Email from Matt Saam 11-23-04
Generous. Bob
From:
Sent:
To:
Cc:
Subject:
8aam, Matt
Tuesday, November 23,20043:30 PM
pryan@ryanengineering.com
Generous, Bob; Haak, Lori
Hidden Creek Meadows
Perry,
To better assist in explaining how the drainage works on this project, the City would like to have you draft up a profile view
of the drainage from the south side of TH 7, thru the Hidden Creek Meadows site, and thru the Hidden Creek site. The
point of this is to show how much elevation change there is and how area on the north side of TH 7 would need to flood out
before any of the exist. properties on the south side of TH 7 would be impacted. We would like this submitted with your
revised plans for the Planning Commission meeting. Prior to submitting this though, we'd like to get together and take a
look at it or you could e-mail it to us to make sure we're on the same page.
Thanks,
Matt 8aam, P.E.
Asst. City Engineer - Chanhassen, MN