Loading...
Approval Letter signedMarch 2, 2017 CITY OF CHANHASSEN Chanhassen is a Community for Life -Providing for Today and Planning for Tomorrow Mr. Rob Conrad RGR Holdings, LLC. 2665 West 781' Street Chanhassen, MN 55317 Re: Tweet Pediatric Dental — Planning Case #2017-01 Dear Mr. Conrad; This letter is to confirm that on February 27, 2017, the Chanhassen City Council approved the site plan for a 5,700 square foot, one-story office building on Lot 1, Bock 1, Arboretum Business Park 6' Addition subject to the following conditions: Building: 1. The building is required to have an automatic fire extinguishing system. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Any retaining walls over four high must be designed by a professional engineer and a permit must be obtained prior to construction. 4. Drainage water collected from (any portion of) the building, or mechanical equipment may not flow across a public walking surface (sidewalk). 5. Detailed occupancy related requirements will be addressed when complete building plans are submitted. 6. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Environmental Resources: The applicant will need to maintain a prairie mix of native plants in order to meet the landscaping requirements. If a transition to non-native, weedy plants occurs on the site, the owner will need to restore the prairie. PH 952.227.1100 • www.ci.chanhassen.nan.us • FX 952.227.1110 7700 MARKET BOULEVARD • PO BOX 147 • CHANHASSEN • MINNESOTA 55317 Planning Commission Tweet Pediatric Dental — Planning Case 2017-01 March 2, 2017 Page 2 of 3 2. Incorporate one additional reliable tree species as a substitute for some of the red maple. 3. A total of 3 overstory trees will be required to be planted along the south property line along the existing parking spaces Engineering: 1. An access agreement with the adjacent property is required for the shared driveway on the east side of the subject property. 2. A hydrant is required. The location of the fire hydrant must be approved by the Fire Chief. 3. The existing 18" reinforced concrete storm sewer in the southwest corner of the property must be removed or abandoned. Planning: 1. The applicant shall enter into a site plan agreement prior to receiving a building permit. 2. A separate sign permit application, review and approval shall be required prior to site sign installation. Water Resources: 1. The applicant shall apply for and receive a General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit) prior to the issuance of a building permit or any earth disturbing activities. The plan submittal must also include a detail of the infiltration basin consistent with the Minnesota Stormwater Manual prior to issuance of a building permit. This detail must include any soils corrections, basin protections and planting plans and schedules in addition to other necessary design elements. 3. After construction, the infiltration basin shall be tested by a third party for permeability to ensure that it is functioning per the stormwater modeling submitted by the applicant. The infiltration basin must pass the permeability testing prior to an issuance of a permanent certificate of occupancy. Or if agreed to by both parties, the city may confirm rates in- house with their Modified Phillip -Dunn infiltrometer. Planning Commission Tweet Pediatric Dental — Planning Case 2017-01 March 2, 2017 Page 3 of 3 4. The applicant shall prepare an operations and maintenance manual specific to the infiltration feature including anticipated inspection schedule, routine maintenance and frequency of said maintenance and supply a copy to the city prior to issuance of a building permit. 5. All erosion control shall be installed and inspected prior to initiation of site grading activities. 6. The site plan must comply with Riley -Purgatory -Bluff Creek Watershed District, RPBCWD, rules for erosion prevention and sediment control and storm water management. 7. The applicant shall obtain permits from all appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering), Riley -Purgatory -Bluff Creek Watershed District) and comply with their conditions of approval. I have requested from you an engineer's estimate of the costs for the infiltration basin and site drainage and erosion control measures as well as site landscaping. Once I have these estimates, I will be able to complete the site plan agreement, which must be executed and required securities submitted prior to any development of the site. If you have any questions or need additional information, please contact me at (952) 227-1131 or bgenerous(i ,ei.chanhassen.mn.us. Sincer 1 Robert Generous, AICP Senior Planner Ec: Kate Aanenson, Community Development Director Todd Gerhardt, City Manager Terry Jeffery, Water Resources Coordinator Jerry Mohn, Building Official Jill Sinclair, Environmental Resource Specialist Stephanie Smith, Project Engineer