2. Storage of material outdoors is prohibited unless it has been approved under site plan review. All approved outdoor storage must be screened with fences, walls and/or landscaping. 3. When parking lots are less than three feet above the adjacent roadway, an undulating or angular berm or elevation change of three feet or more in height shall be installed. All required boulevard landscaping shall be sodded. 4. Loading areas shall be screened 100 percent year round from public right-of-ways. Wing walls may be required where deemed appropriate. g. Signage 1. The Chanhassen West Business Park POO shall be permitted one project identification sign at the entrance on Galpin Boulevard. The sign shall not exceed eight feet in height. A maximum of 80 square feet of sign area shall be permitted. The project identification sign shall not be counted against the permitted signage on an individual parcel. 2. All freestanding parcel signs shall be limited to monument signs. The sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. 3. Each property shall be allowed one monument sign per street frontage. 4. The signage will have consistency throughout the development. A common theme will be introduced at the development's entrance monument and will be used throughout. The sign treatment is an element of the architecture and thus should reflect the quality of the Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 10 of26 development. The signs should be consistent in color, size, and material throughout the development. 5. Wall sign shall be permitted per city ordinance for industrial office park site. 6. All signs shall require a separate sign permit. h. Lighting 1. Lighting for the interior of the business center should be consistent throughout the development. 2. A decorative, shoe box fixture (high pressure sodium vapor lamps) with a square ornamental pole shall be used throughout the development area for area lighting. 3 Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. 4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2 candle at the property line. This does not apply to street lighting. i. Alternative Access 1. Each site shall accommodate transit service within the individual development, whenever possible. 2. Pedestrian access shall be provided from each site to the public sidewalk and trail system. 3. The developer and site users shall promote and encourage Traffic Demand Management Strategies. 4. Each site shall provide areas for bicycle parking and storage. 5. Preferential parking shall be provided for car and van pool vehicles within each site. SUBDIVISION REVIEW The applicant is proposing an eight-lot office-industrial development. LANDSCAPINGffREE PRESERVATION Minimum requirements for landscaping include 9,082 sq. ft. of landscaped area around the parking lot, 36 trees for the parking lot, and bufferyard plantings along all property lines. The applicant's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 11 of26 Required Proposed North Prop. line 36 canopy trees 50 canopy bufferyard D - 25' width x 72 understory trees 120 understory 1200' length 108 shrubs 180 shrubs 75% of totals shown South property line 30 canopy trees 21 canopy trees bufferyard C - 20' x 1000' 60 understory trees 40 understory trees 90 shrubs 60 shrubs East property line 37 canopy trees 22 canopy trees + 16 existing bufferyard C - 20' x 1240' trees 74 understory trees 57 understory trees 111 shrubs 42 shrubs West property line 11 canopy trees 17 canopy trees bufferyard B - 15' x 720' 17 understory trees 35 understory trees 75% of totals shown 27 shrubs 53 shrubs The applicant does not meet minimum requirements for the buffer yards along the south and east property lines. Staff recommends that bufferyard plantings be increased in these areas to meet minimum requirements. The applicant has saved a large portion of the existing, mature oaks on site. This preservation will add a unique feel to the site and proved the residential neighborhood to the north an added buffer for the development. The applicant did an excellent job fitting the design to the site. GRADING, DRAINAGE AND EROSION CONTROL The existing site is about 40.15 acres in size with scattered wetlands. In addition, there are three existing buildings on the property which will have to be razed prior to any grading operations. The current plans show buildings with proposed floor elevations from 961-966. The applicant is now proposing to grade about 83% of the site for the new building pads, storm pond and a proposed street ending with a cul-de-sac. The current plans propose eight lots located along the proposed street and cul-de-sac. There are a few areas of concern with the grading plan. Staff would like to see the applicant do a better job of matching in with the existing topography of the site and maintain a side slope of 3: 1 maximum. The existing site drains toward the existing three wetlands on the northwesterly and southwesterly comers and east side of the parcel. At these elevations, stormwater from the buildings and parking lots will drain toward the proposed catch basins and be conveyed via storm sewer system to the proposed storm pond on the southwesterly comer of the parcel. The pond will treat the water before discharging it to the adjacent wetland. All of the ponds are required to be designed to National Urban Runoff Program (NURP) standards with maximum 3:1 slopes and a 10:1 bench at the NWL. The applicant is required to meet the existing site runoff rates for the lO-year and 100-year, 24-hour storm events. Storm sewer sizing calculations must be submitted at the time of final plat application. The storm sewer must be sized for a 10-year, 24-hour storm event. Drainage and utility easements must be dedicated on the final plat over the public storm drainage system including ponds, drainage swales, and wetlands up to the 100-year flood level. The interior lot storm sewer will require private easements to be dedicated where the sewer crosses from one lot to another. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 12 of26 The applicant must be aware that a retaining wall structure is not allowed within the public street right-of-way. Also, any retaining wall exceeding four feet in height must be designed by a registered structural engineer, with approved safety fence and a building permit must be obtained. Erosion control measures and site restoration must be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that the City's Type II erosion control fence, which is a heavy duty silt fence, be used for the area adjacent to the existing wetlands on the north and south grading limits of the site. Type I silt fence shall be used in all other areas. A minimum 75-foot long rock construction entrance must be shown at the entrance drive that will be utilized during construction. In addition, tree preservation fencing must be installed at the limits of tree removal. Erosion control blankets are recommended for all of the steep 3: 1 slopes with an elevation change of eight feet or more. All disturbed areas, as a result of construction, must be seeded and mulched or sodded immediately after grading to minimize erosion. The applicant should be aware that any off-site grading will require an easement from the appropriate property owner. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. A minimum 75-foot rock construction entrance must be added to the plans at the proposed access off of Galpin Boulevard. Storm Water Mana2ement The proposed development is required to maintain existing runoff rates and meet NURP standards. Storm water calculations should be submitted to ensure the proposed storm water pond is sized adequately for the proposed development. Easements Drainage and utility easements a minimum of 20 feet in width should be provided over all existing wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds. Erosion Control Stable emergency overflows are needed for the proposed pond on site. The emergency overflows should be clearly labeled on the plan and a detail is needed. The emergency overflows can be stabilized with a turf re-enforcement mat or fabric and riprap. Notes on the plan are needed describing timing of temporary stabilization with Type 1 mulch and seed or erosion control blanket and seed. Timing of stabilization will vary depending upon slope and if it is a concentrated flow area. The rate of mulch application is needed as well (2 tons per acre, disc anchored). All riprap/fabric at the flared end section must be installed within 24 hours of flared end section installation. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 13 of26 Erosion control blanket shall be installed on all slopes greater than or equal to 3: 1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Steeper than 3: 1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. Erosion control blanket should be specified in the swale from the flared end section to the wetland along the west boundary of the site. The blanket specified should adequately protect the area from designed velocity and depth of flow. The blanket and seed in the swale should be installed within 5 days of culvert installation. Erosion control blanket is recommended for the pond slopes from around 952 to 942 contours. All blanket on the plan should be shown as a shaded area. Sediment Control Temporary sediment basins are needed prior to disturbing upslope areas. The areas of temporary sediment basins should be labeled on the plan. A temporary outlet (e.g., a perforated riser and rock cone) is needed for the pond; details should be provided. Temporary basins are needed in the area of the proposed permanent storm water pond, the southeast corner of the site prior to discharging to the culvert under Galpin Boulevard, and possibly in the northwest area of the site to handle water runon from the north prior to discharge to the wetland. The Wimco inlet control detail proposed will work for all curbside inlets. Any and all area inlets or drop inlets in paved areas will need alternate controlslWimco details. The engineer should check on alternate designs for Wimco-type inlet controls to fit the various types of inlets. Additional inlet controls may be needed for adjacent inlets on Galpin Boulevard and Street A. Silt fence will be needed around Outlot A along the east side between the pond the wetland. Type 1 and Type 2 silt fence locations need to be specified on the plan. Type 2 silt fence should be installed around all wetland areas and in the southeast corner of the site to protect the culvert under Galpin Boulevard. The silt fence should be extended along the south side to close the gap in the silt fence. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as needed. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 140f26 Surface Water Management Fees Water Quality Fees Because of the impervious surface associated with this development, the water quality fees for this proposed development are based on industrial development rates of $6,330/acre. Based on the proposed developed area of approximately 33.87 acres, the water quality fees associated with this project are $214,397. Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels, and storm water ponding areas for runoff storage. Industrial developments have a connection charge of $5,957 per developable acre. This results in a water quantity fee of approximately $201,764 for the proposed development. SWMP Credits This project proposes the construction of one NURP pond. The applicant will be credited for water quality where NURP basins are provided to treat runoff. This will be determined upon review of the ponding and storm sewer calculations. Credits may also be applied to the applicant's SWMP fees for the provision of outlet structures. The applicant will not be assessed for areas that are dedicated outlots. No credit will be given for temporary pond areas. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $413,661. Other Agencies The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Carver County, Minnesota Pollution Control Agency (NPDES Phase II construction permit), Minnesota Department of Natural Resources (for dewatering), Army Corps of Engineers) and comply with their conditions of approval. UTILITIES Municipal sewer and water stubs are available to the site from Galpin Boulevard on the east side of the parcel. The applicant is proposing to connect to the existing utility stubs and extend them to the proposed lots to service the site. The sanitary and watermain lines that run within the public street right-of-way and within the shared driveway between Lots 4 and 5 until the last sanitary manhole will be considered a public utility line and the remaining will be considered private utility. Additional gate valves are needed for the shared private watermain between any two lots. Minimum 20-foot wide easements will be required over the public portion of the storm sewer lines between Lots 2 and 3. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 15 of26 The underlying property has been previously assessed for sewer, water and street improvements and there is no remaining assessment due payable to the City. Since the developer will be responsible for extending lateral sewer and water service to the lots, the sanitary sewer and water connection charges will be waived. The sanitary sewer and water hookup charges will be applicable for each of the new lots. The 2005 trunk hookup charge is $1,458 for sanitary sewer and $2,955 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Upon completion of the utility improvements, the utilities will be turned over to the City for maintenance and ownership. The applicant is also required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the MPCA, Department of Health, Watershed District, Carver County, MnDOT, etc. STREETS There is one public street proposed with the project. The street is proposed as a cul-de-sac running west of Galpin Boulevard and a private shared driveway between Lots 4 and 5. The applicant is proposing the paved streets to be 32-feet wide with a 60-foot wide right-of-way and a 46-foot cul-de-sac paved radius. The applicant must be aware that the City's standard commercial street pavement width is 36-foot wide from back-of-curb to back-of-curb and the cul-de-sac must be 48-foot in radius. Staff is fine with the 24-foot wide shared driveway between Lots 4 and 5. The developer will be required to submit inspection/soil reports certifying that the private streets were built to a 7-ton design. The proposed development lies west of Galpin Boulevard (CSAH 19) and north of Lyman Boulevard (CSAH 18), A-Minor Expander Arterials as identified on SRF Consulting Group Incorporated's Functional Classification Map. Proposed access to the site will be from Galpin Boulevard, which aligns with Stone Creek Drive, an existing local street extending east of Galpin Boulevard. Staff has researched the feasibility to move the proposed site access from Galpin Boulevard to Lyman Boulevard in response to citizens' requests. Due to wetland conditions, access to Lyman Boulevard would be 1,000 feet west of Galpin Boulevard. Carver County has identified Lyman Boulevard as a regional east-west collector with limited access; therefore, Staff recommends that the access to Chanhassen West Business Park remain at the Galpin Boulevard/Stone Creek Drive intersection. This recommendation is also consistent with Section 18-57 of the City Code, which states that "access to arterial streets shall be at intervals of not less than one-fourth mile [1,320 feet] and through existing and established crossroads" . SRF Consulting Group, Inc. analyzed the 2020 transportation system in conjunction with the City's 2020 Comprehensive Plan. SRF's forecasted 2020 traffic volume for Galpin Boulevard was based on the 2020 Land Use Map and the construction of the new Trunk Highway 212. The Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 16 of26 proposed land use of the Chanhassen West Business Park is consistent with the 2020 land use used in SRF's traffic analysis. SRF's report does not identify a need to upgrade Galpin Boulevard by the year 2020. Right turn lanes for north and southbound traffic exist at the Galpin Boulevard intersection with Stone Creek Road and the proposed site access. The developer must submit an access permit to Carver County Public Works for the proposed connection to Galpin Boulevard. As stipulated by the Assistant County Engineer, the developer must submit information on proposed turn lanes with the permit application. Staff has concerns of movements of truck traffic accessing off Galpin Boulevard to Lots 1 and 8 being too close. Staff recommends increasing the access width to 44 feet to create a three-lane access off Galpin Boulevard and increase the turning curb radius. Also, relocate Lots 1 and 8 easterly accesses further to the west and re-align them opposite of each other. The applicant should be aware that, in commercial districts, six-foot wide sidewalks are required and the parking driveway aisle must be 26-feet wide. Cross-access easements will be obtained for the shared driveways and recorded against the lots. PARKS AND RECREATION PARKS The proposed Chanhassen West Business Park is situated within the park service areas of Stone Creek Park and the Chanhassen Nature Preserve. Stone Creek Park is a seven-acre neighborhood park located across Galpin Boulevard. Amenities at the park include a sliding hill, basketball court, playground, benches and trails. The Chanhassen Nature Preserve is a lOO-acre natural area featuring both wetland and upland areas and a comprehensive pedestrian trial system. TRAILS An existing section of the city's Comprehensive Trail Plan parallels the eastern border of the subject property. Future plans call for a pedestrian trail on the north side of Lyman Boulevard. Care should be taken to protect sufficient right-of-way for this future improvement. MISCELLANEOUS As part of the future development of the site, the applicant should be aware of the following: Each site will require a separate site plan review. Drive aisle widths are 26 feet wide, not 24. The buildings are required to have an automatic fire extinguishing system. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 17 of26 The plans must be prepared and signed by design professionals licensed in the State of Minnesota. The location of property lines will have an impact on the code requirements for the proposed buildings, including but not limited to; allowable size and fire-resistive construction. The plans as submitted do not have the information necessary to determine compliance at this time. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss property line issues as well as plan review and permit procedures. WETLANDS Existing Wetlands Eight Ag/Urban wetlands exist on-site and were delineated by Earth Science Associates, Inc. in October 2004. The wetlands on-site are generally highly disturbed and/or incidental as a result of the site being used historically as agricultural land and a contractor's yard. Basin F 1-30 (Wetland B) is a Type 2/3 wetland located in a farm field in the eastern portion of the property. The wetland is dominated by reed canary grass, smartweed and cattail. The hydrology of the wetland is affected by drain tile. The applicant is proposing to fill the wetland. The total proposed impact to Basin F 1-30 is 19,166 square feet (0.44 acres). Basin F 31-34 was included in the delineation, but has been found to be non-wetland. A no loss determination should be completed for Basin F 31-34. Basin F 35-50 is a Type 2 wetland located in the northwest comer of the property. The wetland is dominated by reed canary grass, stinging nettle and black willow. No impact is proposed to Basin F 35-50. Basin F 51-80 N is a Type 2 wetland located in the southwestern portion of the property. The wetland is dominated by reed canary grass, stinging nettle and black and sandbar willow. The applicant is proposing to fill this wetland; however, it is an incidental wetland and is therefore exempt under MR 8420.0122 Subp. 5C. An exemption request should be completed for Basin F 51-80 N. Basin F 51-80 S is a Type 4 wetland located in the southwestern portion of the property. The wetland is dominated by cattail. No impact is proposed to Basin F 51-80 S. Basin F 81-86 (Wetland D) is a Type 2 wetland located in the south central portion of the property. The wetland is dominated by reed canary grass. The applicant is proposing to fill this wetland. The total proposed impact to Basin F 81-86 is 3,920 square feet (0.09 acres). Basin F 87-90 (Wetland C) is a Type 2 wetland located in the south central portion of the property. The wetland is dominated by reed canary grass. The applicant is proposing to fill this wetland. The total proposed impact to Basin F 87-90 is 2,178 square feet (0.05 acres). Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 18 of26 Basin F 91-97 is a Type 2 wetland located in the south central portion of the property. The wetland is dominated by reed canary grass. The applicant is proposing to fill this wetland; however, it is an incidental wetland and is therefore exempt under MR 8420.0122 Subp. Sc. An exemption request should be completed for Basin F 91-97. On December 30, 2004, City staff conducted an on-site review of the wetland delineation. The wetland boundaries shown on the plans are consistent with staff recommendation. Another wetland basin (Wetland A) is shown on the plans. This area was not identified in conjunction with the Earth Science Associates delineation. Upon review of the soil survey, National Wetland Inventory, aerial photography of the area and an on-site investigation of the basin on July 8, 200S, it has been determined that the wetland is incidental and is therefore exempt under MR 8420.0122 Subp. Sc. An exemption request should be completed for Wetland A. Wetland Replacement Wetland replacement must occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420). A Minnesota Local/State/Federal Application Form for W ater/W etland Projects (Parts I and II) should be submitted for the proposed project. The application should include sequencing discussions and sequencing flexibility requests, if applicable. The applicant must receive approval of a wetland replacement plan prior to or concurrent with final plat approval and prior to wetland impacts occurring. A five-year wetland replacement monitoring plan should be submitted. The replacement monitoring plan should include a detailed management plan for invasive non-native species, particularly purple loosestrife and reed canary grass. The plans should show fixed photo monitoring points for the replacement wetland. The applicant should provide proof of recording of a Declaration of Restrictions and Covenants for Replacement Wetland. Several corrections must be made to the Wetland Mitigation Plan (sheet 10 of 13): 1. Wetland A is shown as an impact area. Upon finalization of exemption paperwork, mitigation will not be required for this wetland; 2. Wetland C (Basin F 87-90) is O.OS acres in area; and 3. Wetland D (Basin F 81-86) is 0.09 acres in area. A wetland buffer 16.S to 20 feet in width (with a minimum average of 16.S feet) must be maintained around all wetlands and proposed wetland mitigation areas. Wetland buffer areas should be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. All structures (including parking lots) should maintain a 40-foot setback from the edge of the wetland buffer. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 19 of26 The applicant must submit a letter of credit equal to 110% of the cost of the wetland creation (induding grading and seeding) to ensure the design standards for the replacement wetland are met. The letter of credit should be effective for no less than five years from the date of final plat approval. The applicant should submit a cost estimate for wetland creation (induding grading and seeding) so the City can calculate the amount of the wetland creation letter of credit. COMPLIANCE TABLE Area (SQ. ft.) Frontage (ft.) Depth (ft.) Notes Code 43,560 150 200 Lot 1 166,233 328 354 Lot 2 144,036 238 354 Lot 3 124,349 329 350 Wetland setback Lot 4 219,215 35 # 380 Wetland setback Lot 5 156,190 75 @ 404 Wetland setback Lot 6 257,813 80@ 460 North buffer yard Lot 7 82,385 205 366 Lot 8 97,843 328 368 Outlot A 180,643 Ponding and wetland mitigation Outlot B 92,577 Wetland Outlot C 165,365 Preserved woodlands ROW 62,069 1.42 acres Total 1,748,718 40.15 acres # Lot must be revised to meet the minimum 60 feet frontage on cul-de-sac. @ Exceeds the 60 feet frontage on cul-de-sac. RECOMMENDA TION Staff recommends that the Planning Commission adopt the following three motions and adoption of the attached findings of fact and recommendation: A. "The Chanhassen Planning Commission recommends rezoning of the property located within the Chanhassen West Business Park from Agricultural Estate District (A-2) to Planned Unit Development (PUD) incorporating the development design standards contained within this staff report based on the findings of fact attached to the report." B. "The Chanhassen Planning Commission recommends approval of the Preliminary Plat for Chanhassen West Business Park, plans prepared by Schoell & Madson, Inc., dated June 17,2005, based on the findings of fact attached to the report and subject to the following conditions: Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 20 of 26 1. Applicant shall increase landscape plantings in the south and east property line bufferyards to meet minimum requirements. A revised landscape plan shall be submitted before final approval. 2. Tree protection fencing shall be installed prior to any construction activities. Fencing shall remain in place until construction is completed. 3. All trees shown as preserved on plans dated 6/17/05 shall be protected. Any trees damaged or removed shall be replaced at a rate of 2: 1 diameter inches. 4. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420). A Minnesota Local/State/Federal Application Form for W ater/W etland Projects (Parts I and II) shall be submitted for the proposed project. The application shall include sequencing discussions and sequencing flexibility requests, if applicable. The applicant must receive approval of a wetland replacement plan prior to or concurrent with final plat approval and prior to wetland impacts occurring. 5. A wetland buffer 16.5 to 20 feet in width (with a minimum average of 16.5 feet) shall be maintained around all wetlands and proposed wetland mitigation areas. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. All structures (including parking lots) shall maintain a 40-foot setback from the edge of the wetland buffer. 6. The applicant shall submit a letter of credit equal to 110% of the cost of the wetland creation (including grading and seeding) to ensure the design standards for the replacement wetland are met. The letter of credit shall be effective for no less than five years from the date of final plat approval. The applicant shall submit a cost estimate for wetland creation (including grading and seeding) so the City can calculate the amount of the wetland creation letter of credit. 7. The proposed development shall maintain existing runoff rates and meet NURP standards. Storm water calculations shall be submitted to ensure the proposed storm water pond is sized adequately for the proposed development. 8. Stable emergency overflows shall be provided for the proposed pond on site. The emergency overflows shall be clearly labeled on the plan and a detail is needed. The emergency overflows may be stabilized with a turf re-enforcement mat or fabric and riprap. 9. Notes on the plan describing timing of temporary stabilization with Type 1 mulch and seed or erosion control blanket and seed shall be included. The notes shall include timing of stabilization as well as the rate of mulch application (2 tons per acre, disc anchored). 10. All riprap/fabric at the flared end section shall be installed within 24 hours of flared end section installation. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 21 of 26 11. Erosion control blanket shall be installed on all slopes greater than or equal to 3: 1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Tvpe of Slope Steeper than 3: 1 10:1 to 3:1 Flatter than 10: 1 Time 7 days 14 days 21 days (Maximum time an area can remain open when the area is not actively being worked.) These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man made systems that discharge to a surface water. 12. Erosion control blanket shall be specified in the swale from the flared end section to the wetland along the west boundary of the site. The blanket specified shall adequately protect the area from designed velocity and depth of flow. The blanket and seed in the swale shall be installed within 5 days of culvert installation. Erosion control blanket is recommended for the pond slopes from around 952 to 942 contours. All blanket on the plan shall be shown as a shaded area. 13. Temporary sediment basins shall be installed prior to disturbing upslope areas. The areas of temporary sediment basins shall be labeled on the plan. A temporary outlet (e.g., a perforated riser and rock cone) shall be provided for the pond; details should be provided. Temporary basins shall be constructed in the area of the proposed permanent storm water pond, the southeast comer of the site prior to discharging to the culvert under Galpin Boulevard, and possibly in the northwest area of the site to handle water runon from the north prior to discharge to the wetland. 14. Any and all area inlets or drop inlets in paved areas shall be protected with alternate controls/Wimco details. The engineer shall research and provide alternate designs for Wimco-type inlet controls to fit the various types of inlets. 15. Additional inlet controls shall be provided for adjacent inlets on Galpin Boulevard and Street A. 16. Silt fence shall be installed around Outlot A along the east side between the pond the wetland. 17. Type 1 and Type 2 silt fence locations shall be specified on the plan. Type 2 silt fence shall be installed around all wetland areas and in the southeast comer of the site to protect the culvert under Galpin Boulevard. The silt fence shall be extended along the south side to close the gap in the silt fence. 18. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as-needed. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 22 of 26 19. The estimated total SWMP fee, due payable to the City at the time of final plat recording, is $413,661. 20. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Carver County, Minnesota Pollution Control Agency (NPDES Phase IT construction permit), Minnesota Department of Natural Resources (for dewatering), Army Corps of Engineers) and comply with their conditions of approval. 21. In lieu of parkland dedication and trail construction, full park fees shall be collected at the rate in force at the time of final plat for the proposed Chanhassen West Business Park. At current rates, the park fee would total $359,500 (35.95 x $10,000 per acre). 22. A demolition permit must be obtained before beginning demolition of any existing structures. 23. Retaining walls over four high must be designed by a professional engineer and a permit must be obtained prior to construction. 24. Provide a water service for Lot 6. 25. A lO-foot clear space must be maintained around fire hydrants i.e., street lamps, trees, shrubs, bushes, Xcel Energy, Qwest, cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. 26. Fire apparatus access roads and water supplies for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternate methods of protection are provided. 27. The new proposed street will be required to have a street name. Submit proposed street name to Chanhassen Building Official and Chanhassen Fire Marshal for review and approval. 28. No burning permits will be issued for trees to be removed. Trees and shrubs must either be removed from site or chipped. 29. Fire apparatus access roads shall be designed and maintained to support the imposed load of fire apparatus and shall be surfaced so as to provide all weather driving capabilities. Pursuant to Minnesota Fire code Section 503.2.3. 30. Temporary street signs shall be installed on street intersections when construction of a new roadway allows passage be vehicles. Pursuant to 2002 Minnesota fire code Section 501.4. 31. Prior to final platting, storm sewer design data will need to be submitted for staff review. Depending on the size of the drainage area, additional catch basins may be required at that time. The storm sewer will have to be designed for a lO-year, 24-hour storm event. Drainage and utility easements will need to be dedicated on the final plat over the public Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 23 of 26 storm drainage system including storm water ponds, drainage swales, emergency overflows, access routes for maintenance, over all existing wetlands, wetland mitigation areas, and buffer areas used as PVC. The minimum easement width shall be 20 feet wide. 32. The interior lot storm sewer will require private easements to be dedicated where the sewer crosses from one lot to another. 33. Private utility easements are required for the sanitary sewer and water lines that serve Lot 4 but go through Lot 5. 34. The sanitary sewer and water hookup charges will be applicable for each of the new lots. The 2005 trunk hookup charge is $1,458 for sanitary sewer and $2,955 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. 35. On the site plan: a. Revise the cul-de-sac pavement radius to 48 feet. b. Revise the parking driveway aisle from 24 feet to 26 feet wide. c. Revise the public street width from 32 feet to 36 feet wide. d. Increase the full access width off Galpin Boulevard to 44 feet and create three lane access. e. Shift Lots 1 and 8 easterly access further toward the west and realign the across each other. f. Show at least one, 6-foot wide, side walk along the public street. g. Show the access off Galpin Boulevard turning curb radius. h. Realign lot 5 access perpendicular to the shared driveway. 1. Show street lights. J. Show handicap parks and ramps. 36. On the grading plan: a. Extend silt fence type between the storm pond and Outlot A. Silt fence Type II must be used adjacent to wetlands and storm pond. b. Revise contour lines to match 3:1 maximum slope and tie the proposed contour lines with the existing contours for Lots 4,5, south of Lot 2 and northeast of Lot 1. c. Show the proposed contour lines for Lot 6. d. Show all retaining walls top and bottom elevations. e. Show all emergency overflows (EOF). The EOF must be 1.5' lower than the adjacent lowest floor. f. Revise Lot 6 parking slope to 0.7% minimum. g. Add a note to remove any existing structure and access off Galpin Boulevard and all disturbed areas, as a result of construction, must be seeded and mulched or sodded immediately after grading to minimize erosion. h. Show 75-foot minimum construction rock entrance. 1. No retaining walls structure is allowed within public street and/or public utility easements, revise accordingly. Chanhassen West Business Park Planning Case 05-23 July 19, 2005 Page 24 of 26 J. Show 20-foot utility easement for the storm sewer between Lots 2 and 3 37. On the utility plans: a. Show all existing and proposed drainage and utility easements. b. Show the proposed sanitary and storm sewer stubs inverts. c. Add storm sewer schedule. d. Public storm sewer pipe type must be RCP and 15-inch minimum diameter. e. The last street accessible storm manhole (STMH#2) must be built with a sump. f. Revise sanitary sewer pipe from DIP to PVC-C900. g. On the utility profile show all sewer and pipe crossings. h. Minimum vertical separation must be 18 inches between watermain and sewer. 1. Call out watermain fittings 38. Any retaining wall over four feet in height must be designed by a registered Civil Engineer in the state of Minnesota with an approved safety fence on top of it. Also, it will require a building permit from the Building Department. 39. Add the following City of Chanhassen Detail Plate Nos. 1002,2109,21102204,3104,3109, 5201,5205,5214 and 5215. 40. Prior to final plat approval, a professional civil engineer registered in the state of Minnesota must sign all plans. 41. All of the ponds are required to be designed to National Urban Runoff Program (NURP) standards with maximum 3:1 slopes and a 10:1 bench at the NWL. 42. Cross-access easements for the shared driveway accesses must be obtained and recorded against the lots for each of the entrance drives. 43. Any off-site grading will require easements from the appropriate property owner. 44. Public utility improvements will be required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. The applicant must be aware that all public utility improvements will require a preconstruction meeting before building permit issuance. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, Carver County, MnDOT, etc. 45. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes and traffic control plans. The applicant should be aware that any off-site grading will require an easement from the Chanhassen West Business Park Planning Case 05-23 July 19,2005 Page 25 of 26 appropriate property owner. 46. All private streets are required to have 24-foot wide paved streets from back-of-curb to back- of-curb, be built to a 7-ton design and contained within a 40-foot wide private easement. At the completion of the project, the developer will be required to submit inspection/soil reports certifying that the private streets were built to a 7-ton design. 47. Six-foot wide sidewalks are required. 48. All plans must be signed by a registered engineer in the state of Minnesota. 49. All of the proposed building pads must have a rear yard elevation at least three feet above the HWL of the adjacent ponds. 50. Installation of the private utilities for the site will require permits and inspections through the City's Building Department. 51. Comply with Carver County memo dated June 28, 2005 and revise the plans accordingly. 52. Revise plan sheet size to 24 x 36 using scale 50." c. "The Chanhassen Planning Commission recommends approval of the Wetland Alteration Permit to fill and alter wetlands within the development, plans prepared by Schoell & Madson, Inc., dated June 17, 2005, subject to the following conditions: 1. A no loss determination shall be completed for Basin F 31-34. 2. Exemption requests shall be completed for Basins F 51-80 N, Basin F 91-97 and Wetland A. 3. Wetland replacement shall occur in a manner consistent with the Minnesota Wetland Conservation Act (MR 8420). A Minnesota LocallState/Federal Application Form for W ater/W etland Projects (Parts I and II) shall be submitted for the proposed project. The application shall include sequencing discussions and sequencing flexibility requests, if applicable. The applicant must receive approval of a wetland replacement plan prior to or concurrent with final plat approval and prior to wetland impacts occurring. 4. A five-year wetland replacement monitoring plan shall be submitted. The replacement monitoring plan shall include a detailed management plan for invasive non-native species, particularly purple loosestrife and reed canary grass. The plans shall show fixed photo monitoring points for the replacement wetland. The applicant shall provide proof of recording of a Declaration of Restrictions and Covenants for Replacement Wetland. 5. Several corrections must be made to the Wetland Mitigation Plan (sheet 10 of 13): a. Wetland A is shown as an impact area. Upon finalization of exemption paperwork, mitigation will not be required for this wetland; Chanhassen West Business Park Planning Case 05-23 July 19,2005 Page 26 of 26 b. Wetland C (Basin F 87-90) is 0.05 acres in area; and c. Wetland D (Basin F 81-86) is 0.09 acres in area. 6. A wetland buffer 16.5 to 20 feet in width (with a minimum average of 16.5 feet) shall be maintained around all wetlands and proposed wetland mitigation areas. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the City $20 per sign. All structures (including parking lots) shall maintain a 40-foot setback from the edge of the wetland buffer. 7. The applicant shall submit a letter of credit equal to 110% of the cost of the wetland creation (including grading and seeding) to ensure the design standards for the replacement wetland are met. The letter of credit shall be effective for no less than five years from the date of final plat approval. The applicant shall submit a cost estimate for wetland creation (including grading and seeding) so the City can calculate the amount of the wetland creation letter of credit. 8. Drainage and utility easements a minimum of 20 feet in width shall be provided over all existing wetlands, wetland mitigation areas, buffer areas used as PVC and storm water ponds. 9. Silt fence shall be installed around Outlot A along the east side between the pond the wetland. 10. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Carver County, Minnesota Pollution Control Agency (NPDES Phase II construction permit), Minnesota Department of Natural Resources (for dewatering), Army Corps of Engineers) and comply with their conditions of approval." ATTACHMENTS 1. Findings of Fact. 2. Development Review Application. 3. Reduced Copy Existing Conditions. 4. Reduced Copy Preliminary Plat. 5. Reduced Copy Preliminary Site Plan. 6. Reduced Copy Wetland Mitigation Plan. 7. Reduced Copy Concept Landscape Plan. 8. Memo from Bill Weckman (Carver County) to Robert Generous dated 6/28/05. 9. Letter from Pete May (Sprint) to Robert Generous dated 6/23/05. 10. Public Hearing Notice and Affidavit of Mailing. g:\plan\200S planning cases\OS-23 chanhassen west business park\staff report preliminary pud.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION INRE: Application of Eden Trace Corp. for a Rezoning of property from A2, Agricultural Estate District, to POO, Planned Unit Development for an Office-Industrial Park, Subdivision approval for eight lots, three outlots and associated right-of-way, and a Wetland Alteration permit to fill and grade wetlands on site - Chanhassen West Business Park. On July 19, 2005, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Eden Trace Corp. for rezoning, preliminary plat approval and wetland alteration permit for the referenced property. The Planning Commission conducted a public hearing on the proposed development preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned A2, Agricultural Estate District. 2. The property is guided in the Land Use Plan for Office/Industrial use. 3. The legal description of the property is: (see Exhibit A) 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; e. The proposed subdivision will not cause environmental damage; 1 f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: 1. Lack of adequate storm water drainage. 2. Lack of adequate roads. 3. Lack of adequate sanitary sewer systems. 4. Lack of adequate off-site public improvements or support systems. 5. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse affects of the proposed amendment. The six (6) affects and our findings regarding them are: a. The proposed action has been considered in relation to the specific policies and provisions of and has been found consistent with the official City Comprehensive Plan. b. The proposed use is compatible with the present and future land uses of the area. c. The proposed use conforms with all performance standards contained in the Zoning Ordinance. d. The proposed use will not tend to or actually depreciate the area in which it is proposed. e. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f. Traffic generation by the proposed use is within capabilities of streets serving the property. 6. The planning report #05-23 dated July 19, 2005, prepared by Robert Generous, et ai, is incorporated herein. RECOMMENDA TION The Planning Commission recommends that the City Council approve the preliminary Planned Unit Development, Preliminary Plat and Wetland Alteration permit. ADOPTED by the Chanhassen Planning Commission this 19th day of July, 2005. CHANHASSEN PLANNING COMMISSION BY: Its Chairman g:\plan\2005 planning cases\05-23 chanhassen west business park\findings of fact chan w business park. doc 2 EXHIBIT A DESCRIPTlON~ That part of the ram Holf (E 1/2) of the Southeost Quarter (SE 1/4). Section 16. Township 116 North, Range 23 West. which lies South of tho NQrth 1066.41 fe~ westerty of the centerline of County State Aid Highway No. 19. ond North of th~ South 100.00 feet;, AlSO '" Thot part of the Southwest Quartet of ~ SoLlthwest Quarter of Section 15, Township 116 North, Range 23 West, lying westerly of the centerline of County state Aid Highway No.. 19 god no~ ..of the centerfine of Counf:y stote Aid HighWay No. 18. Said property being'subject to easement for roodwOy PUfposes for coun1;y State Aid Hig~woy 19 and Count;y State Aid Highway 1S. ,," Planning Case No. OS -;2.3 CITY OF CHANHASSEN 7700 Market,Boulevard - P.O. Box 147 Chanhassen, MN 55317- (952) 227-1100 CITY OF CHANHASSEN RECEIVED .i: .. _ _.. .,' DEVELOPMENT REVIEW APPLICATION 'JUN 1 7 2005 PLEASE PRINT . Applicant Name al)d Address: -E-d~ \~ ~-rF R l S' 6 Ma. U. t) "'1 G. tA. rt" (/NL.,..1n. t),. ~ re."" M. N S S" 'J ''7 Contact: ~(J,t/Jt. ()A.d.t.1 hJ. Phone: trz"l'f-ontt. Fax: 36/- 077.,'5 Email: (JAde' e ~ (.. c..o,^,,- CHANHASSEN PLANNING DEPT Owner Name and Address: ; i)()fLfY1;Yr~~ t~f#J&e.rh<p f? () - 'i3D)t &.-SG7 C-Au-nAus (.eq t?1/V S-.53/7 Contact: PA-t-tJ1ih1M' Phone: <t~-CfAJ~17~~ Fax: 7~-S'2a~ 0:,3? Email: Pl'hcYNj e'.,f (I!l /'heAr,' .~ Comprehensive Plan Amendment Temporary Sales Permit Conditional Use Permit Vacation of Right-of-Way/Easements Interim Use Permit Variance Non-conforming Use Permit K Wetland Alteration Permit / 275.06 x Plann~d Unit Development*.' ~ f 5(.) Zoning Appeal ~_ Rezoning. Zoning Ordinance Amendment Sign Permits Sign Plan Review \ 75 Notification Sign** - $75 + $100 Damage Deposit X Escrow for Filing Fees/Attorney Cost*** .in~~~ACNAR/WAP/Metes & Bounds TOTAL FEE $ ...;1 .'1t;Q,~~ Site Plan Review* . / * Subdivision* 72.0 (foOO-+- IS'f..~ Itr\s) An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to the public hearing. ' * Twenty-six (26) full-size folded copies of the plans must be submitted, including an 8%" X~11" reduced copy for each planshMt along with a diQital copy in TIFF-Group 4 (*.tif) format. ** Applicant to obtain notification sign from City of Chanhassen Public Works at 1591 Park Road and install upon submittal of completed application. $100 damage deposit to be refunded to applicant when sign is returned following City Council approval. . *** Escrow will be required for other applications through the development contract. afi;;~;r.~,;~_;)~ Building material samples must be submitted with site plan reviews. NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. tcANNeo PROJECT NAME: CJNll\ la "5 S~^ LOCATION: Galp\"", 6\vJ. ~ LEGAL DESCRIPTION: We,.{ B,^"$\I\-E! "S- Ly kQ,,,\ 6l \I'd . fOv/1L ~t..J/() ~o. \pif\tslvrl TOTAL ACREAGE: 5e ~t.{ of. tL SF jI\f LfO. (5 ,K <JP- S-ev(-lc.", tb . , '/. I (b I... t "3 I a lI'(,tv ~ , ~t.4.'J~ WETLANDS PRESENT: YES NO PRESENT ZONING: . REQUESTED ZONING: P Ii /J 'v' PRESENT LAND USE DESIGNATION: REQUESTED LAND USE DESIGNATION: REASON FOR REQUEST: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that I am 'making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed. of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc.. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. ~~ Signature of Applicant lcf?/vs- Date m~P%4 Signature of Fee Owner UI1(()~ . Date $CAHKEO GlIW<ltC/i"an\formS\Development Review Application.DOC Rev. 4/05 "+. :~ ~ . . ~ ~ ~ ~ i Hd t;i '" 8 ... nq IS 15 ~ ~ l:l '" VI II> " Ii Ii Ii ~ ~ ~ ~ mil. ~~~!iQ~ :::100", 0 li1 ~i~~ ~ ~ h~~I~ :s: ;l::i!f'iS~< '<i~~~ ~~t:i"~ .S~'3~ ~~~iW ~~i~ t ; I - ; ! : j 1 ~ ,I Ii ~~ ,It I' ~, 1', ,1 -1 ~:1 ~! I j t~j ~:;: t. ih i~ ji h~ . . i.c, !I ~I ~~I i rl' 0 L ~/ ",,0 / *- o / () /cr --1 1- - --t - --\ \ \ L---~ I .;;::: *- I ~ 02- r- 0 \ " " N " ....:;~~~.. '~~-~ ; \Z\ /'..0/ I-~~ - is- .... " rn~~ ~ ~. ,'" .. "5 ~ Mi IN j I l a g ~ z . ;: . ;z ;: 0:1 l! :m ! ..~ i !i u ~B : .. w ..D g= ~a )1 J .. a:t:g a:".. 00" U()Z w>'" ~~:i ~~= z"'c ~:gi III;~ () ~fll lillii :Ef!hl! ~I' ill'li Qj ~ i .8 ! cH -. , J~ mo! tL ~ t 1 ! 0 m , , l UI Lt") UJ ! ~~~g ~ Z en a en 0 (!) , ~:lil~~ I 0 I ~ ~i~~i <(0 ;z _ I rUJ C',J Z I . - :. z> :z t r :, ~;~~~~ . <(- r- :5 i~ Ii il! \1m'~~ h I rUJ z ~~~p~ ~f 00 Q Cl.. ~l It ~:t i u..UJ 2 ~,: o~. U ~ -l LU I; III!I !~p<g ocr: en ~ I!! h .0 .:!~ ! ~ => en H J! p~ Ur~~! J .. -, ~ 0 jljllh WIJ~li! 'J ;Z J .J .;l ,U ~ ;=eatA . e <.> ~ I ~ ~i~i~i~~'~ 1~"I~ ~ ~~ ~ ~ g~9~~~~'~ "+. ~~ =- z ,,0 f= -cs- ",0 <t: --... '" --...w B o 0:: -- "' 0> (f) - -8:: W o I-- ~ I-- - -Q 0:: I-- :: "- "- i ~ i: o ..J ~ . , ..~ ~ ~ ~ l~ ~ ; ~ ~ j; ~ld ~l; ~~9~9~9~ "l~ 1~ "I~ 9~ 9~ ~i .i!1 ",0 I *- o I (Y Ie ---1 1- - --\ - -\ \ \ r--~ *- I ",0 02- r-0--(f \ ..;;;:;; /', i "' (l) ,U._ .. ..... , , , , i: \ oj' ~ Ii \ ., \i ~ p )1 ~ III I. \: 6 \ ~~ i \ " : \ : lei ----)~J~-~~d~~N~lnB-- soaii""~'t JIUO' N01IOO\i o tJ I Hl )jtJ\id tJ08tJ\i '" i:L!i:g ""'" 00" UUz w..:I ~9ffi ...:1: z:lC w..'" 61;~ u ~iI ,I {l r~! II jlR ~l III J '( ~J'il!li Qi ~ i ,g 3 u Ul --- " lij Iii > .... qI ~ ~ ~ je~ p CIlI ... :i! C fii U III II iL ; 0 .it e 'j ", I ql hi · m !l l \ , !~ ~~~:~ ~~~~! l ~ t ~ ~;ml ~;m~ ii Ii ii ;i rn~~ ~ ....0 ~ ~ ~ !1Il i i a I I , i i i ! il i! !i Pi 11 ;i :!i !; i~ lil I: I! ll~ II II .!l :! J 0,1 ~ .~~ ~;..o g~~~I~ ~:~1~~ .g..I, ~ m~i~ ~ 8 ~"ii ~ "o~g5~< ~.i~~~ Otllltl",jI;", i~~~w~ . ^".~o g9sg", ~~~~ .. ~ z ei ; =; ... .z ! ,= ii !i ; ~~ I ,~ 'il ~I ! , ;f z o ~ ::;; a: f2 ;?; ~ -, ff a.. "+. :~ --- N "' Z ,,0 i= -is- "' 0 <( <0 --- w "t:9 "- 0 0::: <Xl 0> (f) -e:: w 0 f--- f--- -Q 0::: f--- ;:: "--- "--- l ~ ..: .....N ii~~~ .'~ " " ~~ .' :::iri::iri~ ~~;~~ .. a:~~ a:".. 00" UOz w.... ~gz a::i~ ....., i5:~ fa;~ o ;;;;~ ',...lj .....b' :'1~~~~& 1~~!i~~ 9~m~ 9~m~ i ~ : ::i~~~; :;j::i::i::i:rl I' ~ ~~~~~ ~~i3~ ~ . . -: :..,~ :..,~ ..; .:..vI....~~!lI .,1II';!i~1lI : ~ ~g~m ~m~i 1---\-- \ ~/ f-...O / --!c- 0/01 /~ J r---? --!c- I f-...O 0!- r-0-0 \ \ \ \,~ ~ ., X ,. , \ .N$ ~\~ G~\.tI\".\."O'\X ...... ~.,"c" ~I1 II ~r~llh ~lll !Il ~I'~'id _ I"li Qj ~ II ~ 3 .., en --- ^WI 1 1 i 1 1 i ~ f "l ::: / '--.... ---....... CD i i . ~~ I.i~ I" 1 i ~, c > .... lI!I Z C ;! .... 11 J II iL . 0 !H t II ii~ I . ,j Hi · HI JJ i U-i i i j \ \1 "';'- } :'.,>\ I \ g o Q..g8 ~~~ ~ii o g: CD ... :c. c iii d i V iJ i i i i i J -------.----------- (, , \ \ \ , , '\ .:i ,'j .:1. Lt., ',-"'1 " ,-::ar:i:. <:'1:-:.. \'\" , .~ ., I. ." , ,"""" , . . <<g-: :<"," . ."'. ,I, . >'::l",,:,'.~ " . '0' '"./., '::::::'::/'C',:'\, , '1'" ~'~'. . " C~0. ':(f' '\~" , '....-... , 1"" - - .---- \ ,.' \:t: ::.: ':: . {' }g:; ,:.', " (:~::::: t:. : \. :- \ t;' N01IOOV OdlHl >JdVd d08dV --+:. ~~ rnrn~ t ..." ~~ IS'i i ~ M l . . ii: . . ~ i J ~ ~/ ,,-0 / o / / J S df (j f-- ?~ I ,,-0 02 r-0-c \ 1----\-- \ "' '''0 "'.,... ..,,", 00"' uUz w>lI ~~z a::n~ ........ ill:; 5J;~ ..'" ...., ~, ~ \ Z\ /..-QJ / 1-( ~II ul ~'~lih dl!1l1 ~J'~l!lt.. _ I'" 4i ~ { .,g 3 o III -- <Xl '-,m \. (J) t\i'\ -L..'~'.. / .' " t/I- HI II Ih . 0 Hi Iii ill ~ m J! '", 'N..QtfQO V" "', <. ..." \\ \ ' _/~,T \ ';\ \<<< c] d I Hl \, ,.., .,"'\ a g : ; !I! c( o::t oar--- Q ci 0 0 ci 0 z j -' ;@@)@@~ l:l II t- U ~ !!l ~ u ~ 0 oC CD ~ v: j: oC II I!l j: N i x l:l U II 0 ~ '" 5 "- GO II ~ ~ g ~ :2 oC 0 l:l Z j -' Iii @>_ @ g . 5 (j) r- CI Di=WO W z~ 36 ~ ~E::;~ a ~6~~ al: ;: ~ ffi (3 0. ~8 ~~ 0: U U U I U o 0 N Of) ~ co o z :5 f- W 3: o W f- o <( D- ~ o z :5 f- W 3: o w (f) o D- o '" D- , t i , I j' !, .." $"- if :, j!, ~l !i '0=1 II h !!l ~ I? In !! ~~ l!~ !! !! ~:! I"'. ~m rn~~ 9 .... ~ ... . c ~ '" ! ~ 1('11 ~ ,+~ c (I)~ 11 ~ d ~ ~ l!! . ~ .! =1 ~ .." f S!~ !i 3 ~a .. .a i ie u "":::I I iO " II ~ ~~~ ~!~ I " f l " :1 . S~ 2 ~:e~ ~ . .~ '" . ~ .... ~ .~ ~~ Z ~ , l:ldlilrs '" . i ~~ ::ll " . " h~~~ '" . "I '" ~~i~g~ "' ~~ S ~8::l ~~.!. a:~g ~ . .~~ ~;3~i~ '"="' ~" 0' ~~~8 00"' ~~ '" ~~i~ UUz '" ';2/ <> ~~~. ~ i~ iiH 3; !Z~~<i.3'" W..:I wO '" ~;~ :: :gffi ;~ 0.. ~ 8 ~.,;~:! ... ~~~ ~ 8- i it ::l::1~ 2;< ~C;!~ !' u '" ~f!:,ii ~~W~ ifi:~ "e Q ~~~ ~~~~ Ba" ~..,;.". .~ Z (it;; ~~ :i m U~i nil 8~.~" ~~~b8 U 08 . ".~~ I . t o ~. hI ~ ' j~ . I 'i wo~ ~ !~ ~ i I n; c ~ ~ 8 ~ '" " l - w .~ ~ ~ 8 fi ~ ~l~ ~OOOP ~D . "~ ~ i ~ ;~~" o'~~~~~ · . ~ j" ~ f;'~ wI.'h ~~ ~: .~~~ ~ mi Il~!~; ~h ~i U~~! t .ii~~ ~~;~~~ ~~"~} .!i~: ! ~w ~~~~~l ~n oS ~h;. I ~H: ~~~~~~ ~~~;~ 8~gh '" ~ iiii~. oW"13l ..; et '~i<. ~ i ~~~Ij .~:wii ~i;:3 ld~~ ~ ; I.i~~~ li'I~1 ~;~;~ !~~:; 13 ~ ~~.. .~i.'~ ~~ ~~.,; ~~n! ~ ~ ~~~g ~~~iU ~ lID~ ~~~ I~~ !Im :i ~ !a~ i!~~~~ a .,~ hI i"~ i::U . " Jg.. .~.~.h j~~~ .l~ .h ..~.~ " h ~ o~ ~~ ~ ~! ~ ;; ~ &" i~ n~ ~~ hK ! ~;. ~l ~!iq idl . j ;~~ ;g Iii i~ J~ ;j .... z :i 0.. . -----1 : i .!. ~ ~Jf I ~!Iilli ~llhu ~ifl!ll ,gtl o III --- ell . II H, I!. ,;! az !I ';'1'1; id fit ili - ~ < ! ! (f) -f'c: W f-- f-- -G- et' f-- '..... l o i i ! .~ <~~i ~~ N01~IOCN; ~ "" m:IIH1~ a t:: E tJ08tJV I I" &~ ~."I:'( ,--'\;" /.:::<J .... 's ::. CARVER COUNTY PUBLIC WORKS T<l 11360 Highway 212 West P.O. Box 300 Cologne, MN 55322-0300 Phone (952) 466-5200 Fax (952) 466-5223 Administration Parks Engineering Highway Maintenance Equipment Maintenance Surveying & Mapping ()ItrJer Cuunty 18JJ - 2005 To: From: Subject: Robert Generous, Senior Planner, City of Chanhassen Bill Weckman, Assistant County Engineer Ilnll) Request for Rezoning \?~UU' Chanhassen West Business Park (05-23) RECEIV!'D JUl - 52005 CITY OF CHANHASSEN June 28, 2005 We have reviewed the information regarding the Chanhassen West Business Park preliminary plat transmitted to Carver County by your memorandum dated June 20, 2005. These comments are based on that review. Further comments may be necessary as the plans progress. 1. Right-of-way widths listed in the Eastern Carver County Transportation Study for roadways functionally classified as "A" Minor Arterials: Urban Undivided 2-lane Roadway Minimum Recommended 1 00' 110' Rural Undivided 2-lane Roadway Minimum Recommended 120' 150' Urban Undivided 4-lane Roadway Minimum Recommended 100' 120' Rural Undivided 4-lane Roadway Minimum Recommended 140' 170' CSAH 18 (Lyman Blvd.) and CSAH 19 (Galpin Blvd.) are functionally classified as "A" Minor Arterial roadways in the Carver County Transportation Study. The preliminary plat needs to be reviewed to determine if the corridor shown on the plat will meet the needs for a future urban roadway. Presently Lyman Boulevard is a rural roadway in this location. 2. An access permit will be required from Carver County for the proposed access onto CSAH 19 (Galpin Blvd.) The information received did not include any information on proposed turn lanes, channelization, etc. to accommodate this access. That detail will be needed for the access application. 3. Any public utility lines that are to be installed within the County Road 18 or19 right-of- way are subject to the utility permit requirements of Carver County. 4. Any proposed grading and installation of drainage structures within the right-of-way of County Road 18 or 19 is subject to review and approval of Carver County. Carver County has concern about the closeness of the proposed pond to the CSAH 18 right of way. This area has many deep peat soil deposits. Has is been verified that this pond excavation will not jeopardize the existing road structure? Reconstruction of CSAH 18 is planned for the near future. Will this pond accommodate runoff and ponding needs from CSAH 18? 5. Development activities (including the installation of both public and private utilities needed to serve the development site) that result in any disturbance of the highway right-of-way (including tree removal, trench settlements, erosion, and sediment deposits) need to be completed in a manner that leaves the right-of-way in "as good or better condition" than what existed prior to construction. It is requested that the city include a provision in the developer's agreement that requires the developer to be ultimately responsible for the final condition of the county highway right-of-way. A clear understanding of this responsibility will result in fewer project oversight problems for both the county and the city. 6. Any trees or landscaping completed within the right-ot-way must be approved by Carver County. When locating shrubs and trees, consideration should be given to maintaining an acceptable sight distance at the CR 19 intersection. Any trees or shrubs overhanging into the right-ot-way could be subject to trimming tor satety or overhead utility consideration. 7. As this area develops, traffic volumes will increase. Carver County considers any potential noise abatement improvements to be the responsibility of the developer. Thank you for the opportunity to comment on this proposed plat. ~Sprint 343 E. 82nd Street Chaska, MN 55318-2354 June 23, 2005 Robert Generous City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN. 55317 Re: Planning Case # 05-23 "Chanhassen West Business Park" The purposed business park is served by two telephone companies. The western half is served by Sprint with the eastern half served by Qwest. Sprint is working with Qwest to establish a boundary to determine who will provide service to which lots. According by the existing plan lots 1,2,6,7 and 8 would be served by Qwest with lots 4 and 5 served by Sprint with lot 3 to be determined. If you have any question regarding this application, please feel free to contact me at 952-448-8354. Sincerely '-)--.? J~~ /': /?l~. Pete May / Network Engineer I Sprint of Minnesota, Inc. gCt\'!tQ 4: If;Jf;J'-J jU~ ~'. \-\~SSEN C\-\,...N C\\'fQr CITY OF CHANHASSEN AFFIDA VIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on Thursday, July 7, 2005, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Chanhassen West Business Park Rezoning, Planned Unit Development, Preliminary Plat Approval and Wetland Alteration Permit - Planning Case No. 05-23 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. ~ Subscribed and sworn to before me this' /I~' day of .:r;: 1. I d , 2005. - I ~~: ~.]/j~~ - Notary blic Wt/WIIWtNtMJ KIM t ME:UWISSEN Notary Public-Minnesota My Commission Expires Jan 31, 2010 8f;ANNED 0) c ;0 a> a> := 0)5 c.- .- In r... In as._ a> E :I:E .2 0 :CO ::so) D..c -'- o C c a> as u- ;oD.. o c Za> In In as .c c as .c o 0) c ;0 a> a> := c 0)0 c'- ._ In r... In as.- a> E :I:E .g 0 :cO ::so) D.. .: -c o c a> as u- ._ D.. - o C za> In In as .c c as .c o "OOl ~ "0 :5~~ ~ C @ .....tCij U) ~ 'E ~ :J 0 Ol...... :J m= := 0.0_ u Ci5 ~ m.g -5,= g C/) w a.. 5;:J '(j) ~ "0 ...: '0 CiL-:. S 0 c.: 0.. g 5 . ..... Cl 0 >, Ol m ~ 'o~ .- ~B~ m E.c..c. ~ C/) - :J a.. ..... C CIl..... ..... 0 Ol 0.. ..!!1 m u _ ,- m ~ 0 E Ol ~ Ol ,g E ..... 'C ..... E F 0 'E o.c. C/) o..c. .0 E J<(~i~ ~ c-~~~e-:Jo ..... Eo.. -' .!!!o.....o>.....o.co.O mE - ..c::.....:JcC/) OOl :2: 0. C 0 - .!!1 0..- 0> Ol C/).c. Ol E 000 - cm .c.c-.c. o ~ (j) ~ 5 0 0>.- Ol'!: ..... mE..... 0~~5;~ ~ ~~~E~~ae~ o ,- Ol Cl :!:: Ol III Q) ..... Ol = ;> "E - m r-.: en g.:t::: <( ~ 21 .c. ~ .s .E .92 Ol"o "0 _~.....c~ ~ ~uoo>Ol~C/)~Q) m .0 0. ~ C .!: > = ..... C ..c Ol ~ .- ~ ~ _~m C CIl.o"O-.....> o.Ol- OEOID~ OOl ~:Jc~.c.o gu o m ~ c > ~ :E ..c:: 0. m Cl 0> C 'S: ..... .!!1 NB~c> .....~ -C/)..... ~m;>Ol - 5~"O 0..... si:~"':""'Ol"E(ijg> m_ a..c .....Ol"O ..... u.c.>_ - ~UN m 0 .....1Il_:JOl....._-C/)...... C ,$ 0 _ 0 E m>.- 0 0" .~O 0> 0> U ..... m t5 :J~""'- 0 OlOl.....c-=cOlOl o ..... C\I ~ Ol U Ol III ..... 0.'- = 0. Ol .c. . 00'0 u.....SE~~C/)(ij~~Eue - <(..... m C/) 0 co...... .- Ol - E = .....- .....Olmo.....c.c..c.-Ol.o C/)Ol~ 1-> ~:Jm"'" m.c.o:JOl ....<(('1) ;> Clll o.u..... uC/).....1-0 a...c. :J 'C c .c. '0. U =:J = - Ol C'"Ci5 m C}I Ol t:: - 0 Ol 0. 0.0 :J.- Ol.- _ ~"O 0 m::; .c. o..o:J . . . . l-oa:Cla..oWZ~~l-mmo.~N('I)~ G) E i=S 01:1;: sB m 0 C..J .!! u: 1110) C C Q).- a.- a,Q) m Q) x:E -Q) mJ: J:- 3:1;; a; III o a. o ... Q. >oc 1:.2 Q)- a.m o U ... 0 Q...J "OOl ~ "0 ~g.s C/) ~ c ::::-E"O Ol Ol .- m:J 0 m C/) Cti~ "E o.o~ ~ Ci5 ~ ctl.g -5,= ~ ~ W a.. 5;:J '(j) ~ "0' ...: '0 Cii -::: S 0 C .: ..... u C . ..... Cl 0 >, Ol m 0. .92. 0 ~B~ m E.c..c."Oe ~ - :J a.. c Gl..... ..... 0 ~ 0. ..!!1 mu_:t::: m uOEQ) w uE ..... 'C ..... E F ~ 'E 0 .c. en 0 Ol = Ol ~ C ..... ~ 0._.......... 0. o..c. .0 E -t:<(Ol~ -' c.8- -Ole.....:Jo .~ E ~c - ~ C/) '[g>Ci5 0.5 ~o E..:::ooo 0 -'-c:;:::::;~OlC/).c.Ol . 0 .::: (j) :;:::::; c '0 0>'- ~ C .c. c - ..c O>,>! 8 Gl~EE~=~E; ot'--t::OlQ) u ~(ijctl 000.0 ot'--OlCl:!:: Ol 0Ol.....0l=>..........~ .:..' ,'; 0. _ <( ~ CIl .0 .c. 0 ;> c - 1-~e~"O Ol IIl.c.O_-~Ol"O"O .....Olo.~c - =Uoo>Ol>C/)OlOl m.o -' C ~=""'c.c.~Ol2C/) ~E~"O~ 5~ Gl.o"O~""'>o..OlO o OlOl:;:::::;.c. ~:JC:J.c.o Uo ojgg>c> m..... ~O'mCl~c=~C/) NO_C> .....- _C/)..... Octl~ - oj 5~"Oc o~ ci:C/)...:..... .....~~ _~Na.._ .....Ol"O.....O.....~u.c.OlcmC ..... - 0 - .... Ol - > ctl .- c&.o _ 0 E ~.!!! 0 C'".O' ~'5> u .$ (ij ...: ~.....~Cii> OOlIIlOl~.....E-~cOlg O 0 '" Ol USE C/) C/) c...... = Ol .c. ' _<(' 0..... u~o 0_ C/)m~9-Eue m w co...... .- Ol _ ,- ctl-Ci5- .....Olmo~S:E.c.~OlED "O~Olt5<(('I)I-~c~~u.....u~.c.o:JOl C/) :J~ ~,c.c.liIllUOl=o.O:J~c/)I-Oa...c...... Ol 0" Ci5 Cti ';' Ol t:: - 0 ~ :J:!:::: Ol.- _ ~ "0 0 m - .c. 0..0 :J I-Oa:Cla..oWZ~<r:l-mmo.~~M~ G) E i= c .2 01:1_ S B m 0 C..J .!! u: 111m ~.5 a.- a.Q) m Q) x:E -Q) mJ: .c- 3:1;; a; III o a. o ... Q. >oc 1:0 Q);: a.m o U ... 0 Q...J ..... g. g~ 0:5 '3: ..... .0('1).....0 E C/) ctl~Ol.....~Q)Q) Ol ~~";- ~ ~.>:t:J:.5 ~Eo/'-.ooolll-G) ~ ci. OlE ~ -5 u 0..:E S;: Q) 0.0 '" Ol - - c E _('I) o~:J c= ....- 0>.. C/)m g,o ~ oj5 c .!: ~ 0 ..... _ Ol ~ -1: Q).2 mo.....m->m ~III Ol......lI<:C/) .ctlC/).....O~1II . Cii :J C/) .c. Q. - .- EE.....o:Jo Q)u:ie Olcuo.....c.....o,.......e .c. .....OlE- ==. ..... O.c. c :J.!: mOo Olc::!C/)Olca.m-"":O o 00 '3: ~ Ol (j) Ol III CD _ - "'C/).c.EQ)oc Olc/):J~c/) J:N.- .0 ~ oS m.!!1 OlI-=::: c C/) o~.....-E:t:::.s. lii c..c_ (.') m -_ c::::- ~Ol .~..c.$00J:Q. 0. u >, C U C Ol'W _ Q) Ol::;::: m 0 .~ Ol U C/) m J: .c.~:2 u~ E S'E- Q)- - .....Ol'O::!IE". co Ol g>u. C/) C/) 0 -6 E = - Ol 'C .c. m :J u m 0 c ... C/) :J g>~ e c coo.2 .8 "0 0 0. Ol Ol'- Ol Q) ... +J= ,-~"C==="""..c- c ctl.c. u Ol"C C ..... .c ctlI.....Ol ~Olo.!!!m ~ >"0'.0 E ..... .- 'C >,m.....-:t:::t::C/)mlll :J O:!::::"O 0. 'Cij E m.92 ~ ... o cC/)E.oo.o. ::s >, >, 0._ I :J Ol 0 Q) J: :!::.o:2::EOlC/)"Ou.c1- 01:1 III.:!! c c o Q) ;:E ~ E ::s 0 00 ..... 0. g~o:5 '3: B .QM+-'O E C/) ctl~Ol_OlQ)Q) Ol - Ol ~ C/) >,:2 _ .c c '^ . C ' 0 0. > .- _ .- CdEo~ooolll G) Ol . Ol '" .c. u ..... .- .... - 0. E N U 0.J: .x: Q) 0.0 '" Ol - - c E _('I) o~:J c= ....- ~"C/)m!2o~oj5c C~ """ _-Q)O .- 0 ..... - Ol - 1: .- mO-ctl->ctl 3:111 Ol-.lI<: m.....O_1II . - C/) en.c. C/) a. CD .- EE~~:Jo Q)u:iE Ol cu .8 ~ c:: 0,=... ": e :Eo.c. c E :J.!: mO 0 Olc::!C/)Olca.m-"":O o 00 '3: el Ol (j) Ol III CD - - ""C/).c.EQ)oc Olc/):J~c/) .cN.- .0 ..... 0 0 m ,!!1 Ol I- ::::: c :J >,m .c. ..... .c. .. c C/) 0 ..... c ,-..... m c.c.:!:: u ctl -_ c::::- ~Ol .~.c..$00J:Q. 0. u >, C U C Ol'W _ Q) Ol ::;::: ctl 0 ,~ Ol U C/) m J: .c.~:2 u u E c'E- Q)_ ..... .....Ol@Ectl co Ol g>u. C/) C/) 0 -6 E = - ~ 'C -5, ffi gum 8 OC 0 :J:J-.....cc .- .8"0 0 0. Ol Ol'- Ol Q) ... ......=......:c:::::........c- c m .c. u Ol 'C C - .c mI.....Ol ~Olo.!!!m ~ >"0'.0 E - .- 'C >,m.....-:t:::t::C/)mlll :J C3 "0 0. 'Cij E m ,92 ~ ... g, >, 5.!a ~ .g ~ g. Q) .E :!::.o:2:.sOlC/)"OU.c1- 01:1 III.:!! c c o Q) ;:E ~ e ::s 0 00 t ID ~a ~~ ~ ~ ~ g::~ 2-5 -'-.~ ~a.Q) -g~ .~ 0 __G>e. ~o ceO) CtS+-> Q)~u .:rg-~ CtS a.. Q) ~<(_5 0:5 c..e c 5+->-~ CQ)IDO>~ ~+->o =a..P J~ j-~_2 -o-~~ '" ~ Q)- Q)Q) <Il~m o E -::;; CU'" cu ~ ~ 9-+->Q) ~ u -:; +->:J 0 sSQ)c E~U ~~ ~ m m mo-- ~u .0 0 Q):e:c: - Q) a. I- I:: I- ~ ~~ ~.o ~ 8 Q; g.7d ~.Q.~; E'E .s::oQ).8Q) '" - C ~g.8 ~~aE~~~~8~ ~~Q) "'_m cu muD :Jmo _~~ ~.Q~ ~~~ ~~..eC~~~~+->~ ~u -~~c en..e (J) c -- +-> ctS (5 0., :J en 0. -0 ~ ~ 0 0 ~gUQ) <Il~SEr.~~~~Q) Q)I .U-o E::c-- c~o.m~en-o~oO:5 o>.m -t::JD ~_~-a;~roQ;~E~ o~ c_~E .ma.~ cum~..e:.aQ)Eo--= -<<s enOCU E:! ~~m:~IE~~~ ~~ ~~~ ~.~= ~d~~l-s8~~~ 'E~ ~+->o cu~o '-_EooOco~en 8~ ~S~ - m +-> cil 'E 1D +-> -~ E Q) ~ 3: Q) ~ VI c: t:: ~I-~C:Q)Q)_Q~.=E<<S~Q)~+-> ctS g&= ~S-=_SE~U~U~r.n~S Q)~ QQ)ctS ~ ~ 8 ~ "55 Co 5. ~ ~ 53 -oQ) en ~-;E :2 ~ Z. ~ Cii cE~Ea.-IDO~E~B~~ ~a. Gr. 8~~~~~:5'~Q;:~[>'~ ~K Q)~'~ ~~j~~~~m~~EQ)~ti s_~ ~~~ ~ <( >- ~ -g 0; -g >.~,g ~ 1"i:2 ~:5 g;~ a: -$Q)t::=-OQ)~CUcen+->E:J 0)0 .~~Q) Q)uQ)ctSgC)~gEctS'Eeno~ ~c: ctSg:5 a: 0 g. 0 .- c a. 0.= Q) Q) c: (J en ::3 15 Q) -- +-> c:OI-+->~-2oQ)genEQ_=(J) 8~ ..eQ)O ~~~~:5~Q):5::3:JU~~~ciC:~ ~~~ ~ctSCU~C:~~Q)8~~~+->(J_5Q)~ ~=o menmc.2Q)=5,(J) ctSE8:SeQi-!:!!u 0.3:0 ~-_~--+-> >O~-ctS a.Q)Q>O CQ) ~~~$~~E~5gQ>=~~E~E ~~~ ",EQ)~li<Q)=Q)c~<Il-o_-<Il~ ~Q) 'EUl-ctSa. ~~..e~::3(J)en..c~'EB ~~- Q)i~a.~~~c~2~~_~~~~..e _(5i~ KEgi~!~~~Q)~~~e8~-~~..cCtSO ~~~uEic~ga:~~g:5z.gc~_~~~ >CtS~~~l-gEg~ctSm8:E--~~ien-Q> ~~~~m~~~08~~ctS~~g~~.~g:5 ~Q)~~:5~~O~~S~~c:5~~a.EE.5 c~G~~~~Q)Gcc~o<ll~!~io<ll-o ..~c .<o,mE~Q)~2~C/)~.8~Qi~u5l'Q) I!~~g .5~o.:5 ~.a .gg>jQ)~~I--g ~c~~ga.ctSo(J)0~-S~S~&E2-2~~ ~~~_!:!!~~!~~-oiW~o~enB.5cC~ g~EE~mctSctSg5~~2e~~~~>.~~Q) _ OE en(J)ul-~wQ)mmc..eo~c~cD ~~Uoc~~c~ctS~ m~-_UOOctS~oo ~ 5 ooo'~ ~ 8. cu g>~.2 g m.~ ~; ~ ~ E ;; g.- ~'~g>ojg!5~~~:J~S~~D03:Q)~~ ~:~'2~~~Q)i~E~8~~5en~gn~~i ocE2i~i~~~8E~~_~~.a~:'~~>.E ~~~~~mF=s~8o~~~~<~~~ffi~ 0.. ... <Ii 0 0 ~ c ~_m ~t ~Q) ~ m j g~ctS 25 ~ ffi ~~ ctS 0 ~ _5Q a. ctS - e >--- a. Q) ctS +-> QiQ)~ ctS2:ctS ([0 ctScg> .Q5 c..c:c ::!::::Sm ~Q)(J) 2 ~<(~ m3: Q)_~o <Q)~ Q)E;~ ~~ a.cD~ a;_~ ~3:1a ~.e g ECij ~ ctS~~ g.]2 0) U ~ -;; i5.g ~ ~ m g e 8.j "E -~ cij ~ a.!: $ ~ ~~:g Q) D oIDocua.____Ee -_ en-C ~gs ~~~EI-~im8Q) O~ B~ID uf(ij2 CUQ)ID~O<l)-a~S-€ :>.~ ~g= Q)Q)'- ~>~i~-ee m == --:JC ~~U i~~ E~ ~~~:5 g ~ ~ ~8-6 E~-~ C~~$~~-5~go Em ~~Q) 'C~~ j=ctS;~m~~E~ ~g c~E 2 a. en co m ~ ~ :c Q) E 0 - .- - (ij en 0 ~ ~:~ ~~~;~~E~m~ ~_~ ~~c ~-~= ~cig.~1-~8~~a: 'Ei ~~i m:JO --.5o(J0c:o~en 0_ -5-Qi m g- ci>'EQ)--~ E Q)~::: Q>~ ow et c~Q)eQ)Q)ou~Ecuu~- ctS _ :Jo= .Qm~~~E~~~~~~S5 ~! 8~s :a ~ 8 Q) i a 5. m ~ Q) ~ ~ ~.~ -$ 0 ~ Q) 00 c E U) E a.,o; Q) 0 ~ E '0; U E ~ 2 g. G ,E 8~~~~~~~~:~K>.~ a.~ Q)C-~ ui"~j;~~~m~~EQ)~~ s~ =~i ~ < >- fii -g 0:;"6 ~~ g "6~:g ~ = gl~ ([ -$Q)i~~O~~~c$-E~ ~o -~~~ ~ ~ ~ 0 _5 ~ ~ ~= : ffi ~ 8 ~ 5 ~ m .5 = cU~-~~oQ)~(J)E8~(J) 8~ ..emU ~~~~=~~=:J~~~~~ci~~ ~~~ ~ctSctS-$C([_Q)8CQ)~-gS0~ ~-~o 2 S ~ _~ :8 Q) ~ en >.~ E 8:B ~ Qi .- ~ a. U -- I:: -- en co.c .Q - - m cu Q) a. Q) Q) 0 Q) 5 ~ ~Q)~--~=E~58Q)=::3~E~~ 5=CO ",EQ)~li<Q)=Q)~"'<Il-o_-<Il~ <IlQ) EUI-cua. =:::..e'2::3en(J)..c:-D'E~ ~_Q- m~~a.~~!c~2~_~~~g~..c: .~~~ ~Eg~~!~'~~Q)3~~e8!~~..c:ctSO .Q<(~~Eac~g~~Q)g=>.ic~5Q)Q) Q)C--m::3!oE~ _c~a.E-~Q)o~=~ >.!:!;! U I- (J) >.~ E 0 c ctS m c. U c:.c en w Ol Q) ~~~~Q)D~oUj~:m~Q)O~Qi~_5= ~~~';S~fiiU~~_E~~I::S~~~E~.5 c.-oceD Q)oce octS~a.>Q)om~ ..~~ <(o.!:!;!E.c Q)22U);tS(J)1D~OOQ) ~i~~ .~'~g~~E!.a .gg>jQ)!g~~ ~c~~~a.ctSU~og-s~S~REm'2~~ Q) ; a..~:-e ! ~ ~ Q) - 0 arU) ~ 0 -5 en.s.5 c: C.S g~EE~ctSctSctSg5~~2c~Q)u~>.~~Q) _ oE (J)en~l-~wQ)ctSml::~omc~cD ~ ufO 0 _5 ! t:: c a.~ ~c = en en:c ~ .,g g> CO Q) RB ~gOOOcCtS&ctS~cQgcu_~~u~SE~en ~:~~~8~~~-~~_~g~~~~~B~~~~ >2c-na.Q)a.Q)EEUQ)~c",ocU:>o- ~uo~~~(J)!~oE c~i::3-ffiQ)Q)coum ~~.!:!;!QS~Q)Q)oo~~-~~~c~~~~E ~C/)OC~~oo~,E,E~UU~~!~<<Ila.rn<llg o .. c .. ~ " : .c .c :; 0 '0 .c 0 i?:' '0 i:J ,., "" 0 Disclaimer This map is neither a legaUy recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes !j466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shaU not be liable for any damages, and expressly waives aU claims, and agrees to defend, indemnify, and hold harmless the City from any and all claims brought by User, its employees or agents, or third parties which arise out of the use~s access or use of data provided. <<NAME>> <<NAME1 >> <<ADD1 >> <<ADD2>> <<CITY>> <<STATE>> <<ZIP>>-<<ZIP4>> c i j 0 ~ '0 0 i?:' '0 i:J i?:' i:J Disclaimer This map is neither a legaUy recorded map nor a survey and is not intended to be used as one. This map is a compilation of records, information and data located in various city, county, state and federal offices and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952-227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes !l466.03, Subd. 21 (2000), and the user of this map acknowledges that the City shaU not be liable for any damages, and expressly waives aU claims, and agrees to defend, indemnify, and hold harmless the City from any and aU claims brought by User, its employees or agents, or third parties which arise out of the user's access or use of data provided. <<Next Record>><<NAME>> <<NAME1 >> <<ADD1 >> <<ADD2>> <<CITY>> <<STATE>> <<ZIP>>-<<ZIP4>> Public Hearing Notification Area (500 feet) Chanhassen West Business Park Planning Case No. 05-23 8470 Galpin Boulevard City of Chanhassen ~ o Cll .c o '0 >- - (3 SCANNED 4275 NOR EX LLC 5354 PARKDALE DR MINNEAPOLIS, MN 55416 -1603 ROGER A & GAYLEEN M SCHMIDT 8301 GALPIN BLVD CHANHASSEN, MN 55317 -8413 JEFFREY A & CYNTHIA L OLSON 2520 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9372 GINO R TENACE & ROBIN S MARSH-TENACE 2557 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9372 JEFFREY J & ANDREA R SEBENALER 2499 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 SCOTT T MURPHY & LORI A BOETTCHER-MURPHY 2550 BRIDLE CREEK TRL CHANHASSEN, MN 55317 -9372 CURTIS J & MARGARET A ZOERHOF 2530 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9372 REILLY M DILLON & STEPHANIE GIMBLE-DILLON 2542 BRIDLE CREEK TRL CHANHASSEN, MN 55317 -9372 STEPHEN D & PATRICIA V PETERS 2536 BRIDLE CREEK TRL CHANHASSEN, MN 55317 -9372 DAVID E & MONICA L KILBER 2470 BRIDLE CREEK TRL CHANHASSEN, MN 55317 -9369 JEANNE M LINDBERG 2480 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 ALAN W JR & CATHERINE D HECHT 2490 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 TIMOTHY R CAHLANDER & KARLA B PLADSEN.CAHLANDER 2495 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 ALEXANDER D DONALDSON & ALETA M DONALDSON 2460 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 STEVEN G & DEBORAH A WATTS 2563 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9372 MICHAEL C & KRISTIN M MATTSON 2560 BRIDLE CREEK TRL CHANHASSEN, MN 55317 .9372 CRAIG W & DANA A JOHNSON 2450 BRIDLE CREEK TRL CHANHASSEN, MN 55317 -9369 THOMAS M & MARCIA A KLADEK 2491 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 FRANK J & REBECCA A LAENGLE 2440 BRIDLE CREEK TRL CHANHASSEN. MN 55317 -9369 LEGEND HOLDINGS LLC C/O LEWIS 11750 OLD GEORGETOWN RD APT 2202 ROCKVILLE . MD 20852 -2652 WILLIAM G & KAREN N LOOMIS 2567 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9372 JAY & FAITH M CUTLER 2430 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 CHARLES L & BARBARA C NICKOLAY 2420 BRIDLE CREEK TRL CHANHASSEN. MN 55317 -9369 KARIL YNN KIRMEIER 2410 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 STEVEN W & SARAH S DALE 2487 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 SCOTT & AMY C KAEHLER 2380 BRIDLE CREEK CIR CHANHASSEN, MN 55317 -9338 GENE M & BEVERLY G HERMES 2571 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9372 DANIEL R & SHELLEY R LUNA 2483 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 SCOTT P & LESLIE M LOEHRER 2370 BRIDLE CREEK CIR CHANHASSEN . MN 55317 -9338 JEFFREY L & HANNAH R CROMETT 2471 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 SCANNED CLARENCE E & L1EV A L SCHMIDT 2461 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 CRAIG V & NINA F WALLESTAD 2475 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 ANGILBERTO HERNANDEZ & LAURIE HERNANDEZ 2451 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 THOMAS J RADERMACHER & JOELLEN ANTONSON RADERMACHER 2479 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 PAUL M & CONSTANCE M PALMER 2360 BRIDLE CREEK CIR CHANHASSEN . MN 55317 -9338 STEVEN J & NANCY J CAVANAUGH 2441 BRIDLE CREEK TRL CHANHASSEN. MN 55317 -9369 PETER & LUANN SIDNEY 2431 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 BARRY & MARY L LABOUNTY 2421 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 RODNEY H & JANICE C MELTON 2413 BRIDLE CREEK TRL CHANHASSEN. MN 55317 -9369 MARK & CHRISTINE FISCHER 2407 BRIDLE CREEK TRL CHANHASSEN . MN 55317 -9369 ANDREW M DINGMAN & STEPHANIE J DINGMAN 2403 BRIDLE CREEK TRL CHANHASSEN , MN 55317 -9369 CALVIN DISCHER 5476 WOODLAND RD MINNETONKA , MN 55345 -5658 RICHARD B BURY 4175 TRILLIUM LN E MOUND, MN 55364 -7730 SAMUEL 0 & KIMBERLY A STlELE 2375 BRIDLE CREEK CIR CHANHASSEN, MN 55317 -9388 MERLE D & JANE VOLK 16925 CO RD 40 CARVER, MN 55315 -9635 JEFFREY D & REBECCA R BRICK 2365 BRIDLE CREEK CIR CHANHASSEN , MN 55317 -9338 CHARLES E & DIANA L KIRCHOFF 2355 BRIDLE CREEK CIR CHANHASSEN , MN 55317 -9338 KEVIN M & CATHLEEN A DILORENZO 2382 STONE CREEK LN W CHANHASSEN. MN 55317 -7413 WILLIAM G JR & PAMELA FRANZEN 2370 STONE CREEK LN W CHANHASSEN , MN 55317 -7413 JAMES A & LAURIE L1SIGNOLl 2356 STONE CREEK LN W CHANHASSEN, MN 55317 -7413 CHARLES 0 & ERIN M BUSALACCHI 2342 STONE CREEK LN W CHANHASSEN , MN 55317 -7413 LBI ACQUISITION CORP C/O CHEF SOLUTIONS: L PETRICH 20 N MARTINGALE SUITE 600 SCHAUMBURG, IL 60173 -2417 TOM & SOMMANA MONTHISANE 2381 STONE CREEK LN W CHANHASSEN. MN 55317 -7413 RICHARD B & CHRYSAUNA A BUAN 2369 STONE CREEK LN W CHANHASSEN. MN 55317 -7413 WILLIAM A & LORRAINE RODRIGUEZ 2357 STONE CREEK LN W CHANHASSEN , MN 55317 -7413 DAVID G & YAEL M RUBIN 2345 STONE CREEK LN W CHANHASSEN, MN 55317-7413 BRIAN C & SALLY L SNABB 2333 STONE CREEK LN W CHANHASSEN , MN 55317 -7413 THOMAS E & MARY K WITEK 2318 STONE CREEK DR CHANHASSEN. MN 55317 -7403 JEFFREY J & ABIGAIL M WILSON 2332 STONE CREEK DR CHANHASSEN , MN 55317 -7403 MARK SUNDQUIST 2374 STONE CREEK DR CHANHASSEN , MN 55317 -7403 JAMES D & TRACI L LEONARD 2360 STONE CREEK DR CHANHASSEN , MN 55317 -7403 JOHN F & LAURIE SULLIVAN 2346 STONE CREEK DR CHANHASSEN , MN 55317 -7403 THE NORDICK GROUP INC 67512TH AVE NE WEST FARGO, ND 58078 -3502 RODDY Y & LAURIE L W ZIVKOVICH 2337 BOULDER RD CHANHASSEN , MN 55317 -7401 THOMAS V & BEVERLY L ANTILLEY 2361 STONE CREEK DR CHANHASSEN . MN 55317 -7403 JOSHUA T KRIENKE & CHRISTINA A KRIENKE 2375 STONECREEK DR CHANHASSEN, MN 55317 -7403 DANIEL J & PAMELA J CULHANE 2333 BOULDER RD CHANHASSEN, MN 55317 -7401 ALOTA PROPERTIES LLC 4035 NOREX DR CHASKA, MN 55318 -3043 JOEL E & HEIDI M LEHRKE 2329 BOULDER RD CHANHASSEN, MN 55317 -7401 JEFFREY J & KARLA M ALTHOFF 2326 BOULDER RD CHANHASSEN , MN 55317 -7401 KELLY K MORLOCK & SARA B ROMANSKI-MORLOCK 2325 BOULDER RD CHANHASSEN , MN 55317 -7401 DOUGLAS VERNON JOHNSON 2322 BOULDER RD CHANHASSEN, MN 55317 -7401 CHARLENE A STENDER 2321 BOULDER RD CHANHASSEN , MN 55317 -7401 JAMES M & JENNIFER D LARRANAGA 2318 BOULDER RD CHANHASSEN , MN 55317 -7401 DOUGLAS G & SARAH P HIPSKIND 2317 BOULDER RD CHANHASSEN , MN 55317 -7401 DONALD W & CATHY BORGMANN 2308 BOULDER RD CHANHASSEN , MN 55317 -7401 RORY D & AMY J LEA 2313 BOULDER RD CHANHASSEN , MN 55317 -7401 GERHARD & HELENE A SCHOCK 2309 BOULDER RD CHANHASSEN, MN 55317 -7401 DELORIS B HOLASEK LIVING TRUST C/O DELORIS HOLASEK 8610 GALPIN BLVD CHANHASSEN , MN 55317 -9413 SCOTT T & NICOLE M BRUSH 2301 BOULDER RD CHANHASSEN , MN 55317 -7401 MICHAEL & JACQUELINE R MROSKO 2305 BOULDER RD CHANHASSEN , MN 55317 -7401 RICHARD F RIEGERT C/O RIEKER ENTERPRISES 7875 187TH ST BELLE PLAINE . MN 56011 -8932 CHASKA WATERTOWER MINI 149 JONATHAN BLVD N CHASKA . MN 55318 -2342