9.1.B FH - U&S PF 061517PROJECT : FAWN HILL LOCATION : CHANHASSEN, MINNESOTA Proposal Form PREPARED FOR : HP HOLDINGS LLC. PREPARED BY : SATHRE-BERGQUIST, INC. Revised: Unit Bid Estimated Description Unit Quantity Price Amount Sanitary Sewer - Mobilization - Utility L.S.1.0 Permits & Bonds L.S.1.0 8" PVC SDR 35 0-15'L.F.445.0 Manhole 0-8'EACH 3.0 Manhole Extra Depth L.F.15.3 Furnish & Install Castings EACH 3.0 8" x 4" Wyes (SCH. 40)EACH 10.0 4" PVC Service (SCH. 40)EACH 10.0 Improved Pipe Fndtn L.F.445.0 Televise L.F.445.0 Connect to Existing EACH 2.0 Insulate (-4x8x2 Sheets, 2sheets)EACH 1.0 Sanitary Sewer Total: Date : June 15, 2017 PROJECT : FAWN HILL LOCATION : CHANHASSEN, MINNESOTA Proposal Form PREPARED FOR : HP HOLDINGS LLC. PREPARED BY : SATHRE-BERGQUIST, INC. Revised: Unit Bid Estimated Description Unit Quantity Price Amount Date : June 15, 2017 Watermain - Watermain 6" C-900 PVC L.F.15.0 Watermain 8" C-900 PVC L.F.540.0 Connect to Existing EACH 3.0 6" Valves EACH 2.0 Valve Box Apaptor II #6 Base - By Adaptor Inc. (On All 6"-12" GV's)EACH 2.0 8" x 6" Tee EACH 1.0 8" Bends EACH 4.0 8" x 6" Reducer EACH 1.0 Hydrants (WB 67, 5 ft back of curb)EACH 2.0 Hydrant Extensions EACH 1.0 1" Services EACH 10.0 Optional 1.5" Services EACH 10.0 Improved Pipe Fndtn L.F.555.0 Watermain Total: Watermain Optional Total: PROJECT : FAWN HILL LOCATION : CHANHASSEN, MINNESOTA Proposal Form PREPARED FOR : HP HOLDINGS LLC. PREPARED BY : SATHRE-BERGQUIST, INC. Revised: Unit Bid Estimated Description Unit Quantity Price Amount Date : June 15, 2017 12" RCP - Cl 5 L.F.30.0 15" RCP - Cl 5 L.F.240.0 21" RCP - Cl 4 L.F.585.0 24" RCP - Cl 4 L.F.180.0 24" RCP APRON EACH 1.0 Catchbasin (2' x 3')EACH 1.0 Catchbasin Manhole (4' Dia)EACH 9.0 Storm Manhole (4' Dia)1.0 Furnish & Install Castings EACH 3.0 Storm Sewer Inlet Protection (wimco's)EACH 3.0 Improved Pipe Fndtn L.F.1,035.0 6" Rear Yard Draintile L.F.90.0 27" PVC Catchbasin EACH 1.0 Rip Rap/Overflow C.Y.20.0 Televise L.F.1,035.0 Storm Sewer Total: Storm Sewer - PROJECT : FAWN HILL LOCATION : CHANHASSEN, MINNESOTA Proposal Form PREPARED FOR : HP HOLDINGS LLC. PREPARED BY : SATHRE-BERGQUIST, INC. Revised: Unit Bid Estimated Description Unit Quantity Price Amount Date : June 15, 2017 Street Construction - Mobilization - Streets L.S.1.0 Permits & Bonds L.S.1.0 Subgrade Preparation S.Y.2,655.0 Curb & Gutter (B618)L.F.0.0 Curb & Gutter Surmountable (28")L.F.1,210.0 Backfill Curb & Gutter L.F.1,210.0 Concrete Walk (5' Wide - 6" Concrete walk Incl. 4" Cl 5)L.F.385.0 Remove Temp Turnaround and Conc Walk L.S.1.0 Restore Yard S.Y.350.0 Ped Ramps EACH 2.0 24" Select Granular TONS 4,030.0 12" Class 5 Base TONS 1,910.0 2.0" Bit Base Coarse TONS 285.0 2.0" Bit Wear Course TONS 285.0 Tack Coat GALS 200.0 Regrade Boulevards after Small Utilities L.F.1,210.0 Restoration L.S.1.0 Blvd Sod & Silt Fence L.F.1,210.0 PROJECT : FAWN HILL LOCATION : CHANHASSEN, MINNESOTA Proposal Form PREPARED FOR : HP HOLDINGS LLC. PREPARED BY : SATHRE-BERGQUIST, INC. Revised: Unit Bid Estimated Description Unit Quantity Price Amount Date : June 15, 2017 Adjust Castings-Base Course EACH 4.0 Adjust Castings - Wear Course EACH 4.0 Adjust Gate Valves-Base Course EACH 0.0 Adjust Gate Valves - Wear Course EACH 0.0 All Street - 4" Draintile w/wrap L.F.1,020.0 All Street - 4" Cleanouts EACH 7.0 Conduit Crossings (estimated)EACH 8.0 Street Base Total: SUMMARY : Sanitary Sewer - Watermain - Storm Sewer - Street Construction - Total -