Loading...
CC Staff Report Final Plat Approval for Audubon Corporate 2nd Addition (Outlot A, Audubon Corporate Center 1st Addition) 101 MEMORANDUM CITY OF TO: Todd Gerhardt, City Manager CHANHASSEN FROM: Bob Generous, Senior Planner 7700 Markel Boulevard DATE: July 25, 2016 Dr Coe PO Box 147 Chanhassen,MN 55317 SUBJ: Audubon Corporate Center 2nd Addition, Development Contract, - Planning Case#2016-18 Administration Phone:952.227.1100 Fax:952.227.1110 PROPOSED MOTION Building Inspections "The Chanhassen City Council approves: Phone:952.227.1180 Fax:952.227.1190 1. A resolution approving the final plat for Audubon Corporate Center 2nd Engineering Addition subject to the conditions of the staff report." Phone:952.227.1160 Fax:952.227.1170 Approval requires a simple majority vote of the City Council. Finance Phone:952.227.1140 Fax:952.227.1110 PROPOSAL SUMMARY Park&Recreation The applicant, Eden Trace Corp. and Equitable :. ':':"% • ' '«°''- Phone:952.227.1120 HoldingCo. LLC.,is requesting final plat V. Fax:952.227.1110 �� "`. `.4:-.-- approval to create one lot for the property �,.` . :„n located north of the existing IDI Distribution Recreation Center building. \ ' ` -. -- .. . . 2310 Coulter Boulevard g $,.yrs" ' `� " Phone:952.227.1400 ". r% —� Fax:952.227.1404 BACKGROUND \\ , , ' Planning& On April 14,2008,the Chanhassen City #' r° ' ; \ ` + • Natural Resources \4 - •'4y Phone:952.227.1130 Council approved(Planning Case#2008-07) \ 4 . 4," •.' •; • Fax:952.227.1110 the Subdivision (preliminary and final plat) " a • creating one lot and one outlot and right-of-way Public Works for Audubon Road; Site Plan for IDI itillik 7901 Park Place Distributors for a 71,500 square-foot, two- „ • ';...-r i. Phone:952.2271300 story, office-warehouse building to be built in ! ,= ` •1 s_ Fax:952.227.1310 two phases (55,200 square-foot initially with a _ _ • • future 16,272 square-foot expansion); and a l t s" 4 1.x.4}'• J': Senior Center . Wetland Alteration Permit. Phone:952.227.1125 `' ,1.� r.: . dfi Fax:952.227.1110 "" —'"" Website www.ci.chanhassen.mn.us Chanhassen is a Community for Life-Providing for Today and Planning for Tomorrow IDI Expansion—8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 2 of 11 SUBDIVISION REVIEW The applicant is creating one lot of the existing Outlot A,Audubon Corporate Center. The lot area is 2.65 acres. The property is zoned Office Industrial District,IOP, and is guided for Office Industrial uses. i ` 8 • 1•644 k 1 41L‘ \\ V \ • 1 I \\ _ 1 I I d \ \+ q • / \ S \ Y a rn...T - ' \ 1 \\ r \\ NT i \\ \\ \ • M5919'461 415.19 Audubon Corporate Center 2nd Addition This lot will include a portion of the building expansion for IDI Distribution as well as additional parking for the building. In conjunction with the site plan, the applicant is requesting that the two lots become a zoning lot and that the easement along the common property line be vacated. GRADING, DRAINAGE AND EROSION CONTROL Site grading is proposed in conjunction with the site plan review for IDI Distribution building expansion, which is proceeding concurrently with the final plat. IDI Expansion-8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 3 of 11 PARKS AND RECREATION Parks This property is located within the park service area of Sunset Ridge Neighborhood Park. This 10- acre property features off-street parking, a ball field,basketball court,play area,trails,a wetland and open space.No additional parkland acquisition is being recommended as a condition of approval for this subdivision. Trails The subject site has convenient access to the Audubon Road pedestrian trail. The applicant should be required to protect and maintain access to this public amenity during the construction of their project. The Audubon Road trail connects to the Lake Drive West pedestrian trail just south of this proposed subdivision providing convenient access to Sunset Ridge Park and the remainder of the City's trail system.No additional trail construction is being recommended as a condition of approval for this subdivision. It is recommended that full park fees in lieu of parkland dedication and/or trail construction be collected as a condition of approval for this subdivision. The park fees shall be collected in full at the rate in force upon final plat submission and approval. For 2016,the required park fee is $12,500.00 per acre,which would be a fee of$33,125.00. SURFACE WATER MANAGEMENT PLAN (SWMP) CONNECTION CHARGES Storm Water Utility Connection Charges Section 4-30 of code sets out the fees associated with surface water management. The fees for Outlot A were deferred with the original subdivision. They will be collected with the site improvements. These fees are based on land use type and are intended to reflect the fact that more intense the development type, the greater the degradation of surface water. These fees can be credited up to 50%if the design has a reasonable expectation of achieving abstraction of the first 1.1 inches of runoff from all proposed hardcover on the site. The wetland and buffer and upland area put into the outlot will be removed from the assessed property. This area is 0.59 acres so the net assessable land area is 2.06 acres. They are indicating that 1.0 inches of runoff will be infiltrated. Barring any major changes in design assumptions, this warrants a 45% credit. Based upon the area and land use type, the Storm Water Utility Connection Charge is estimated to be $20,742/acre x 2.06 acres x 0.55 = $23,500.69 IDI Expansion—8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 4 of 11 WETLANDS A wetland is located in the northeast corner of the site. This wetland is classified as a Manage 2 wetland which requires a 20 foot buffer with a 30 foot building setback and a 15 foot accessory structure setback. A drainage and utility easement shall be placed over this wetland and associated buffer on the final plat. REVIEW CONDITIONS OF APPROVAL 1. Lot 1, as shown in the preliminary plat, shall be designated as Outlot A until the ultimate development of the lot is determined and a revised grading plan submitted that shows the wetland impacts. *This condition has been met. 2. The applicant shall use BWSR U8 in all graded areas along the eastern property line. *This condition no longer applies. 3. Existing City boulevard trees will be protected with fencing during all phases of construction. The applicant will be responsible for replacing any trees that die as a result of construction activity. *This condition still applies. 4. The north lot will be required to provide buffer yard and parking lot landscaping as required by ordinance at the time of site plan approval. *This condition has been met. 5. All trees on the north lot within the wetland buffer and setback shall be preserved until a final grading plan is approved for the lot. The developer shall work with staff as part of the development of the site to preserve these trees through revised grading and the use of retaining walls. *This condition has been met. 6. A wetland buffer 20 feet in width and a 30-foot setback from the wetland buffer must be maintained around all wetlands on the property. Secondary structures are allowed to encroach up to 50% of the setback. It appears that the retaining wall has exceeded the allowed encroachment and needs to be moved out of this 15-foot setback. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs,under the direction of City staff,before construction begins and must pay the City$20 per sign. *This condition still applies. 7. The retaining wall needs to be moved so that it is at least 15 feet from the edge of the buffer or 35 feet from the wetland edge. *This condition has been met. IDI Expansion— 8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 5 of 11 8. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency(MPCA) for this site. *This condition has been met. 9. The proposed storm water pond shall be constructed prior to disturbing upgradient areas and used as a temporary sediment basin during mass grading. Diversion berms/ditches may be needed to divert water to the pond and a temporary pond outlet shall be provided. The outlet could be a temporary perforated standpipe and rock cone. The plans shall be revised to include a detail for the temporary pond outlet. *This condition has been met. 10. A detailed construction plan needs to be created for the pond construction which shows how water quality of the existing pond and adjacent water body will be protected. At a minimum, this must show how the pond will be dewatered and what best management practices will be employed. * This condition has been met. 11. All silt fence that is not laid parallel to the contours shall have J Hooks installed every 50-75 feet. *This condition no longer applies. 12. A stable emergency overflow (EOF) for the stormwater pond shall be provided. The EOF could consist of riprap and geotextile fabric or a turf reinforcement mat(a permanent erosion control blanket). A typical detail shall be included in the plan. The overland route from the EOF to the existing wetland shall be shown on the plans and shall be encumbered by a drainage and utility easement. * This condition has been met. 13. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All exposed soil areas shall have temporary erosion protection or permanent cover year round, according to the following table of slopes and time frames: Type of Slope Time (Maximum time an area can Steeper than 3:1 7 days remain open when the area 10:1 to 3:1 14 days is not actively being worked.) Flatter than 10:1 21 days These areas include constructed storm water management pond side slopes, and any exposed soil areas with a positive slope to a storm water conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or man- made systems that discharge to a surface water. * This condition has been met. IDI Expansion—8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 6 of 11 14. Inlet protection may be needed prior to installation of the castings for the curbside catch basins. In that case, all storm sewer inlets shall be protected by at least fabric draped over the manhole with a steel plate holding the fabric in place. * This condition has been met. 15. At this time,the estimated total SWMP fee,due payable to the City at the time of final plat recording, is$59,365.80. *This condition shall be modified as follows: Based upon the area and land use type, the Storm Water Utility Connection Charge is estimated to be$23,500.69 due with the final plat. 16. The applicant shall apply for and obtain permits from the appropriate regulatory agencies(e.g., Minnesota Pollution Control Agency,Minnesota Department of Natural Resources(for dewatering)) and comply with their conditions of approval. *This condition still applies. 17. Full park fees in lieu of parkland dedication and/or trail construction shall be collected as a condition of approval for this subdivision. The park fees shall be collected in full at the rate in force upon final plat submission and approval. *This condition shall be modified as follows: Park fees in the amount of$33,125.00 shall be paid prior to recording the final plat. 18. Approval of the subdivision in no way should convey to the applicant, the land owner or any subsequent owners and occupants approval of the wetland impacts indicated within Wetland 2 as shown on the conceptual grading plan or any other wetland impacts resulting from the development of this parcel. Any grading which, as a result of the development of Lot 1, occurs on Lot 2 must provide sediment and erosion control best management practices to protect the wetland and the buffer area. *This condition no longer applies. 19. No burning shall be issued for trees to be removed. Trees and shrubs must be removed from site or chipped. *This condition still applies. 20. Remove all existing structures prior to the commencement of grading. *This condition has been met. 21. This site must be mass graded to minimize future truck traffic upon completion of the southern parcel. A 20-foot buffer is required around the wetland on the northern parcel to prevent grading from taking place. Please revise the grading plan and show silt fence in this location so the contractor can determine the grading limits. Also, the building pad elevation of the northern parcel shall be lowered to an elevation of 952 to minimize the impacts to the wetland. *This condition has been met. IDI Expansion—8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 7 of 11 22. The grading plan needs to be revised. The proposed contours on the northern property need to be revised showing the wetland buffer of 20 feet. Show the existing conditions within 100 feet of the property line. *This condition has been met. 23. Normal water level of the existing wetlands should be shown on the plan. Also,include the normal water level and high water level of the revised pond. Show emergency overflows on the plan. Keep a minimum of 2 percent slope in the grass areas, 1 percent in the pavement areas, and .5 percent along the curb lines. *This condition has been met. 24. Development of the northern parcel will require a stormwater pond to treat the water prior to discharge into the wetland. This pond should discharge to the wetland northeast of the site. *This condition has been met. 25. Revise the drainage calculations. The existing drainage map should include three areas: One area discharges to the northern wetland, one to the eastern wetland and one to the existing pond. Revise the calculations to show the pre- and post-development peak discharge into the northern and eastern wetland. Post-development peak discharges must remain less than pre-development peak discharges for the 2-, 10-, and 100-year storm events. Drainage calculations must be signed by a Professional Engineer registered in the State of Minnesota. *This condition has been met. 26. Rational method calculations, including drainage map, must be provided for the sizing of the storm sewer. *This condition has been met. 27. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. *This condition still applies. 28. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. Additional top and bottom elevations should be added to the retaining wall. *This condition still applies. 29. All of the utilities within the boundary should be privately owned and maintained. These utilities must be covered by a cross-access agreement. The proposed watermain connection into Chanhassen Lakes Business Park 7th Addition must wet tap the existing watermain. *This condition has been met. 30. Utility plans shall show both plan view and profiles of all utilities (sanitary sewer, water, and storm sewer lines). *This condition has been met. IDI Expansion—8303 Audubon Road—Planning Case 2016-18 July 25,2016 Page 8 of 11 31. Determine actual elevations of existing utilities. A minimum vertical separation of 18 inches is required at all storm, sanitary, and watermain crossings. Provide details of each crossing to ensure minimum separation. *This condition shall be modified as follows: Determine actual elevations of existing utilities. A minimum vertical separation of 18 inches is required at all storm, sanitary, and watermain crossings. Provide details of each crossing to ensure minimum separation. 32. Each new lot is subject to the sanitary sewer and water hookup charges. Lot 1, Block 1 will get credit for 8 trunk sanitary sewer charges. Lot 2 will get credit for 15 trunk sanitary sewer charges. No trunk water charges have been paid. The 2008 trunk hookup charge is $1,769 for sanitary sewer and $4,799 for watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. *This condition shall be modified as follows: Each new lot is subject to the sanitary sewer and att.hcckup chargee. Let 1, Blcc'k I will gct credit for 8 trunk sanitary sewer charges. Lot 2 will get credit for 15 trunk sanitary c,;;;vcr ch;:bas. No trunk water charges have been paid. The 2008 trunk hookup charge is $1,769 for sanitary sewer and $4,799 for watermain. Sanitary sewer and watermain hookup fees will be required •• . . against the parcel at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 33. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. The applicant is also required to provide the City with the necessary financial security in the form of a letter of credit or cash escrow in the amount of$13,200.00 to guarantee the installation of the pond, erosion control, and seeding. The applicant must also notify the City after installation of the erosion control and 48 hours prior to the commencement of grading. Permits from the appropriate regulatory agencies will be required, including the MPCA and the Dept. of Health. *This condition has been met. 34. Easements are required to provide access to Lot 1, Block 1. A private drive easement will be required to provide access to Lot 1, Block 1 off of Audubon Road. An additional private easement will be required to provide truck access through Chanhassen Lakes Business Park 7th Addition and up to Lot 1, Block 1. The easements for the gas line and power line must be shown on the plat. No work will be allowed in this area without the approval of the owner of the easement. A drainage and utility easement will be required over the proposed pond for Lot 2, Block 1. Also, a temporary drainage and utility easement should be placed on the entire Lot 1, Block 1 until the time of final plat of this parcel. Provide location and easement for pond access. *This condition has been met. IDI Expansion—8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page 9 of 11 35. Shift proposed drive off of Audubon Road so that the center of the driveway is located 70 feet north of the Kingdom Hall drive. Due to limited site distance,this driveway location will be limited to passenger vehicles only. Truck-trailer access must be provided to Lot 1, Block 1 through Chanhassen Lakes Business Park 7th Addition. *This condition has been met. 36. The boundary survey and preliminary plat need to be revised. Add existing conditions and property lines within 100 feet of the boundary. Also,the legal description does not match the bearings on the preliminary plat. *This condition does not apply. 37. Upon completion of the public street,the applicant shall submit a set of"as-built"plans signed by a professional engineer. *This condition has been met. 38. Collector and Arterial Roadway Traffic Impact Zone fees will be collected with the final plat. The fee will be based on the commercial rate of$3,600 per developable acre. *This condition shall be modified as follows: Collector and Arterial Roadway Traffic Impact Zone fees will be collected with the final plat. The fee will be based on the commercial rate of$3,600 per developable acre. With 2.06 developable acres, the fee is $7,416.00. 39. All outstanding assessments must be paid prior to final plat. *This condition has been met. Based on review of the proposed plan, the following condition shall be added: A drainage and utility easement will need to be placed over the wetland and associated buffer with final plat. COMPLIANCE TABLE AREA (sq. ft.) I WIDTH (ft.) I DEPTH (ft.) I NOTES Code (IOP) 43,560 200 200 1.0 acre Lot 1 115,555 318 308 I 2.65 acres RECOMMENDATION Staff recommends approval of the final plat for Audubon Corporate Center 2nd Addition subject to the following conditions: 1. Existing City boulevard trees will be protected with fencing during all phases of construction. The applicant will be responsible for replacing any trees that die as a result of construction activity. IDI Expansion— 8303 Audubon Road—Planning Case 2016-18 July 25, 2016 Page l0of11 2. A wetland buffer 20 feet in width and a 30-foot setback from the wetland buffer must be maintained around all wetlands on the property. Secondary structures are allowed to encroach up to 50% of the setback. It appears that the retaining wall has exceeded the allowed encroachment and needs to be moved out of this 15-foot setback. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff,before construction begins and must pay the City$20 per sign. 3. The retaining wall needs to be moved so that it is at least 15 feet from the edge of the buffer or 35 feet from the wetland edge. *This condition has been met. 4. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency(MPCA) for this site. *This condition has been met. 5. Based upon the area and land use type,the Storm Water Utility Connection Charge is estimated to be$23,500.69 due with the final plat. 6. The applicant shall apply for and obtain permits from the appropriate regulatory agencies(e.g., Minnesota Pollution Control Agency,Minnesota Department of Natural Resources(for dewatering))and comply with their conditions of approval. 7. Park fees in the amount of$33,125.00 shall be paid prior to recording the final plat. 8. No burning shall be issued for trees to be removed. Trees and shrubs must be removed from site or chipped. 9. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. 10. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. Additional top and bottom elevations should be added to the retaining wall. 11. A minimum vertical separation of 18 inches is required at all storm, sanitary, and watermain crossings. Provide details of each crossing to ensure minimum separation. 12. Sanitary sewer and watermain hookup fees will be required at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. IDI Expansion— 8303 Audubon Road —Planning Case 2016-18 July 25, 2016 Page 11 of 11 13. Collector and Arterial Roadway Traffic Impact Zone fees will be collected with the final plat. The fee will be based on the commercial rate of$3,600 per developable acre. With 2.06 developable acres,the fee is $7,416.00. 14. A drainage and utility easement will need to be placed over the wetland and associated buffer with final plat. ATTACHMENTS Reduced Copy of Final Plat Resolution Approving Audubon Corporate Center 2°d Addition la2z Zz> ' YFe y� f.- m <5z / Nwa "1 / 9// O p z z ir_ O '�/ N.: r U _ i P�'op r� ill •__ ' / USp h;r ; P' 8 k9be '' rdca" rn d" J: ,�n � t,. F- d _ 90 rr* �j/��Fm Z NO- \7a O \\ \ m ; a = owe \i a� � yes sol Z \ � 3t a g_$ N = . \ `F,i 4' 5 Do. \ -o, y sg s= Guy N \ mg nq 2§ LU \ t V\,.<- ',_ t ` `J _ o ' i/ • \ • -\.... I £L'212 3,49$0.005 Z \ ea \\ Ill \ U \ \ W \\ -- - - - - J- - - - - - F \ Q�/ LJ a ; I € a III/1 z R 1..1... gas e 0 1 asg` 1 � I m tri9 F N R Z x L y ?^ O E ' a'iog € ^ u$ d CO a fel m aas a 'x 1 R tat R >i a y Q E 1 4 I P B c o 2 C H i gz Q aC €g t L r a ii F Q z r �$ a * s. e$ �fr g F,EF ': 5I 8 4! k 1 V F ,, 8 . k E @i�E .I' 1 �� 4 3 8 s E y E.E 3 £ggg F E Ig € 5 z g r ix ) z 0 € my ` 'c >; 3 ,,-i z 3 1 i x I 1 : i 3 3 ! 8 m g e 3 3 E 1 g y 5 $spa E € a 8 a 5 2 a 3 x e i § -fi 3 ag � i x o f" a i i air 4 i it 'Q d'E z'o Zr = 2 Fe e ., aee - a W g ai 1•:'.''. z a € € Y t§ : a m k8 #1 5$ g3 a Ell 9€ 5 .44 k 8 d 8 m 8 f 9 ffi g 8 3 m ✓I CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: RESOLUTION NO: MOTION BY: SECONDED BY: A RESOLUTION APPROVING A FINAL PLAT AUDUBON CORPORATE CENTER 2ND ADDITION WHEREAS, Eden Trace Corp. and Equitable Holding Co. LLC. have requested the final plat of Outlot A,Audubon Corporate Center into 2.65-acre lot; and WHEREAS, the Chanhassen City Council held a hearing on July 25, 2016, and found the plan consistent with the Chanhassen Comprehensive Plan and Zoning ordinance. NOW,THEREFORE,BE IT RESOLVED that the Chanhassen City Council hereby approves the final plat for Audubon Corporate Center 2nd Addition (Planning Case#2016-18) for Equitable Holding Co. LLC for property legally described Outlot A, Audubon Corporate Center, Carver County, Minnesota, subject to the following conditions: 1. Existing City boulevard trees will be protected with fencing during all phases of construction. The applicant will be responsible for replacing any trees that die as a result of construction activity. 2. A wetland buffer 20 feet in width and a 30-foot setback from the wetland buffer must be maintained around all wetlands on the property. Secondary structures are allowed to encroach up to 50% of the setback. It appears that the retaining wall has exceeded the allowed encroachment and needs to be moved out of this 15-foot setback. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must install wetland buffer edge signs,under the direction of City staff,before construction begins and must pay the City$20 per sign. 3. The retaining wall needs to be moved so that it is at least 15 feet from the edge of the buffer or 35 feet from the wetland edge. *This condition has been met. 4. A NPDES Phase II Construction Site Storm Water Permit will be required from the Minnesota Pollution Control Agency(MPCA) for this site. *This condition has been met. 5. Based upon the area and land use type, the Storm Water Utility Connection Charge is estimated to be$23,500.69 due with the final plat. 1 6. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering)) and comply with their conditions of approval. 7. Park fees in the amount of$33,125.00 shall be paid prior to recording the final plat. 8. No burning shall be issued for trees to be removed. Trees and shrubs must be removed from site or chipped. 9. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. 10. Building permits are required for all retaining walls four feet tall or higher and must be designed by a Structural Engineer registered in the State of Minnesota. Additional top and bottom elevations should be added to the retaining wall. 11. A minimum vertical separation of 18 inches is required at all storm, sanitary, and watermain crossings. Provide details of each crossing to ensure minimum separation. 12. Sanitary sewer and watermain hookup fees will be required at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council and are due at the time of building permit issuance. 13. Collector and Arterial Roadway Traffic Impact Zone fees will be collected with the final plat. The fee will be based on the commercial rate of$3,600 per developable acre. With 2.06 developable acres, the fee is $7,416.00. 14. A drainage and utility easement will need to be placed over the wetland and associated buffer with final plat. Passed and adopted by the Chanhassen City Council this 25th day July of 2016. ATTEST: Todd Gerhardt, City Clerk/Manager Denny Laufenburger, Mayor YES NO ABSENT g:\plan\2016 planning cases\2016-I8-idi expansion-8303 audubon road\resolution audubon corporate center 2nd add.doc 2