Loading...
Lake Lucy Sanitary Sewer Serviceability StudyCB=999.18INVN=6.30INVS=6.41 CB=998.44INVN=8.4INVS=8.45 18"CULVERTINV=993.49 STMH=995.39INVN=7.3INVS=7.32 SANMH=1021.12INVE=13.18INVW=13.16 E - B G -B G-B G - B G-BG-BG-B > S-7ELEV=1029.2 SBELEV=1028.7 SBELEV=1028.7 B-6ELEV=1009.4 B-8ELEV=1011.3 B-5ELEV=1017.5 B-4ELEV=1010.20 B-3ELEV=1008.08 B-2ELEV=1007.88 B-1ELEV=1009.90 B-10ELEV=1004.52 OHP OHP OHP OHP OHP OHP OHP OHP O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P Sanitary Sewer Serviceability Study Lake Lucy Road Chanhassen, MN EXISTING CONDITION Basement Levels: 31% of site can be served without grading (cuts). (Area shown is above 1,014’) MIN. BASEMENT ELEVATION1,014’ Assumptions AREA OF SITE ABLE TO BE SERVED BY EXISTINGSANITARY SEWER ELEVATION AS IS NORTH 1-6-2016 V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDITIONS.IND EXISTING SEWER SERVICABLE AREA EXISTING SANITARY SEWER PIPE ELEVATION 1007.96’ Areas above 1,014’ Elevation ƒSanitary sewer main, 8” pipe at 0.5%. Sewer service line 4” at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5’ and 1,014.5’. A 1,014.0’ elevation was used for a average minimum basement elevation. ƒFront building pad: An 8’ difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8’ =1,022’. ƒStreet grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2’ below garage floor or 1,022 - 2’ =1,020’ 0’ 40’ 80’ 160’ 5 CB=999.18INVN=6.30INVS=6.41 CB=998.44INVN=8.4INVS=8.45 18"CULVERTINV=993.49 STMH=995.39INVN=7.3INVS=7.32 SANMH=1021.12INVE=13.18INVW=13.16 E - B G -B G-B G - B G-BG-BG-B > S-7ELEV=1029.2 SBELEV=1028.7 SBELEV=1028.7 B-6ELEV=1009.4 B-8ELEV=1011.3 B-5ELEV=1017.5 B-4ELEV=1010.20 B-3ELEV=1008.08 B-2ELEV=1007.88 B-1ELEV=1009.90 B-10ELEV=1004.52 OHP OHP OHP OHP OHP OHP OHP OHP O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P Sanitary Sewer Serviceability Study Lake Lucy Road Chanhassen, MN ƒSanitary sewer main, 8” pipe at 0.5%. Sewer service line 4” at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5’ and 1,014.5’. A 1,014.0’ elevation was used for a average minimum basement elevation. ƒFront building pad: An 8’ difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8’ =1,022’. ƒStreet grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2’ below garage floor or 1,022 - 2’ =1,020’ PROPOSED CONDITION Site Plan #7, Basement Levels: 51% of site must be served via grading (fills). (Area shown is above 1,014’) MIN. BASEMENT ELEVATION1,014’ Assumptions AREA OF SITE ABLE TO BE SERVED BY EXISTINGSANITARY SEWER ELEVATION BY FILLING NORTH 1-6-2016 V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDITIONS.IND PROPOSED MINIMUM BUILDING AREA Areas above 1,014’ Elevation FILL IN EXCESS OF 10’ REQUIRE SPECIAL MATERIALS AND COMPACTION - SEE SOIL REPORT EXISTING SANITARY SEWER PIPE ELEVATION 1007.96’ 0’ 40’ 80’ 160’ 6 CB=999.18INVN=6.30INVS=6.41 CB=998.44INVN=8.4INVS=8.45 18"CULVERTINV=993.49 STMH=995.39INVN=7.3INVS=7.32 SANMH=1021.12INVE=13.18INVW=13.16 E - B G -B G-B G - B G-BG-BG-B > S-7ELEV=1029.2 SBELEV=1028.7 SBELEV=1028.7 B-6ELEV=1009.4 B-8ELEV=1011.3 B-5ELEV=1017.5 B-4ELEV=1010.20 B-3ELEV=1008.08 B-2ELEV=1007.88 B-1ELEV=1009.90 B-10ELEV=1004.52 OHP OHP OHP OHP OHP OHP OHP OHP O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P Sanitary Sewer Serviceability Study Lake Lucy Road Chanhassen, MN Areas above 1,020’ Elevation ALL FRONT YARDS WITHSTREET MUST BE ABOVE THIS ELEVATION 1,020.0’ EXISTING CONDITION Street & Front Yards: (Site is too low given existing sanitary sewer invert) In order to serve a basement elevation of 1,014’, the garage floor needs to be at 1,022’ and the street needs to be at 1,020’ Assumptions NORTH 1-6-2016 V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDITIONS.IND ƒSanitary sewer main, 8” pipe at 0.5%. Sewer service line 4” at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5’ and 1,014.5’. A 1,014.0’ elevation was used for a average minimum basement elevation. ƒFront building pad: An 8’ difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8’ =1,022’. ƒStreet grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2’ below garage floor or 1,022 - 2’ =1,020’ 0’ 40’ 80’ 160’ 7 Areas above 1,020’ Elevation CB=999.18INVN=6.30INVS=6.41 CB=998.44INVN=8.4INVS=8.45 18"CULVERTINV=993.49 STMH=995.39INVN=7.3INVS=7.32 SANMH=1021.12INVE=13.18INVW=13.16 E - B G -B G-B G - B G-BG-BG-B > S-7ELEV=1029.2 SBELEV=1028.7 SBELEV=1028.7 B-6ELEV=1009.4 B-8ELEV=1011.3 B-5ELEV=1017.5 B-4ELEV=1010.20 B-3ELEV=1008.08 B-2ELEV=1007.88 B-1ELEV=1009.90 B-10ELEV=1004.52 OHP OHP OHP OHP OHP OHP OHP OHP O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P O H P Sanitary Sewer Serviceability Study Lake Lucy Road Chanhassen, MN ƒSanitary sewer main, 8” pipe at 0.5%. Sewer service line 4” at 1.5%. The minimum basement floor that is servicable is at an elevation between 1,013.5’ and 1,014.5’. A 1,014.0’ elevation was used for a average minimum basement elevation. ƒFront building pad: An 8’ difference between garage floor and basement floor was used to determine front building pad elevation. Front pad elevation - average 1,014 + 8’ =1,022’. ƒStreet grades 2-5% slopes were used to determine street and garage grades (slopes and elevation) Street grades are 1-2’ below garage floor or 1,022 - 2’ =1,020’ PROPOSED CONDITION Site Plan 7 Street & Front Yard 25 % of site must be served via grading (fills). (Area shown is above 1,014’) 20,000 - 25,000 yards (Areas above 1,020’) Assumptions NORTH 1-6-2016 V:1938/ACTIVE/193803412/GRAPHICS/LAKE LUCY EXISTING CONDITIONS.IND 0’ 40’ 80’ 160’ EXISTING SANITARY SEWER PIPE ELEVATION 1007.96’ FILL IN EXCESS OF 10’ REQUIRE SPECIAL MATERIALS AND COMPACTION - SEE SOIL REPORT PROPOSED FRONT PAD AREAELEVATIONS PROPOSE BETWEEN 1,020’ & 1,022’ FILL IN EXCESS OF 10’ REQUIRE SPECIAL MATERIALS AND COMPACTION - SEE SOIL REPORT ELEV. 1,020’ 8