CONSTRUCTION NOTES
1. ALL DITCHES AND SWALES MUST BE STABILIZED WITHIN 24 HOURS OF CONNECTING TO SURFACE WATER OR DISCHARGING OFFSITE.
2. ENERGY DISSIPATION MUST BE INSTALLED AT ALL OUTLETS WITHIN U HOURS OF BEING PUT ONLINE.
3. ROADS MUST BE CLEARED OF TRACKED MATERLRLS DAILY.
4. NATURAL TOPOGRAPHY AND SOIL CONDITIONS MUST BE PROTECTED, INCLUDING RETENTION ONSITE OF NATIVE TOPSOIL TO GREATEST EXTEND POSSIBLE
5. FINAL SITE STABILIZATION TO INCLUDE MINIMUM 6" OF TOPSOIL OR ORGANIC MATERIAL TO BE SPREADAND INCORPORATED INTO THE UNDERLYING SOIL
DURING FINAL SITE TREATMENT WHEREVER TOPSOIL HAS BEEN REMOVED
6. CONSTRUCTION SITE WASTE MUST BE PROPERLY MANAGED SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAND SANITARY WASTE AT THE
CONSTRUCTION SITE
7. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS
ESTABLISHED SUFFICIENTLY TO ENSURE STABILITY OF THE SITE, AS DETERMINED BYTHE DISTRICT
7.1. TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTABILIZATION
a. SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTED
THOUGH SOIL AMENDMENT AND/OR RIPPING TO A DEPTH OF 18" WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS OR EXISTING VEGETATION PRIOR
TO RE VEGETATION OR OTHER STABILIZATION.
9. AT A M IN IMUM ON DAYS WORK IS TO BE DONE, INSPECTION, MAINTENANCE, AND REPAIR OF ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT
CONTROL FACILITIES AND SOIL STABILIZATION MEASURES MUST BE CARRIED OUT, AND AT LEAST WEEKLY UNTIL LAND DISTURBANCE ACTIVITIES CEASE.
THEREAFTER, THE DUTIES MUST BE CARRIED OUT WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED
10. CONSTRUCTION 5ITE WASTE MUST BE PROPERLY MANAGED, SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAN—NITARVWAS7EATTHECONSTVUCTIONSITE.
11. ALLTEMPORARY EROSION AND SEDIMENT CON TROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS ESTARLISHEDSUFFICIENTLYTO ENSURE
STABILITY OF THE SITE, AS DETERMINED BVTHE DISTRICT.
12. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTARILI LION.
1B. SOILEURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUSTBE DECOMPACTEDTHROUGH SGLAMENDMENT
AND/OR RIPPING TO A DEPTH OF 19 INCHES WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS, AND OTHER EXISTNG VEGETATION PRIORTO FINAL REVEGETATION OR OTHER
STABILIZATION.
14. THE PERMITTEE MUST, AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMEWCONTROL FACILITIES AND SOILSTABILIZATION
MEASURESEVERV DAYWORKIS PERFORMED ON THE 5ITE AND AT LEAST WEEKLY UNTIL—DISTURBING ACTIVITY HAS CEASED.THEREAFTER, THE PERMITTEE MUST PERFORM
THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED.
HIGH PRESSURE PIPELINE
Excavation and/or Construction Prohibited
Without compliance With State One -Call, AND
Without Written Permission From
MAGELLAN PIPELINE, L.P.
A MAGELLAN REPRESENTATIVE MUST BE PRESENT DURING WORKAROUND PIPELIN
-�
1 1
B
11 11
liil
liili
I
I
I
Id
EXISTING
FFE:
25'CN
50 25 0 25I W 100
EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR
SHALL DETERMINE THE EXACT
I�
IS
o
I
BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR
000^,,
7N. 0 0 =
ROCK ENTRANCE BERM
ANY AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES.
DRAWING NAME
NO.
BY
DATE
REVISIONS
USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF
INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT
SATHRE-BERGQUIST,INC.'s EXPRESS WRITTEN AUTHORIZATION. USEWITHOUT
SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY
INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY.
SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE
USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING
FROM ILLEGITIMATE USE.
I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.
^ p -;v7��//
V 1 n A /�D?k?y`�v—
/,J`- Lam, .,,P. IC/r l�
�EE1s suR�
�`' "I
w N
SATHRE-BERGQUIST, INC.
o
FINAL EROSION CONTROL PLAN
ARBOR GLEN
GOLF LAKE CONDOS, LLC
FILE NO.
23605-001
EKLO BASE
09
DLS 07/26/16
WATERSHED REVISIONS
DRAWN BY
10
MDM 07/26/16
GRADING REVISIONS
CHANHASSEN,
MINNESOTA
IJW
11
DLS 09/12/16
WATERSHED DISTRICT REV.
6
11
CHECKED 8Y
12
DLS 01/25/17
FINAL PLAN SUBMITTAL
o .,., 150 SOUTH BROADWAY WAYZATA, MN. 55391 (952) 476-6000
m
`�
c11F,B PSP?2
----------
13
MDM 04/07/17
m
j
14
DLS 04/21/17
REVISE SITE PLAN
Daniel Schmidt, P.E.
Date: 01-11-17 Lie. No. 26147
04/08/15
SILT FENCE
U ECTE �
o
_l�l� \
d
g
i
/
POST GRADING SILT FEI
—
12
BIO -ROLL
/
CONCRETE WASHOUT
L
O
INLET PROTECTION
ry
EX GDRB
EROSION BLANKET
we WETLAND BUFFER MONUMENT
CONSTRUCTION NOTES
1. ALL DITCHES AND SWALES MUST BE STABILIZED WITHIN 24 HOURS OF CONNECTING TO SURFACE WATER OR DISCHARGING OFFSITE.
2. ENERGY DISSIPATION MUST BE INSTALLED AT ALL OUTLETS WITHIN U HOURS OF BEING PUT ONLINE.
3. ROADS MUST BE CLEARED OF TRACKED MATERLRLS DAILY.
4. NATURAL TOPOGRAPHY AND SOIL CONDITIONS MUST BE PROTECTED, INCLUDING RETENTION ONSITE OF NATIVE TOPSOIL TO GREATEST EXTEND POSSIBLE
5. FINAL SITE STABILIZATION TO INCLUDE MINIMUM 6" OF TOPSOIL OR ORGANIC MATERIAL TO BE SPREADAND INCORPORATED INTO THE UNDERLYING SOIL
DURING FINAL SITE TREATMENT WHEREVER TOPSOIL HAS BEEN REMOVED
6. CONSTRUCTION SITE WASTE MUST BE PROPERLY MANAGED SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAND SANITARY WASTE AT THE
CONSTRUCTION SITE
7. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS
ESTABLISHED SUFFICIENTLY TO ENSURE STABILITY OF THE SITE, AS DETERMINED BYTHE DISTRICT
7.1. TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTABILIZATION
a. SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTED
THOUGH SOIL AMENDMENT AND/OR RIPPING TO A DEPTH OF 18" WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS OR EXISTING VEGETATION PRIOR
TO RE VEGETATION OR OTHER STABILIZATION.
9. AT A M IN IMUM ON DAYS WORK IS TO BE DONE, INSPECTION, MAINTENANCE, AND REPAIR OF ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT
CONTROL FACILITIES AND SOIL STABILIZATION MEASURES MUST BE CARRIED OUT, AND AT LEAST WEEKLY UNTIL LAND DISTURBANCE ACTIVITIES CEASE.
THEREAFTER, THE DUTIES MUST BE CARRIED OUT WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED
10. CONSTRUCTION 5ITE WASTE MUST BE PROPERLY MANAGED, SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAN—NITARVWAS7EATTHECONSTVUCTIONSITE.
11. ALLTEMPORARY EROSION AND SEDIMENT CON TROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS ESTARLISHEDSUFFICIENTLYTO ENSURE
STABILITY OF THE SITE, AS DETERMINED BVTHE DISTRICT.
12. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTARILI LION.
1B. SOILEURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUSTBE DECOMPACTEDTHROUGH SGLAMENDMENT
AND/OR RIPPING TO A DEPTH OF 19 INCHES WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS, AND OTHER EXISTNG VEGETATION PRIORTO FINAL REVEGETATION OR OTHER
STABILIZATION.
14. THE PERMITTEE MUST, AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMEWCONTROL FACILITIES AND SOILSTABILIZATION
MEASURESEVERV DAYWORKIS PERFORMED ON THE 5ITE AND AT LEAST WEEKLY UNTIL—DISTURBING ACTIVITY HAS CEASED.THEREAFTER, THE PERMITTEE MUST PERFORM
THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED.
HIGH PRESSURE PIPELINE
Excavation and/or Construction Prohibited
Without compliance With State One -Call, AND
Without Written Permission From
MAGELLAN PIPELINE, L.P.
A MAGELLAN REPRESENTATIVE MUST BE PRESENT DURING WORKAROUND PIPELIN
�
�
�
I I
� I
I
50 25 0 25I W 100
EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR
SHALL DETERMINE THE EXACT
No B B
LOCATION OF ANY AND ALL EXISTING UTILITIES
BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR
O RZ SCALE IN FEET
ANY AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES.
DRAWING NAME
NO.
BY
DATE
REVISIONS
USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF
INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT
SATHRE-BERGQUIST,INC.'s EXPRESS WRITTEN AUTHORIZATION. USEWITHOUT
SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY
INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY.
SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE
USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING
FROM ILLEGITIMATE USE.
I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE
LAWS OF THE STATE OF MINNESOTA.
^ p -;v7��//
V 1 n A /�D?k?y`�v—
/,J`- Lam, .,,P. IC/r l�
�EE1s suR�
�`' "I
w N
SATHRE-BERGQUIST, INC.
CITY PROJECT NO.
FINAL EROSION CONTROL PLAN
ARBOR GLEN
GOLF LAKE CONDOS, LLC
FILE NO.
23605-001
EKLO BASE
09
DLS 07/26/16
WATERSHED REVISIONS
DRAWN BY
10
MDM 07/26/16
GRADING REVISIONS
CHANHASSEN,
MINNESOTA
IJW
11
DLS 09/12/16
WATERSHED DISTRICT REV.
6
11
CHECKED 8Y
12
DLS 01/25/17
FINAL PLAN SUBMITTAL
o .,., 150 SOUTH BROADWAY WAYZATA, MN. 55391 (952) 476-6000
m
`�
c11F,B PSP?2
DLS
13
MDM 04/07/17
REVISE SITE PLAN
DATE
14
DLS 04/21/17
REVISE SITE PLAN
Daniel Schmidt, P.E.
Date: 01-11-17 Lie. No. 26147
04/08/15