5. ECC.S.A.H NO. 18 (LYMAN BLVD.) ROCK ENTR/ BERM ENTRANC OUTLOT 7- -i we WETLAND BUFFER MONUMENT CONSTRUCTION NOTES 1. ALL DITCHES AND SWALES MUST BE STABILIZED WITHIN 24 HOURS OF CONNECTING TO SURFACE WATER OR DISCHARGING OFFSITE. 2. ENERGY DISSIPATION MUST BE INSTALLED AT ALL OUTLETS WITHIN U HOURS OF BEING PUT ONLINE. 3. ROADS MUST BE CLEARED OF TRACKED MATERLRLS DAILY. 4. NATURAL TOPOGRAPHY AND SOIL CONDITIONS MUST BE PROTECTED, INCLUDING RETENTION ONSITE OF NATIVE TOPSOIL TO GREATEST EXTEND POSSIBLE 5. FINAL SITE STABILIZATION TO INCLUDE MINIMUM 6" OF TOPSOIL OR ORGANIC MATERIAL TO BE SPREADAND INCORPORATED INTO THE UNDERLYING SOIL DURING FINAL SITE TREATMENT WHEREVER TOPSOIL HAS BEEN REMOVED 6. CONSTRUCTION SITE WASTE MUST BE PROPERLY MANAGED SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAND SANITARY WASTE AT THE CONSTRUCTION SITE 7. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS ESTABLISHED SUFFICIENTLY TO ENSURE STABILITY OF THE SITE, AS DETERMINED BYTHE DISTRICT 7.1. TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTABILIZATION a. SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTED THOUGH SOIL AMENDMENT AND/OR RIPPING TO A DEPTH OF 18" WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS OR EXISTING VEGETATION PRIOR TO RE VEGETATION OR OTHER STABILIZATION. 9. AT A M IN IMUM ON DAYS WORK IS TO BE DONE, INSPECTION, MAINTENANCE, AND REPAIR OF ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL STABILIZATION MEASURES MUST BE CARRIED OUT, AND AT LEAST WEEKLY UNTIL LAND DISTURBANCE ACTIVITIES CEASE. THEREAFTER, THE DUTIES MUST BE CARRIED OUT WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED 10. CONSTRUCTION 5ITE WASTE MUST BE PROPERLY MANAGED, SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAN—NITARVWAS7EATTHECONSTVUCTIONSITE. 11. ALLTEMPORARY EROSION AND SEDIMENT CON TROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS ESTARLISHEDSUFFICIENTLYTO ENSURE STABILITY OF THE SITE, AS DETERMINED BVTHE DISTRICT. 12. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTARILI LION. 1B. SOILEURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUSTBE DECOMPACTEDTHROUGH SGLAMENDMENT AND/OR RIPPING TO A DEPTH OF 19 INCHES WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS, AND OTHER EXISTNG VEGETATION PRIORTO FINAL REVEGETATION OR OTHER STABILIZATION. 14. THE PERMITTEE MUST, AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMEWCONTROL FACILITIES AND SOILSTABILIZATION MEASURESEVERV DAYWORKIS PERFORMED ON THE 5ITE AND AT LEAST WEEKLY UNTIL—DISTURBING ACTIVITY HAS CEASED.THEREAFTER, THE PERMITTEE MUST PERFORM THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED. HIGH PRESSURE PIPELINE Excavation and/or Construction Prohibited Without compliance With State One -Call, AND Without Written Permission From MAGELLAN PIPELINE, L.P. A MAGELLAN REPRESENTATIVE MUST BE PRESENT DURING WORKAROUND PIPELIN -� 1 1 B 11 11 liil liili I I I Id EXISTING FFE: 25'CN 50 25 0 25I W 100 EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT I� IS o I BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR 000^,, 7N. 0 0 = ROCK ENTRANCE BERM ANY AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. DRAWING NAME NO. BY DATE REVISIONS USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT SATHRE-BERGQUIST,INC.'s EXPRESS WRITTEN AUTHORIZATION. USEWITHOUT SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY. SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING FROM ILLEGITIMATE USE. I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. ^ p -;v7��// V 1 n A /�D?k?y`�v— /,J`- Lam, .,,P. IC/r l� �EE1s suR� �`' "I w N SATHRE-BERGQUIST, INC. o FINAL EROSION CONTROL PLAN ARBOR GLEN GOLF LAKE CONDOS, LLC FILE NO. 23605-001 EKLO BASE 09 DLS 07/26/16 WATERSHED REVISIONS DRAWN BY 10 MDM 07/26/16 GRADING REVISIONS CHANHASSEN, MINNESOTA IJW 11 DLS 09/12/16 WATERSHED DISTRICT REV. 6 11 CHECKED 8Y 12 DLS 01/25/17 FINAL PLAN SUBMITTAL o .,., 150 SOUTH BROADWAY WAYZATA, MN. 55391 (952) 476-6000 m `� c11F,B PSP?2 ---------- 13 MDM 04/07/17 m j 14 DLS 04/21/17 REVISE SITE PLAN Daniel Schmidt, P.E. Date: 01-11-17 Lie. No. 26147 04/08/15 SILT FENCE U ECTE � o _l�l� \ d g i / POST GRADING SILT FEI — 12 BIO -ROLL / CONCRETE WASHOUT L O INLET PROTECTION ry EX GDRB EROSION BLANKET we WETLAND BUFFER MONUMENT CONSTRUCTION NOTES 1. ALL DITCHES AND SWALES MUST BE STABILIZED WITHIN 24 HOURS OF CONNECTING TO SURFACE WATER OR DISCHARGING OFFSITE. 2. ENERGY DISSIPATION MUST BE INSTALLED AT ALL OUTLETS WITHIN U HOURS OF BEING PUT ONLINE. 3. ROADS MUST BE CLEARED OF TRACKED MATERLRLS DAILY. 4. NATURAL TOPOGRAPHY AND SOIL CONDITIONS MUST BE PROTECTED, INCLUDING RETENTION ONSITE OF NATIVE TOPSOIL TO GREATEST EXTEND POSSIBLE 5. FINAL SITE STABILIZATION TO INCLUDE MINIMUM 6" OF TOPSOIL OR ORGANIC MATERIAL TO BE SPREADAND INCORPORATED INTO THE UNDERLYING SOIL DURING FINAL SITE TREATMENT WHEREVER TOPSOIL HAS BEEN REMOVED 6. CONSTRUCTION SITE WASTE MUST BE PROPERLY MANAGED SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAND SANITARY WASTE AT THE CONSTRUCTION SITE 7. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS ESTABLISHED SUFFICIENTLY TO ENSURE STABILITY OF THE SITE, AS DETERMINED BYTHE DISTRICT 7.1. TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTABILIZATION a. SOIL SURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUST BE DECOMPACTED THOUGH SOIL AMENDMENT AND/OR RIPPING TO A DEPTH OF 18" WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS OR EXISTING VEGETATION PRIOR TO RE VEGETATION OR OTHER STABILIZATION. 9. AT A M IN IMUM ON DAYS WORK IS TO BE DONE, INSPECTION, MAINTENANCE, AND REPAIR OF ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL STABILIZATION MEASURES MUST BE CARRIED OUT, AND AT LEAST WEEKLY UNTIL LAND DISTURBANCE ACTIVITIES CEASE. THEREAFTER, THE DUTIES MUST BE CARRIED OUT WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED 10. CONSTRUCTION 5ITE WASTE MUST BE PROPERLY MANAGED, SUCH AS DISCARDED BUILDING MATERIALS, CHEMICALS, LITTERAN—NITARVWAS7EATTHECONSTVUCTIONSITE. 11. ALLTEMPORARY EROSION AND SEDIMENT CON TROL BMPS MUST BE MAINTAINED UNTIL COMPLETION OF CONSTRUCTION ANDVEGETATION IS ESTARLISHEDSUFFICIENTLYTO ENSURE STABILITY OF THE SITE, AS DETERMINED BVTHE DISTRICT. 12. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED UPON FINALSTARILI LION. 1B. SOILEURFACES COMPACTED DURING CONSTRUCTION AND REMAINING PERVIOUS UPON COMPLETION OF CONSTRUCTION MUSTBE DECOMPACTEDTHROUGH SGLAMENDMENT AND/OR RIPPING TO A DEPTH OF 19 INCHES WHILE TAKING CARE TO AVOID UTILITIES, TREE ROOTS, AND OTHER EXISTNG VEGETATION PRIORTO FINAL REVEGETATION OR OTHER STABILIZATION. 14. THE PERMITTEE MUST, AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMEWCONTROL FACILITIES AND SOILSTABILIZATION MEASURESEVERV DAYWORKIS PERFORMED ON THE 5ITE AND AT LEAST WEEKLY UNTIL—DISTURBING ACTIVITY HAS CEASED.THEREAFTER, THE PERMITTEE MUST PERFORM THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED. HIGH PRESSURE PIPELINE Excavation and/or Construction Prohibited Without compliance With State One -Call, AND Without Written Permission From MAGELLAN PIPELINE, L.P. A MAGELLAN REPRESENTATIVE MUST BE PRESENT DURING WORKAROUND PIPELIN � � � I I � I I 50 25 0 25I W 100 EXISTING UTILITIES SHOWN ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT No B B LOCATION OF ANY AND ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE FOR O RZ SCALE IN FEET ANY AND ALL DAMAGES ARISING OUT OF HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES. DRAWING NAME NO. BY DATE REVISIONS USE (INCLUDING COPYING, DISTRIBUTION, AND/OR CONVEYANCE OF INFORMATION) OF THIS PRODUCT IS STRICTLY PROHIBITED WITHOUT SATHRE-BERGQUIST,INC.'s EXPRESS WRITTEN AUTHORIZATION. USEWITHOUT SAID AUTHORIZATION CONSTITUTES AN ILLEGITIMATE USE AND SHALL THEREBY INDEMNIFY SATHRE-BERGQUIST, INC. OF ALL RESPONSIBILITY. SATHRE-BERGQUIST, INC. RESERVES THE RIGHT TO HOLD ANY ILLEGITIMATE USER OR PARTY LEGALLY RESPONSIBLE FOR DAMAGES OR LOSSES RESULTING FROM ILLEGITIMATE USE. I HEREBY CERTIFY THAT THIS PLAN OR SPECIFICATION WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. ^ p -;v7��// V 1 n A /�D?k?y`�v— /,J`- Lam, .,,P. IC/r l� �EE1s suR� �`' "I w N SATHRE-BERGQUIST, INC. CITY PROJECT NO. FINAL EROSION CONTROL PLAN ARBOR GLEN GOLF LAKE CONDOS, LLC FILE NO. 23605-001 EKLO BASE 09 DLS 07/26/16 WATERSHED REVISIONS DRAWN BY 10 MDM 07/26/16 GRADING REVISIONS CHANHASSEN, MINNESOTA IJW 11 DLS 09/12/16 WATERSHED DISTRICT REV. 6 11 CHECKED 8Y 12 DLS 01/25/17 FINAL PLAN SUBMITTAL o .,., 150 SOUTH BROADWAY WAYZATA, MN. 55391 (952) 476-6000 m `� c11F,B PSP?2 DLS 13 MDM 04/07/17 REVISE SITE PLAN DATE 14 DLS 04/21/17 REVISE SITE PLAN Daniel Schmidt, P.E. Date: 01-11-17 Lie. No. 26147 04/08/15