Loading...
Opinion of Probable Coststill 4 � Sambatek OPINION OF PROBABLE COSTS Client: EDEN TRACE CORPORATION Assumptions Project: IDI DISTRIBUTION BUILDING EXPANSION UNIT PRICE Project No.: 20592 Completed By: JEB Construction Phase: PRELIM 1 SUBTOTAL EROSION CONTROL Erosion Control QUANTITY UNIT UNIT PRICE TOTAL 1 Rock Construction Entrance 1 EA $1,800.00 $1,800.00 2 Inlet Protection- IP 1 6 EA $285.00 $1,710.00 3 Inlet Protection- IP 2 6 EA $260.00 $1,560.00 4 Bio -Roll 760 LF $2.75 $2,090.00 5 Install/Maintain/Remove Silt Fence 1,000 LF $2.10 $2,100.00 6 Seed & Mulch 3 AC $780.29 $2,340.87 7 Wetland Buffer Monument 23 EA $100.00 $2,300.00 SUBTOTAL EROSION CONTROL 1 $13,900.87 SUBTOTAL EROSION CONTROL INFILTRATION BASIN QUANTITY UNIT I UNIT PRICE TOTAL 1 4" Draintile 911 LF $11.00 $10,021.00 2 Cleanout 14 EA $265.00 $3,710.00 3 Soil Media Mix A 300 CY $12.00 $3,600.00 4 Sand 160 CY $12.00 $1,920.00 5 Common Excavation 3,200 Cy $3.75 $12,000.00 SUBTOTAL STORM SEWER $31,251.00 SUBTOTAL EROSION CONTROL $13,900.87 SUBTOTAL INFILTRATION BASIN $31,251.00 CONTINGENCY (20%) $9,030.37 GRAND TOTAL $54,182.24 Concept 1 of 1 10/5/2016